HomeMy WebLinkAboutNC0024244_Email_20220415Strickland, Bev From: Adam Kiker <adam@lkcengineering.com> Sent: Friday, April 15, 2022 12:31 PM To: Basinger, Corey; Scheller, Roberto Cc: Worl, Dan; Rob McIntyre; Brandon Plyler (bplyler@ci.albemarle.nc.us); Whitley, Derek S; Hinson, Bryan L Subject: [External] Albemarle SOC quarterly report Attachments: 2022 - Q2 Report - SOC WQ S19-007.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good morning Corey and Roberto — Attached is the quarterly report for 2Q 2022 for the Albemarle SOC. Please let us know if you have any questions or need additional information. Do you have any updates to the revised SOC application we sent on March 31? Have a great weekend, Adam ADAM P. KIKER, P.E. LKC Engineering, PLLC 140 Aqua Shed Court Aberdeen, NC 28315 Ph: (910) 420-1437 Fax: (910) 637-0096 Cell: (910) 639-2132 Follow us on Instagram! @Ikc_engineering 1 ILKC ___________ LKC Engineering, PLLC, 140 Aqua Shed Court, Aberdeen, North Carolina 28315 PH: 910/420-1437 * FAX: 910/637-0096 * License No. P-1095    April 15, 2022    Mr. W. Corey Basinger  Regional Supervisor, Mooresville  NCDEQ – Division of Water Resources  610 E Center Avenue, Suite 301  Mooresville, NC  281115    Re: Quarterly Report – Second Quarter 2022  SOC WQ S19‐007    Dear Mr. Basinger:    On behalf of Albemarle, please accept this as a Quarterly Report for the subject Special Order by Consent.   Below is a brief update on the SOC and associated projects:    1. Albemarle received funding through the Division of Water Infrastructure for $16,453,000 in  funding for a major renovation to the Long Creek Wastewater Treatment Plant.  The primary  objective of the project is to transition the aeration process from the floating aerators over to  diffused aeration.  The project would also provide for 8,000,000 gallons of flow equalization  volume to manage peak flow events.    2. The Engineering Report was submitted to the NCDEQ Wastewater Projects Unit on August 25,  2021.  3. A Request for Additional Information was received on November 9th, 2021.    4. The revised Engineering Report was submitted back to the Division of Water Infrastructure on  December 8th, 2021.     5. The project cost has increased to $19,385,000.  This was presented to the Albemarle City Council  in December of 2021 and Council re‐affirmed their commitment to the project.    6. The Final Engineering Report will be submitted this month.  We expect to receive approval from  NCDEQ DWI upon submittal of final ER.    7. On March 31, 2022, the City submitted a revised SOC application with new proposed milestone  completion dates.  These dates reflect the scope and timeline of the proposed improvements at  the WWTP, project CS370522‐08. Please see the table below for those milestones and dates:    Scheduled Activity Original Due Date Proposed Due Date Submit Quarterly Progress Reports (see details in paragraph 2(b) below.) Beginning October 15, 2020 Ongoing For NPDES Permit NC0024244: Begin implementation or construction of WWTP improvements items in Attachment B. March 31, 2022 July 31, 2024 Complete construction of all WWTP improvements September 30, 2023 February 28, 2026 Attain Compliance with NPDES permit limits September 30, 2023 May 31, 2026 8. Albemarle’s Council voted to utilize all funds obligated under CS370522‐07 on gravity sewer  rehabilitation.  The Phase 3 project includes an investment of $6,156,000 on the rehabilitation of  24”, 18”, 12”, and 8” gravity sewer along two major outfalls that are known sources of inflow and  infiltration.    9. The project CS370522‐07 is currently in the design phase and will be submitted to DWI for review  February 2022.  The project is expected to begin construction in the Summer of 2022 and take  approximately nine months to complete.  10. The project design package for project CS370522‐07 was submitted to DWI in early February.  DWI  completed its review and provided comments on April 1st, 2022.  We plan to resubmit the design  package this month to address the comments.  11. On March 31, 2022, the City submitted a revised SOC application with new proposed milestone  completion dates.  The proposed work for the collection system is slated to be completed by  November 30, 2023.  Please see the table below for the milestones and proposed completion  dates:    Scheduled Activity Original Due Date in Executed SOC Proposed Due Date Submit Quarterly Progress Reports (see details in paragraph 2(b) below.) Beginning October 15, 2020 Ongoing For Collection System Permit WQCS00016: Complete Sanitary Sewer Rehab, Phase 1 December 31, 2019 Met Begin construction on Sanitary Sewer Rehab, Phase 2 July 31, 2019 Met Apply for funding for Sanitary Sewer Rehab, Phase 3 September 30, 2019 Met Receive Letter of Intent to Fund for Phase 3 March 31, 2020 Met Submit finished plans and specifications for review for Phase 3 September 30, 2021 Met Complete construction on Phase 2 November 30, 2020 Met Begin Construction and execute construction contract for Phase 3 March 31, 2022 August 31, 2022 Complete construction on Phase 3 March 31, 2023 June 30, 2023 Review infrastructure improvements for maintaining compliance September 30, 2023 November 30, 2023 Attain Compliance with the Collection System Permit September 30, 2023 November 30, 2023     If you have any questions, or if we may be of assistance, please do not hesitate to contact me by phone  at (910) 420‐1437 or by email at adam@LKCengineering.com.     Very Best,      Adam P. Kiker, P.E.