HomeMy WebLinkAboutNCC221593_ESC Approval Submitted_20220425Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
WAKE
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
COUNTY TEL 919 856-7400 • FAX 919 743-4772
NORi-n (,AR01 anon
WMCPA - WATERSHED MANAGEMENT CONSTRUCTION PLAN APPROVAL
Project Name The Reserve at Falls Lake — Phase 4
Date Received 12/12/2021
SEC-071980-
S&E Permit Number 2021
SW F-072016-
SW Permit Number 2021
Watershed Falls Lake
Date Processing
Initiated 2/1/2022 Disturbed Acreage 4.4 acres
S&E
Plan Review Fee $ 1,100.00 PAID S&E Permit Fee $ 1,100.00 PAID
SW
Plan Review Fee $ 1,100.00 PAID SW Permit Fee $ 1,100.00 PAID
Applicant:
Engineer:
Peter Cnossen/Jones & Cnossen
Peter Cnossen/Jones & Cnossen Engineering,
Name
--------------------------------------------------------------
Engineering, PPLC
Name:
------------------------------------------------------------------------------------
PPLC
PO Box 1062
PO Box 1062
Address:
--------------------------------------------------------------
Apex, NC 27502
Address:
------------------------------------------------------------------------------------
Apex, NC 27502
Phone:
--------------------------------------------------------------
919-387-1174
Phone:
------------------------------------------------------------------------------------
919-387-1174
Email:
peter@jonescnossen.com
Email:
peter@jonescnossen.com
Plan Date/Revision Date: 3.18.2022
1
APPROVAL_WatershedMan agement-V.2_WM
Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
WAKE
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
COUNTY TEL 919 856-7400 • FAX 919 743-4772
NORi-n cAR01 NA
WMCPA - WATERSHED MANAGEMENT CONSTRUCTION PLAN APPROVAL
The above -referenced erosion control and stormwater
conditionally approved.
have been reviewed and
• Notarized landowner consent to conduct the land disturbing activity.
• Add Tc flow paths on Drainage Area Maps.
• Encroachment agreement(s) completed, signed and notarized for all off -site construction.
/
( f EXTEND
r
,." EXISTING
PAVEMENT
- 5UMMER _
{
12
Approval Date:
pp
U- F // -
gg ,,..
CONSTRUCTION N%F GILiR T t MAPY;-'
"ENTRANCE
4.8.2022
0 For temporary sediment controls, include weir size per calculation required minimum
10 ft.
• Provide Phase 1 erosion control sheet, add temporary sediment traps on roadside
ditches prior to culverts and provide stream crossing details.
• Ensure compliance with silt fence outlets (SFO) per table below -add additional SFOs as
needed.
Table 6.62a Maximum Slope Slops Langth (M Max#ntum Am (W)
Slope Length and Slope for <2% 100 10,000
which Sediment Fence is 2 to 5% 75 7,500
Applicable 51010% 50 5,000
10 to 20% 25 2.500
}20% t5 1.500
• Item 13.w, No note 7 in Sheet 4 as indicated in the cover letter.
• Add NCG-01 Stabilization & Materials Handling and Self -Inspection Details to plan set.
The Reserve at Falls Lake — Phase 4 is approved for the creation of 16 lots. Plans approved limiting the maximum
impervious surface of 177,181 SF (4.07 acres) that has been dispersed over 16 lots, roads, utilities, and mail
kiosk. The project shall provide stormwater control (peak attenuation and volume management) with 1 Wet
Detention Device. See approved site data below.
Approved Site Data:
Permitted Imp
Other ISA
(SF)= 177,181
Road ISA (SF)=
31,003
Lots ISA (SF)=
144,000
(SF)= 2,178
Nitrogen Post
Nitrogen Pre
Nitrogen Post
BMP
Nitrogen
(lb/ac/yr)= 0.48
(lb/ac/yr)= 2.28
(lb/ac/yr)= 1.98
Offset (lb)= NA
Nitrogen Post
Phosphorus
Phosphorus
BMP
Phosphorus
Pre (lb/ac/yr)= 0.03
Post (lb/ac/yr)= 0.28
(lb/ac/yr)= 0.22
Offset (lb)= NA
APPROVAL_WatershedManagement-V.2_WM
WAKE
COUNTY
NORi-n (,AR01 anon
Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
TEL 919 856-7400 • FAX 919 743-4772
WMCPA - WATERSHED MANAGEMENT CONSTRUCTION PLAN APPROVAL
Conditions of Approval
Items marked with an "X" were noted as conditions of the Stormwater and Sediment and Erosion Control Plan approval. Unless
otherwise noted, all references shown in brackets are for the Wake County Unified Development Ordinance (UDO), adopted
04/17/06.
A mandatory preconstruction meeting is required between the owner, contractor, and Wake County prior to
®
1.
issuance of the Stormwater and Land Disturbance Permits. Please call to schedule this meeting at your convenience.
The Stormwater and Land Disturbance permit fees are due at that time.
®
2.
Grading, other than for installation of soil erosion and sedimentation control measures, is prohibited prior to the
issuance of a Certificate of Compliance. [10-30-7(D)]
®
3'
Contractor shall follow plans strictly and maintain contact with Wake County prior to making any field modifications
to erosion and sediment control devices. No devices shall be removed without prior approval from Wake County.
Wake County's sedimentation pollution control program is performance oriented, requiring protection of the natural
resources and adjoining properties. If at any time during the project it is determined that the Erosion and
®
4.
Sedimentation Control Plan is inadequate to meet the requirements of the Erosion and Sedimentation Control
Ordinance of Wake County, this office may require revisions in the plan and its implementation to ensure compliance
with the Ordinance.
All projects that have approved plans for an E&SC permit on or after Aug. 3, 2011 are covered by the NPDES
Construction Stormwater General Permit, NCG 010000. In addition, effective October 1, 2010, persons conducting
®
S.
land -disturbing activities larger than one acre must inspect their project after each phase of the project, and
document the inspection in writing. A packet with information on the NPDES General Permit and the Self -inspection
Program will be provided at the preconstruction meeting. Permits and inspection reports shall be maintained on site.
®
6.
SUBDIVISIONS ONLY Builders are required to obtain grading permits for cumulative disturbance over one acre
(including non-contiguous lots).
Stormwater COAs - All conditions of approval must be completed and approved by Wake County prior to final plat approval or
signoff of the Certificate of Occupancy (C.O.) for future building permits. Items required prior to final plat or building permit
approval are checked and listed below.
As -Built Plans — Upon completion of required improvements, an as -built plan of required stormwater improvements
®
7.
must be submitted (must indicate that stormwater improvements were constructed in accordance with the
approved plan). [9-31-2]
®
8.
Maintenance Plan
®
The developer must record and reference on the record plat, a maintenance plan providing instruction about
a.
annual maintenance tasks and associated costs for at least a 20-year period. [9-32-3(A)]
®
It will be the responsibility of the property owners association or lot owner to update the maintenance plan at
b.
least every 10 years. [9-32-3(8)]
®
9.
Maintenance Agreement
The developer must record and reference on the record plat, a maintenance agreement or restrictive covenant
®
a.
that sets for the property owners association's or lot owner's continuing responsibilities for maintenance,
including how cost will be apportioned among lot owners served. [9-32-4(A)]
®
b
The maintenance agreement must provide that the association and its individual members are jointly and
severable liable for maintenance. [9-32-4(8)]
All maintenance documents required must be submitted prior to record plat approval and must be referenced on the
®
10.
record plat. For developments not requiring record plats, documentation must be submitted prior to building permit
issuance. [9-32-6]
Performance Guarantee — The county may not approve a record plat or issue a building permit until stormwater
®
11.
improvements required of the developer have been completed or a performance guarantee has been provided.
[9-31-1]
APPROVAL_WatershedMan agement-V.2_WM
WAKE
COUNTY
NORi-n (,AR01 anon
Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
TEL 919 856-7400 • FAX 919 743-4772
WMCPA - WATERSHED MANAGEMENT CONSTRUCTION PLAN APPROVAL
Applicable Regulations
®
12.
9-32-2 Parties Responsible for Maintenance of Improvements
The developer must maintain stormwater improvements until accepted by a property owners association or lot
®
a.
owner. The developer must disclose which party will be responsible for continued maintenance on the record
plat.
Before improvements are accepted for maintenance by the property owners association or lot owner, the
®
b.
developer must certify to the property owners association or lot owner and the county that improvements are
complete and functioning as designed.
®
13.
Part 5 — Enforcement and Penalties
®
a.
Failure to complete required improvements or failure to maintain improvements as required by the approved
plan are violations and subject to a fine of up to $1,000 per day. [9-50]
Inspection of Stormwater Improvements — Wake County agents have the right to inspect sites to determine
®
b.
whether stormwater improvements are being installed and maintained in compliance with the ordinance. [9-
51]
10-30-6 Validity of Plan, Lapse of Approval - An approved erosion and sedimentation control plan is valid for 2
®
14.
calendar years from the date of approval. If a land disturbance permit has not been obtained within the 2-year
period, the erosion and sedimentation control plan approval becomes null and void.
®
15.
10-30-8 Actions Required Prior to Land Disturbance
S&EC plan approval and land disturbance permit issued must be prominently displayed until all construction is
®
a.
complete, all permanent sedimentation and erosion control measures are installed and the site has been
stabilized. A copy of the approved plan must be kept on file at the job site.
®
b
No person shall initiate a land -disturbing activity until notifying Wake County of the date that the land -
disturbing activity will begin.
®
16.
10-31-1 Authority
County officials may enter any property, public or private, at reasonable times for the purpose of investigating
and inspecting the sites of any land -disturbing activity. No person shall refuse entry or access to any authorized
®
a.
representative or agent for the County who requests entry for purposes of inspections, and presents
appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representatives
while in the process of carrying out their official duties.
Agents and officials of the County will periodically inspect land -disturbing activities to ensure compliance with
®
b
the North Carolina Sedimentation Pollution Control Act, this article, or rules or orders adopted or issued
pursuant to this article, and to determine whether the measures required in the erosion and sedimentation
control plan are effective in controlling erosion and sedimentation resulting from land -disturbing activity.
Any land -disturbing activity will be the responsibility of the person(s) conducting the land disturbing activity,
®
c.
including the property owners. Failure to prevent off site sedimentation will be deemed a violation of the
erosion and sedimentation control regulations of this article.
APPROVAL_WatershedMan agement-V.2_WM
WAKE
COUNTY
NORi-n (,AR01 anon
Wake County Environmental Services Department
Water Quality Division, Watershed Management Section
336 Fayetteville St. • P.O. Box 550 • Raleigh, NC 27602
TEL 919 856-7400 • FAX 919 743-4772
WMCPA - WATERSHED MANAGEMENT CONSTRUCTION PLAN APPROVAL
15A NCAC28.0233 - Due to the location of this project, it should be noted that a rule to protect and maintain
existing buffers along watercourses in all of Wake County became effective in 2006. The Neuse River Riparian
Area Protection and Maintenance Rule applies to all perennial and intermittent streams, lakes, ponds and
estuaries in Wake County with forest vegetation on the adjacent land or "riparian area". In riparian areas with
existing forest vegetation in the first 30 feet directly adjacent to the stream, the rule prohibits land disturbance,
®
17.
new development and fertilizer use within the first 50 feet of land next to the water. In riparian areas with
forest vegetation that is less than 30 feet wide, the rule prohibits land disturbance, new development and
fertilizer use within the area that contains forest vegetation (but not the entire 50 foot riparian area). For more
information about this riparian area rule, please contact the Division of Water Quality's Wetland/401 Unit at
919-807-6300. Wake County enforces the Neuse Buffer Rules in both the Cape Fear River Basin and the Neuse
River Basin except when superseded by the Jordan Buffer Rules[15A NCAC 02B.0265].
Wake County Watershed Management Section is not responsible for subject approvals of other Local, State or Federal Agencies. The
subject approvals are (but not limited to) Federal Emergency Management Area Flood regulations/requirements, Division of Water
Quality under stormwater or other water quality regulations/requirements, U.S. Army Corps of Engineers under Article 404/401
(Wetlands/Streams) jurisdiction/requirements, and/or any Federal, State, County and Local municipal regulations or permit
requirements. The approval issued in this letter cannot supersede any other required permit or approval.
Environmental Scott Reams REHS Contact Info: Scott.reams@wakegov.com
Consultant: 919-868-4986
Wake County PE: Jie Liu, PE Contact Info: Jie.liu@wakegov.com
919-856-7418
Wake County PE: Shawn Springer PE, CFM Contact Info: Shawn.springer@wakegov.com
919-369-6135
APPROVAL_ Watershed Management-V.2_WM