HomeMy WebLinkAboutSW4210801_Supplement-EZ Form_20220421SUPPLEMENT-EZ COVER PAGE
PROJECT INFORMATION
1 Project Name ....�,..,...,<,,..,.�._..,. w....�_.a....�....,�.�,.....�._-,,�.... .,...,�.,y.-nm..m._
2 Project Area (ac)
_ 3 Coastal Wetland Area (ac)
_ - ----- -- -- - -- -------- ---
4 Surface Water Area (ac)
5 Is this project High or Low Density?
6 Does this proiect use an off -site SCM?
Holt Farm
Aft
No
COMPLIANCE WITH 02H .1003(4)
..,.:._.::..,,.v:........,.,..�..., ..._o.,:..... , �.,�..
7 .Width of vegetated setbacks provided (feet)
8 Will the vegetated setback remain vegetated? N/A
9 If BUA is proposed in the setback, does it meet NCAC 02H.1003(4)(c-d)?
10 Is streambank stabilization proposed on this project? No
11
iInfiltration System
0
12
Bioretention Cell
_. - -
13
Wet Pond
0
14
Stormwater Wetland
0
15
Permeable Pavement
0
_ 16
Sand Filter
0
-17
Rainwater Harvesting (RWH)
_ _ -- --------- -.._ -
0
18
Green Roof
0
19
Level Spreader -Filter Strip (LS-FS)
0
20
Disconnected Impervious Surface (DIS)
- ---- 0
_ 21
Treatment Swale
- — --
- ------ -- -0
22
Dry Pond
0
23
StormFilter
0
24
Silva Cell
0 .__.--------
25
Bayfilter
0
0
ORMS LOADED
DESIGNER
CERTIFICATION
27
Name and Title:
Chad E. Abbott, PE
28
Organization:
C3 Design and Engineering, PLLC
29
Street address:
2537 East Lyon Station Road, Suite 102
30
City, State, Zip:
Creedmoor, NC 27522
31
Phone number(s):
.. _
919-230-0996
32
Email:
-
shad@c3designeng.com
I ---
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the
information provided In the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans,
specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here.
`X������� t C A R01'//
��
;a SEAL
4 �Z/�,•'
Signature of Designer
�
Date
DRAINAGE AREAS
1
Is this a high density project?
No
2
If so, number of drainage areas/SCMs
0
3
Does this project have low density areas?
Yes
4
If so, number of low density drainage areas
1
5
Is all/part of this project subject to previous rule
versions?
No
FORMS LOADED
DRAINAGE AREA INFORMATION
Entire Site
LID 1
4
Type of SCM
NA
5
Total drainage area (sq ft
1023201
6
Onsite drainage area (sq ft
1023201
7
Offsite drainage area (sq ft)
0
8
Total BUA in project (sq ft)
141052 sf
9
New BUA on subdivided lots (subject to permitting)
(sq ft
108000 sf
10permitting)
New BUA not on subdivided lots (subject to
s
33052 sf
11
Offsite BUA (sq ft
sf
12
Breakdown of new BUA not on subdivided lots:
Parkin (sq ft
Sidewalk (sq ft
Roof (sq ft)
Roadway s ft
30154 sf
Future (sq ft)
sf
Other, please specify in the comment box
below (sq ft
2898 sf
13
New infiltrating permeable pavement on
subdivided lots (sq ft)
sf
14
New infiltrating permeable pavement not on
Isubdivided lots (sq ft
sf
15permitting)
Existing BUA that will remain (not subject to
s ft
sf
16
Existing BUA that is already permitted (sq ft
13816 sf
17
Existing BUA that will be removed (sq ft)
13816 sf
18
Percent BUA
13%
19
Design storm (inches)
NA
20
Design volume of SCM cu ft
NA
21
1 Calculation method for design volume
NA
ADDITIONAL INFORMATION
22
Please use this space to provide any additional information about the
drainage area(s):
Property has two drainage area (DA), but summarized in one DA since the
mafority of proposed impervious area are located in one specific DA.
Other BUA not on subdivided is gravel drive and other concrete area such as
fire tuck turning area or mail kiosk.
LOW DENSITY
DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H .1003
1 Is project below density thresholds set forth in the applicable stormwater rule?
Yes
2
Does project maximize dispersed flow and minimize channelization of flow?
Yes
3
Has the use of piping been minimized per.1003(2)(c)?
Yes
4
Side slopes of the vegetated conveyances (H:V)
3 sf
5
Maximum velocity in the vegetated conveyances during the 10-year storm?
4.23
6
Are curb outlet swales proposed?
No
7
Maximum longitudinal slope of curb outlet swale(s) (%)
N/A
8
Bottom width of curb outlet swale(s) (feet)
N/A
9
Maximum side slope of curb outlet swale(s) (H:V)
N/A
10
Minimum length of curb outlet swale(s) (feet)
N/A
11
Are treatment swales used instead of curb outlet swales?
Yes
12
Is stormwater released at the edge of the setback as dispersed flow?
Yes
13
Have stormwater outlets been designed to prevent downslope erosion?
Yes
14
lAre variations to rule .1003 proposed?
No
ADDITIONAL INFORMATION
15
Please use this space to provide any additional information about this low density project:
Swale#1 is DWD-1/PD-1
Swale#2 is DWD-2/PD-2
Swale#3 is DWD-3/PD-3
Swale#4 is DWD-4/PD-4
Swale#5 is CWD-1
Swale#6 is CWD-2
Please refer to sheet C-1.1 for diversion/ditch schedule
Swale
#
FDrainage
Area
ac
BUA
(ac)
Pervious
area
ac
C
Q
(cfs)
Slope
( % )
Va„ow
(fps)
Va ua
(fps)
Flow depth
(ft)
1
5.92
0.32
5.60
0.24
10.16
1.85
8.00
4.48
0.87
2
6.16
0.07
6.09
0.21
9.17
1.66
8.00
4.20
0.85
3
2.91
0.25
2.66
0.26
5.50
1.96
8.00
3.93
0.68
4
1.64
0.07
1.57
0.23
2.72
1.85
8.00
3.23
0.53
5
7.74
0.00
7.74
0.20
11.07
1.17
8.00
3.86
0.98
6
5.97
0.00
5.97
0.20
8.53
1.77
8.00
4.23
0.82
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Diversion / Ditch Schedule
Name
Q10
cs
V70
s
Sies opes
X1
Slope (%)
Dept
Flow Dept
Shear Stress
s
Lining
DWD-1/PD-1
10.16
4.48
3
1.85%
1.50
0.87
1.00
NAG-SC150
DWD-21PD-2
9.17
4.20
3
1.66%
1.50
0.85
0.88
NAG-SC150
DWD-31PD-3
5.50
3.93
3
1.96%
1.50
0.68
0.83
NAG-SC150
DWD-41PD-4
2.72
3.23
3
1.85%
1.50
0.53
0.61
NAG-SC150
CWD-1
11.07
3.86
3
1.17%
1.50
0.98
0.71
NAG-SC150
CWD-2
8.53
4.23
3
1.77%
1.50
0.82
0.91
NAG-SC150
DESIGN &
2537 E. Lyon Station Roa
Suite 102, PO Box0361
FIRM LICA
LENGINEERING, PLLC
Creedmoor, NC 27522
P-1764
919-230-0996
Project NO:
20-085
Calculated/
Joel H. Sain, EIT
Project Name:
Holt Farm
Prepared by:
4601 Mt. Hermon Rock Creek
Project Location:
Checked by:
Chad E. Abbott, PE
Road, Snow Camp, NC 27349
Diversion / Ditch Schedule Calculations
Diversion / ditch name:
DWD-1/PD-1
Impervious coefficient number (Cl)
0.95
Impervious area
13,822
sf
0.32
ac
Pervious coefficient number (C2)
0.20
Pervious area
243,836
sf
5.60
ac
Diversion / ditch coefficient number (CJ
0.24
Intensity (1)
7.15
in/hr
Peak flow (Q10); Q = C x I x A = 1.49 / n x AW x R2/3 x S0.5
10.16
cfs
Start elevation
657.00
ft
sf
Ift
Ift
Ift
Stop elevation
640.00
Length
921
Slope (S)
1.85%
Sideslopes (X:1)
3
n-value
0.025
Wet area (AW)
2.27
Wet parameter (W)
5.50
ft
Hydrulic radius (R)
0.41
Total Depth
1.50
ft
Depth of flow
0.87
Shear stress
1.00
Ibs/sf
Free board
0.63
Velocity (V10)
4.48
ft/s
Lining:
I NAG-SC150
Diversion / ditch name:
I DWD-2/PD-2
Impervious coefficient number (Cl)
0.95
Impervious area
2,989
sf
0.07
ac
Pervious coefficient number (C2)
0.20
Pervious area
265,085
sf
6.09
ac
Diversion / ditch coefficient number (CJ
0.21
Intensity (1)
7.15
in/hr
Peak flow (Q10); Q = C x I x A = 1.49 / n x AW x R2/3 x S0.5
9.17
cfs
Start elevation
641.00
ft
sf
Ift
Ift
Ift
Stop elevation
638.00
Length
181
Slope (S)
1.66%
Sideslopes (X:1)
3
n-value
0.025
Wet area (AW)
2.18
Wet parameter (W)
5.40
ft
Hydrulic radius (R)
0.40
Total Depth
1.50
ft
Depth of flow
0.85
Shear stress
0.88
Ibs/sf
Free board
0.65
Velocity (V10)
4.20
ft/s
Lining:
I NAG-SC150
&
2537 E. Lyon Station Roa
Suite 102, PO Box0361
FIRM LICA
L:SIDEESIGN
ENGINEERING, RLLC
Creedmoor, NC 27522
P-1764
919-230-0996
Project NO:
20-085
Calculated/
Joel H. Sain, EIT
Project Name:
Holt Farm
Prepared by:
4601 Mt. Hermon Rock Creek
Project Location:
Checked by:
Chad E. Abbott, PE
Road, Snow Camp, NC 27349
Diversion / Ditch Schedule Calculations
Diversion / ditch name:
DWD-3/PD-3
Impervious coefficient number (Cl)
0.95
Impervious area
10,909
sf
0.25
ac
Pervious coefficient number (C2)
0.20
Pervious area
115,821
sf
2.66
ac
Diversion / ditch coefficient number (CJ
0.26
Intensity (1)
7.15
in/hr
Peak flow (Q10); Q = C x I x A = 1.49 / n x AW x R2/3 x S0.5
5.50
cfs
Start elevation
657.00
ft
sf
Ift
Ift
Ift
Stop elevation
637.00
Length
1023
Slope (S)
1.96%
Sideslopes (X:1)
3
n-value
0.025
Wet area (AW)
1.40
Wet parameter (W)
4.32
ft
Hydrulic radius (R)
0.32
Total Depth
1.50
ft
Depth of flow
0.68
Shear stress
0.83
Ibs/sf
Free board
0.82
Velocity (V10)
3.93
ft/s
Lining:
I NAG-SC150
Diversion / ditch name:
I DWD-4/PD-4
Impervious coefficient number (Cl)
0.95
Impervious area
3,016
sf
0.07
ac
Pervious coefficient number (C2)
0.20
Pervious area
68,551
sf
1.57
ac
Diversion / ditch coefficient number (CJ
0.23
Intensity (1)
7.15
in/hr
Peak flow (Q10); Q = C x I x A = 1.49 / n x AW x R2/3 x S0.5
2.72
cfs
Start elevation
657.00
ft
sf
Ift
Ift
Ift
Stop elevation
640.00
Length
921
Slope (S)
1.85%
Sideslopes (X:1)
3
n-value
0.025
Wet area (AW)
0.84
Wet parameter (W)
3.35
ft
Hydrulic radius (R)
0.25
Total Depth
1.50
ft
Depth of flow
0.53
Shear stress
0.61
Ibs/sf
Free board
0.97
Velocity (V10)
3.23
ft/s
Lining:
I NAG-SC150
&
2537 E. Lyon Station Roa
Suite 102, PO Box0361
FIRM LICA
L:SIDEESIGN
ENGINEERING, RLLC
Creedmoor, NC 27522
P-1764
919-230-0996
Project NO:
20-085
Calculated/
Joel H. Sain, EIT
Project Name:
Holt Farm
Prepared by:
4601 Mt. Hermon Rock Creek
Project Location:
Checked by:
Chad E. Abbott, PE
Road, Snow Camp, NC 27349
Diversion / Ditch Schedule Calculations
Diversion / ditch name:
CWD-1
Impervious coefficient number (Cl)
0.95
Impervious area
0
sf
0.00
ac
Pervious coefficient number (C2)
0.20
Pervious area
337,130
sf
7.74
ac
Diversion / ditch coefficient number (CJ
0.20
Intensity (1)
7.15
in/hr
Peak flow (Q10); Q = C x I x A = 1.49 / n x AW x R2/3 x S0.5
11.07
cfs
Start elevation
656.00
ft
sf
Ift
Ift
Ift
Stop elevation
643.00
Length
1115
Slope (S)
1.17%
Sideslopes (X:1)
3
n-value
0.025
Wet area (AW)
2.87
Wet parameter (W)
6.19
ft
Hydrulic radius (R)
0.46
Total Depth
1.50
ft
Depth of flow
0.98
Shear stress
0.71
Ibs/sf
Free board
0.52
Velocity (V10)
3.86
ft/s
Lining:
I NAG-SC150
Diversion / ditch name:
I CWD-2
Impervious coefficient number (Cl)
0.95
Impervious area
0
sf
0.00
ac
Pervious coefficient number (C2)
0.20
Pervious area
259,850
sf
5.97
ac
Diversion / ditch coefficient number (CJ
0.20
Intensity (1)
7.15
in/hr
Peak flow (Q10); Q = C x I x A = 1.49 / n x AW x R2/3 x S0.5
8.53
cfs
Start elevation
657.00
ft
sf
Ift
Ift
Ift
Stop elevation
641.00
Length
904
Slope (S)
1.77%
Sideslopes (X:1)
3
n-value
0.025
Wet area (AW)
2.02
Wet parameter (W)
5.19
ft
Hydrulic radius (R)
0.39
Total Depth
1.50
ft
Depth of flow
0.82
Shear stress
0.91
Ibs/sf
Free board
0.68
Velocity (V10)
4.23
ft/s
Lining:
I NAG-SC150
TEMPORARY
Designip
Product Description
Longevity
Applications
Permissible Shear
lbs/ft'
Velocity ft/s (m/s)
ERONET
Stress (Pa)
IS lb., accelerated photodegradable, polypropylene
45 days
Low Flow Channels
Unvegetated 1.SS (74)
Unvegetated 5.0 (1.52)
top net, 100 % straw fiber matrix
4:1 - 3:1 Slopes
US75
-
IS lb., photodegradable, polypropylene top 5
60 days
Moderate Flow Channels
Unvegetated 1.75 (84)
Unvegetated 6.0 (1.83)
bottom net, 100 %straw fiber matrix
3:1 - 2:1 Slopes
US1S0
1.S lb., photodegradable, polypropylene top net,
Low Flow Channels
Unvegetated
Unvegetated S.0
100 % straw fiber matrix
12 months
4:1 - 3:1 Slopes
1.55 (74)
(1.52)
S75
IS lb., photodegradable, polypropylene top 5
12 months
Moderate Flow Channels
Unvegetated 1.75 (84)
Unvegetated 6.0 (1.83)
bottom net, 100 % straw fiber matrix
3:1 - 2:1 Slopes
S1s0
2.9 lb., UV -stable polypropylene top net,
uOok
MediumFlow Channels
�
70 %straw/30 % coconut fiber matrix, 1.5 lb.,
24 months
2:1Medi
Slopes
Unvegetated 2.0 (96)
Unvegetated 8.0 (2A4)
owl
photodegradable polypropylene bottom net
SG1so
Ik
2.9 lb., UV stable polypropylene top B bottom nets,
36 months
High Flow Channels
Unvegetated 2.25 (108)
Unvegetated 10.0 (3.OS)
100 % coconut fiber matrix
1:1 and Greater Slopes
C125
BIONET
-�
9.3 lb., leno woven biodegradable jute top net,
12 months
Low Flow Channels
Unvegetated 1.60 (76)
Unvegetated 5.0 (1.52)
.
100 % straw fiber matrix
4:1 - 3:1 Slopes
S75BN
op
9.3 lb., leno woven biodegradable jute top net, 100%
fiber 7.7lb., biodegradable
12
Moderate Flow Channels
Unvegetated 1.85 (88)
Unvegetated 6.0 (1.83)
straw matrix, woven jute
bottom net
months
3:1 - 2:1 Slopes
S150BN
9.3 lb., leno woven biodegradable jute top net, 70 %
Medium Flow Channels
straw/30%coconut fiber matrix, 7.7lb., woven
18 months
Unvegetated 2.10 (100)
Unvegetated 8.0 (244)
biodegradable jute bottom net
2:1-1:1 Slopes