HomeMy WebLinkAbout20220590 Ver 1_Shoreline Stabilization_20220421Shoreline Stabilization Application Form
NORTH CAROLINA
Environmental Quality
15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2013
DRAFT -NOT FOR USE AT THIS TIME
Submission Form
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email *
hager@lakepermit.com
Please provide an email address for payment and requests for more information here.
Pre -Filing Meeting Date Request was 4/19/2022
submitted on: *
Owner Information:
.............................................................................................................
Name: * STEVEN L ROBBINS
Email: * SLRNAT@AOL.COM
Phone Number: (407)963-0808
(xxx)xxx-xxxx
Mailing Address:* Street Address
7430 Norman Drive
Address Line 2
City
Sherrills Ford
Postal / Zip Code
28673-9751
State / Province / Region
NC
Country
US
Is there an agent working on the project?* Yes
No
Agent/Consultant Information
Name: * TAMARA HAGER
Company Affiliation: * RENEGAR CONSTRUCTION
Email: * hager@lakepermit.com
Phone Number:*
Mailing Address:*
(704)575-2227
(xxx)xxx-xxxx
Street Address
PO BOX 5335
Address Line 2
City State / Province / Region
MOORESVILLE NC
Postal / Zip Code Country
28117 US
A signed and dated copy of the Agent Authorization letter:*
ROBBINS AUTH.pdf 170.7KB
Link to: Sample Agent Authorization Form
Project Information [15A NCAC 02H .0502(a) & (b)]
Project Name: *
ROBBINS
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads.*
Upload File
Look up address
Upload Map: ROBBINS SURVEY.pdf 173.22KB
Latitude:*
35.582107
Longitude: *-81.005986
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 12.normal pool lake level/normal water level*
ROBBINS SKETCH.pdf 104.12KB
Please use the diagram at the link below:
https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)
ROBBINS PICS.pdf 183.88KB
4. Location of the property (where work is to be conducted)
Nearest Town: * SHERRILLS FORD
County: * Catawba
Lake/ river/ ocean adjacent to NORMAN/CATAWBA
property:
Subdivisions name or site address: *
CACCIA COVE LOT NUMBER 5
Include phase/lot number
Directions to site: *
FROM MARSHALL STEAM STATION TURN RIGHT ONTO HWY
150 250 FT, TURN RIGHT ONTO LITTLE MOUNTAIN RD 2.7
MILES, TURN RIGHGT ONTO NORMAN DR .40 MILES, PROPERTY
ON LEFT .30 MILES.
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application: *
RESIDENTIAL
Residential, undeveloped, etc.
6. Property Size .66
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
RIP RAP BARE ERODED AREAS FOR SHORELINE
STABILIZATION
8. How will the work be done?*
From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
0
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward:*
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
0
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted:*
(number of trees, for instance)
NONE BY LONG REACH BARGE
Sketch: ROBBINS SKETCH.pdf 104.12KB
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
o $240.00 for impacts to lake (below normal water level) of less than 1 acre
o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act");
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* STEVEN L ROBBINS
Signature:
"7r-vrosiLidvfrikr,,1S
Submittal Date: 4/19/2022
Initial Review
Is this accepted into the review process?* Yes No
Project Number:* 20220590 Version:* 1
Select Reviewer: * Doug Perez:eads\djperez
Select Reviewing Office: Mooresville Regional Office - (704) 663-1699
Has payment been received?* ( No Payment Needed
C Fee Received
C• Need Fee - send electronic notification
What amount is owed?*
C• $240.00
C $570.00
Protect katwialdract. '7 3 0 POrfrtaav.Dr/ 5k .1h f"P, . C rti (- -
OWIldarl411r-
Nine' ignature
c trac tort agent
Pr(
The approval is for the purpose and design describe your applictrtion. Impacts oat Indicated In the
application is a violation&the Buffer Rule.Sits specific work should be prov'ded in the application. I?5A N CAC
b�K.0506 and ISA NCAC 02B.0243(13}1
Trees are not allowed to be removed from Zone I of the Suffer{within 30 rt of the full pond elevst1on), unless
approved.Exceptian,those tress tist Ira sev.rety undermined along tie immedlete shoreline can be removed.
Minimal shaping and sloping alongthe rr imediate shoreline is allowed [15A iJCAC 025 .07.43(6))
9anc.King, ding fn the buffer is rot allowed. 6xcess've disturbance of ground cavar_ [15A N CAC 62B_0243(0))
aearhas,Impervious patios,impervious walkways,etc.are not allowed in the buffer unless specalcnllyapproved
by the Division. There are limitation on size for decks. [15A NCAC OZB_6243[4)and (6)]
Work to be conducted from land must tndlcate an a:z ss aria indicate zny trier that are to be removed. T`,e
work corridor should be dinaibed.The approved access corridor shall be restored.2taging,spoil, constru:ctlor•
matere)must be outside tilt buffer. [15A NCAC 02H_0502 and 15A NCAC 0213.D24 (4), (6), (3)]
Storm water cwnot be piped or chsnnoted for direct drschseme to tine lake. All constructed I-tormwvv.
discharges must be at the rvatunil elevation and discharged prior to Entering the buffer directed u dtt'fuse or
sheet flow at non-ero,f a velocities to the hike. (I5A NCAC 02.$.0243{5], l5)
Acknawledprrnent of Noteraflon •
;,_ Skit-CA- L . eo . Al , hereby state that I have been to ormea of the Catawba
Riparian RuffsrRule. Any work conduded in the buffer,not spedflwily stated in the application and approved
by the Division of Water Resources(DWR), is a violetlan and subject to enforcement. Due diligence will be
Titan such that the ennstixtton will be built within substantial cvnptlance and intro t of the 401 Water
QuNlty Certification end Buffer Rules,the appraved plan(s) and nnedficatlon(s), and other supporting
materials. /
� r Signature(owne -
� � Lil lC122
.'w'. • L.n - aaa..
�4war.[..� r . •H lw•/ • .•a ate• ar 1eRa•11..r-
kao
1..• 1l K+ I•ir• wee mumsMAIM - craA. r. ..n i
+art..q tea• d M e na .• ' • •• .1 is.
.•I NMa _ r r....u..90 4•
. y fr• ry
•LY A 1.r.wn a1 �sd.a ED.L .1 4 .MR.
M M 1Eir• A a .faAai caa. r•(
e.semorm. r moor ..ate • 1 - aIe4ir.) 5.••4. ••.
..e.o ..0•.a 4 44 r1.11•. d rrr.r'.
..er, r 31EIPM. New 4.Ec1.lils We e r ;�•
ftrJv.• n fJ.01
PEr xsi.v-.n
w P c-•1w
•
VEEP. 1••
•
IpMµ1 13A1E11. MM r 1.1. ltl..•i a� AIDE[.
a.sm .. oMa•. ! •
AM. K 1.r M REM. ■Yrr
.......Ra._ - Haan
3••7.wewRc r K cm!. AND as dAL
/ •• 1
•'••a.v!s r K e... ia0
PP nME OtIMPI TEMP
MI a MI .EO1r rta.PS
a 1L.• r1•• PI•v .' • - ■
l
i�rcwr~ ..ice
1. ftftft/•R 1 1•41.•• _14r•
L. •� EVE V .r Lew+• w aL.rL Tara
�EP1�i•.L.y
■ y. � M Il�rr I.Ere1
a.. rJ iN .Eli
• •+[r.... t t••1.EP•Ar•a� 1
•L�•4 eu...•4 i AGE.. .E•. ^raft/
L .•�4 .M .aa ••a r•� .I•E•.. a
R>�• taimalimt
• • GG mamma, 0 • ..Ao .Aa.aR a ••W. ••
•• N. .4 M MOM
µ~4 A_ 1gi• h••1M r +AIM.lwM 014
Si mil - Eft MN
• .y rm• M! r1•.M ..Y B
r.• .r1 r - Ism p.m..r - r OEM i as
Ow 141 a. •M..•• S r ••••..I ••.Ir. - -
•or--- a. r.rr •MM MH
• 11 �...r• ., - ._r4Mr 4 E..+A1•
.ii•; SL •.•..1 W A -
•
al .ra..L &� if r.w1.
w-- - • •• +•.•1W
■s'w'i Wm.& .ra.a•
a at M O•• ■.
li A..+ L • r-
•
4. rr...41e�'^
r.
131..E OWL
4
►aa a147 MI 161ra
mid, _i mosbA/
enseiilm
mil MO Mr atA
4740•1o7
pyw�
a r.RL
•
I.L LYIS
..Ir.. M •
4. •area •+.+•.'n... M �••lr1•T__
• .b
.r .��• M -f•• '•.•••.v•
M• ar I4 M!•-fl7FM7 6,80-11 M.1. •alww•Rs , a.M .
w. r m arKlfaY Fa •■ •/w MOM i
an ! a /r•-i.1•. cAE 4.Ee-y Aa RLiy.•MN . h1 t• r rs 4
.r. a• A 4I •4l3..ry41,J1-41 rye •asar..•pen •ar.c f aas r
Is /i 10
�ilF�t ECEU - .11E
.. l
ch.
b.' r Pm
TWO;
1,91.10
4'
TU
Soivroil
.�rE , 'MN
.arr4 Pooh cry
4 rr* rota
avc 1011 ti PM. M.. 1.11,1.0 A >•A
P.m( .k.l ►V-i..•
•....w..1W1.•r4fw• .-.
•n=1.1 f1441 Mt
Ear r 1.
LEWIS A 5 40 AN •Wi q... In..
ws ]/HIe•a• .•a. rc• EaA.
roar
....I
o. a•r'
4141■'T1' M1l --
!Rnl
.YE... • .1•wr NI • . !•. • 4 ...•..
....
Il i_mr
I>
4
.a
MVP. E1aa1-411.
M• as o .may
_Jc Rf1
A� • EL.J
Ream'! VMS .oar IMAM
....
n.R •1.1
MEW. UM
10.rall• Mt bet IOW API
• Meta
.Es MY
1•1r.r �1F. R1
• v..Ir
car ua 1Xrav PLA r
STEVE d NATALIE
ROBBINS
IIE31n11M1 DIEM rwp, nr.
Chaes.of lilt 3•ar atl •M1Me/ infra
lidRears 14•21
•i5r il77d1A0il112
.C[7 ikr.Er 10-015-1
`W eat w--cQavre-aal
1'- L11M .1'• .V+a•iC?'r
s-7-6/1=41 L
Lake
lotEgliPond/NormaiWaterL J
41)661 di
65'
SaCiva
r=ull Pond/
Norm 1.�>Uip R;,�� ,,f.:�• i;. it
c&REIF►
S ❑re TIC eir' ' ';',*• 1- I 'Pgr";e" 'I«lf;♦ c I'" "ir�yy r.r
1 ' LA'S
Nb "TFEES gJ
I N'Pik L DISTuJe( r
ail Te 3t1 )
IA tr L6N4 W•Ok
Please approximately sketch the following information on this plan?tall, such a51 o ft X•1D0 f)*: (provide dlmensians for each
1. Ali proposed vegetation clearing
2 Location of rip rap or fill to be placed above the Full Pond/'Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elev
4. Location of any proposed structures such as buildings, gelevation
s, etc.
5• Location of any en-martian or dredging below the Ful Pond/ Normal�WaterLevel elevat
6, location of construction access corridors inn
FORM:SSGP 10-2013
Page 3 of 3
From: Tamara Hager tamarahager@icloud.com
Subject: Robbins shoreline pics
Date: Apr 15, 2022 at 1:13:47 PM
To: TAMARA HAGER lager@Iakepermit.com
Nid IF
agiaskji
•;
rr • kirk-
? -
.:- MOM- - - tie-....:•,,
. . ' grit.
1. . �: i _
.•- . _'fir .-� ,, 4. �y�
1 ate• :k; � 7.
'
N.,4i,AO _ , . •iig . t '
_ ;
_ L �t
A.
{ • , , -
4. 4_.1 v j
Tamara Hager
704-575-2227
The information contained in this message is confidential
and is intended solely for the recipient(s) identified above. If
you are not the intended recipient or there are any
s-7-6/1=41 L
Lake
lotEgliPond/NormaiWaterL J
41)661 di
65'
SaCiva
r=ull Pond/
Norm 1.�>Uip R;,�� ,,f.:�• i;. it
c&REIF►
S ❑re TIC eir' ' ';',*• 1- I 'Pgr";e" 'I«lf;♦ c I'" "ir�yy r.r
1 ' LA'S
Nb "TFEES gJ
I N'Pik L DISTuJe( r
ail Te 3t1 )
IA tr L6N4 W•Ok
Please approximately sketch the following information on this plan?tall, such a51 o ft X•1D0 f)*: (provide dlmensians for each
1. Ali proposed vegetation clearing
2 Location of rip rap or fill to be placed above the Full Pond/'Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elev
4. Location of any proposed structures such as buildings, gelevation
s, etc.
5• Location of any en-martian or dredging below the Ful Pond/ Normal�WaterLevel elevat
6, location of construction access corridors inn
FORM:SSGP 10-2013
Page 3 of 3