Loading...
HomeMy WebLinkAboutNC0023965_Authorization to Construct_20120822NPDES DOCUMENT SCANNINL COVER SHEET NPDES Permit: NC0023965 Wilmington Northside WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtCj ) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: August 22, 2012 This document is printed an reuse paper - ignore any content on the resrerse side fl)P/\ 6119 � Cape Fear Public Utility Authority A To C No. 023965A04 Issued May 30, 2012 Engineer's Certification t1 bl L a V u �) r ,'as a duly registered Professional Engineer in the State of North Carolina, having bee thorized to observe (periodically/weekly/full time) the construction of the modifications and improvements to the Wilmington Northside WWTP, located on North 23rd Street in New Hanover County for the Cape Fear Public Utility Authority, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Replacement of a portable caustic soda (NaOH) feed system with a permanent caustic feed system including the addition of a new pump with an operating range of 0 gpd to 648 gpd, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature 414,42-4:4--Ai Date Mail this Certification to: Registration No. .2- C 1 Attn: Michelle McKay, E.I. Infrastructure Finance Section DENR/DWQ 1633 Mail Service Center Raleigh, NC 27699-1633 R :pi., 42S7a.: ATA NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Governor Director Secretary May 30, 2012 Mr. Kenneth L. Vogt, Jr. Cape Fear Public Utility Authority 235 Government Center Drive Wilmington, North Carolina 28403 SUBJECT: Authorization to Construct A to C No. 023965A04 Cape Fear Public Utility Authority Wilmington Northside WWTP Dear Mr. Vogt: A letter of request for an Authorization to Construct was received April 26, 2012, by the Division of Water Quality (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 16.0 MGD Wastewater Treatment Plant, with discharge of treated wastewater into the Cape Fear River in the Cape Fear River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Replacement of a portable caustic soda (NaOH) feed system with a permanent caustic feed system including the addition of a new pump with an operating range of 0 gpd to 648 gpd, in conformity with the project plans, specifications, and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0023965 issued March 7, 2008, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0023965. The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919-807-6300 l FAX: 919.807-6492 Internet: www.ncwateraualitv.orq An Equal Opportunity t Affirmative Action Employer NorthCaroGna ?aturaUij Mr. Kenneth L. Vogt, Jr. May 30, 2012 Page 2 In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Wilmington Regional Office, telephone number (910) 796-7215, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: Infrastructure Finance Section, DWQ/DENR, 1633 Mail Service Center, Raleigh, NC 27699-1633. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. Mr. Kenneth L. Vogt, Jr. May 30, 2012 Page 3 Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. One (1) set of approved plans and specifications is being forwarded to you. If you have any questions or need additional information, please contact Seth Robertson, P.E. at telephone number (919) 707-9175. Sincerely, Charles Wakild, P.E. de MM:sr cc: New Hanover County Health Department DWQ Wilmington Regional Office, Surface Water Protection Point Source Branch, NPDES Program Michelle McKay, E.I. ATC File