HomeMy WebLinkAbout20190914 Ver 1_Certification of Completion_20220307ROY COOPER
covernar
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
Dfrei Or
DW R Project No.:
19-0914
NORTH CAROLINA
Environmental Quality
County:
Applicant: Duke Energy Progress, LLC (Alan Lewis)
Project Name: Bridgeton 115kV Substation
Date of Issuance of Wetland Permit: $/30/2019
RECEIVED
LIAR - 7 2022
Craven
DEOVATER RESOURCES
401 & BUFFER PERMITTING
Upon completion of all work approved within the 401 Water Quality Certification and/or Buffer Rules, and any subsequent
modifications, the applicant Is required to return this certificate to the 401 & Buffer Permitting Unit, North Carolina Division of
Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to DWR by the applicant, the
applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
1, Alan Lewis I hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial compliance and intent
of the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting
materials. 1
Date: O a
Signature: ---
Agent's Certification
1, 1 hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial compliance and intent
of the 401 Water Quality Certification and /or Buffer Rules, the approved plans and specifications, and other supporting
materials
Signature:
Of this project was designed by a Certified Professional
Date:
Elizabeth B. Stefiens as a duly registered Professional Engineer (i.e., Engineer, Landscape
Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the
construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial Compliance and intent
of the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting
materials.
Registration No. 30166 Date 2+
North Carolina Deparime ni or Environmental Quality Division of Water Resources
�� Washington Regional Oflir e 1 943 Washington 5yuare trail Washington. North Carolina 7.71ia9
n.•�•^�� �•." Z5Z9466481