Loading...
HomeMy WebLinkAboutNCC221566_Site Plan or Location Map_20220421SITE DATA GRADING TOTAL AREA IN TRACT: 18.41 ACRE PITT COUNTY PARCEL NO.: 12770 TAX MAP NO.: 4656267817 CURRENT ZONING: RR TOTAL DISTURBED AREA: 1.36 AC REQUIRED PARKING: 75 SPACES (1 SPACE/4 SEATS 300 SEATS) EXISTING PARKING SPACES: 0 SPACES PROPOSED NEW PARKING SPACES: 84 SPACES REQUIRED HC PARKING: 3 SPACES PROPOSED HANDICAP PARKING: 4 SPACES MAXIMUM BUILDING HEIGHT: 60 FT BUILDING HEIGHT: FT SETBACKS: FRONT 40 FT REAR 10 FT SIDE 1 OFT BUFFER YARDS: BUFFER YARD 70' NOTE: ALL DEWATERING OPERATIONS SHALL BE FILTERED BEFORE DRAINING OFFSITE AND A 10 DAY NOTICE SHALL BE GIVEN PRIOR TO START OF PUMPING PER THE UPDATED NCG01 PERMIT STREETS WILL BE SWEPT AS NEEDED BUT A MINIMUM OF ONCE A WEEK WHILE THE SITE IS ACTIVE ALL STOCK PILES ARE TO REMAIN 50' AWAY FROM ALL DRAINAGE INLETS AND SURFACE WATERS NOTE: STORMWATER DATA TOTAL DRAINAGE AREA — 18.41 AC TOTAL OFFSITE DRAINAGE — 0.0 AC IC11��T.�ICIlIL�P.IIII17.9�I��I� [Il PRE DEV. RUNOFF Q10 = 42.43 CFS POST DEV RUN OFF Q 10 = 42.69 CFS NITROGEN AND PHOSPHORUS LEVELS ARE WITHIN THE REQUIRED LIMITS AND THEREFORE NO SCM IS NEEDED FOR WATER QUALITY. POST DEVELOPMENT 1 YR 24 HR EVENT SHALL BE DETAINED AND RELEASED AT PRE DEVELOPMENT FLOWS Q (PRE SITE ONLY ) = CFS Q (PST SITE ONLY ) = CFS REDUCTION IN OVERALL FLOW FROM THE SITE SO NO DETENTION IS REQUIRED. 2" SURFACE COURSE 8" ABC STONE e ae TYPICAL PAVEMENT SECTION COMPACTED SUBGRADE 1 Scale: Not To Scale: SELF INSPECTION IS REQUIRED AS LISTED — INSPECTION FORM CAN BE OBTAINED AT FOLLOWING WEBSITE: HTTP://DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY—MINERAL—LAND—RESOURCES/ EROSION—SEDIMENT—CONTROL/FORMS THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGEL THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT , SLOPES LEFT EXPOSED WILL WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY GROUND COVER, DEVISES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PERMANENT GROUND COVER WILL BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR NO MORE THAN 90 CALENDAR DAYS WHICH EVER IS SHORTER FOLLOWING COMPLETION OF CONSTRUCTION. TEMP. DIVERSION SWALE TEMP. CHECK. DAM 166.92 X SPOT ELEVATION SILT FENCE LOD LIMITS OF DISTURBANCE 0 o CONSTRUCTION ENTRANCE 0 TSW = TOP OF SIDEWALK TA = TOP OF ASPHALT TC = TOP OF CONCRETE North Carolina One -Call Center Know what's below. Call before you dig. SEEDING PLAN 1. TEMPORARY SEEDING PLANING DATES DEC. 1 - APR. 15 APR. 15 - AUG. 15 AUG. 15 - DEC. 1 LIME FERTILIZER MULCH 2. PERMANENT SEEDING GRASS TYPE RYE (GRAIN) KOBE LESPEDEZA GERMAN MILLET RYE (GRAIN) 10-10-10 STRAW PLANING DATES GRASS TYPE SEPT. 1 - OCT. 3 TALL FESCUE KOBE LESPEDEZA RYE (GRAIN) LIME FERTILIZER 10-10-10 MULCH STRAW TACK RATE = 11 GAL / 1000 SF POUNDS/ACRE 120 50 40 120 3,000 800 4,000 POUNDS/ACRE 200 50 25 4,000 1,000 4,000 CONFIDENTIALITY STATEMENT: THIS DRAWING IS THE PROPERTY OF INNER BANKS ENGINEERING SERVICES,PC. THIS INFORMATION IS CONFIDENTIAL AND IS TO BE USED ONLY IN CONNECTION WITH WORK DESCRIBED BY INNER BANKS ENGINEERING, PC NO PART IS TO BE DISCLOSED TO OTHERS WITHOUT EXPRESS WRITTEN PERMISSION FROM INNER BANKS ENGINEERING, PC O �_00 L0D LOD LOD LOD LOD LOD LOD��, LOD LOD LOD LOD LOD �. LOD LOD inn inn inn inn_ IN 06 CF 9 CF 69 SF SF i= 2' 1.5" 1.0" V WEIR = 10, N= 0. 5' EVERY ZONES LINE BASIN ION IS PLETE. i I I I I I I I I I I I I I I I I I I I PLAN U N _ C U � N Q = Q n U D�z0-) V / Q n,, —I W � = W 10 U m>m n, � Q LLJ o Z Q 0 0 r 0 O n u Cll N O File No. 21029 Scale: 1 "= 20' Sheet No. C-03 CENSE NO. C-4111 INNER BANKS ENGINEERING, PC -.- 0 BOX 154 b Wasgton, NC 27889 252-945-2983 M U PEEDI N@1 BXENGI N EERI NG.COM