Loading...
HomeMy WebLinkAboutNCC221240_ESC Approval Submitted_20220421ROCKY MOUNT ENGINEERING THE CENTER OF IT ALL LETTER OF APPROVAL FOR SEDIMENTATION & EROSION CONTROL March 23, 2022 Hubbell Lenior City, Inc 546 English Road Rocky Mount, NC 27804 Re: Project Name: Permit Number: Location: Submitted By: Acres Approved To whom it may concern: Hubbell Lenior Expansion 2021-02768 546 English Road Appian 2.69 acres This office has reviewed the subject erosion and sedimentation control plan sealed by Joyner Keeny Planning, Surveying and Engineering. We find the plan to be acceptable and hereby issue this letter of approval. This letter of approval shall be valid for a period not to exceed twenty-four months, or the time required for the proposed construction activities, whichever comes first. Please be advised that Section 801, Sub -section E12 of the City of Rocky Mount's Land Development Code (hereinafter referred to as LDC) requires that a copy of the approved erosion control plan be on file at the job site. Also, you should consider this letter the notice required by the LDC, Section 802, Sub -section Q1 of our right of periodic inspection to ensure compliance with the approved plan. The City of Rocky Mount's Sedimentation Pollution Control Program is performance oriented, requiring protection of the natural resources and adjoining properties. If following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Soil Erosion and Sedimentation Control Ordinance of the City of Rocky Mount (Section 801 of the LDC, also NCGS 113A-51 through 66,) this office will require revisions to the plan and implementation of the revisions to ensure compliance with the Ordinance. Performance Reservations for this plan are included as part of this approval. The (252) 972-1121 1 331 S. Franklin St- PC Box 1180, Rocky Mount, NC 27802.1180 1 www.rockymountnc,gov developer is responsible for the control of sediment on -site.. If the approved erosion and sedimentation control measures prove insufficient, the. developer must take additionalsteps necessary to stop sediment from leaving: this site. Each sediment storage..device must be:.inspected after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 54°Io capacity. Please be aware that this approval is based in part on the accuracy of the information in the Financial Responsibility/Ownership Form, which you have provided. You are. required to file an amended form if there is: any change in the information. included on the forrn. Also, please note that this approval does: not relieve the permittee of the responsibility to obtain any other Federal, State; or Local approvals or permits: The responsible party may need to contact the appropriate Federal, State, and Local agencies prior to beginning work. This approval does not permit the construction of any impervious surface, nor does, it allow for the placement of fill in any area for which a floodplain development permit is required. In addition, LDC Section 801-E1 O.requires that you notify this office of the proposed starting date for this project. Your cooperation is appreciated; and we:look forward to working.. with you on this project. Also, this letter gives the notice required by G " & 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. As. of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COQ under the NCGO100.00 Construction 5tormwater General Permit. This form. MUST be submitted prior to the commencement of any land disturbing activity on the above project. The NOT form maybe accessed at deq.nc.govINCGOI. Please direct questions about the NOI farm to Annette Lucas at Annette.lueas@,Licdenr.gov or Paul Clark at Paul.clark cdenr. ov. After you submit a complete and correct NOI Form, a COC will be emailed to you within. three business days. A $100 fee will be charged annually. This fee must be sent to the.DEMR 5tormwater Central Office staff in Raleigh. Title 1.5A NC.A,C 4B .01.18(a):an4 the NCGO1 permit require that the following documentation he kept on file at. the. job site; 1. The approved E&SC plan. as well. as any approved deviation. 2. The NCGO1 permit and the COG, once it is received. 3. Records of inspections made during the previous 30 days. (252) 97Z.1325 / 3315. Franklin 5t., PO 3ox 1180, 3ocky Mount, NC 27802d 180 1 www.ro4ymountn.c:.gov2. Also, this letter gives the notice required l?y. G:S. 113A-6 1.1(4) of our right of periodic inspection to ensure. compliance with the approved plan. Please complete the e-NO1 submittal process as soon as. you receive this letter. for the subject.site. Please visit: https://deg.nc.gov/NCGOI The General Contractor or delegated agent is re aired to set up a Pre -construction meetine_(before construction „begins with:the Control Inspector. Sincerely,: Scott..A Miles,.-P.E. Stormwater Engineer City of Rocky Mount 252-972-1122 (252):9U-1325 1 381 S, FrankIin .St., PO Box 1180 fan* Mo.unt,.NC 27842=i 180 J www.roc kytountnc-9M3