HomeMy WebLinkAboutWQ0031317_Monitoring - 03-2022_20220414 n ..
ti
DWR - NonDischarge Monitoring Report Submittal
'
•4 ..
NORTH CAROLINA
Erwlranmenlcl QHaflly
Monitoring Report Submittal
..............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Permit Number#* WQ0031317
Name of Facility:* Global Nuclear Fuel Americas. LLC
Month:* March Year:* 2022
Report Information
Type* Upload Document*
NDMR, NDAR-1, NDAR-2, NDMLR Mar2022 NDMR report.pdf 106.93KB
PDF Only
Please upload one PDF containing all applicable monitoring reports
(i.e., NDMR, NDAR-1, NDAR-2,NDMLR,GW-59).
Confirmation Email Address:* karen.williams@ge.com
Name of Submitter:* Karen Williams
Signature:
Date of submittal: 4/14/2022
This will be filled in automatically
Initial Review
.............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................
Reviewer: Gerald,Wanda
Is the project number correct?* WQ0031317
Is the monitoring report accepted?* Yes No
Regional Office* Wilmington
Accepted Date: 4/25/2022
Global Nuclear Fuel
Karen Williams
ENS Specialist
3901 Castle 1fayne Road
P0.Box 780
Wilmington,NC 28402
USA
' ��� IIIIIIIIIIIIIIIII@ C 910-547-2758
Karen.williams@ge.com
Global Nuclear Fuel
April 14, 2022
DEQ
Division of Water Resources
Attention: Information Processing Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
Subject: Monthly Monitoring Report
Global Nuclear Facility,Wilmington
NDMR Permit WQ0031317
Attached are the March 2022 PPI001 and PPI002 Non-Discharge Monitoring Reports for the
Global Nuclear Fuel Facility in Wilmington, North Carolina. Note all effluent was reclaimed as
indicated in the report.
If you have any questions or need additional information, please call me at 910-547-2758.
Sincerely,
Karen Williams
Environmental Specialist
Global Nuclear Fuel -Americas
61,1141 Nuclear Rraal
FORM: D• -_ NON-DISCHARGE MONITORING - T MR; Page 1 o;2
Domit No.P/00031317 ! FaciliM Name:Global Nuclear Fuel-Americas 1 COUUU: pew;Hanover 1 Month:MARCH Year:2022
FPI-001 mow p0e0u,0,0 001,1, 0 1006061 •Elnuent Li 140 666 66660006 a € Monitoring 90.9r U 1600601 =Enluent 0 umunduu-oar.0 0666400 Waler
Parameter Come —>, 50050 31616 _ 00310 1 _ i 00076 1 C06000 e 00525 1 I i I
IIIMIMIIIIMIE. MIIIIIIIIIIIIIIIgMIIIIIMIII =
g ..° ! 8 I ! I -
— a I
`a r OD G t ! I 0 of _ _ _ _ !
Ell woo : s = . i _o is_ , _.— ,
¢ I I
1 16 1 r i €
11111115= 8 = . i—i- — - --- ;
Daily mum: • 5 1 72 5 3 9 — ' — I u 1 I
SaMM r mammy: arce y • cam_ I I
s ,7 - -s1 NON-DISCHARGE ` NIc 3 .G REPORT(ND MR) Roue 2 of 2
Sam piing Person{e I Ceniiie Laboratories
same Mike Phipps Name. Environmental Chemists
!Name:Jeff Hollis Name. Global Nuclear Fuel=Americas
Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your pent€it= _ 0 ac,romp%am
t,toe'awry.s a€=n camA.-3r please eyp.am it me space eeew the reaSON I ttta fa';''.-.r was:r«in oe€mp tffi 1C Pre- C.a your eap:at a eri the-a-e(-)of Ma nog to ee:anme and aese iba t.e=active
acfronts]taken Attach ac it:orrai sta---s,eip it necessary
I
s
I
Operator in Responsible Charge(CRC)Certification _ Parmtitte -Certification
Irert ittee: Deane Wilson
��: ��it<�Mugs
li
Codification s Signing €iciai Deems tisa -
U. Phone Number: 91.0.617.9373 _ Signing Official's Title: € itmise can Pant Maria-see
Prone Number: 9e e9.,14 se it Eani atiah; O_ et? a3
Has ORC changed singe the previous NSW? 0 yes Na
t
-x _
___ 7 _ ‘ Signature -t£
5g re a-` Date
enmity,un-pe -fia:t<-of taw,M3E EOM OOCument ate a..anaCra O Ua%aal a-mpaten-saar my due-mien or supervision.:,s® O€OO-reO-
with a system designed.e assure that all quaiMied --manner pry,€1y cantered and evaluated th iramanalieu submitted,bases an my _
inquiry et the pemen ar Parana who maroon a m ayatm o.of Muse pets a directly€-spmna bty toe gemen=tita tritonmanon,UFO
b'y this re
signatu . .: i=mat at this rearm is accurate axecomplete.o the Post at r— .riowle ge, intannelion submittedis,to the best ot o}knows an-MOO,MOO;;accurate,and complete, au aware that there me sig refiCant
penalties tot 5Obr..itt'ug lease`.fur 7atia..,including the eons—maw of fines and f-r-e seprecet fat Mmating viotalto.F s,=
Mail Original and Two Copies to:
Division of Water Resources
Information Processing Unit
1617 Mad Service Center
Raleigh,NC 27699-1617
FORM;MOHR 1043 NON-DISC ARSE MONITORING REPORT(ND Pad'1 at
Permit N -WM0031317 hacilityName:Global Nuclear Fuel=Mmeny County: ;•Hang h MARCH dear; 22
FPI=002 icw 9-88209n9 Point: inn—en; -tn ent D tosn is Est Par e&o mg : nn Pint W t . > M often' D 005500 750 t 3 0 89073400
Parameter Cony I 500n01 t
i
t
I I
gn. I i I t
t I
I
t
1 I
6
t
7 = eta 20 - 5 - I - - - -
IIZE a
I I —I t
I =
t I
Ell a DD i 8 , iI t t I
era I I 1
1
mPally Maximum: 1 ;
! t
E
Sams n - c_s - - _ [[ - -- - - - -- -
I t I
:Mon.-- - ' I ' ----- 1 - I---- — - --- - - -----
I
I
Bade Frequency! 1 mm 6: I • i I -
FORM NDMR t _ - NON-DISCHARGE MONITORING REPORT(NDMR) Pane 2 of 2
Sampling to t 4 F _ Cerhfe Laboratories
Name-Mike Phipps _Name: Environmental Chem€is
Name Jeff Hollis _Name: Global Nuclear Fuel-Americas
Does all m-onitering data and sate;piing frequencies meet the requirements in Ariachment A of your permit? Er . ._m:. . d _
it the face`-,ty is non-corp.tanl.pease explain.n the space beta- the reason(s)the tacitly was of.n compiiance.Provide€n your explanation the da,e(s)of the non-comotance and describe the coaective
act Oa(s)eaten n Attach additional sheets if necessary
Operator in Responsible Charge( RC)Codification Pomittee Codification
aR : -N-Phipps
Pensitfe : Duane Wilson
-ertification No.: 988538
Signing Official: Duane Wilson
Grade: WWII Phone etc E be : 910,517.9373
Signing Official's s itie: Wilmington Plant Manager
Has ORD changed since the previous I1DMR `es o Phone Number: 0- Oar 4 Pe E.t Expiration: 02 €/2023
}
1=,r'' ?
c
Signature Bate
Signature - - 0-ate
I s.rtity,under penally of taw that tilts document and all attacthmema were prC:Crud tinder ny Oira tion air supercision in accordance
with a system designed to assure that all qualified personnel prmpefy gathered and evader-sled the®.so..-w[ioa submitted.Base an my
inch}of the person or neurons Who MMatalI6 the systank or those person directly responsible for-gathering• station ..
By ibis el-nattira:i rectify that this repaid is accurate and compete to tit,beat at Ma kno .aege. €n=a Minn submitted€ to tta host o --k € €€ tee end ha tree assume,arc complete.tar t f Mora ark�:e,:ii.�aar
penalties for submitting false 1.fa.:alas,including,dm possibility of tees and imprisonment.or knowing violations,
Mail Original and Two Copies to:
Division of Water Resources
information Processing Unit
16_'7 Mail Se ice Center
Raleigh,NC 2 6 - 17