HomeMy WebLinkAbout20220493 Ver 2_20220324_Photolog_Optimized_20220421Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
1 03/26/2021
Direction: South
Feature:
Pole 147Y10 /
Proposed Utility ROW
Description:
View looking at the
north end of the study
area near existing pole
174Y10. This pole will
remain and a new line
will be extended south
along the west side of
Poole Road.
Photo
I D: Date:
2 03/26/2021
Direction: South
Feature:
Proposed Utility ROW
Description:
View looking at
roadside were tree
clearing for the utility
right-of-way will be 15-
foot wide, since most
of this portion of the
ROW is already
cleared.
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
3 02/08/2022
Direction: Northeast
Feature:
Stream SIB / Proposed
Utility ROW
Description:
View looking upstream
at stream SIB as it flows
into the project area
from a culvert under
Poole Road. The utility
line would cross this
stream perpendicularly
(Buffer Impact Site 1).
Photo
I D: Date:
4 02/08/2022
Direction: Southwest
Feature:
Stream SIB / Proposed
Utility ROW
Description:
View looking
downstream at stream
SIB as it flows through
the project area within
a forested wetland.
The channel loses
definition within the
wetland area (Buffer
Impact Site 1).
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
Date:
ID:
03/26/2021
5 _W-
Direction: East
Feature:
Stream SC / Proposed
Utility ROW
Description:
View looking upstream
at stream SC where it
enters the project site
from a culvert under
Poole Road. This
feature is not depicted
on the USGS topo map
or NRCS soil map.
Photo
I D: Date:
6 03/26/2021
Direction: West
Feature:
Stream SC / Proposed
Utility ROW
Description:
View looking at the
stream as it flows
through the study area
toward wetland WA
and Lake Myra.
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
02/08/2022
Direction: Northwest
Feature:
Wetland WA / Lake
Myra
Description:
View looking at the
edge of wetland WA
and Lake Myra.
Photo
I D: Date:
$ 02/08/2022
Direction: Northeast
Feature:
Lake Myra / Proposed
Utility ROW
Description:
View looking edge of
Lake Myra and Poole
Road near the location
of a proposed pole.
The utility line would
parallel the lake near
this location for a short
distance within Zones
1 and 2 (Buffer Impact
Site 2).
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
9 03/26/2021
Direction: Northeast
Feature:
Poole Road / Proposed
Utility ROW
Description:
View looking Poole
Road where utility line
will extend over the
road. Branches of the
large oak tree (right
side of photo) will be
trimmed (Buffer
Impact Site 3). Buffer
Impact Site 2 is
depicted in the upper
left side of the photo.
Photo
I D: Date:
10 03/26/2021
Direction: Northeast
Feature:
Lake Myra / Proposed
Utility ROW
Description:
View looking at the
retaining wall along
the edge of Lake Myra.
An existing pole
GY11BF depicted on
the right side of the
photo will be replaced
with a new pole.
Clearing around the
new pole would occur
within Zone 1(Buffer
Impact Site 4).
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
11 03/26/2021
Direction: South
Feature:
Stream SA / Proposed
Utility ROW
Description:
View looking at
existing maintained
utility ROW adjacent to
stream SA (Marks
Creek). The yellow on
the left side of the
photo is a guy wire for
an existing pole that
will be replaced. The
left side of the photo
depicts the existing
ROW. Buffer Impact
Photo
I D: Date:
12 03/23/2022
Direction: Northeast
Feature:
Stream SA— Lake Myra
Complex
Description:
View looking portion of
stream SA that is
diverted from the main
channel and flows
through the Lake Myra
Complex (an old mill).
The buffer of this
stream extends east
into the proposed
utility ROW along
Poole Road.
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
13 03/31/2021
Direction: South
Feature:
Stream SA
Description:
View looking
downstream at stream
SA (Marks Creek)
(stream SIB). The buffer
of this stream extends
east into the proposed
utility ROW along
Poole Road.
Photo
I D: Date:
14 03/26/2021
Direction: Northeast
Feature:
Wetland WB /
Proposed Utility ROW
Description:
View looking at
existing maintained
utility ROW within
wetland WB and
stream SA (Marks
Creek). An existing
utility pole
(background) will be
replaced. Some tree
limb trimming is
proposed in this area
(Buffer Impact Site 5).
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
15 03/26/2021
Direction: Southwest
Feature:
Existing Utility ROW
Description:
View looking at the
southern end of the
study area. Pole GY00,
shown in the center of
the photo, will be
replaced.
Photo
I D: Date:
16 03/26/2021
Direction: Southwest
Feature:
Wetland WC
Description:
View looking at small
wetland depression
near the intersection
of Poole Road and Lake
Myra Road. A portion
of this wetland will be
cleared for the
installation of a new
pole. Buffer Impact
Site 5 is shown in the
background.
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
17 03/26/2021
Direction: Northeast
Feature:
CM Martin House /
Proposed Utility ROW
Description:
View looking at the
intersection of Poole
Road and Lake Myra
Road. Utility lines
depicted in the upper
left side of the photo
would be removed,
and lines in the upper
right side of the photo
would be replaced. The
house in the center of
the photo is the CM
Martin House.
Photo
I D: Date:
18 03/26/2021
Direction: East
Feature:
Lake Myra Complex
Direction: East
Description:
View looking at
foundations associated
with an old mill that is
part of the Lake Myra
Complex.
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
19 03/26/2021
35.752585°,-78.428739°
Feature:
Wetland WC
Direction:
Southwest
Description:
View looking at small
depression near the
intersection of Poole
Road and Lake Myra
Road.
Photo
I D: Date:
203/26/2021
35.752276°,-78.429106°
Feature:
Wetland WC
Direction:
Northwest
Description:
View looking at
wetland area.
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
21 03/26/2021
35.752344°,-78.429259°
Feature:
Study Area
Direction:
Northeast
Description:
View looking at study
area near the
intersection of Poole
Road and Lake Myra
Road. House in the
center of the photo is
the potential historic
CM Martin House
Photo
I D: Date:
22 03/26/2021
35.752686°,-78.429923°
Feature:
Stream SD
Direction:
East
Description:
View looking at
foundations associated
with an old mill that is
part of the potential
historic Lake Myra
Complex.
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259
Photo
I D: Date:
23 03/26/2021
34.945578,-79.856459
Feature:
Stream SE
Direction:
North
Description:
View looking upstream
at the 36-inch culvert
from which the stream
enters the study area.
Photo
I D: Date:
24 03/26/2021
34.948653,-79.86322
Feature:
Study area
Direction:
Southeast
Description:
View looking of the
powerline easement
taken from the
western end of the
study area.
Client: Duke Progress Energy
Project: Poole Road Distribution Line Extension Project PHOTOGRAPH LOG
Client Project #: 39520259