Loading...
HomeMy WebLinkAbout20201285 Ver 1_ePCN Application_20220413 t i Division of Wader Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13,2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process?* • Yes No Is this project a public transportation project?* O Yes ® No Change only if needed. Pre-Filing Meeting Date Request was submitted on: BIMS#Assigned* Version#* 20201285 1 Is a payment required for this project?* O No payment required 0 Fee received Reviewing Office* O Fee needed-send electronic notification Raleigh Regional Office-(919)791-4200 Select Project Reviewer* Colleen Cohn:eads\cmcohn Information for Initial Review 1a.Name of project: Arbor Creek-Middle Creek Greenway 1a.Who is the Primary Contact?* Matt Beard,Park Planner,Town of Holly Springs lb.Primary Contact Email:* 1c.Primary Contact Phone:* matt.beard@hollyspringsnc.us (919)567-4018 Date Submitted 4/13/2022 Nearest Body of Water Middle Creek Basin Neuse Water Classification C Site Coordinates Latitude: Longitude: 35.667619 -78.816937 A. Processing Information C^) County(or Counties)where the project is located: Wake Is this a NCDMS Project 0 Yes ONo Is this project a public transportation project?* 0 Yes ® No la.Type(s)of approval sought from the Corps: O Section 404 Permit(wetlands,streams and waters,Clean Water Act) ❑ Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* O Yes OO No lb.What type(s)of permit(s)do you wish to seek authorization? e Nationwide Permit(NWP) O Regional General Permit(RGP) O Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? O Yes 0No Nationwide Permit(NWP)Number: 14-Linear transportation NWP Numbers(for multiple NWPS): 1d.Type(s)of approval sought from the DWR: pO 401 Water Quality Certification-Regular 0 401 Water Quality Certification-Express O Non-404 Jurisdictional General Permit O Riparian Buffer Authorization O Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: 0 Yes O No For the record only for Corps Permit: 0 Yes O No If.Is this an after-the-fact permit application?* O Yes O No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? O Yes O No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? O Yes O No 1 h.Is the project located in any of NC's twenty coastal counties? O Yes O No 1j.Is the project located in a designated trout watershed? O Yes ONo B. Applicant Information C") Id.Who is applying for the permit? OO Owner 0 Applicant(other than owner) 1e.Is there an Agent/Consultant for this project?* O Yes 0No 2.Owner Information 2a.Name(s)on recorded deed: Matt Beard,Park Planner,Town of Holly Springs 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 128 S.Main Street Address Line 2 City State/Province/Region Holly Springs NC Postal/Zip Code Country 27540 USA 2e.Telephone Number: 2f.Fax Number: (919)567-4018 2g.Email Address:* matt.beard@hollyspringsnc.us 4.Agent/Consultant(if applicable) 4a.Name: Anna Reusche,PWS 4b.Business Name: SEPI Inc. 4c.Address Street Address One Glenwood Avenue Address Line 2 Suite 600 City State/Province/Region Raleigh NC Postal/Zip Code Country 27603 USA 4d.Telephone Number: 4e.Fax Number: (919)816-7745 4f.Email Address:* areusche@sepiinc.com C. Project Information and Prior Project History 0 1.Project Information 1 b.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Holly Springs 2.Project Identification 2a.Property Identification Number: 2b.Property size: See attached map 146.5 2c.Project Address Street Address Sunset Lake Road Address Line 2 City State/Province/Region Holly Springs North Carolina Postal/Zip Code Country 27540 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Middle Creek 3b.Water Resources Classification of nearest receiving water:* C 3c. What river basin(s)is your project located in?* Neuse 3d.Please provide the 12-digit HUC in which the project is located. 030202010901 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* The project study area consists of forested areas along a large stream feature,Middle Creek,portions of an existing greenway and boardwalk as well as an existing sewer line easement. The surrounding area consists of single-family residential subdivisions including Arbor Creek,Bridgewater,Woodcreek and Sunset Ridge. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* 0 Yes O No 0 Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 68.31 4g.List the total estimated linear feet of all existing streams on the property: 18,330 4h.Explain the purpose of the proposed project:* The proposed greenway is intended to serve residents of the directly adjacent Arbor Creek,Bridgewater,Woodcreek and Sunset Ridge residential subdivisions as well as the overall community. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The approximate 146.5-acre project study area begins immediately south of Sunset Lake Road and extends approximately 2 miles south southeast to the terminus,north of Holly Springs Road.The proposed project is located south of Sunset Lake Road in Holly Springs in Wake County,North Carolina.The coordinates of 35.667619°,-78.816937°generally correspond to the center of the site.The project study area consists of forested areas along a large stream feature,Middle Creek,adjacent to a sewer line easement. 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* • Yes No Unknown Comments: A PJD was received from the USACE via email on August 19,2020.Subsequently an additional 10 acres was added to the study area.A PJD request for the additional study area is included with the PCN. 5b.If the Corps made a jurisdictional determination,what type of determination was made?* O Preliminary 0 Approved 0 Not Verified 0 Unknown 0 N/A Corps AID Number: SAW-2020-00572 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Anna Reusche,PWS Agency/Consultant Company: SEPI,Inc. Other: 5d.List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR USACE email jurisdictional determination received 8/19/2020 NCDEQ Buffer determination(NBRRO#20-098)received 4/16/2020 6.Future Project Plans 6a.Is this a phased project?* 0 Yes ® No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 0 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): O✓ Wetlands s Streams-tributaries O✓ Buffers O Open Waters 0 Pond Construction 2.Wetland Impacts 2a.Site#*(?) 2a1 Reason(?) 2b.Impact type*(?) 2c.Type of W.* 2d.W.name 2e.Forested* 2f.Type of Jurisdicition*2g.Impact (?) area* 1(WA-1) Paved Greenway P Bottomland Hardwood Forest WA Yes Both 0.030 (acres) 2(WA-1) Paved Greenway P Bottomland Hardwood Forest WA Yes Both 0.001 (acres) 3(WA-1) Paved Greenway P Bottomland Hardwood Forest WB Yes Both 0.040 (acres) 4A(WA-2) Paved Greenway P Bottomland Hardwood Forest WD Yes Both 0.150 (acres) 4B(WA-2) Paved Greenway P Bottomland Hardwood Forest WJ Yes Both 0.010 (acres) 5(WA-3) Paved Greenway P Bottomland Hardwood Forest WJ Yes Both 0.060 (acres) 6(WA-4) Greenway/Culvert P Bottomland Hardwood Forest WJ Yes Both 0.470 (acres) 7(WA-5) Paved Greenway P Bottomland Hardwood Forest WJ Yes Both 0.004 (acres) 8(WA-5) Paved Greenway P Bottomland Hardwood Forest WJ Yes Both 0.010 (acres) 9(WA-5) Paved Greenway P Bottomland Hardwood Forest WJ Yes Both 0.001 (acres) 10(WA-6) Boardwalk P Bottomland Hardwood Forest WJ Yes Both 0.110 (acres) 1(WA-1) Remove Boardwalk T Bottomland Hardwood Forest WJ Yes Both 0.263 (acres) 2g.Total Temporary Wetland Impact 2g.Total Permanent Wetland Impact 0.263 0.886 2g.Total Wetland Impact 1.149 21.Comments: All crossing are single and complete.Three crossings exceed 0.10 of and acre. There will be no indirect loss of wetlands due to culverts. 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width 3h.Impact (?) Jurisdiction* length* Si Greenway Crossing Permanent Culvert SB Perennial Both 3 22 Average(feet) (linear feet) S2 Greenway Crossing Permanent Rip Rap Fill SB Perennial Both 4 18 Average(feet) (linear feet) S3 Greenway Crossing Permanent Culvert SAA Intermittent Both 3 22 Average(feet) (linear feet) S4 Greenway Crossing Permanent Rip Rap Fill SAA Intermittent Both 3 33 Average(feet) (linear feet) S5 Greenway Crossing Permanent Culvert SG Perennial Both 4 30 Average(feet) (linear feet) S6 Greenway Crossing Permanent Rip Rap Fill SG Perennial Both 4 21 Average(feet) (linear feet) S7 Greenway Crossing Permanent Culvert SI Intermittent Both 3 17 Average(feet) (linear feet) S8 Greenway Crossing Permanent Rip Rap Fill SI Intermittent Both 3 6 Average(feet) (linear feet) S9 Greenway Crossing Permanent Culvert SK Perennial Both 4 16 Average(feet) (linear feet) S10 Greenway Crossing Permanent Rip Rap Fill SK Perennial Both 4 12 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 197 0 3i.Total stream and ditch impacts: 197 3j.Comments: All crossing are single and complete.No individual crossing exceeds 150' 6. Buffer Impacts (for DWR) 6a.Project is in which protect basin(s)? Check all that apply. pO Neuse a Tar-Pamlico O Catawba 0 Randleman 0 Goose Creek 0 Jordan Lake O Other 6b.Impact Type 6c.Per or Temp 6d.Stream name 6e.Buffer mitigation required? 6f.Zone 1 impact 6g.Zone 2 impact (BA-1)Allowable Upon Authorization P SB No 5,047 2,278 (BA-2)Allowable Upon Authorization P SB1 No 5,316 3,913 (BA-3)Allowable Upon Authorization P SAA No 2,858 1,139 (BA-4)Allowable Upon Authorization P SG No 3,161 1,452 (BA-5)Allowable Upon Authorization P SA No 4,916 8,191 (BA-6)Allowable Upon Authorization P SA No 13,825 8,100 (BA-7)Allowable Upon Authorization P SA No 12,810 8,908 (BA-8)Allowable Upon Authorization P SI No 2,774 2,844 (BA-8)Construction Access T SI No 1,778 1,079 (BA-9)Allowable Upon Authorization P SJ No 1,797 1,203 (BA-10)Allowable Upon Authorization P SK No 2,461 1,790 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 1,778.00 1,079.00 Zone 1 Zone 2 Total Permanent impacts: 54,965.00 39,818.00 Zone 1 Zone 2 Total combined buffer impacts: 56,743.00 40,897.00 6i.Comments: E. Impact Justification and Mitigation C^U 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: The applicant requested a detailed delineation of streams and wetlands within the proposed project boundaries prior to finalizing the plan to ensure the limitation of impacts of the natural environment.Following the delineation,the proposed grading and disturbance limits were shifted in places to minimize impacts to the wetlands,streams and buffers. The proposed project was designed to maintain existing drainage patterns and avoid impacts to Middle Creek and its tributaries in the project area.The configuration of the proposed path avoids impacts to the main stem of Middle Creek and reduces the number of crossings as well as the length of each crossing(<150 LF).Crossings were designed at a perpendicular angle and pipe end walls were used to further reduce the length of each crossing.All bridge supports proposed for Middle Creek crossings will be outside of the tributary top of bank.Where boardwalks are proposed to cross tributaries, they span the entire stream channel,and the supports are located To avoid temporary stream impacts on streams,the project includes the installation and use of a temporary bridge to span the channel in its entirety. For the proposed wetland crossings,equalization pipes will be utilized so that water can back up and migrate through the pipes as needed depending on the wetland the pipe arrangement varies from a single pipe to a system of quad pipes.As such no secondary or indirect losses are anticipated to result from the wetland crossings. A section of existing boardwalk through a wetland will be removed.Vegetation within the area will be allowed to revegetate naturally.Also,the area within LOD but outside of trail shoulder will be allowed to revegetate naturally 1 b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Prior to construction,the contractor will install watershed fencing to delineate approved working limits.Temporary silt fencing,wattles and dewatering devices will be installed to treat runoff from the work area.All impacted areas will be restored to the pre-construction conditions including stabilization of the slopes and other disturbed areas.The contractor will maintain erosion and sedimentation control measures until groundcover or vegetation is well established. Vegetation will be re-established in areas where the existing boardwalk is being removed. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? • Yes No 2c.If yes,mitigation is required by(check all that apply): • DWR s Corps 2d.If yes,which mitigation option(s)will be used for this project? • Mitigation bank Payment to in-lieu fee program Permittee Responsible Mitigation 3.Complete if Using a Mitigation Bank 3a.Name of Mitigation Bank: EBX-Neuse sponsored Neu-Con Wetland&Stream Umbrella Mitigation Bank 3b.Credits Purchased/Requested(attach receipt and letter) Type: Quantity: Riparian wetland 1.43 3c.Comments Wetland mitigation credits have been requested for those sites that exceed 0.10 acre including sites 4a(WA-2),6(WA-4)and 10(WA-6).A ratio of 2:1 is assumed for wetlands. 6. Buffer mitigation (State Regulated Riparian Buffer Rules)-required by DWR 6a.Will the project result in an impact within a protected riparian buffer that requires buffer mitigation?If yes,you must fill out this entire form-please contact DWR for more information. O Yes O No F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1 a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? O Yes O No What type of SCM are you providing? ❑ Level Spreader O Vegetated Conveyance(lower SHWT) O Wetland Swale(higher SHWT) O Other SCM that removes minimum 30%nitrogen ci Proposed project will not create concentrated stormwater flow through the buffer 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* Yes • No 2b.Does this project meet the requirements for low density projects as defined in 15A NCAC 02H.1003(2)? • Yes No Comments: G. Supplementary Information 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* O Yes O No 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* Yes O No 3.Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* O Yes O No 3b.If you answered"no,"provide a short narrative description. the project is intended to serve existing neighborhoods and no further development is anticipated to occur as a result of the project.In order to prevent the potential for secondary impacts,all erosion and sedimentation control practices,including the application of silt fences and erosion control matting, will be constructed and maintained according to the standards and specifications of the current North Carolina Erosion and Sediment Control Planning and Design Manual. 4.Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* O Yes 0No ® N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* • Yes No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* O Yes C• No 5d.Is another Federal agency involved?* O Yes O No Unknown 5e.Is this a DOT project located within Division's 1-8? O Yes 0No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? O Yes 0No 5g.Does this project involve bridge maintenance or removal? O Yes 0No 5h.Does this project involve the construction/installation of a wind turbine(s)?* O Yes 0No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? Yes • No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Information Planning and Consultation(IPaC)tool and species specific surveys. 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes • No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NOAA EFH mapper https://www.habitatnoaa.gov/application/efhmapper/index.ht 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* O Yes a No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* Concurrence received from SHPO and attached 8. Flood Zone Designation (Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* O Yes No 8b.If yes,explain how project meets FEMA requirements: Parts of this project are located within a Federal Emergency Management Agency(FEMA)regulated flood plain will require a Conditional Letter of Map Revision from FEMA.The project has been coordinated with appropriate state and local officials and FEMA to assure compliance with FEMA,state,and local floodway regulations.A proposed model incorporates the project's physical changes and new riverine structures that are the basis of the revision request.The proposed model ties-in with the effective floodplain model upstream and downstream of the project area.The model was produced in accordance with FEMA guidelines and the results have been provided to FEMA for review and approval. 8c.What source(s)did you use to make the floodplain determination?* FIRM 3720065900J 5/2/206 Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Arbor Creek Final Permit Package_04-13-2022.pdf 158.48MB DWR Pre-Filing Meeting Request Form.pdf 51.32KB DEQ PreFiling Response.pdf 89.48KB File must be PDF or KMZ Comments Signature O By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Anna Reusche Signature Date 4/13/2022 DWR Pre-Filing Meeting Request Form NORTH CA:iOL INA 6nrtrnnfnerrfal Qualify Contact Name* Bob Lepsic Contact Email Address* blepsic@sepiinc.corn Project Owner* Town of Holly Springs Project Name* Arbor Creek Greenway Project Project County* Wake Owner Address:* Street Address Town of Holly Springs Address Line 2 PO Box 8 City State/Rovince/Region Holly Springs NC Ebstal/Zip Code Country 27540 United States Is this a transportation project?* C Yes f• No Type(s)of approval sought from the DWR: rJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* Yes r No Please list all existing project ID's associated with this projects.* NBRRO#20-098; SAW-2020-00572 Do you know the name of the staff member you would like to request a meeting with? No Please give a brief project description below.* The Town of Holly Springs wants to construct a greenway within the easement south of Sunset Lake Road and north of Holly Springs Road. The approximately 136-acre project study area consists of forested areas along a large stream feature, Middle Creek,adjacent to a sewer-line easement. Please give a couple of dates you are available for a meeting. Please attach the documentation you would like to have the meeting about. 20200423142712049.pdf 1.28MB Arbor Creek NRTR.pdf 4.6MB pdf only By digitally signing below,I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • !also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature* „?...aogre Qekeca.iG Submittal Date 9/24/2020 Anna Reusche From: laserfiche@ncdenr.gov Sent: Sunday, October 25, 2020 12:00 AM To: Bob Lepsic Cc: stephanie.goss@ncdenr.gov Subject: Pre-Filing Meeting is not needed for Arbor Creek Greenway Project - 20201285 Ver 1 The North Carolina Division of Water Resources has received the Pre-Filing Meeting Request Form for Arbor Creek Greenway Project that you submitted on 9/24/2020 4:39 PM.The ID number for that project is 20201285, Version 1. It has been decided that no meeting is needed for this project. Project file link: https://edocs.deq.nc.gov/WaterResources/Browse.aspx?dbid=0&startid=1304091 When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. 1 RALEIGH: 1 GLENWOOD AVENUE,SUITE 600, RALEIGH, NC 27603 I OFFICE: 919.789.9977/FAX:919.789.9591 /WWW.SEPIINC.COM April 13, 2022 RE: Arbor Creek Greenway Project,Town of Holly Springs,Wake County,NC Dear Sir/Madam, On behalf of the Town of Holly Springs, SEPI Inc. (SEPI) submits this Preconstruction Notification (PCN) form for impacts to Waters of the U.S. associated with the proposed Arbor Creek Greenway Project. The purpose of this letter is to request approval for a Section 404 Nationwide Permit 14 and corresponding Section 401 General Water Quality Certification (No. 4135). The following is intended to summarize information provided in the corresponding PCN and assist you in your review.In addition to this cover letter,the following has been included to assist your review: • Attachment A—Agent Authorization • Attachment B—USACE PM Concurrence and Modification Request Information • Attachment C—Riparian Buffer Determination • Attachment D—Aquatics Survey Report • Attachment E—Wetland, Stream and Buffer Impact Drawings • Attachment F—Construction Drawings • Attachment G—SHPO Scoping Response Letter • Attachment H—Mitigation Statement of Availability Letter Purpose and Need The proposed greenway is intended to serve residents of the directly adjacent Arbor Creek, Bridgewater, Woodcreek and Sunset Ridge residential subdivisions as well as the overall community. Project Description The approximate 146.5-acre project study area begins immediately south of Sunset Lake Road and extends approximately 2 miles south southeast to the terminus,north of Holly Springs Road. The proposed project is located south of Sunset Lake Road in Holly Springs in Wake County,North Carolina. The coordinates of 35.667619°,-78.816937°generally correspond to the center of the site. The project study area consists of forested areas along a large stream feature(Middle Creek)adjacent to a sewer line easement. Resource Status Water resources in the study area are part of the Upper Neuse River basin [U.S. Geological Survey(USGS) Hydrologic Unit Code 03020201. All surface water in the project study area flow to Middle Creek. Streams 01) 00 S= 7I in the project area are subject to State's Neuse Riparian Buffer rules. Eighteen jurisdictional streams, eleven wetland features, and one pond/open water feature. Regulatory Approvals Environmental due-diligence for the project study area has been completed. and a Preliminary Jurisdictional Determination was submitted to the U.S.Army Corps of Engineers April 4,2020. A site visit was performed by George Phillips, USACE Wilmington District-Raleigh Field Office on June 4, 2020. Verification of the PJD was received via email on August 19,2020(SAW-2020-0572). An additional 10 acres was added to the study area in September 2020. The coordinates of 35.66778°,- 78.820258°generally correspond to the center of the additional area(Attachment B—Figure 2).Wetland WJ was expanded approximately 1.7-acres. In addition, an intermittent stream, SAA,was also added.As such a modification of the PJD is requested.Additional information needed for the PJD modification(i.e.revised ORM table,figures,and additional data forms)are included in Attachment B. As stated above, water resources in the study area are part of the Upper Neuse River basin and, as such, are subject to the Neuse River Buffer Rules as regulated by NCDWR. A Riparian Buffer Determination(NBRO #20-098)was received for the project on April 16,2020, as provided in Attachment B. Stream SAA, identified in the additional assessment area, is shown on both the USGS topographic mapping and NRCS Soil Survey for the area. This feature will also,therefore,be subject to the Neuse Buffer Rules. Federally Protected Species As of June 17,2021,the United States Fish and Wildlife Service(USFWS)lists six federally protected species for Wake County(Table 1). Table 1. Federally protected species listed for Wake County. Scientific Name Common Name Federal Habitat Biological Status Present Conclusion Eicoides borealis Red-cockaded E Y MA-NLLA woodpecker Alasmidonta heterodon Dwarf E MA-NLAA wedgemussel Noturus furiosus Carolina E MA-NLAA madtom Necturus lewisi Neuse River l MA-NLAA Waterdog Elliptio lanceolata Yellow lance T Y MA-NLAA Rims michauxii Michaux's E No Effect sumac E-Endangered T—Threatened MA-NLAA—May Affect,Not Likely to Adversely Affect 0 �_ QUtsit) UUOOO (JO20 Aquatic surveys were conducted for the project study area in December 2020 by a permitted aquatic biologist, Chris Sheats(Permit# 19-ES00558).The survey efforts resulted in no observations of Neuse River waterdog, Carolina madtom, dwarf wedgemussel,Atlantic pigtoe, green floater, Tar River spinymussel or yellow lance individuals within Middle Creek or its unnamed tributary.Based on the distances to known occurrences of the target species and the results of these surveys, the project may affect but will not adversely affect the target species. Critical habitat is not identified within the study area therefore the project will have no effects on critical habitat for any listed aquatic species. In addition, surveys were conducted for Michaux's sumac on June 3,2020,during the USFWS recommended survey window. Potential habitat for Michaux's sumac is located at the southern end of the study area where it follows a maintained powerline and Sunset Fairways Drive. No individuals were identified. NHP records generated on February 27, 2020 document occurrences of Michaux's sumac within one-mile of the project study area. The eastern tiger salamander (Ambystoma tigrinum) is a state threatened animal species that has been documented within the study area.Tiger salamanders use ephemeral ponds for breeding and moist upland area for their burrows.In the late-winter or early-spring,they migrate from their burrows to the breeding sites.Tiger salamanders feed mostly at night,catching prey in and around their burrows rather than foraging for food. In an effort to reduce the potential impacts to the tiger salamander population, Section 10.05 of the Town's Engineering Design and Construction Standards will be implemented during the construction of the project. These standards specifically address work that occurs in the area upstream of Holly Springs Road. Other measures will include: • Land disturbance in habitat area will be minimized and carefully designed to avoid impact to suitable breeding pools. • Logs from construction in preserve shall be left on the ground to enhance habitat. Virginia least trillium(Trillium pusillum var.virginianum)is a state endangered plant species identified within the study area by SEPI biologists. This is a new population for Wake County, with only one other known population within the county.Virginia least trillium prefers mesic to swampy hardwood forests in low alluvial woodlands. Flowering occurs in March-April. Seeds are disbursed mainly by ants and yellow jackets and wasps. Seeds require two winters and one summer to break dormancy, generally 1.5—2 years. In an effort to reduce the potential impacts to Virginia least trillium populations, the land disturbance and greenway path construction will be designed to avoid the identified population. Cultural Resources NC Department of Natural and Cultural Resources - State Historic Preservation Office conduced a review of the project and had no comments.A copy of the scoping comment response letter is included in the attachment. Impacts to Jurisdictional Resources and Mitigation Summary Proposed permanent impacts to jurisdictional areas total 197 linear feet of permanent stream impacts from stream crossings. These crossings are single and complete and no individual crossing is over 150 feet. There is 0.87-acres of permanent wetland impacts resulting from wetland crossings proposed for the greenway.Each of these crossing is single and complete and only three exceed 0.10 acres. There are 0.263-acres of temporary impacts that will result from the existing boardwalk removal. Ou1OOOOOOOOO J3Q In addition, permanent impacts proposed to the riparian buffers total 54,427 square feet in the Zone 1 and 39,335 square feet in Zone 2.Temporary impacts to Zone 1 are 1,778 square feet and 1,079 square feet in Zone 2. Based on the amount and type of impacts, compensatory mitigation is required and will be purchased through a private mitigation bank.Wetland mitigation credits have been requested for those sites that exceed 0.10 acre including sites 4a(WA-2),6(WA-4)and 10(WA-6).A ratio of 2:1 is assumed for wetlands for a total of 1.43 credits.A statement of availability letter has been obtained and a copy is included in Attachment I. Avoidance and Minimization The applicant requested a detailed delineation of streams and wetlands within the proposed project boundaries prior to finalizing the plan to ensure the limitation of impacts of the natural environment. Following the delineation, the proposed grading and disturbance limits were shifted in places to minimize impacts to the wetlands,streams and buffers. The proposed project was designed to maintain existing drainage patterns and avoid impacts to Middle Creek and its tributaries in the project area. The configuration of the proposed path avoids impacts to the main stem of Middle Creek and reduces the number of crossings as well as the length of each crossing (<150 LF). Crossings were designed at a perpendicular angle and pipe end walls were used to further reduce the length of each crossing. All bridge supports proposed for Middle Creek and other tributaries crossings will be outside of the tributary top of bank. Where boardwalks are proposed to cross tributaries, they span the entire stream channel, and the supports are located to avoid temporary stream impacts on streams, the project includes the installation and use of a temporary bridge to span the channel in its entirety. For the proposed wetland crossings,equalization pipes will be utilized so that water can back up and migrate through the pipes as needed depending on the wetland the pipe arrangement varies from a single pipe to a system of quad pipes. As such no secondary or indirect losses are anticipated to result from the wetland crossings. A section of existing boardwalk through a wetland will be removed.Vegetation within the area will be allowed to revegetate naturally. Also, the area within LOD but outside of trail shoulder will be allowed to revegetate naturally Avoidance During Construction: Prior to construction, the contractor will install watershed fencing to delineate approved working limits. Temporary silt fencing,wattles and dewatering devices will be installed to treat runoff from the work area.All impacted areas will be restored to the pre-construction conditions including stabilization of the slopes and other disturbed areas. The contractor will maintain erosion and sedimentation control measures until groundcover or vegetation is well established. Secondary Impacts: In order to prevent the potential for secondary impacts, all erosion and sedimentation control practices, including the application of silt fences and erosion control matting, will be constructed and maintained according to the standards and specifications of the current North Carolina Erosion and Sediment Control Planning and Design Manual. 0 � __ JU0000OOO 4 ) FEMA Requirements Parts of this project are located within a Federal Emergency Management Agency (FEMA)regulated flood plain will require a Conditional Letter of Map Revision from FEMA. The project has been coordinated with appropriate state and local officials and FEMA to assure compliance with FEMA, state, and local floodway regulations. A proposed model incorporates the project's physical changes and new riverine structures that are the basis of the revision request. The proposed model ties-in with the effective floodplain model upstream and downstream of the project area. The model was produced in accordance with FEMA guidelines and the results have been provided to FEMA for review and approval. Please do not hesitate to contact Anna Reusche, PWS at(919) 816-7745 or areusche@sepiinc.com with any questions or comments regarding the attached application. Sincerely, Anna Reusche, PWS SEPI,Inc. sRALEIGH: 1 GLENWOOD AVENUE.SUITE 00, RALEIGH, NC = I OFFICE: 919.789.9977/FAX:919.789.9591 /WWW.EPIINC.COM3 ATTACHMENT A S 4 I RALEIGH: 1 GLENWOO❑AVENUE,SUITE 600,RALEIGH, NC 27603 OFFICE:919.789.9977/FAX:919.789.9591 /WWW.SEPIINC.COM AGENT AUTHORIZATION FORM All Blanks to be Filled in by the Municipal Official Name Matt Beard, Park Planner,Town of Holly Springs Address 128 S. Main Street, Holly Springs, NC 27540 Phone (919)567-4018 Project Name/ Description Arbor Creek- Middle Creek Greenway Extension I,the municipal official,do hereby authorize SEPI Engineering&Construction, Inc.to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached for the above reference project. I hereby certify the above information submitted in this application is true and accurate to the best of our knowledge. By: 7411— Matt Beard Print Name Signature 3/25/2020 Date 0 5=?I ATTACHMENT B 0000000000000020 000000000000000 Bob Lepsic From: Phillips, George L CIV USARMY CESAW(USA) <George.L.Phillips@usace.army.mil> Sent: Wednesday,August 19, 2020 11:33 AM To: Bob Lepsic Subject: Arbor Creek Greek Greenway Project/Holly Springs/SAW-2020-00572 Attachments: Figure 2.pdf Bob, Based on my site visit on 06/04/2020 the Corps concurs with the delineation within the red outlined "Project Study Area" on the attached exhibit"Figure 2". It may take 90-120 days for the issuance of a written jurisdictional determination. The delineation may be used for planning and permitting purposes,should a permit be required the JD can be issued and the time of permit verification.The AID for the project is SAW-2020-00572. I have attached the delineation for reference. Please let me know if you have any questions or concerns. Lyle Phillips Regulatory Specialist US Army Corps of Engineers CE-SAW-RG-R 3331 Heritage Trade Drive,Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554-4884, Ext. 25. Fax: (919) 562-0421 Email: George.L.Phillips@usace.armv.mil We would appreciate your feedback on how we are performing our duties.Our automated Customer Service Survey is located at: http://corpsmapu.usace.armv.mil/cm apex/f?p=136:4:0.Thank you for taking the time to visit this site and complete the survey. i y ' •, • ' , : >r+%• , ii. .. 1 Project Study Area `-' - _.+- L ,s F Additional Study Area i - � l ` `, - Potentially Jurisdictional Wetlands *_ F `••6,"I'lI Tr°,,1 1„4 ..%1111 -.604. ,#. a. --r-- Potentially Jurisdictional Streams - Intermittent • ti "•r� - � Potentially Jurisdictional Streams - Perennial ,; ► . — �, 4 .0„,,,,,au ,,,, ___ . J • - . . ,...,... _ . _ . • Ponds __,.,......,,,,i_ .. .....,_ . • 4, _ -01 . • t + 5C 1-,t . .,�_ ��. re- �� '", v.;, _ } , . , SW' .4'..i', •, 7ir r i,�•'i{-: a Middle Creek(SA] .. !�(ivf .1` ,• ^`r,-^ J ..a.,.. rA; - I': R• # ��wL IP �a . ♦•.� • ^w- .r ��- err - . "P �F��.. r n: ` t1�+;. � � ref �. �, - - _ - Cr ' - r,• rr II r ! p• tv CJr , '' a # it al �� rF n A f SF ' -..."c„„,,,..-1: PA ".• .fir r�lr R r.• r- 4 103 �� r . • 4 ..-ur - -11.IP .1 :i ::-1-,:di titi Ilt ' • <0 4-' 41' i C 4., . . .0.1rA .-• 'dr'...- • 1 .,4' ; ii,„. ,10.. 11411, 44;„too 0 . . .... ,.,,,,. ..,..., , ., . ....„, , , .... ., 4 t .. . . . al ADP t �� a�,,,. i le .... ?' T tip" ,,,• * :PP ki yy • ir. *! I ^. 1 .. r : J S' `tii, ' . •* 1eilL f � l ' f � rM . T ' r i ' A. f?i $ iii it�`�m. ' ' - - .'ai .':' #h41 1111 This Exhibit 5 for planning purposes only andme shown Figure 2. Jurisdictional Features Map herein does not meet NC 47-30 Requirements and therefore is not for design,construction.or recording or REV 49J2a24} transfer of title.The E#n6it was compiled from available information obtained from the souces listed below. SouM N Arbor Creek Greenway Project I S PHOLLY NCDOT,NC Oneap,E5RI Town of Holly Springs RINGS September2G20 Wake County, North Carolina 0 500 1,000 1,500 2,000 Feet NC DWG) Stream Identification Form Version 4.11 SAA 0 Date: 09/01/2020 Project/Site:Arbor Creek Greenway Latitude: 35.6695 Evaluator: R.Quindlen,SEPI Inc. County:INake I Longitude:-78.8198 Total Points: Other 24.5 Stream Determination: Stream is at least intermittent if e.g. Quad Name:Intermittent >19 or perennial if>30 A. Geomorphology (Subtotal =11 ) Absent Weak Moderate Strong SCORE 1a. Continuous bed and bank 0 1 2 3 3 2. Sinuosity of channel along thalweg 0 1 2 3 2 3. In-Channel structure: ex. riffle-pool,step-pool, ripple- 0 1 2 3 1 pool sequence 4. Particle size of stream substrate 0 1 2 3 1 5. Active/relic floodplain 0 1 2 3 2 6. Depositional bars or benches 0 1 2 3 1 7. Recent alluvial deposits 0 1 2 3 1 8. Headcuts 0 1 2 3 0 9. Grade controls 0 0.5 1 1.5 0 10. Natural valley 0 0.5 1 1.5 0.5 11. Second or greater order channel No=0 Yes=3 0 a artificial ditches are not rated;see discussions in manual. B. Hydrology (Subtotal =8_) Absent Weak Moderate Strong SCORE 12. Presence of Baseflow 0 1 2 3 3 13. Iron oxidizing bacteria 0 1 2 3 1 14. Leaflitter 1.5 1 0.5 0 1 15. Sediment on plants or debris 0 0.5 1 1.5 0 16. Organic debris lines or piles 0 0.5 1 1.5 0 17. Soil-based evidence of high water table? No=0 Yes=© 3 C. Biology (Subtotal =5 ) Absent Weak Moderate Strong SCORE 18. Fibrous roots in streambed 3 2 1 0 1 19. Rooted upland plants in stream bed 3 2 1 0 3 20. Macrobenthos(note diversity and abundance) 0 1 2 3 0 21. Aquatic Mollusks 0 1 2 3 0 22. Fish 0 0.5 1 1.5 0 23. Crayfish 0 0.5 1 1.5 0 24. Amphibians 0 0.5 1 1.5 0.5 25. Algae 0 0.5 1 1.5 0.5 26. Wetland plants in streambed FACW=0.75;OBL=1.5 Other=0 0 'perennial stream may also be identified using other methods.See p.35 of manual. Notes: Bank Height(feet) 1-3 -looks ditched Bankfull Width (feet) 3-5 -not much structure or geomorphic features present Water Depth (inches) 5-20 -appears to be straightenedlditched Channel Substrate mud/clay -1 frog present Velocity: alow Clarity: clear Sketch: Cowards'.Code I HGM_Code I Meas_Type I Amowt I Units I Waters_T I Local Waterway SA(Middle Creek) NORTH CAROLINA R5 Linear 10557 FOOT DELINEATE 35.67949200 -78.824248 Middle Creek SB NORTH CAROLINA R5 Linear 520 FOOT DELINEATE 35.67557400 -78.826913 Middle Creek SB1 NORTH CAROLINA R4 Linear 299 FOOT DELINEATE 35.67547800 -78.825237 Middle Creek SB2 NORTH CAROLINA R4 Linear 843 FOOT DELINEATE 35.67547800 -78.825237 Middle Creek SC NORTH CAROLINA R5 Linear 272 FOOT DELINEATE 35.67604400 -78.825838 Middle Creek SD NORTH CAROLINA R5 Linear 47 FOOT DELINEATE 35.66743900 -78.824572 Middle Creek SE NORTH CAROLINA R4 Linear 123 FOOT DELINEATE 35.66852600 -78.825829 Middle Creek SF NORTH CAROLINA R5 Linear 867 FOOT DELINEATE 35.66806200 -78.82679200 Middle Creek SG NORTH CAROLINA R5 Linear 587 FOOT DELINEATE 35.66840800 -78.81974000 Middle Creek SH NORTH CAROLINA R4 Linear 226 FOOT DELINEATE 35.66405100 -78.8156'7300 Middle Creek SI NORTH CAROLINA R4 Linear 716 FOOT DELINEATE 35.66405700 -78.81293700 Middle Creek SJ NORTH CAROLINA R5 Linear 578 FOOT DELINEATE 35.66424400 -78.8105630D Middle Creek SK NORTH CAROLINA R5 Linear 1085 FOOT DELINEATE 35.66414500 -78.8080650D Middle Creek SM NORTH CAROLINA R5 Linear 215 FOOT DELINEATE 35.67570800 -78.82522900 Middle Creek SN NORTH CAROLINA R4 Linear 267 FOOT DELINEATE 35.66831300 -78.82296200 Middle Creek SO NORTH CAROLINA R4 Linear 313 FOOT DELINEATE 35.66510200 -78.81755400 Middle Creek SP NORTH CAROLINA R5 Linear 814 FOOT DELINEATE 35.66447300 -78.81432700 Middle Creek SAA NORTH CAROLINA R4 Linear 314 FOOT DELINEATE 35.66965600 -78.81949800 Middle Creek WA NORTH CAROLINA PFO Area 2.75 ACRE DELINEATE 35.67891800 -78.82487000 Middle Creek WB NORTH CAROLINA PFO Area 0.91 ACRE DELINEATE 35.67669200 -78.82478200 Middle Creek WC NORTH CAROLINA PFO Area 0.37 ACRE DELINEATE 35.67584400 -78.82583700 Middle Creek WD NORTH CAROLINA PFO Area 6.76 ACRE DELINEATE 35.67434400 -78.82452700 Middle Creek WE NORTH CAROLINA PFO Area 0.11 ACRE DELINEATE 35.66949900 -78.82267500 Middle Creek WF NORTH CAROLINA PFO Area 0.12 ACRE DELINEATE 35.66891900 -78.82226600 Middle Creek WG NORTH CAROLINA PFO Area 0.02 ACRE DELINEATE 35.66819600 -78.82213100 Middle Creek WH NORTH CAROLINA PFO Area 2.11 ACRE DELINEATE 35.66816700 -78.82594900 Middle Creek WI NORTH CAROLINA PFO Area 0.12 ACRE DELINEATE 35.66752300 -78.82395700 Middle Creek WJ NORTH CAROLINA PFO Area 48.9 ACRE DELINEATE 35.66676400 -78.8180200D Middle Creek WK NORTH CAROLINA PFO Area 7.84 ACRE DELINEATE 35.66426500 -78.80765300 Middle Creek PA NORTH CAROLINA POW Area 2.91 ACRE DELINEATE 35.66804500 -78.82399300 Middle Creek 5=?I ATTACHMENT C 000000000000000 000000000000000 r ;r ST a A7r,��`' - Governor' r° i43 G MICHAEL S.REGAN ` - .' a Secietary ki wy' S.DANIEL SMITH NORTH CAROLINA Direcror Environmental Quality April 16,2020 John Schifano,Town Attorney Town of Holly Springs PO Box 8 Holly Springs,NC 27540-0008 . Subject:Surface Water Determinations Letter NBRRO#20-098 Wake County Determination Type: Buffer Call Isolated or EIP Gall ® Neuse(15A NCAC 2B .0233) ID Tar-Pamlico(15A NCAC 2B.0259) ❑ Ephemeralllntermittent!Perennial Determination ❑ Isolated Wetland Determination 0 Jordan(15A NCAC 2B.0267) Project Name: Arbor Creek Greenway Location/Direct The projected area is at 4300 Sunset Lake Road in Holly Springs,Wake ions: County(136-acre area between Sunset Lake Road and Holly Springs Road) Subject Stream UTs to Middle Creek Determination Date: 4/16/2020 Staff: Cheng Zhang Stream VIM* Not Subject Subject to Start@ Stop@ Soil USGS to Buffers. Buffers Survey Topo SA** P X — X X SB I X X SC I X X SB2 I X Confluence of SB DWR flag(SB2- X and SC 04) _ SB2 I DWR flag(SB2-05) X SD P X X SF P X X _ X Pond A _ X X X SY E X X SG P X X X SP P X _ X X SI I x - x SJ P X X X SIC. P X X SZ E X X Nor fig C r,rollna Depart.nect of cn\t onrnental Quality Division of Water ke sources Ra[eis�tt IZegiorial Uf"ice 13800[3arrett 17rlve ; Raleir}�,North Cacolirk�'L"1649 moor,,.-„,„ ,,..na~.i iv.' 91,1.791:1200 *E/I/P=Ephemeral/Intermittent/Perennial **Middle Creek- ***Features within the vicinity of the project area that are not evaluated in this letter are on the opposite side ofMiddle Creek with the proposed greenway and will not be impacted by the project. Explanation: The feature(s)listed above has or have been located on the Soil Survey of Wake County,North Carolina or the most recent copy of the USGS Topographic map at a 1.24,000 scale. Each feature that is checked "Not Subject"has been determined not to be a stream or is not present on the property. Features that are checked "Subject"have been located on the property and possess ciaracteristics that qualify it to be a stream. There may be other streams located on your property that do not show up on the maps referenced above but,still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Resources (DWR). This on-site determination shall expire five(5)years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWR or Delegated Local Authority may request a determination by the Director.An appeal request must be made within sixty(60)days of date of this letter or from the date the affected party(including downstream and/or adjacent owners)is notified of this letter. A request for a determination by the Director shall be referred to the Director in writing If sending via US . Postal Service clo Paul Wojoski DWR—401 &Buffer Permitting Unit 1617 Mail Service Center Raleigh,NC 27699-1617.If sending via delivery service (UPS,FedEx.etc.)Paul Wojoski DWR—401 &Buffer Permitting Unit, 512 N.Salisbury Street Raleigh,NC 27604 This determination is final and binding unless,as detailed above,you ask for a hearing or appeal within sixty (60)days. The oWner/future owners should notify the Division of Water Resources(including any other Local,State, and Federal Agencies)of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Resources(Central Office) at(919)-807-6300,and the US Army Corp of Engineers(Raleigh Regulatory Field Office)at(919)-554-4884. If you have questions regarding this determination,please feel free to contact Cheng Zhang at(919)791-4259. Sincerely, 57 n4-1(7 0,ir Sc , l v WaterottVinson QualityRegiona Regional Super Operationisors Section Raleigh Regional Office Division of Water Resources cc: RRO DWR File Copy Bob Lepsic,SEPT(electronic copy only) ___. ._._ • :.,?411 ro -. ..-it---. ---\\ \\„.... ...__TILT•Tc......., _ if AgC2 - i:El •/ Ag47[ -- - I Project Study7-Area HrC a. CgB (7 CRC2 ?P CgB2 \. r �. CgB2 - — . + kfe • --... ' .2 e CRC? ► 2 J 111111/4 HrB �� AgB2 41, 4, - .,. .. , vii....... ,‘% * .tilt...,r' , . 1, / \ 10 , . .1.'4 ,L. Civr::),040" ' - --- ' 1 • it'11 ' - .:B2 . 4 .\17:- r 0 '.‘lk...N , .. '‘ —in;. 0.4 i ilir , .. . __---- N. HrB Ce 11\11 .". Cg82 'i, • ., WyrGeq'! r, . ---4 , I Au ( eC CeD CggCO) 4 .. • P / 'CgC - » r . .T CgB2 I-lrt32 I G6ee y � f\'' Wh - + gB2 . ..,,... ,..,, . 7 Cgg `1 1C 0 . -. / . P. r CeD � \\.......::x......„....., Cie,,D / . 1:rgliii.f.4.44: °MI I. f a i 4. I eT. AP Cei2 r .., �---"F :"'• _ N,Wv �.L y•i* te , T �' ' fWet 1 Cflr • �• \ Wn Gel:2" °V ' Gee. � iiilki14:41141ksh\plii GeF � GeIB • Ga1]Z \,..0 I -4. -7 A . . , . 1 4 ,,,, -.. ,,- .01141. ..- . .,ire CeF P ilirl ' Pr gill. C11044474° a .. ,--.4. :: ., This EMhi611 1s far p€anninp purposes wily and ohovm Figure 4 r N RC S Soils Map herein dons not meat NC 47-30 Requirernonls and *magma Is nal for design.conatruotlon,or roaoeding or /mutter of lllio.The Exhibit wets oompaed from available information oblaine d ham the sources Wed holm Arbor Creek Greenway Project •� MU,,L,, Seeress: Town of Hilly Springs }►WRINGS NCOOT,NC OneMap,ESRI N Wake County,North Carolina March2020 500 1,000 1,5O0 2r000 0 UU�I lJllll 1 �IL,lL7m ` r•r Feet 7...g I 1 i- VA A I 7 V 1 I I 1074M vri- i Project Study Area �ifi, ,w- , r ;i �� y h dig � I F f 0 . _... � ;r i f �: *it y /.ei itiT4iii. litiikiki N" --s: ' -.--al -- - 111 . ..,._,...„,. L .,%,--- .,. . - -, iv: 171.. 1-4 1 � E1,,Af:-\\... z { , `•ti:„ ` Ito, , • •� 1 f )1-\ : i) 1 iit'*;,z'k% iti wah. i . i _ , 1 1 . , . ... . Pi\ • . 7 L:-.-fr:i ki miiku.-:, 40".P.ag Wak . i 1( Apy . ., I ___07-Alc\ 1 1 il. 4&\'‘ 'Pik Vir, _ ,---,) . f i ) , yi, ---, ,. ., , g,,,L „, i r . - \,_..._,f) 1h ej))1 L/:(e, i ,g. _.,,z...7„.-... 40.0c‘ 0 . . , .. .. )11;, .\ gic.. ‘, ,i , . \ . • rI4V ` rit"*71111. ! p I � �L/ Its4 • ej n IF t I ,gigi , , . 1 A. ,.. . G..'r 1 1 � y� � �I ,��� ;7714111‘ r S ?" ; 4-1. _ft_ "1111111411,4 •0 VIP - - Wil M Ili If i \it k..) aim. .4ert,:=. .41\ 1,e, • ,‘„,, --di, c__ -- .•,, --' ..-0, , i. 1 nip>7- 07:. _ , # .\ / ., �� ti _ ,.. ..,, . _t-fir:� - i ' A' ,At . 141114, irk' Jiir '. ' ii:titx (,41/ -7,---17t, ..iii ,L if:: iii-akte .... , Eb...._-:,,,,ar - ., This Exhihit is lar plannhl9 purpasn nny and annrm Figure 3. USGS Topographic Map Herein does not meat NC f73p Requlrementa and herelorr is not for daatgn,construction,or recard.b or yansler oFtitle-Yhe E.Ir,hltwas compiled hom evallahte Arbor Creek Greenway Project :n Eorma6on ohtelnEd iro nl Ilse sources fisted 6elaw, � snnr�e.: Town of Holly Springs S pi dsiNiii,L , NCDOT,NC onaMap,ESN N Wake County, North Carolina March 0 500 1,000 1,500 2,000 mIr immi Feet 5=? I ATTACHMENT D OOOOOOOOOOOOOOO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Aquatic Survey Report Arbor Creek Greenway Middle Creek Wake County, North Carolina tt 4 , Upstream facing view of Middle Creek Prepared For: HOLLY LSPRINGS Morlh Co rollne Town of Holly Springs Raleigh, North Carolina Contact Person: Matt Beard, Park Planner 128 S. Main Street Holly Springs, NC 27540 December 2020 Prepared by: S PI 1 Glenwood Avenue, Suite 600 Raleigh, NC 27603 Contact Person: Chris Sheats csheats@sepiinc.com 919-417-2732 Table of Contents 1.0 Introduction 1 2.0 Waters Impacted 2 2.1 303(d) Classification 2 2.2 NPDES Discharges 2 3.0 Target Protected Species Description 2 3.1 Necturus lewisi (Neuse River Waterdog) 2 3.1.1 Species Characteristics 2 3.1.2 Distribution and Habitat Requirements 2 3.2 Noturus furiosus (Carolina Madtom) 3 3.2.1 Species Characteristics 3 3.2.2 Distribution and Habitat Requirements 3 3.3 Alasmidonta heterodon (Dwarf Wedgemussel) 3 3.3.1 Species Characteristics 3 3.3.2 Distribution and Habitat Requirements 4 3.4 Fusconala masoni(Atlantic Pigtoe) 4 3.4.1 Species Characteristics 4 3.4.2 Distribution and Habitat Requirements 4 3.5 Lasmigona subviridis (Green Floater) 4 3.5.1 Species Characteristics 4 3.5.2 Distribution and Habitat Requirements 5 3.6 Parvaspina steinstansana (Tar River Spinymussel) 5 3.6.1 Species Characteristics 5 3.6.2 Distribution and Habitat Requirements 5 3.7 Elliptio lanceolata (Yellow Lance) 6 3.7.1 Species Characteristics 6 3.7.2 Distribution and Habitat Requirements 6 4.0 Survey Efforts 6 4.1 Methodology 7 4.1.1 Neuse River Waterdog Surveys 7 4.1.2 Freshwater Muss& and Carolina Madtom Surveys 7 5.0 Results 7 5.1.1 Neuse River Waterdog 7 5.1.2 Freshwater Mussels and Carolina Madtom 10 6.0 Discussion/Conclusions 12 7.0 Literature Cited 14 Appendix A. Figure 1: Project Vicinity&Survey Locations Figure 2: NCNHP Element Occurrences Figures 3-5: Proposed Critical Habitat Figure 6: NPDES Discharges 1.0 INTRODUCTION The Town of Holly Springs (Town) proposes to extend its greenway network by constructing a 2- mile hard surface trail along the Arbor Creek, Bridgewater, Woodcreek, and Sunset Ridge North subdivisions. Bridges and boardwalks will be constructed to cross portions of Middle Creek, as necessary. Seven aquatic species known in the Neuse River Basin are federally listed or are proposed for protection by the United States Fish and Wildlife Service for Wake County. Two federally endangered freshwater mussels (dwarf wedgemussel,Tar River spinymussel), one federally threatened freshwater mussel (yellow lance), and four "At Risk Species" (ARS) are known from the Neuse River basin in Wake County which includes two freshwater mussels (Atlantic pigtoe, green floater), one fish (Carolina madtom), and one aquatic amphibian (Neuse River waterdog). Atlantic pigtoe is proposed for listing as "Threatened", and the green floater is petitioned for listing as threatened or endangered. Carolina madtom (CMT) is proposed "Endangered", Neuse River waterdog (NRWD) is proposed "Threatened". ARS's are species that are Petitioned, Candidates or Proposed for Listing under the Endangered Species Act (ESA). Consultation under Section 7(a) (2)of the ESA is not required for Candidate or Proposed species, although a Conference, as described under Section 7(a) (4) of the ESA is recommended for actions affecting species proposed for listing. According to the NC Natural Heritage Program database (NCNHP,Access date: March 23, 2020), There is one element occurrence (ED) record for Atlantic pigtoe 2.3 miles downstream of the survey area in Middle Creek (EO#34956).There is one EO in the Neuse River for CMT approximately 15 miles upstream of the survey area (EO#10676).There is an EO for dwarf wedgemussel (EO#13799) and yellow lance (EO#21894) 11.9 miles downstream from the survey area in Swift Creek. There is an ED for green floater 16.5 miles upstream of the study area in the Neuse River (EO#28706). The closest ED for NRWD is 1.3 miles from the study area in Middle Creek(ED#8258). There is an EO for the Tar River spinymussel 38.5 miles away in the Tar River (EO#21412). According to the US Fish and Wildlife Services Threatened and Endangered Species Active Critical Habitat Report (USFWS, Update date: March 27, 2020), there is proposed critical habitat for NRWD, CMT, Atlantic pigtoe, and yellow lance (Figure 3-5). Proposed critical habitat for NRWD and Atlantic pigtoe occurs in Middle Creek approximately 9 miles downstream of the study area. Proposed critical habitat for yellow lance occurs 12 miles from the study area in Swift Creek.The distance to proposed critical habitat for CMT is 30 miles to the east in mainstem of the Little River. SEPI was contracted by the Town to conduct surveys targeting the NRWD, Carolina madtom, dwarf wedgemussel, Atlantic pigtoe, green floater,Tar River spinymussel, and yellow lance as part of the federal permitting process that requires an evaluation of potential project-related impacts to federally protected species. Arbor Creek Greenway Aquatic Survey Report December 2020 Page 1 2.0 WATERS IMPACTED Middle Creek is part of the Upper Neuse River sub-basin of the Neuse River basin (U.S. Geological Survey [USGS] Hydrological Unit Code 03020201). 2.1 303(d) Classification The N.C. Department of Environmental Quality(NCDEQ) 2018 Final 303(d) list was reviewed to better understand water quality upstream of the survey area. A 6 mile portion of Middle Creek from 0.8 miles south of US 1 to the backwaters of Sunset Lake [(27-43-15-(1)b1),( 27-43-15- (1)b2)] is listed for benthos, which starts approximately 6 miles upstream of the survey area and flows through it (NCDEQ, 2020a). 2.2 NPDES Discharges Several discharges are located throughout the Upper Neuse River basin. The closest active permitted NPDES discharge to Middle Creek is approximately 1.75 miles upstream of the study area (NCDEQ, 2020b); Wall Recycling LLC(NPDES Permit# NCG130099) is located along Middle Creek (Figure 3). 3.0 TARGET PROTECTED SPECIES DESCRIPTION 3.1 Necturus lewisi(Neuse River Waterdog) 3.1.1 Species Characteristics The NRWD is a fully aquatic salamander that ranges in size from six to nine inches in length, with a maximum record length of 11 inches. It has a stocky, cylindrical body, small limbs, smooth skin, and a flattened, elongate head with a square ended nose. The tail is keeled on both the top and bottom. It has four toes on each foot and is a rusty brown color on the dorsal side and dull brown or slate colored on the ventral side. Both sides are strongly spotted, but the ventral side tends to have fewer and smaller dark bluish to black spots. They have a dark line running through the eye. Adults are neotenous and retain three bushy, dark red external gills. Male and females are similar in appearance and can be distinguished by differences in the cloaca (Amphibiaweb 2019; Brimley, 1924; Conant and Collins, 1998). NWRD become sexually mature at approximately five to six years, breeding typically occurs in the spring. The male deposits a spermatophore that is picked up by the female and used to fertilize between 30 and 50 eggs that are attached to the underside of flat rocks or other large objects. The female guards them until they hatch in June or July (Conant and Collins, 1998). 3.1.2 Distribution and Habitat Requirements The NRWD is found only in the Neuse and Tar River basins of North Carolina, inhabiting rivers and larger streams, where it prefers leaf beds in quiet waters. This species needs high levels of Arbor Creek Greenway Aquatic Survey Report December 2020 Page 2 dissolved oxygen and good water quality. The NRWD is generally found in backwaters off the main current, in areas with sandy or muddy substrate. Adults construct retreats on the downstream side of rocks or in the stream bank where they remain during the day. This species is active during the night, leaving these retreats to feed. The NRWD is carnivorous, feeding on invertebrates, small vertebrates, and carrion. It is most active during winter months even when temperatures are below freezing. During summer months, it will burrow into deep leaf beds and is rarely found. Inactivity in the summer may be an adaptation to avoid fish predators, which are more active at these times. In addition,the NRWD produces a defensive,toxic skin secretion that is assumed to be distasteful to predators (AmphibiaWeb 2019; Conant and Collins, 1998). 3.2 Noturus furiosus(Carolina Madtom) 3.2.1 Species Characteristics The CMT is a freshwater fish reaching up to five inches in length.The body is short and chunky with a distinct pattern of three dark saddles starting at the dorsal fin and ending at the caudal fin. These dark saddles connect a wide, black stripe along the side which extends from the snout to the base of the tail (Menhinick 1991). The adipose fin is connected to the caudal and has a dark blotch that ends slightly below the fins edge.The belly is not speckled, and crescent shaped brown bands are present at the edge of the caudal. Its pectoral spines have serrated projections along both margins (USFWS 2018). The CMT feeds on larval midges, mayflies, caddisflies, dragon flies and beetles. They are most active during dawn and dusk. Individuals reach reproductive maturity by 2 years and spawn from May to July in moderate to slow flowing areas, often using mussel shells, woody debris and trash as cover. Females produce up to 300 eggs per breeding season and the male guards the nest until eggs are hatched (Burr et al. 1989). 3.2.2 Distribution and Habitat Requirements The CMT is endemic to the Tar and Neuse River basins in North Carolina, and currently exists in fragmented populations. Streams harboring the CMT often have sand, gravel and detritus bottoms with free-flowing conditions (USFWS 2018a).This species tends to avoid areas with large submerged plants, however specimens have been found in small patches of vegetation. During warm months, adults occupy areas with a swift current and a maximum depth of about one meter.Juveniles inhabit shallow riffles and runs with slower currents. 3.3 Alasmidonta heterodon(Dwarf Wedgemussel) 3.3.1 Species Characteristics The dwarf wedgemussel is a freshwater mussel reaching up to 56mm in length, but is mostly found under 45mm (Beans and Niles 2003). Shell shape is classified as trapezoid to ovate. Individuals possess a small,thin shell that is somewhat inflated and thickens anteriorly. The Arbor Creek Greenway Aquatic Survey Report December 2020 Page 3 anterior margin is sharply curved,while the ventral margin is broadly curved to straight; the posterior region is roundly pointed near the base. Lateral teeth are a defining characteristic of this species, two are present on the right valve and one on the left valve (Bogan 2002, Ortmann 1919). 3.3.2 Distribution and Habitat Requirements The dwarf wedgemussel is endemic to the Atlantic Slope basins from New Brunswick to North Carolina,with populations being historically located in the Neuse and Pamlico River basins in North Carolina.This species is thought to be a habitat generalist, as it has been found in small streams to large rivers with slow to moderate flows and occupies a variety of substrates to include sand, gravel and firm silt (Fuller 1977). 3.4 Fusconaia mason'(Atlantic Pigtoe) 3.4.1 Species Characteristics The Atlantic pigtoe is a freshwater mussel reaching up to 60mm in length.This species is characterized by having a sub-rhomboidal shaped shell with a distinct posterior ridge. The umbo is elevated well above the dorsal margin and the beak cavity is shallow.The periostracum is yellow to dark brown and has a parchment- like texture (Bogan 2002, Bogan and Alderman 2008). Pseudocardinal and lateral teeth are well developed except for the anterior pseudocardinal tooth in the right valve, while the interdental tooth is absent in the left valve (USFWS 2018b). The Atlantic pigtoe is a tachytictic breeder, gravid females have been found from late June to early July(Fuller 1973). Fish hosts for this species include bluegill sunfish, shield darter, longnose dace, rosefin shiner and creek chub (Watters and O'Dee 1997, Wolf and Emrick 2011). 3.4.2 Distribution and Habitat Requirements The Atlantic pigtoe is endemic to the southern Atlantic Slope, and is found from the Ogeechee River Basin in Georgia to the James River Basin in Virginia. In North Carolina, this species is known from the Catawba, PeeDee, Cape Fear, Neuse, Pamlico, and Roanoke River basins (Johnson 1970, Bogan 2002).This species can be found in medium to large streams with clean, swift waters and a stable gravel or sand and gravel substrate. Individuals are often found on the downstream edge of riffle areas. 3.5 Lasmigona subviridis (Green Floater) 3.5.1 Species Characteristics The green floater is a small,thin shelled freshwater mussel that reaches a maximum length of 55mm. Individuals have a subovate shaped shell with depressed beaks that only project slightly above the hinge line. A double-looped sculpture is present on the beak.The lateral teeth are Arbor Creek Greenway Aquatic Survey Report December 2020 Page 4 long, straight and thin; two lamellate pseudocardinal teeth are present on the left valve while one is present on the right, both are directed forward of the beak and parallel with the hinge line.The dorsal margin forms a blunt angle with the posterior margin (Kogan 2002). The green floater is a bradytictic breeder, with a reproductive season from August to May. Interestingly,this species is also hermaphroditic, meaning individuals contain both male and female gonadal tissues. Host fish for this species are currently unknown. 3.5.2 Distribution and Habitat Requirements The green floater spans across the Atlantic slope and Interior basins, with a historical range spanning from the Savannah River in Georgia to the Hudson River in New York, as well as in the New, Kanawha, and Watauga Rivers. In North Carolina,this animal occurs in the Watauga, New, Neuse, and Tar River basins. Individuals can be found in small to medium sized streams in low flow areas, specifically in pool or eddy habitats with gravel and sand substrates. 3.6 Parvaspina steinstansana (Tar River Spinymussel) 3.6.1 Species Characteristics Young individuals are often a shiny yellowish-brown color with greenish rays streaking outward from the hinge area,while older individuals tend to have a brown color and rays are absent from the shell. Short spines reaching a maximum length of 5mm are on the anterior region of the shell and curve ventrally. Spines can be inane or two rows with up to six spines on each valve that are symmetrical to the other valve. Shells are thicker toward the anterior end while the posterior end is thinner, and the nacre usually fades from pink to bluish white (Johnson and Clarke 1983, USFWS 2014). This species is a tachytictic breeder with gravid females occurring from April to August (Widlak 1987). Fish host for this species include bluehead chub, pinewoods shiner, satinfin shiner and white shiner(Eads and Levine 2008). Like other mussel species,these individuals are filter feeders and forage by siphoning and filtering small food particles that are suspended in the water. 3.6.2 Distribution and Habitat Requirements The Tar River spinymussel is endemic to the Tar and Neuse River basins in North Carolina, and is currently only found in Edgecombe, Franklin, Halifax,Johnston, Nash, Pitt, and Warren Counties.This species lives in fast flowing streams with silt-free unconsolidated beds composed of coarse sand and gravel. Arbor Creek Greenway Aquatic Survey Report December 2020 Page 5 3.7 Elliptio lanceolata (Yellow Lance) 3.7.1 Species Characteristics The yellow lance is characterized by having shells twice as long as they are tall, with elongate shells reaching up to 86mm in length. A bright yellow and waxy periostracum without rays is present, however older individuals may have a brownish color at the posterior end. The posterior ridge is round and curves dorsally towards the posterior end.The periostracum has brown growth rings. Two long lateral teeth are present on the left valve and one is present on the right, while two pseudocardinal teeth are present on each valve. The nacre is normally an iridescent blue color shifting to white or salmon on the anterior region (USFWS 2017). Historically many species were synonymized with yellow lance (E. lanceolata) as a part of the lanceolate Elliptio complex, but in 2009 the yellow lance was recognized as its own species (Bogan et al. 2009). The yellow lance is a short-term brooder that spawns in the spring. Lab studies found that white shiners and pinewood shiners are acceptable host fish for this species, while other members of the minnow family are also believed to serve in this role. Like other mussels, the yellow lance is a filter feeder that has a diet consisting of phytoplankton, zooplankton, bacteria, detritus and dissolved organic matter. (Haag 2012). 3.7.2 Distribution and Habitat Requirements Historically, this species was found from the Patuxent River Basin in Maryland to the Neuse River Basin in North Carolina, ranging from the foothills of the Appalachian Mountains through the Piedmont and Coastal Plain. In the last 10 years, individuals have only been found in the Patuxent, Rappahannock, York, Chowan,Tar, and Neuse River Basins (USFWS 2017). Yellow lance can be found in clean rivers or streams with moderate flows and high dissolved oxygen concentrations. Individuals are often found buried in coarse to medium sand, however they have also been found in gravel substrates. Individuals tend to aggregate to sand substrates downstream of stable sand and gravel bars. 4.0 SURVEY EFFORTS Field efforts were conducted by SEPI personnel Chris Sheats (Permit# 19-ES00558), Bob Lepsic and Tori Fowler. NRWD traps were set in Middle Creek on March 2, 2020, and checked on March 3, 4, 5, 6 and 7, 2020. NRWD traps were set in the UT to Middle Creek on March 3, 2020, and checked on March 4, 5, 6 and 7, 2020. Freshwater mussel and CMT surveys were completed on April 8 and 10, 2020. Due to design revisions, a segment of Middle Creek immediately upstream of the original study reach was surveyed by Chris Sheats and Tori Fowler. Freshwater mussel and CMT surveys were completed in this reach on November 6, 2020. NRWD traps were set on December 7, 2020 and checked on December 8, 9, 10, and 11, 2020. Arbor Creek Greenway Aquatic Survey Report December 2020 Page 6 4.1 Methodology 4.1.1 Neuse River Waterdog Surveys Ten traps were set on March 2, 2020 to soak in Middle Creek for five consecutive nights. Traps 1-3 were deployed upstream of the powerline easement at Arctic Ridge Way in the Arbor Creek neighborhood.Traps 4-6 were deployed within the easement and traps 7-10 were deployed downstream of the easement. Eleven traps (Traps 1-11) were set on March 3, 2020 to soak in an UT to Middle Creek for four consecutive nights. Traps 1-4 were deployed upstream of the boardwalk area,traps 5-8 were deployed starting at the boardwalk going downstream to the confluence with the pond, and traps 9-11 were deployed downstream of the pond area. Ten traps were set on December 7, 2020 to soak in the upstream segment of Middle Creek for five consecutive nights.Trap sites were selected based on habitat conditions and accessibility.Traps were checked daily during the soaking period and, were baited and refilled as needed with a combination of chicken livers and chicken hotdogs. All species observed in traps were recorded. 4.1.2 Freshwater Mussels and Carolina Madtom Surveys Freshwater mussel and CMT surveys were completed on April 8, in UT to Middle Creek, April 10, 2020 in Middle Creek and on November 6, 2020 in the upstream segment of Middle Creek. Visual and tactile surveys were completed at each location using bathyscopes and hand dip nets. Habitat conditions were recorded at each location. 5.0 RESULTS 5.1.1 Neuse River Waterdog The NRWD was not found during the trapping survey efforts. Species observed in the traps include bluehead chub, creek chub, bluegill sunfish, green sunfish, pumpkinseed sunfish, golden shiner, pirate perch and snail bullhead (Table 1-3). Water temperature ranged from 7-8 degrees Celsius. Table 1. Species observed during NRWD trapping surveys in Middle Creek. Trap Day 1 Day 2 Day 3 Day 4 Day 5 (3/3/2020) (3/4/2020) (3/5/2020) (3/6/2020) (3/7/2020) 1 1 bluehead chub (Nocomis leptocephalus) 2 1 pirate perch 1 green sunfish (Lepomis 1 crayfish sp. 1 pirate perch (Aphredoderus cyanellus) (Aphredoderus sayanus) sayanus) 3 3 bluehead chub 1 bluehead chub 3 bluehead 2 crayfish sp. (Nocomis (Nocomis leptocephalus) chub leptocephalus) (Nocomis leptocephalus) 4 1 bluehead chub 8 bluehead chub 1 bluehead (Nocomis (Nocomis chub leptocephalus) leptocephalus), (Nocomis leptocephalus) Arbor Creek Greenway Aquatic Survey Report December 2020 Page 7 Trap Day 1 Day 2 Day 3 Day 4 Day 5 # (3/3/2020) (3/4/2020) (3/5/2020) (3/6/2020) (3/7/2020) 1 pirate perch (Aphredoderus sayanus), 1 crayfish sp. 5 1 pumpkinseed sunfish(Lepomis gibbosus) 6 1 pumpkinseed sunfish(Lepomis gibbosus) 7 3 bluehead chub 8 bluehead chub 1 bluegill sunfish 1 bluehead 1 crayfish sp. (Nocomis (Nocomis (Lepomis macrochirus), chub leptocephalus) leptocephalus) 1 bluehead chub (Nocomis (Nocomis leptocephalus) leptocephalus) 8 2 bluehead chub 1 golden 1 crayfish sp. (Nocomis leptocephalus) shiner (Notemigonus crysoleucas) 9 10 1 bluehead chub (Nocomis leptocephalus) Table 2.Species observed during NRWD trapping surveys in UT to Middle Creek. Trap Day 1 Day 2 Day 3 Day 4 U (3/4/2020) (3/5/2020) (3/6/2020) (3/7/2020) 1 2 1 creek chub(Semotilus 3 green sunfish 1 pumpkinseed sunfish atromaculatus), (Lepomis cyanellus), (Lepomis gibbosus) 1 green sunfish(Lepomis 1 pumpkinseed cyanellus), sunfish 2 crayfish sp. (Lepomis gibbosus) 3 1 crayfish sp. 1 bluegill sunfish(Lepomis macrochirus), 1 green sunfish (Lepomis cyanellus) 4 1 pumpkinseed sunfish lgreen sunfish 1 green sunfish 1 bluehead chub (Lepomis gibbosus) (Lepomis cyanellus) (Lepomis cyanellus), (Nocomis 1 crayfish sp. leptocephalus), 2 pumpkinseed sunfish (Lepomis gibbosus), 1 green sunfish (Lepomis cyanellus) 5 lgreen sunfish(Lepomis lgreen sunfish 2 pumpkinseed sunfish cyanellus) (Lepomis cyanellus) (Lepomis gibbosus) 6 1 bluegill sunfish 1 crayfish sp. (Lepomis macrochirus), 1 pumpkinseed sunfish Arbor Creek Greenway Aquatic Survey Report December 2020 Page 8 Trap Day 1 ❑ay 2 Day 3 Day 4 (3/4/2020) (3/5/2020) (3/6/2020) (3/7/2020) (Lepomis gibbosus) 7 1 bluegill sunfish 1 snail bullhead (Lepomis macrochirus) (Ameiurus brunneus) 8 1 pumpkinseed 4 bluegill sunfish 1 bluegill sunfish sunfish (Lepomis macrochirus), (Lepomis macrochirus) (Lepomis gibbosus), 1 green sunfish 1 bluegill(Lepomis (Lepomis cyanellus), macrochirus) 3 pumpkinseed sunfish (Lepomis gibbosus) 9 1 yellow bullhead 1 green sunfish 1 bluehead chub(Nocomis (Ameiurus natal's) (Lepomis cyanellus) leptocephalus) 10 1 green sunfish(Lepomis 3 bluehead chub(Nocomis cyanellus) leptocephalus), 1 creek chub (Semotilus atromaculatus), 1 green sunfish(Lepomis cyanellus) 11 1 green sunfish(Lepomis 1 bluehead chub 1 green sunfish(Lepomis cyanellus), (Nocomis cyanellus), 1 creek chub(Semotilus leptocephalus) 1 pumpkinseed sunfish atromaculatus) (Lepomis gibbosus), 1 bluehead chub(Nocomis leptocephalus) Table 3. Species observed during NRWD trapping surveys in upper Middle Creek. Trap Day 1 Day 2 Day 3 Day 4 (12/8/2020) (12/9/2020) (12/10/2020) (12/11/2020) 1 2 bluehead chub 1 bluehead chub 1 bluehead chub {Nocomis (Nocomis (Nocomis leptocephalus), leptocephalus), leptocephalus) 2 crayfish sp. 1 pirate perch (Aphredoderus sayanus) 2 2 bluehead chub (Nocomis leptocephalus), 2 crayfish sp. 3 3 crayfish sp. 1 bluehead chub (Nocomis leptocephalus) 4 3 crayfish sp. 1 bluehead chub (Nocomis leptocephalus), 1 crayfish sp. 5 1 crayfish sp. 1 bluehead chub (Nocomis leptocephalus), 1 green sunfish (Lepomis cyanellus) 6 7 2 bluehead chub 1 bluehead chub Arbor Creek Greenway Aquatic Survey Report December 2020 Page 9 Trap Day 1 Day 2 Day 3 Day 4 (12/8/2020) (12/9/2020) (12/10/2020) (12/11/2020) (Nocomis leptocephalus) (Nocomis leptocephalus) 8 3 crayfish sp. 1 bluehead chub 1 bluehead chub 1 bluehead chub (Nocomis (Nocomis leptocephalus) (Nocomis leptocephalus) leptocephalus) 9 1 crayfish sp. 10 1 bluehead chub (Nocomis leptocephalus) 5.1.2 Freshwater Mussel and Carolina Madtom Na dwarf wedgemussel, Tar River spinymussel, yellow lance,Atlantic pigtoe, green floater or CMT individuals were located during our survey efforts. Mussel species observed include eastern elliptio, Eastern floater and the paper pondshell (Table 4-6). Asian clam was the only clam species observed. Other species observed include pumpkinseed sunfish, bluegill sunfish, largemouth bass, creek chubsucker, mosquitofish, tessellated darter, fantail darter, creek chub and an unknown crayfish species (Table 4-6). Middle Creek(200412.1cros) The surveyed area of Middle Creek started along Creekvista Drive and extended to 100 meters above the powerline easement along Arctic Ridge Way.The stream was five meters wide with majority of the reach having depths less than one meter. Substrate was dominated by silt, sand, and cobble particles. Evidence of beaver activity was noted by the presence of gnawed branches. Within this reach run, riffle and pool habitats were present. Water levels were normal and visibility was clear during surveys. This site had 80%forest cover with moderate wooded buffers and a surrounding land-use being classified as natural and urban. Table 4.Species observed in Middle Creek(200412.1cros)10.5 hrs total time Scientific Name Common Name #Live Abundance/CPUE Freshwater Mussels CPUE Elliptio complanata Eastern eiliptio 106 10.10/hr Freshwater Clams and Fish Relative Abundance Corbicula fluminea Asian clam common Lepomis gibbosus Pumpkinseed sunfish common Lepomis macrochirus Bluegill sunfish common Erimyzon oblongus Creek chubsucker common Gambusia affinis Mosquitofish common Etheostoma olmstedi Tessellated darter common Etheostoma flabellare Fantail darter common Semotilus atromaculatus Creek chub common UT to Middle Creek (200408.1cros) Surveys within UT to Middle Creek started at the confluence with Middle Creek and extended to 100 meters above the current boardwalk crossing (Figure 1).The stream width was two Arbor Creek Greenway Aquatic Survey Report December 2020 Page 10 meters with majority of the reach having depths less than 0.5 meter within the reach downstream of the pond. Substrate was dominated by silt, sand, cobble, and gravel. Evidence of beaver activity was noted by the presence of gnawed branches. Run, riffle, and pool habitats were present within this reach.The stream width ranged from 2-3 meters with majority of the reach having depths less than one meters upstream of the pond and substrate was dominated by sand and silt. Evidence of beaver activity was noted by the presence of gnawed branches. Run and pool habitats were dominant within the upstream reach. Water levels were normal, and visibility was clear during surveys.This site had 70%forest cover with moderate wooded buffers and a surrounding land-use being classified as natural and urban. Table 5.Species observed in UT to Middle Creek(200408.1cros)6.5 hrs total time Scientific Name Common Name #Live Abundance/CPUE Freshwater Mussels CPUE FNiptio complanata Eastern elliptio 99 15.23/hr Pyganodon cataract° Eastern floater 1 0.15/hr Utterbackia irnbecillus Paper pondshell 1 0.15/hr Freshwater Clams and Fish Relative Abundance Corbicula fluminea Asian clam common Lepomis gibbosus Pumpkinseed sunfish common Lepomis macrochirus Bluegill sunfish common Micropterus salmoides Largemouth bass common Erimyzon oblongus Creek chubsucker common Garnbusia affinis Mosquitofish common Etheostoma olmstedi Tessellated darter common Etheostoma flabellare Fantail darter common Semotilus atromaculatus Creek chub common Upper Middle Creek(201206.1cros) This segment extended approximately 900 feet immediately upstream of the Middle Creek survey (200412.1cros) reach.The stream was four meters wide with majority of the reach having depths less than one meter. Substrate was dominated by silt, sand, and cobble particles. Evidence of beaver activity was noted by the presence of gnawed branches. Within this reach run, riffle and pool habitats were present. Water levels were normal and visibility was clear during surveys. This site had 80%forest cover with moderate wooded buffers and a surrounding land-use being classified as natural and urban. Table 6.Species observed in upper Middle Creek(201206.1cros)3.5 hrs total time Scientific Name Common Name #Live Abundance/CPUE Freshwater Mussels CPUE Elliptio complanata Eastern elliptio 1 0.28/hr Freshwater Clams and Fish Relative Abundance Corbicula fluminea Asian clam common Lepomis macrochirus Bluegill sunfish common Micropterus salmoides Largemouth bass common Etheostoma olmstedi Tessellated darter common Semotilus atromaculatus Creek chub common Arbor Creek Greenway Aquatic Survey Report December 2020 Page 11 6.0 DISCUSSION/CONCLUSIONS The survey efforts resulted in no observations of Neuse River waterdog, Carolina madtom, dwarf wedgemussel, Atlantic pigtoe, green floater,Tar River spinymussel or yellow lance individuals within Middle Creek or its unnamed tributary. Mussel species observed include eastern elliptio, eastern floater and the paper pondshell. The exotic Asian clam was the only clam species observed. Fish species observed include bluehead chub, creek chub, bluegill sunfish, green sunfish, pumpkinseed sunfish, golden shiner, creek chubsucker, mosquitofish, tessellated darter, fantail darter, largemouth bass and snail bullhead. Based on the distances to known occurrences of the target species and the results of these surveys, the project may affect but will not adversely affect the target species. Critical habitat is not identified within the study area therefore the project will have no effects on critical habitat for any listed aquatic species.The survey efforts detailed in the report serve to update species information for the reaches surveyed within Middle Creek and its unnamed tributary. Neuse River Waterdog Biological Conclusion: May Affect, Not Likely to Adversely Affect Habitat for the species was observed but no individuals were found within the surveyed reaches. Recommended Biological Conclusion for Proposed Critical Habitat: No Effect Proposed critical habitat for Neuse River waterdog is not located in the study area, suggesting that the proposed project will have no effect on proposed critical habitat for this species. Carolina Madtom Biological Conclusion: May Affect, Not Likely to Adversely Affect Habitat for the species was observed but no individuals were found within the surveyed reaches. Recommended Biological Conclusion Proposed Critical Habitat: No Effect Proposed critical habitat for the Carolina Madtom is not located within the study area, suggesting that the proposed project will have no effect on proposed critical habitat for this species. Dwarf Wedgemussel Biological Conclusion: May Affect, Not Likely to Adversely Affect Arbor Creek Greenway Aquatic Survey Report December 2020 Page 12 Habitat for the species was observed but no individuals were found within the surveyed reaches. Atlantic Pigtoe Biological Conclusion: May Affect, Not Likely to Adversely Affect Habitat for the species was observed but no individuals were found within the surveyed reaches. Recommended Biological Conclusion Proposed Critical Habitat: No Effect Proposed critical habitat for Atlantic pigtoe is not located within the study area, suggesting that the proposed project will have no effect on proposed critical habitat for this species. Green Floater Biological Conclusion: May Affect, Not Likely to Adversely Affect Habitat for the species was observed but no individuals were found within the surveyed reaches. Tar River Spinymussel Biological Conclusion: May Affect, Not Likely to Adversely Affect Habitat for the species was observed but no individuals were found within the surveyed reaches. Yellow Lance Biological Conclusion: May Affect, Not Likely to Adversely Affect Habitat for the species was observed but no individuals were found within the surveyed reaches. Recommended Biological Conclusion for Proposed Critical Habitat: No Effect Proposed critical habitat for yellow lance is not located within the study area, suggesting that the proposed project will have no effect on proposed critical habitat for this species. Arbor Creek Greenway Aquatic Survey Report December 2020 Page 13 7.0 LITERATURE CITED AmphibiaWeb. 2019. <http://amphibiaweb.org> University of California, Berkeley, CA, USA. Accessed 10 Apr 2019. https://amphibiaweb.org/search/index.html Beans, BE and Niles, L. 2003. Endangered and Threatened Wildlife of New Jersey. Rutgers University Press. 303pp. Bogan, AE. 2002. Workbook and Key to the Freshwater Bivalves of North Carolina. North Carolina Freshwater Mussel Conservation Partnership, Raleigh, NC 101 pp, 10 color plates. Bogan, AE and Alderman,J. 2008. Workbook and key to the freshwater bivalves of South Carolina. Revised Second Edition. Bogan, A.E.,J.Levine, and M.Raley. 2009. Determination of the systematic position and relationships of the lanceolate Elliptio complex (Mollusca: Bivalvia: Unionidae)from six river basins in Virginia. NC Museum of Natural Sciences, Raleigh, NC. 37pp. Brimley,CS. 1924. The waterdogs (Necturus)of North Carolina. Journal of the Elisha Mitchell Scientific Society 40: 166-168. Burr, BM, Kuhajda, BR, Dimmick, WW, Grady,JM. 1989. Distribution, Biology, and Conservation Status of the Carolina Madtom, Noturus furiosus, an Endemic North Carolina Catfish. Brimleyana 15:57-86. Conant, R and Collins,JT. 1998. A Field Guide to the Reptiles and Amphibians of Eastern and Central North America. Third Edition, Expanded. Houghton Mifflin Company. Boston, Massachusetts. Eads, C.B. and J.F. Levine. 2008. Carolina Heelsplitter(Lasmigona decorata) and Tar River Spinymussel (Elliptio steinstansana) Conservation Research:July 2007-June 2008. Final report submitted to the North Carolina Wildlife Resources Commission. Raleigh, NC. 18 pp. Fuller, SLH. 1973. Fusconaia masoni(Conrad 1834) (Bivalvia: Unionacea) in the Atlantic drainage of the Southeastern United States. Malacological Review 6:105-117. Fuller, SLH. 1977. Freshwater and terrestrial mollusks. In: John E. Cooper, Sarah S. Robinson, John B. Fundeburg (eds.) Endangered and Threatened Plants and Animals of North Carolina. North Carolina State Museum of Natural History, Raleigh. Haag, W. 2012. North American Freshwater Mussels: Natural History, Ecology, and Conservation. Cambridge University Press, Cambridge, NY. Arbor Creek Greenway Aquatic Survey Report December 2020 Page 14 Johnson, R.I. 1970.The systematics and zoogeography of the Unionidae (Mollusca: Bivalvia) of the southern Atlantic Slope region. Bulletin of the Museum of Comparative Zoology 140(6):263-449. Johnson, R.I. and Clarke,A. H. 1983. A new spiny mussel, Elliptio(Canthyria)steinstansana (Bivalvia: Unionidae), from the Tar River, North Carolina. Occasional Papers on Mollusks, Museum of Comparative Zoology, Harvard University, 4(61): 289-298. Menhinick, EF. 1991. The Freshwater Fishes of North Carolina. Raleigh, N.C. North Carolina Department of Environmental Quality (NCDEQ)a. Division of Water Resources. 2019. 2018 North Carolina Final 303(d) List. https://deq.nc.gov/about/divisions/water- resources/planni ng/modeli ng-assessment/water-q ua lity-data-assessment/integrated- report-files North Carolina Department of Environmental Quality (NCDEQ)b. Online GIS NPDES Stormwater Permits.Accessed March 23, 2020. https://data- ncdenr.opendata.arcgis.com/datasets/aec2efd41f844be499db8adef43f9fd3_0 North Carolina Natural Heritage Program (NCNHP). 2020. Natural Heritage Element Occurrence. February 2020. North Carolina Wildlife Resources Commission. 2007. Carolina madtom species profile. Raleigh, N C.https://www.n cwi l d l ife.o rg/Portals/O/Conserving/documents/Ca rol i na_madto m_fa c t_sheet_lo_res.pdf Ortmann,A.E. 1919. A monograph of the naiades of Pennsylvania. Part Ill: Systematic account of the genera and species. Memoirs of the Carnegie Museum 8(1):xvi-384, 21 pls. U.S. Fish and Wildlife Service. 2014.Tar River Spinymussel (Elliptio steinstansana) 5-Year Review: Summary and Evaluation. Raleigh, NC. U.S. Fish and Wildlife Service. 2017. Species status assessment report for the Yellow Lance (Elliptio lanceolata). Version 1.2. March, 2017.Atlanta, GA. U.S. Fish and Wildlife Service. 2018a. Species status assessment report for the Carolina Madtom (Naturus furiosus). Version 1.1. November 2018. Atlanta, GA. U.S. Fish and Wildlife Service. 2018b. Endangered and Threatened Wildlife and Plants; Threatened Species Status With Section 4(d) Rule and Critical Habitat Designation for Atlantic Pigtoe. 50 CFR 17: 83 FR 51570, 51570-51609 Docket No. FWS-R4-ES-2018- 0046. United States Fish and Wildlife Service (USFWS). 2019 Endangered and Threatened Wildlife and Plants; Threatened Species Status With Section 4 (d) Rule for Neuse River Waterdog and Arbor Creek Greenway Aquatic Survey Report December 2020 Page 15 Endangered Species Status for Carolina Madtom and Proposed Designation of Critical Habitat. 50 CFR 17:84 FR 23644, 23644-23691 Docket No. FWS-R4-ES-2018-0092. Watters, G.T. and S.H. O'Dee 1997. Identification of potential host: Elliptio fisheriana (Lea, 1838), Fusconaia masoni (Conrad, 1834), Fusconaia flava (Rafinesque, 1820), and Pleurobema clava (Lamarck, 1819). Triannual Unionid Report No. 13:38. Widlak,J.C. 1987. Recovery Plan for the Tar River spiny mussel (Elliptio (Canthyria) steinstansana)Johnson and Clarke. U.S. Fish and Wildlife Service. Wolf, ED and Emrick V. 2011. Propagation and Culture of Species at Risk Atlantic Pigtoe. Arbor Creek Greenway Aquatic Survey Report December 2020 Page 16 APPENDIX A Figures ti.g.i. .,%"".441‘ Wia‘lij . ar ;.._ .....‘ lYi x''r r .A .,.,s. liri.itlir ,. _.. • ••• * * "4 N. ?04 4.'.•V ...., } ' 411. *� r^`• Holly Springs t r e • ' �' • . e .`f� '' aaL�w" . . r' _ r~�" Sources.Esri, HERE,Garmin - R - f ..:. ‘ r FuytrS 'aln,4grmap, . r• •C i- i w t) 1 'S.. ,' INCREMENT P,NRCan,Esri r• 1.... ~ r I s { r•• , - • a L ----PG, _z -‘ifl_ 1 4-4....... .' 14 [..t , — , pt)e.,41.1 I •ei'..V* .,', ' ' • . I v ,..44., — t. ,I %,1,,,, ._. . "•A.• , .., + '? • � li r am! a • • • r� ii � ^err. f' F •. ,'•;a - .....•_•�A. 41111 .ti •i- 4 N. } ... • Middle Creek :� �.4 .r c:"*-.' ''••• ` a * '. L ti .•• 9�, � ,! o .,h -III" .fir fit ' �- . .t, er _f' A-.L aa�Y � w a r r�4 . J .v�. w .. ,.:. t,•...,.0... _ I! . # fir,, tk..ri2 1 J{ I • w- • ►.., t. .,, ',.i ' , ate.- i t:S•t;{;;g ,,r••H w • r s+ L. r}�,it s . .. �- �_ "'iiti i c' it . ..•� .� 14,E - - . �. , Ir 4:•:_ }. Aquatic Survey Reach ,��'!f `, r,,. . • .1. .•` �' Y'_ \' f,, Middle Creek A y'tom �f UT to Middle Creek : ;,.1 • �. , y ;'" ;Ny,}y."I'' �r r- +: -1 Upper Middle Creek r =� li l&tilo"E C4o-n �rsaiicAo i. (I�� �i �ll +l-'•r tee :E`•i.12Io in- . c _ qi p'h . Project Study Area - �! ■ .�:s�_ _ Bckarror Q11�C } :di'ff7 4.' i I1t"! '.., milt.,• • ' " `'PFEITinl",�.t"' • ' �+dULIi. ? - 3 . ' y • : . f . f N Prepared By: Prepared For: Created Sy: Checked By: Arbor Creek Greenway Project VCF CMS Figure _ Vicinity Map and Survey Location Seale: I SPRINGS Middle Creek and UT Middle Creek 0 250 500 from the vicinity of Sunset Lake Road —•Feet to Lockley Road Date: Wake County, North Carolina December 2020 N A PAP NM Iig . .- '4 lr purndd. 4 ,.., z Th6 to GM it "-- ..god Rd �� % l..1..v.r ; �p,0 "9� a�' :r�,a EO#21412 -0ryer frryw 4 1 y45r A 4 r 1tr.c klIw A4rf+ e i °Rz r'�a 0416 4 fd zY4rt ttd 0 e vs 11\4":":" '' V o v 'I. ��yj I. v Q It, r r t 9- ,n.i�' i MA hAL. a % r.i� v+ .'�� r eIMP • 3 I - RIIif 'd P M21 ary r.RW 9 = EO#19676 P. gay tazeili Bond . r Nn,.6rr*+4 Srf 1 p 4- % y‘o .ti' 1'PlrrV �;J od.Re e - Sa 4 pp4 R 6;k r��oa' $ Pr* t {aMoPitr Rd rr� $ 4 Q AIR ' `r- rR4 � :� � s +T s1 '► e 1 • M.r �r ,7-1' - �G_ �p bBr�dy0R y 7'i' ++char Rr r' .. ke "4 6 EO#8258 0 �` , r-rr lino6Rd EO#21894 , luZicZ27-0jam.,( EO#34956 4,4v .r„*„. ., CI4 tOn x.,ti . 41 EO#13799 -. . • n e• RI y� Lr:v. ) . - .A $r ,vie' IA lowPri IIIj m 4 r a r1 r ub,_ ma Y r'° veil'b 2.,-2 ‘) fib. u Project Study Area cr�`" d . 1r+ Tar River spiny mussel 4a Atlantic pigtoe a !Sit tri * Yellow lance � y ; * Dwarf wedgemussel . : D Neuse River waterdog TP %yroa .• Green floater SOLrces: Esri,HEftEF..G m rt4 4,GSK.I ter ap,INCREMENT Esri Carolina madtom A Japan,METI,Est China ;Hong ).Esri ea, Esri ;Thailand),NGC \:\'. Opfer"treethlakcontributcrs,art: he GIS User Community, Esri, HERE. li lir Carmin,{c4 OperfStreetMap a ributcrs,and the GIS user community .�Ra t Created By. 4urdd B 79V re Prepareo 9y: Prepared For: F i7 Arbor Creek Greenway Project vcr ems NCNHP Element Occurrences 5 pl I II &,ti srrzn6;s Middle Creek and UT Middle Creek o � 2 from the vicinity of Sunset Lake Road2 to LocKley Road mate: Wake County, North Carolina May2:20 n.� ti 42- h ' J a ��l4la ''Rd• � Lwi�, Nw I.�°JHd ���a l').- I 1■1 f Do Ire A *� �L C°ryR ,�RVY A/p'Hdw Rr I:. ', r4 km `r� • Rd A_ I� Sin cYlq� inbrrR • pd li°IiryAY Rv ClQ. IF 000 • a , 03402 I Fa LYn.ud I a 9 "s. $ 4 ♦.• Fes. 4 i-k i 4- r TA,,,,I Z s. �t w i::,' s v *-0 nd 'a' ,E b�'Fa.R. 9 ¢ R Pa , Q q s qv 4 r� fua V e d �{ Cary _ gaga Beni? 10 • 64 fig'$ Qra s 6 4 t. t~ /' I P s r S` ''Y Pl" a l Pod.,yd y P yE ,� II• ',. n . a 1. `dry r? ors r-1 "M"rRd VI •? GIA 3 ir r 71 M.` PPS .:il'• n. -_ _¢O °+� 4P rl,� N v *,%.v t fin , u car mb.r E' i2 Sa x ,i 5 • b qi .ram i ¢ 10r R..6 Rd .:C rniysplrlpa o F'Rc r' 4 CD 1� 2 �p _ , c. P4 m?� ... f As __ r Al Wit In* a �p b .4. a 1 I ix G •p .41',9Q .�' Rp Pac,1;hr,pt in 114. 4 :iu l x '[ Rd SY.1 '1 $r +r \.a4,4. ems, re9 t four Oaks D I n l it i i:� 671' ,ec. 9 E W ?rF 1 Il _ —Ms.\\ 1=3:1 16. • Project Study AreaSources:Esri.HERE,Garmin, US- .,Interrnk INCREMENT P,NRCan.Esri Japan,MET!, EsriChina{Hong g).Esri Kar Esri(Thailand).NGCC,{c) ' Atlantic pigtoe Proposed Critical Ha itat CpenStreetMap contributors,and a GIs user C munity,Esri, HERE, -.. Garmin. [c Open streeti:fap cartr butars.and the ser community Ca7>Cd By. •Okt. d By. C Figure _.epared By: Prepared Far: r1 Arbor Creek Greenway Project •'Gr :J.15 xnT„ Proposed Critical Habitat3 . -- i I �ti spi n�i;s Middle Creek and UT Middle Creek ❑ 2 from the vicinity of Sunset Lake Road =rviles to Lockley Road am. WakeCounty, North Carolina May2020 r T Hd N A �d Nce4 s} o-n xy� p�■p 1 '/ r� v r1 c F. ��� nv A". "-r, , , i r dw Llr R ,fr • vr ,i FwY _.��'v ` r y�lnckl e+R �p s ❑ ..rR �h Aa.ar r 4,�y a a y p rL, d 7 ad 4 v4r^ eingttan - Fq LYr•rt Ad V 4 it y 0 4 d w "'�'" i �ffer,� kd A a• Y ID • + 4 4 • M�� MOrns,1-. PI i 4 .4 �� -.4 M � 0. it -a,-. ?f 9 o 3 4.s 'I.L' Cary I �_ 3 I _ • lig01 rye w fsrq ��� Now grn a ■ Sa M'7• Rny_ 4. h.ialr r, r8r} 4 G� n F e 1 a Pvd■,gb a —vM1 Q. e �9r r7 on Rv o A- m �'''+npvr Rd G C 4ar Xr kt. Peony lPd 0 ,r? Gi r 4 g 'CI."'' nrl-..• a q,a4'+ga.' r ''�.'r�d or r•l": `, ns6■rDr .. v YSf At, n`l �� U �Q+ :r t 1l. rer t Revd Rd . -o h5p Ira • ; i *'Rs i57• .. �D H m y ° 3 e° 21 V. `'' ia- r I. W $9 XV �v v2 v ct- Y � 2 o •h .cq . " Pachrn Rrn1 1L1 O r3 • Four Oaks • R°n ; * #, n4 .J 46. n� ., L_ q I] Project Study Area Sources: Esri, HERE, Garmin, US , Interco INCREMENT P, NRCan, Esri Neuse River waterdog Proposed Critical Habitat Japan. MET!. Esri China I Hong gj, Esri Kcr Esri I:Thailandj. NGCC, Ic cpenStreetMap contributors, and he GIS User C mun ty, Esri, HERE, ,71p Germin, OpenStreetMap it (c) cony !Nita*, , and the G set community t Prepared By: Prepared For: Arbor Creek Greenway Project Proposed Critical Habitat 4LUvd By. vcr arc,-Maed iBy.ir •iu Figure p I 1 .„T.,...„ -i. -ti S>mm{-,4 Middle Creek and UT Iv1 iddle Creek o a from the vicinity of Sunset Lake Road Mile is 4 to Lockley Road %Mike County, North Carolin a Onto; ' ° �r , N - ' r n I. w gd ` . .k 4A lkili r1ND w pd„t.�+� qe h,,.„....44,,,. x gni CO q.t. - GMiW to % Rd if ••T '■4 9 d°' 1 4 = it L c 'at O. .. v Cn CV Pd Lyn„vd B ` 4. r.•.1111(\ lna r, a v' qdc ^� L&'hoaa R■r • a r cir ' �a a a- - - kw i6t +s e� 1' >0 0 S6i bra�11 vi can .Y ;' Cary $ FI ::! - fi WW1 'Mr-La leg4, ■are,7 Now.e err'''1 i.- u� '}: '' ?`'rr ' a1 t g 2 e- bekwY - _ .1 d Podo kd 4 a .,,cy_- II c R Af Cr _ '7anR4• , o ok- YµoRPM Rd II iil `' `$ n ! - I : r' a n F a F• 0.,n,,,ytl + Giant"' s PI a vali Ra ■ °nx kn a �Na ;w i' 'lethal 0, yg [ Y 4 r n d a ?' 7., Rry,d Ad l a' F-±-1 ado .,,, • \iiviiiip.,., y a r 4� ' • o t . ..* 't diir(o) L.% ii IN +r ty ovia" wubw spring , x �4:FI-i��L„ rin,' 'p �� i, i(144,44.... .%C\D s mi tt. il111114106 Project Study Are a -4,■.R Carolina madtom Proposed Critical Habitat -- So res:Esri, H.,EREi,•G$rrnjnµW c,r,InTcr map,It'iCREMENT , fin, Esri Jspan,METI, sri China I:Hcng <.ng),Esn4<crea, Esri IThailand),NG mie" Yellow lance Proposed Critical Habitat nStreetthe contributcr, ='d the GIS user Community, Esri.HERE, C '. 4-1 Garmin. Icy 4 4iSt►eetMap. rrrtributcrs,and the Cs IS user community 2,aa n.r� k J7 5 Prepared By: Prepared Far: aes�xdBy. ' i d d3y: Arbor Creek Greenway Project vcr c,ii Figure LY 5 - pi Por KC Proposed Critical Habitat E4,sr�zritiL;s Middle Creek and UT Middle Creek a 1 2 fro mthle vicinity of Sunset Lake Road !Ai has to Lackley Road xi. Wake County, North Carolina May2020 s. N NCG130099 ,�•="o' ?a 3. .catcQr RJR V0<l3 . A 7 , • ._,., �,�n v a y.l.urn 4,, Trn i h'&v deb t..,rm Lr a f• i 4• x �i ISim •Y wi r. c L a.r�aar �[� 4Le h = e a r .� e C" " rrr 4 $ t4 F°`CkC 1,11 a n $ letrs=f a3*. 'i fi „tr R4 - s H•Y A..q' Vy''' ? 5a1aw flay ‘ R I.�s Rt 4 A ci m p.iy { M..3,}ern C: i. o E er_ G .t t 1. ¢ Geew.r ch.,,4, �, $t l.: .per •:~ a 54 1'.W Re M1.. 1,.., 1,-,i,.Lr, 8Nn'QCwii'-^ r e_ 6 aL.. s _ r F hTvy} V' el tk i i Ito n.owu: cr i .,, d a �"ppy nn." m+' eArr,,,,• 4.''r.,.*IA 501110,1V1,..4 , ro yp. �` .� ""p^m a or z Gon•nde"i �� Gpce.hi C, .n. ,z I s A i 1 I t i I; ^l:, fR, Cawara'7k Cragr,r . Hn,ry n,In ,.x w.r Or ;' ''rt"r } Hoe rwnm1Cenr.Lr _ oP6 p I1 a ; 4. t. ( 4 .. R an*' P P ,; ,c�,na,�r * •p PV ry;Y II... � p e l ' e :,, T ~ \ :it r�iCa•sr Byre _ 4 P 0 uaY 6Rr Ciy4.:I, 4. v ; e d o i• rastrn Si F. •' " i : h # . Yv s Lwvter1 four i$ n I �e r t S b yra •rr Rd 4'nL R'o 3 t,4 J -,E,m an'a ip t'S'r,• pi c t,.rC 0.,---1i,R r Z Sr..,,1< /. ..` k VY iV ^i r ] A f v ; ¢5 %ocrer to c g s I see.nrprnr e. a b9,a - e . a r.. Pro al.Cr E u cr.,. Ga .. d' a .5 e i 4 ^ 1-4- -' C r° • µ'ern q _ sraArrr= +nss fc' ko awt"91s19A" v.,,�l Di 1 � Project Study.Area 1 3 ' T w + do a ; v Sol�rp s Esr1,HERE„Garmin,�JSGS,inter map,INCREMENT P, �JRCsn E sri Jetpen,ME7I, EsriChirra{Hong Kong},Esri Kcrea, Esri 1Tfrai land),NC-CC,{4 NPDES Discharges 3 w N.. QPenStreeftetzpcontribli he CIS User Corn m Lin 6, Eri,HERE, % y drn Rd Garmlp,(S)OpenStreetMap carttributcrs,and the C-IS user cammunity - dr.•, 'ti Prepared By: Prepared Fo-r: Created©y. Oiesi ed By. FI gu r e Arbor Creek G reenway Project vcr cats NDPES Discharges6 C• — pi S , w I++ �ti srran+t;s Middle Creek and UT Middle Creek U 51]0 1,000 from the vicinity of Sunset Lake Road Feet to Lockley Road a,x. Wake County, North Carolina Kay2f}20 ATTACHMENT E 000000000000000 000000000000000 1 ARBOR CREEK BRIDGEWATER SUNSET RIDGE NORTH PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP.) WA-3 KEY MAP (UDDER C NS UCr! QNl WOODCREEK PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP.) WETLAND IMPACTS (PERMANENT) IMPACT AREA AREA (AC) SHEET 1 0.03 W A-1 2 0.001 WA-1 3 0.04 WA-1 4A 0.15 WA-2 4B 0.01 WA-2 5 0.06 W A-3 6 0.47 WA-4 7 0.004 W A-5 8 0.01 WA-5 9 0.001 WA-5 10 0.11 WA-6 TOTAL 0.89 800' 400' 0 SCALE: 1" = 800' SEP! SEPI ENGINEEEINGd CONSTRK LION, NC. RALSGt1 I YHAf 3TON I CHARLOTTE BEAUFCRr, SC I CJWRL STON, SC 1 GLENWOOD AVE l SURE WO R.IHGH, NC 27603 PHONE 1915..784.9477 sepin.om j BEFORE TOU DIG Know wM1a7s belowuinK.Ka�Erocanc Coll before you dig. ere AOTCE CDIOTRUCT)OF! SRE SAFETY S THESOIE REUMSERIIT CF THE CONTRACTORNEITFER THE OWNER nORTFE EFINEeJ SHALL BE E[PFOTED TO PS3 W.E MN REPDISI&IIPY FCR SAFETY DE THE WORT[ OF PERSONS ENGAGE El TIE NOW CF ANY FEARBT STRUCTURE. ORCF ASA' OIFERPS0 NS. FM ENMESH. 6 Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROMDE SE2n027m RAZE REVt9GfS Rev_ Trai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PEOJ.AIGE IA MAI1 DRAYNI8T S IEYI#XO CEEC® BT: IA MAI1 WETLAND IMPACT COVER WA-0 s 0 J� + 1+301-SF+ + + + + + + + + + + + + + + + +1AV04/417+I1*A-0- + + AREA 2 +PE-RMANENT+ + + 5VSF+ + + + + + + + + + + + 4- + + + + + + + + + + + + + i r• + + + + + + + + + + + + - + + + + + + + + + + + + + EXISTING + + +WETLAND] (TYP) + + Nx.Yrs + + + + l ..--GREENWAX.TRAIL 10' WIDE, PAVED (TYP.) TEMPORARY WETLAND IMPACT: REMOVE EXISTING WOOD BOARDWALK = ± 6,993 SF EX. SANITARY SEWER EASMENT (TYP.) .1 •w • w tt �O G rz�JP� •�i �a— +WETLAND (TYP) + EMPORARY WETLAND IMPACT: / R OVE EXISTING WOOD BOARDWP1 = ± 4,460 SF 4 t I WET NE) IMPACT q/ PE: MANE. T -1 T712SF /Ij t SEP! SEPI ENGINEERING& D NSTtUCI1ON, NC. RALSGt1 I HEAL GTOIr I CFARLOTE BEAUFORr. Sc I GWRLESTOuc 1 GLBJWOOO AVE I SUITE WO 12.81J3GH, NC 27603 PHONE 1915..789.9477 sepinc.com BEFORE TOU GIG Know viKes Ca I I before you dig. .r▪ �....c.uu ,a m.nec � .e••c 1 COHSTR LTIGIr sr1E SNIT( THESOIE REPONSI ENT CF THE COMPACTOR ROPER PIE E OWNER nOR 11-E EIFNEe1 SHALL BE EIPECI® TO AS W.EAnY REPOISI&IIIYFOR SUEIYCF THE WORK, R PERSONS ENGAGED TI NE NO CF ANY FEARBT STRUCTURES. RES. OR CF ANY OIFER PERS'NS. 7r, Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM SEin027m WETLAND IMPACTS (PERMANENT) IMPACT AREA AREA (AC 1 0.03 2 0.001 3 0.04 SUBTOTAL 0.07 TEMPORARY WETLAND IMPACT BOARDWALK REMOVAL IMPACT LENGTH AREA {SF) 1,1453 LF X 10' 11,453 SUBTOTAL 11,453 NORTH 50' 25 0 SCALE: 1" = 50' Rev_ Trai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 P ROM. RIRE IA TATLCR GRANFI BT: S1ETAIOIRI CPECCED BT: IA MAP? WETLAND IMPACT AREA 1 WA-1 ANCHOR CREEK WAY .e -0 Plw,i i.e�irxYi 'U,,U �1it ti RIPARIAN BUFFER- ZONE 2 • (TYP.) RIPARIAN BUFFER- ZONE 1 (TYP.) • + ON WETLAND IMPACT + AREA 4B - PERMANENT + 269 5F + + 1y, + + i + + + + + + + + + + + + + + 1 1+ 1 0 latE BB + 1 + + + + + + 1 + D • + + A 77 + ▪ + + /6. + + + + + + ▪ + + + + + + + + + 0 + + + + + + + + p+ + + + + + + + + + + + ❑+ + + + + + • + + + + + + + + + + EX. SANITARY SEWER EASMENT (TYP.) EX. COLONIAL PIPELINE EASMENT (TYP.) WETLAND IMPACT AREA 4A - PERMANENT 6,391 SF PROPOSED GREENWAY TRAIL 10' WIDE. PAVED (TYP.) 0 0 6� :3 ='s + + + + + + t + + + + + + + + + + + + + + + ©+ + p+ + 40 + + + + +© + + + + + O+ + 4- + + + + + + + + + + + + + + + + + + + + + + + EXISTING F + + + + +++ + + + + WETLAND (TYP) F+++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + 9`, + 'rF+++ + +++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + I1 i li 9 9 SEP! SEPI ENGINEEEINGd D NSTtUL71ON, NC" RALBCE1 HEAP 3TON 1 CHARLOTTE ErAMORE BC I CIERLESTON, SC 1 GLENWOOD AVE I SUITE WO R.I HGH, NC 27603 PHONE 1 914"784.9477 sepinc.com BEFORE YOU DIG IG,owwhars below'''''F Call before you dig" ALL SCE CONSTRIICTKJF! SITE SAF TY S PIERCE RESPCNSIEIIT CF THE CONTRACTOR NETFER THE OWNER NOR TIE BEARER SHALL BE E[PECTE TO ASLWE MN REPOISI&IIWY FCR SAFETY OF THE WORT[ ce PERSONS ENGAGE El TIE NOW CR ANY REAM STRUCTURES. OR OF ANY O I ER PBi Ct4S. Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM m WETLAND IMPACTS (PERMANENT) IMPACT AREA AREA (AC) 4A 0.15 4B 0.01 SUBTOTAL 0.16 NORTH 1 00' 50' 0 SCALE: 1"= 100' REASIONi Rev_ Trai Gradrg 4202021 Rev" New Trail 07.062021 Rev" Per Town Comments 09.032021 PROJ"61OE IA TATLCR DRAMTI BT: anliacum CHEC®BT: IA TATLCR WETLAND IMPACT AREA 2 WA-2 + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +_ + —+ — +- -+ — +^ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + •.+ + + ++_�_ +._+-+-+-H-- +- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +• + + + + + + + + + + + + + -1- + + -+ + + + + + + + + + -+ + + + + -•+. + + + + + + + + + + + + + + I', + + + + + + + + + + + + -1- + + + + -+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ;+ + + + + + + + + + + + + + + +1' + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + H- + + - + + EXISTING + + + + + + + + - WETLAND (TYP) + + + ;- + + + + + + + + + + + + + + + + + + + + + + + + + + + - F + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + -+ + + + + \-t + + + + + + + + + + + + + ▪ + + + + • + + + + + + + + + + + + + + + \+- + +- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +, FUTURE + + + + ▪ + ++ ++ t + + + ROAD R.O.W. - + + + + + + + + + /+ + + + + + + + + EX. SANITARY SEWER + +- + + + EASMENT (TYP.) - h + + • + + + I + + + RIPARIAN + -H + + BUFFER- ZONE 2 + + I + ;- + (TYP.) + + + + + + + + + RIPARIAN + + + BUFFER- ZONE 1 + + + +++ (TYP.) r ++++ + + + +- + + + + + + + + + + + + +- + 9 9 9 9 9 9 ` 1 `‘ Te -es_-1§1 PROPOSED • , / GREENWAY TRAIL `.i' j ;` 5- HI`"r,.I‘I.':_°w."`° " ~ 1 _ 10' WIDE. PAVED (TYP.) // //.r ~'''\r- t1 ` ,i 1 ' `I 1 ti, WETLAND IMPACT ` 1 _ 5 AREA 5 PERMANENT' , , ;', ; l ,I '1 '; CURRENT END OF 'I ; ' } ; ' t , t ', 1 ---- -- STREET - LNCKLEY RD_ :'`, 1t'i'',1 ,'\'', }`. - - _.__ mil.- c� 1 'L ', A6, O'. `\ ,, 'L 11 1 I i i i 11 ' , -_-_--- ~`•1} 1' 1 1 l 5 ` 1, 1 \ • , t `\ ,`-_------ - 1 , 1 L � '1 ,`I 5'1''1 L 1 L L L L - .,' 1 • 'S ', 5 'I 5' '1 ' LI ' ` 't + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ----- I . I 1 1, GI + + + + + ;- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + EXISTING + + + + + + + + + WETLAND {TYP} + + + + + + + + + + 4+ + + + + + + + + + + + + + + + + + + 4- + + + + + + + } + + + + + + + + + + + + + + + + + + + + + + + + + - a I I ' ▪ • I. `. ''1 , g T S 1 u,T\ lL L all 1 '. SEP! SEPI ENGINEEEING& CONSTRUCINC 1, NC. RALSGt11 ALIANGTON I CHMLOTIE PEAL/FORT.SC I CJWRLESTON, SC 1 GLBJW000 AVE I SURE WO R.IHGH.. NC 27403 PHONE 1914-784.9477 sepgnc.com S WOH,iv[. onrs BEFORE TO . DIGG Know wha0s below. Ca I I before you dg- .ram sed..e rem , 00 COMTRUMCI.4 SITE SAFETY S THESOIE RESPONSIA IT CF THE COMPACTOR NSTFER THE OWNER nOR TFE WAVER SHALL BE E[PFOTED TO ASILWE MN R0PO,SI&IIWY FP? SAFETY OF THE WORK, Cf PERSONS ENGAGE CITE NOW CF ANY 1EARBT STRUCTURES. OR CF ANY OIFER PSIICI.41 /40 t9�pGWV g"kI,R' n'' 12 y2,21 Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROJEQ: senfm WETLAND IMPACTS (PERMANENT) IMPACT AREA AREA (AC) 5 0.06 SUBTOTAL 0.06 NORTH 100' 50' 0 SCALE: 1" = 100' Rev_ Trai Gradlg 4202021 Rev- New Trail 07.062021 Rev- Per Town Comments ents 09-032021 PROD - AIDE IA MICR W AN" BT: arenacum CHEC® BT: IA MICR WETLAND IMPACT AREA 3 WA-3 + + — + + + 1 + + + + + 4 1 i + + + ++++ + + 4. + + + + + + + \ + + + + + + + + 1 -F\ + + 4 + + +\ +\ + + + + i \I- + 4- + + + -- + + 4 I+ + + +I + + f 1+ + J + I +I + + + + I+ + + + + / + + + + + + + + + + + t� + \+ �+ + + + + + + + - + + + + + + + + + + + + +\ + + + + + + + + + + ti- + + + + + + + + + + \+ \ + + + RIPARIAN BUFFER— ZONE 2 + + + (TYP.) h + + + RIPARIAN BUFFER—Z (TYP.) EXISTING W °a + + + �4 + + + + + + + + + + + + + + + + + + + + + + + + + + + + 4- + + + + + + + + + + + + + + + + + + + + + + + + + + + + �- + + + + -I- + + + + WETLAND IMPACT + - + + ▪ + + AREA 6 — PERMANENT — + + + + + 20,400 SF I—+ + + + _ + + + + EX. SANITARY SEWER + + }+t+ } +++++++EASMENT(TYP.) ++ + + + + + + + PROPOSED 4 + + + + + + + + + + GREENWAY TRAIL + + + +++ ,—++++10'WIDE, PAVED (TYP.)+++ + — + + + + + + + + + + + + + + + + + + 9 + -` + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + +' + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ;+; + + + + + + + + + + + + + + + + + EXISTING 4_ WETLAND (TYP) + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + -I + + + + + + + + + + + + + + + + + + + + + + + + + + + 1 + -F + + + + + + + + -r + + + + + + + + T + + + + + + + + + + + + + + + + + 4- -{- + + N • 1- SEP! SEPI ENGINEERING& D NSTtUCDC01, NC. RALSGt1 I xaxruTorl I CHMLOTE BEAUFORr, SC I GWRLSTON, SC 1 GL NWOOD AVE I SURE WO RALBGH.. NC 27603 PHONE 1915..784.9477 sepinc.com F 3WOHag[. xs BEFORE TOLL OIG Know wM1a's below..`�`"F„a��, Col before you dig. ••• ••pw..F pa. r.�mntotmottaeneettLtemameetwees owe.. VIM,. FUME WNSTRUCRLl1 Sr1E SAFETY S rHESOIE RESPONSIEIIT CF THE CONTRACTOR Ne1FER THE OWNER nOR 1FE UIGNEe1 SHALL BE ESACTED TO ASLWE MY REPO,SI&IIWYFOR SAFER' CF THE WORT[ OF PERSONS S ENGAGE Fr TIE KNOW CF ANY IEARBT STRUCTURES. OR OF ANY OTI ER REEMS. Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM ffi027ID RASE WETLAND IMPACTS (PERMANENT) IMPACT AREA AREA {AC) 6 0.47 SUBTOTAL 0.47 NORTH 100' 50' 0 SCALE: 1'= 100' REVISIONS Rev_ T,ai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PROD. AIDE IA TA1LCR BRAM BT: S1EYI#xI!1 CHEC® BT: IA TAttM WETLAND IMPACT AREA 4 WA-4 + + + + + + + + + + 4- + + + + + + + + + + + + + + + + + + + + + + + + + + + + -1+ + + + + + + + + + -1- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + 4- + + + + + + + + + + + + + + + + + + + + + Y- - + + + + + + + + + + + T EXISTING + + + + + + + + + + + + + + + + + + + + + + -F + + + WETLAND (TYP) + + + + + + + + + + + + + - + + + + + + + + + + + + + + + + + + + 4 + + + + + + + + + + + + + + + + + + + + + + + + + + 4. + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + WETLAND IMPACT + + + + + WETLAND IMPACT + + + + + + + + + r + + + + + + + + + + + + + + + + + AREA7-PERMANENT + + + + AREA8-PERMANENT + + + + + + + + + + 187 SF + + + r + 311 SF + + + + + + + + + + • • • • • + + + + t t t't t t t + + + + + t + + + EX. SANITARY SEWER - + + + PROPOSED - + + + + + + + EASMENT(TYP.) ++ +++GREENWAY TRAIL +++-+ + +++ + + T + + + + + + + + + + • 10' WIDE, PAVED (TYP.) + + + + + 1 + + + + + + + + T T t t T t T + + + 4' + + + + + + + + + + + + + + + + + F + '� T .,.,..Att„ '--------------' --gmil-,e••••=--- _ A__14,- IRI\ II L RIPARIAN BUFFER- ZONE 2 (TYP.) RIPARIAN BUFFER- ZONE 1 (TYP.) + + + l- + + + + + + + + + + + +- - + + + + + + + + + + + 4- + + + + + + + + + + + + + + + + + + + +.-- + + +- + + + + + + + 0 + + + + + + + + + + + + + + + + + I + + + + + + + + + + + /+'+ + +/ + + + + + + + + + + + + -L + A + + + I + + + + + I I + + + + + + + + + + + + + + + + + + + + + + + + + + -f- + + + + + + + + + I + I + + + + + + + + + + + F + + + + + + + + I+ I + + +.' + + i- + + + + + + + + + + + + + + / / + + + + + + + + + s+ + + + + + + +I - + + + + + EXISTING + + + + + t + + + \+ \+ +- + + + + WETLAND (TYP) + + + + + + + + + • + • + + + + + + + + ++ �+ + + + + + + + + , + 4- + + + +\ +\ -'- + + + ± + + + + + PROPOSED + + +a +\ + + + + + + + + n+ + + \ \ + GREENWAY TRAIL + +�_F+++++++++ 10'WIDE,PAVED(TYP.) + + + �` + + -+ + + + + + + + T� + +/y ,+ + + + + + + + + _+ / + + + \ + + + 1- + -L + + , + + + + _1- + + T i + + + + + '+ + + + + + + + + + + + + + ± + + + + +�. + + + + + + + + r, +' +- 4- + j,, + + + + EXISTING -k + + +r+ + WETLAND (TYP) \ WETLAND IMPACT AREA 9 - PERMANENT 32 SF IOG�t rG tpp� SEP! SEPI ENGINEEEINGd D NSTtUL71ON, NC. PALSGt11 xaxruTOrl I CHARLOTTE BEAUFORT. SC I CFEEESiON, SC 1 GLENWOOD AVE I SUITE WO 12.11J3GH, NC 27603 PHONE 1914-789.9477 sepinc.onl .-.Till 3wAW..[.um, I �1�?„•-.'1 BEFORE TOIL GIG Know what's belowu�ue�.ew`"��ca�c Coll before you dig- A...16tneum Am nrvn owlet NOTICE COFErRI MM sfTE SAFETY S THESOIE RESPONSIA IT CF THE CONTRACTOR NETFER THE OWNER nOR TIE HEALER SHALL BE EOTCT®TO ASSUME MN REIPOnSBIIIWY FCR SUETY THENORI[Ce PERSONS ENGAGE CI TIE NOW CF ANY IEARBT STRUCTURE. OR CF ANY OTI ER PERS'l1S. 7r, Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM WETLAND IMPACTS PERMANENT) IMPACT AREA AREA (AC) 7 0.004 8 0.01 9 0.001 SUBTOTAL 0.01 NORTH 100' 50' 0 SCALE: 1"= 100' REASIONS Rev_ T,ai Gradrg 4202021 Rev- New Trail 07.062021 Rev- Per Town Comments 09-032021 PROI-MOE IA TATLC? MAMA BT: 3.1111ACUil PECKED BT: IA TATLCR WETLAND IMPACT AREA 5 WA-5 + + + + + + 4' + + -t + + + + + + + \-k + + + + + + + + + + + + + + + + + + PROPOSED GREENWAY TRAIL ++ + ++:10:fw1E,PAVED(TYP.) +• +4 + + + + + + + + + WETLAND IMPACT + + + ++-F AREA 10-PERMANENT ++ + + + H4,622SF + + + + + + -r + -r + -r + + + + + + + + + + + + + + + PROPOSED BOARDWALK • + + + + + + + + _ EX. SANITARY SEWER + + + EASMENT (TYP.) + + ,+ � � -r i- + + + f + rr+ + + + + + + + + + + + + + -F + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + -1- + + + + + + + + + + + '+ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + 1 _L 1 _L 1 _L -19 n ± 1,647 SF Cn + + + + + + + + + + + • + -r + + + + + + + E ,.�lyIt ti I.tLt ' t LI 1 V. i t t t L L tt t — - �. l51 L 1 L L ▪ - . TM�` '' - •--------- ^- �++tip /� • •- - • RIPARIAN _ BUFFER- ZONE 2 _ + • + + + + + + + + + (TYP.) + + + + + + + + + + + + RIPARIAN +- + + + + + + + BUFFER- ZONE 1 + + + + t + + + + + + + -L + + + + (TYP.) + + -- + EXISTING + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + -1- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + -t + + + + + + + + + _+ + + + + + + + 1- + + + + + + + + +' + + + + + + ▪ + + + + 'E J51NG WETLAND (TYP) + + + + + + + + + + + + + + a- + + + _ + + + + + SEP! SEPI ENGINEEEINGd D NSTtUL71ON, NC. PALSGt11 HEAL GTO I I OURLOTIE BEAFaer,sc I cmmESTON, SC 1 GLENWOOD AVE I SUITE WO 12.81J3GH, NC 27603 PHONE 1914-789-9477 sepgno.com F 3 w AW.. [. um, BEFORE TOIL DIG Know what's belowue 5''"E`�`'srocanc Ca I I before you dig - NOTICE CONSRu TICEI s11E SAFETYS THEsc1ERESPONSIAIT CF THE CONTRACTORNe1FER THE OWNER EORTFE EFG1Ee1 SHALL BE E[PECT®TO ASZ.LEAE MN REPOtSI&IIIY FP? SUETYCF THE WORK, Cf PERSONS ENGAGED TI-E NOW CF ANY FEARBT STRUCTURE, DR CF ANY O I -ER PERS NS. �9p g"kt,' n'' I2-g -2ar1 FM 6 Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE EAE WETLAND IMPACTS (PERMANENT)BOARDWALK INSTALLATION IMPACT AREA AREA (AC) 10 0.11 SUBTOTAL 0.11 BOARDWALK INSTALLATION IMPACT LENGTH AREA (SFj ± 165 LF 1,647 SUBTOTAL 1,647 NORTH loot 50' 0 SCALE: 1'= 100' 1165731014E Rev_ Tral Gradrg 4202021 Rev- New Trail 07.062021 Rev- Per Town Comments 09-032021 PROD.MDE IA MICR DRAM1 BT: 11ETMOIRI CEEC®BT: IA MICR WETLAND IMPACT AREA 6 WA-6 PAin ap PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP. E RIPARIAN BUFFER & STREAM IMPACTS I PROJECT TOTAL AREA (SF) NOTES ZONE1 ZONE2 ALLOWABLE UPON AUTHORIZATION 54,965 39,818 LIMITS OF DISTURBANCE (CLEARING PLUS BUILTUPON AREA) BUILT UPON AREA I PERMANENT 19,602 13,592 10' WIDE PAVED GREENWAYTRAIL PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP_) 800' 400' 0 SCALE: 1 " = 800' SEP! SEPI ENGINEEEINGd D NSTtUL71ON, NC. RALSGt11 HIAf 3TON 1 CHARLOTTE BEAUFCRr, SC I 0J1416ESTON, SC 1 GLENWOOD AVE I SURE WO RALHGH, NC 27603 PHONE 1 915..789.9477 sepinc.com w AW.. [. wxs 11�� BEFORE TOU DIG 1CnowwM1o3s C01I before you dig. FUDGE W1.4116..Ll1 SfE SAFETY S THESOIERESPONSIA ITCF THE CONTRACTORNEITFER THE OWNER nORTIEEIGNIEJ SHALL BE ERECTED TO A0LWE MN REIPO,SI&IIWY FCR SAFETY CF THE WORT[ GY PERSIX6 ENGAGE FI TIE NOW CF ANYIEARsT STRUCTURES. ORCF ANY OIFERPS0 NS. 7r, 643. e0 m1[Tc11 FE' Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PRDEU: 9361.027m 666E REVISION. Rev_ Trai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PROJ. AIGR IA WACO DRAMA 6T: S 1E I#Xt CHEO® 6T: IA iAI1 BUFFER/STREAM IMPACT COVER BA-0 22� \\NN- ZONE 1 - Allowable Upon Authorization 4,432 SF ---Z2 21 H ----rz ��z2 I, Z1 - ZONE 1 - Allowable f Upon Authorization ---- 1,213 5F - - f ZONE 2 - Allowable ----- ~11- Upon Authorization 615 SF 22� — EX. SANITARY SEWER EASMENT (TYP.) v I1�j / / ,� ' /� jro D O• h,,,, ' ' ` + + + 1 PROPOSED GREENWAY TRAIL 10' WIDE. PAVED (TYP.) RIPARIAN + BUFFER- Z (TYP.) RIPARIAN + BUFFER- Z + (TYP.) + + + + + ZONE 1 1 ZONE 2 + + + + + 1 + + + +l + + + EXISTING WETLAND (TYP) 1- + + + + + + + + + + + + + + + + + + + fI + + + + + 11 + SEP! SEPI ENGINEEEING& CONSTRK LION, NC. RALBCE1 AUPRGTON 1 CHARLOTTE ErAMORE Sc I CIERLSTO3SC 1 GLBJWOOD AVE I SUITE WO R.IHGH.. NC 27603 PHONE 1 915..784.9477 sepinc.com . 3wIA,E.L. xs 11�� BEFORE TOIL DIG Knoll, har:below Call before you dig. mow ere t r.--=.«RA. pstmtnear not Am FE,RCE COF6ir1.I000N SfE SAFETY S THESOIE RESPC,ISIEIIT CF THE CONTRACTOR Ne1I ER THE OWN NOR TIE EERIER SHALL BE E[PECTED TO AELN.E MY REPO,SI&IIWY FP? SAFETY OF THE WORK, OI PERSONS ENGAGE CI TIE KNOW M ANY FEARBT STRUCTURES. OROF ANY OIFERPS3 N8. 7r, COPAEGAM EMI Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM m EDE RIPARIAN BUFFER IMPACTS AREA (SF) NOTES ZONE 1 ZONE 2 ALLOWABLE UPON AUTHORIZATION 5,047 2,278 LIMITS OF DISTURBANCE (CLEARING PLUS BUILT UPON AREA) BUILT UPON AREA I PERMANENT 1,900 420 10' WIDE PAVED GREENWAY TRAIL NORTH 50' 25' 0 SCALE: 1"= 50' REVISIONS: Rev_ Trai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PROJ. AIDE IA TATLOR O QAMT1 BT: STEfIJ1011R1 PECKED BT: IATATLOR BUFFER IMPACT AREA 1 BA-1 22 z2 41, 22 ��z2 -r2 r2 ` rz� PERMANENT STREAM IMPACT 22 LF 469 SF r EX. SANITARY SEWER EASMENT (TYP.) / — / • — / / — / . / + / -▪ — / / "J I +J // / + /// /' J/ / N/F I + +J I ; ARBOR CRQEK HOMEOWN€RS + + + ) ASSOC INrp / PIN # 0750-10 f923 + + + + + + + RIP RAP PERMANENT STREAM IMPACT + NOT MITIGABLE 18 LF 426 SF /+ � + + ,I+ + + + +, PROPOSED GREENWAY TRAIL 10' WIDE. PAVED (TYP.) + 4 RIPARIAN + BUFFER- Z (TYP.) RIPARIAN ZONE ▪ BUFFER- ZONE (TYP.) + + 1 1 EXISTING WETLAND (TYP) 1- + + + + + + 11 + SEP! SEPI ENGINEEEINGd D NSTtUCDC01, NC. RALBCE1 NFAfGTON 1 CHARLOTTE BEAUFORr, Sc I CJWRLESTO.J, SC 1 GLENWOOD AVE I SUITE WO R.IHGH, NC 27603 PHONE 1 915..789.9477 sepinc.om F 3 w AW.. [. um, BEFORE TODIGG Know, har: below Ca I I before you ,rig. r,e ER Rs ftweamerre Arrel :S A.EMANE Ann.. woe. NOTICE COEMEM0N Sf1E SAFETY S THESOIE RESPONSIEIIT CF THE CONTRACTOR NEVER THE OWNER NOR TIE EERIER SHALL BE E[PECTED TO AELWE MY R0P01SI&IIWY FP? SAFETY OF THE WORK, OI PERSONS ENGAGE CI TIE NOW CF ANY REARM STRUCTURES. OROF ANY OTTERPS0 NS. 7r, COPERIGAM ,o. eOD mI e[TOR FE' Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM m STREAM IMPACTS LENGTH (LF) AREA (SF) STREAM I MPACT J PERMANENT 22 469 EXISTING STREAM IMPACT (SEWER) STREAM IMPACT I PERMANENT I NOT MITIGABLE 18 426 RIP RAP OUTLET NORTH 50' 25' 0 SCALE: 1"= 50' REASEENE Rev_ Trai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PROJ. AIDE IA TAILCR WANE BT: SIERAOIRI PECKED BT: IA TAT'LOR STR EAM IMPACT AREA 1 SA-1 ZONE 1 - Allowable Upon Authorization 4,296 SF ` ZONE 2 - Allowable y Upon Authorization 2,742 SF 1 . . . - 1 I 1 1 \ - __ �q `\ • .—... 7-._ _. - - - -...` \-.. �; . PROPOSED \ '\ \\\\\� \\ \ 11,1\\\\\ \1 1 ,.111 •,,. ', �11111 \ 1 \ l' GREENWAY TRAIL 10' WIDE, PAVED (TYP.) ZONE 2 - Allowable Upon Authorization N/F 858 SF NETTEC &TAYLfJ 'IN t! 0659-29-2534 ZONE 1 - Allowable Upon Authorization 1,02OS F o �_J I+I1 111 N/F fi• I ULI,,MAN, THOMAS SCOTT /TR & VOLKmAN. I + + I 1 + GINNY PAULETTE /TR °IN # 0659-24-2357 r l l l l 111! �1TI II 1 1 1 111 1 2 n o 0 + + ZONE 2 - Allowable Upon Authorization + -3135F v m l H + + + I ~ + + + + 2 i 1\ ■ 1 \ 1 \ + + + -♦• + + + + + + + + I + + + + EX. SANITARY SEWER EASMENT (TYP.) PROPOSED + - BRIDGE + + + f i� t I RIPARIAN + + + i + BUFFER -ZONE 2 fi I (TYP.) + + + + RIPARIAN + '- r 1 + \i + + - - BUFFER- ZONE 1 + + +I + (TYP.) + + + + + + + + + + + +. +j + + + + EXISTING 1 + + { + + + + WETLAND (TYP) + + 1\ - + + + + + + + + +~�1\+ + + + + + + +++ I I + + + + + I + + + 1 + + + + + + rft + \ \ 1 .. ---,.. + + + + + + + + +� 0 + + + + I+ + 1+ + l 11 + + + + + + + + 1\ + + + + id + 1+ + \1 .`-°j �� + + + ++ + y -11-.+ J + + I - - + SEP! SEPI ENGINEERING& D0NSTRUCNC I, NC. RALBCE I MEARGTON I CHARLOTTE BEAMORr•8c I CIERLESTON, SC 1 GLENWOOD AVE I SURE 603 RALHGH, NC 27603 PHONE 1915..789.9977 sepinc.om a 3w AW.. [. wxs 1�� BEFOE TOILICnow DIG 3bee Call before you dig. I6000 CDIOTRUCM I sFE SARTY S PIERCE RESPONSIEIITCF THE CONTRACTOR NETFER THE OWNER NOR TIE BEARER SHALL BE EV3EOT®TO AEIWE MY REPOESIIIIITY FOR SAFETY OF THE AUK OR PERSONS ENGAGE El TIE NOW CR ANY REAM STRUCTURES. OROF ANY OIFERPS0 N8. FM ENMESH. 6 0.7121.1L—DCH, Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM RIPARIAN BUFFER & STREAM IMPACTS AREA (SF) NOTES ZONE 1 ZONE 2 ALLOWABLE UPON AUTHORIZATION 5,316 3,913 LIMITS OF DISTURBANCE (CLEARING PLUS BUILT UPON AREA) BUILT UPON AREA I PERMANENT 1,620 1,120 10' WIDE PAVED GREENWAY TRAIL NORTH 50' 25' 0 SCALE: 1"= 50' REAR ORE Rev_ Tlai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PROJ. AIOE IA MEM 0QAMEI BT: a.IERa2JR1 CEEC®BT: IA TAT'IAR BUFFER IMPACT AREA 2 BA-2 1- + zo cp ` 07 ib a7 Lb 07 d7 07 Lo LD 1.0 PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP.) ZONE 2 - Allowable Upon Authorization 592 SF + + + + + + - ZONE 1 - Allowable Upon Authorization 1,701 SF + + + + + + rt rt- rt + + + + +_ _+ _+ + + + i + + + + + + + + + EXISTING + + WETLAND (TYP) + + + + + + + + + + ZONE 1 - Allowable Upon Authorization + -1,157 SF + + + + + + + + ZONE 2 - Allowable Upon Authorization + + + 547 SF 1- --+-- +-- +-- + + + + + + + + + + 1- + + + + ;^+, + + + + + _ A '1 + H--1 I + + + + + I+ 01 1,0 40 CI) 2 R 21 a 22—_ Z2 f ft RIPARIAN BUFFER- ZONE 2 (TYP.) RIPARIAN BUFFER- ZONE 1 (TYP.) SEP! SEPI ENGINEEEINGd CONSTRK LION, NC. RALBCE I HEAfGTON I CHARLOTTE BEAUFORr, SC I CIERLESTON, SC 1 GLENWOOD AVE I SURE WO R.IHGH, NC 27603 PHONE 1915..789.9477 sepinc.com F 3MAW..[.unrs 11�� BEFORE TOU DIG ICnowwinr rs below •�",a��, Coll before you dig. NOTICE COF6ir1.ICOON Sf1E SAFETY S THESCIE RESPC,ISIEIIT CF THE CONTRACTOR Ne1IER THE OWN NOR TIE EERIER SHALL BE E[PECTED TO AELWE MN REPO,SIIhLIWY FCR SAFETY OF THE WOK OI PERSONS ENGAGE El TIE KNOW CF ANY REARM STRUCTURE. OROF ANY OILERPS0 NS. Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM m RIPARIAN BUFFER IMPACTS AREA (SF) NOTES ZONE1 ZONE2 ALLOWABLE UPON AUTHORIZATION 2,858 1,139 LIMITS OF DISTURBANCE (CLEARING PLUS BUILT UPON AREA) BUILT UPON AREA I PERMANENT 600 400 10' WIDE PAVED GREENWAY TRAIL NORTH 50' 25' 0 SCALE: 1"= 50' REASIORE Rev_ Trai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PROJ. AIDE IA TAILOR 0QAMF1 BT: S1Ef1X0JRI PECKED BT: IA 'FATED? BUFFER IMPACT AREA 3 BA-3 ` 47 SEP! 1- zO Lq L0 a7 Lp 07 d7 07 c ` u Lp LD Lb� PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP.) RIP RAP PERMANENT STREAM IMPACT NOT MITIGABLE + 33 LF + 333 SF 1- + + + + + + + + + + + + + + _I + a?_ LO o} , °� ft I _ PERMANENT STREAM IMPACT 22 LF + + 1 1+ + _250SF EXISTING '- + + WETLAND (TYP) + + + + I- + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + 1- --+-- +-- +-- + + + + + + + + + 1- + + + + ;^ + I + + + + + I+ v r a 22_ 22 f u RIPARIAN BUFFER- ZONE 2 (TYP.) RIPARIAN BUFFER- ZONE 1 (TYP.) SEPI ENGINEEEING& D NSTtUL71ON, NC. RALSGt11 MAI GTON I CHARLOTTE BEAuraar. SC I cmRLsrou, SC 1 GLENWOOD AVE I SURE WO R.IHGH, NC 27603 PHONE 1915..789.9477 sepinc.com 1+�� BEFORE TOIL DIG ICnow,Mwrs below •�",a��, Coll before you dig. n.funadExur C. nn.n.1.4 ere Am NOTICE WF6TRUDDCE1 STE SAFETY S rHEsc1ERESPONSIA ITCF THE CONTRACTOR NEITFERDIE OWNER NOR TFE EIINEeJ SHALL BE E[PECTED TO ASILE E MN REIPO,SIIIIITY FP? SAFELY CF THE WORK, OF PERSONS ENGAGED El TFE KNOW CF ANY IEARBT STRUCTURES. OR CF ANY OTFER PS0Ct4S. COMMON. Mil Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PRDEU: MEE STREAM IMPACTS LENGTH (LF) AREA (SF) STREAM IMPACT I PERMANENT 22 250 CULVERT STREAM IMPACT I PERMANENT I NOT MITIGABLE 33 333 RIP RAP OUTLET NORTH 50' 25' 0 SCALE: 1"= 50' REASIONC Rev_ Tlai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PROJ. AIDE IA TAILOR 0QAME BT: S1Ef1X0JRI CHEO® BT: N TAILOR STREAM IMPACT AREA 3 SA-3 + + I + + \ + DV'IN µ 0659-24-7388 1- ,' + + + ±, + 1- ,■ + + + + + + + + + + + + + + + + + + + + + + + + + + + + PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP.) + + + + + + ZONE 2 - Allowable Upon Authorization + + + + + + 826 SF + + + + + + ZONE 1 - Allowable -F- + + + + + + Upon Authorization + + + + + 1,902 SF EXISTING + + + + 1 + WETLAND (TYP) 1- + + + + + + + + + + + ZONE 1 - Allowable - Upon Authorization 1,259 SF + + + + + ZONE 2 - Allowable Upon Authorization + + + + + + + 626 SF + EX. SANITARY SEWER EASMENT (TYP.) RIPARIAN + + + + + + 7 BUFFER- ZONE 2 (TYP-) + + + + + + �/ + + RIPARIAN + + + + + + + BUFFER- ZONE 1 if + (TYP.) + + + + +" + + + + / + a i i 1 11 of N/F FILIPSKI, CARLIN SAE & ILIPSKI. BERNARD ANTHONY III PIN # 0659-38-5385 - + ft N/r HINNANT, R5 HINNANT, JENNIr PIN # 0659-g::-t. /ice z\. ■■ I =_ /, \ .. �■ ■■\.\ \,\ f, + + +■� 1 + + + ++ + + + +•_ + + + + + + +■� \ / vocl �<D ■ ` \\`\\` ,°� is \ \\ •\\ --- 1 a -J SEP! SEPI ENGINEERING& CONSTRUCTION, INC. RAIEGH J 'NLI.YNGTON I CHARLOTTE EEALFORr. Sc I CHARLESTON, SC 1 GLENWDOD AVE I SURE 603 RALBGH. NC 27603 PHONE 1919-789.9977 sepinc.00m —�� BEFORE TOMDIG IG knowwhat's below. " Call before you dg- IMALTLOCEDELEL .to..aaemd -.-.irc w - •EI,.,ocw-.w HOME CONSTRUCTION sFTE SAFEY 6 THESOIE RESPCf4S6Ffr, CP THE CornRAeroR NETFER THE OWNER NOR TFE ENGINEER :HULL BE E[PE01EDTo ASSUME ANY RESPOn9INLTY FOR SAFETY OF THE WORT[ OF RERSON:1 ENGAGED N THE R.ORK CP ANY HEARD} STRUCTURES. OR OF ANY OTFER PEGOILS. 12 —2021 Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenwoy DATE PRO-ECf: SE20.02L0 RIPARIAN BUFFER IMPACTS AREA (SF) NOTES ZONE1 ZONE2 ALLOWABLE UPON AUTHORIZATION 3,161 1,452 LIMITS OF DISTURBANCE (CLEARING PLUS BUILTUPON AREA) BUILT UPON AREA I PERMANENT 760 540 10' WIDE PAVED GREEN WAYTRAI L NORTH 50' 25' 0 SCALE: 1" = 50' REODON:k Rev. Trail Grading 4.202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PROD. MGR: M. TAYIAR DRAHN EY: S.1Efr.10TIRI CHECKED EY: M. TAYI0R BUFFER IMPACT AREA 4 BA-4 1- + +1 + + '1 1\ ' + + 11 \, - - _+ + \th + + + +,' - +,. 1 1 / • r 1- ,' + + + `\ + + ' + +1, 1- 11 + + + + + + + + + II f7 1 r +1 + + + + + + PROPOSED I- `+ + + + + + - GREENWAY TRAIL + + + + + + + 10WIDE, PAVED (TYP.) I- + + + + + + + 1 + + + + - +' - __ + +r 1- + + + + + + '1+ + + + + + I- I, + EXISTING 30 LF + WETLAND (TYP) + + - 242 SF + + + + + - _ RIP RAP DV'IN 3 0659-228-7388 + + + + + + r + + + PERMANENT STREAM IMPACT a PERMANENT STREAM IMPACT + f + + + + + NOT MITIGABLE f I- + + H- ± + + - 21 LF 193 SF + + + + ± + + + I— + + + + + + + + A +`'+ + a i Ci i 6 1 + + + + + + + t EASMENT (TYP.) + + + + + + + + RIPARIAN + + + + + + + 7 BUFFER- ZONE 2 ▪ (TYP.) + + + + + + �� + + RIPARIAN BUFFER- UF (TYP.) R-ZONE 1 + + + + + + + + + 1 + + + + +'/ + + + + EX. SANITARY SEWER a + N/F FILIPSKI, CAITLIN SAE & ILIPSKI, BERNARD ANTHONY III PIN # 0659-38.5385 NI- HINNANT, R HINNANT, JEN:tI. PIN # 0659-"' \\\\ I. , \ \ 111 1 \\\\\,\ I\ • 1 pPp 0 ,1f- o) + + + '� ` \\�\�_•� 1 1 1 1 1 1 1 1 SEP! SEPI ENGINEEEING& D NSTtUCI1ON, NC. RALBMI I xaxr 3TON I CHPEOTIE BEAUFCRr. SC I GWRLSTO3SC 1 GLBJWOOO AVE I SUITE WO R.IHGH, NC 27603 PHONE 1915..789.9477 sepgnc.corn a 3w AW.. [. wxs 1�� BEFORE TOU DIG Know whars below .` F a Ca I I before you dig. .M. da..o�«. `nerl�a; .seeaNE.rPR m tre er..0 er.0 odAet wen p a ueipw,,..c .V.lFzrelE..., �.,,,.m..0 ,M..d, IR CCOLI ._,� COaR,Ets a , � lE PEUINDE COEST1A.CDCN snE SAFETY S TIESCIE EERIER RESPONSNT CF THE CONTRACTOR Ne1FER THE OWNER nOR TIE EINIER SHALL BE E[PELT® TOPSZLN.EREPOnSIIIIIPY SAFFCR ETYCFTHE WOK R NY PERSIXt4, K ENGAGED CI TCN MANY IEMBT STRUCTURES. OR CF AOTFER PERS�"N1. Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM EDE STREAM IMPACTS LENGTH (LF) f AREA (SF) STREAM IMPACT 1 PERMANENT 30 242 CULVERT STREAM IMPACT 1 PERMANENT I NOT MITIGABLE 21 193 RIP RAP OUTLET NORTH 50' 25' 0 SCALE: 1" = 50' Rev_ T,ai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PRO1.AI2R: IA MICR 0QAMFI BT: S1ERAC.0P CHEC®BT: IA 'FATED!? STREAM IMPACT AREA 4 SA-4 ' I• ZONE 2 - Allowable Upon Authorization 4,767 SF ZONE 1 - Allowable Upon Authorization 1,638 SF RIPARIAN BUFFER- ZONE 1 (TYP.) RIPARIAN BUFFER- ZONE 2 (TYP.) I2 Ij 1 y _ ▪ 1 • + + + + + • + + + + + --y + + + + + + + + + + + + + + + + + + + J- + + + + + + + + + PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP.) EX. SANITARY SEWER EASMENT (TYP.) + + + + -I- + + + + + + + + + + + + + + + + EXISTING + + + + + + WETLAND (TYP) + + 1I— + + + + 4- + + + + + + + + + + L + + + + -1- + + + + + + + - + + + + + ZONE 2 - Allowable + + Upon Authorization + 3,456 SF e2 2] f ZONE 1 - Allowable Upon Authorization 3,278 SF + + + + + + + + + + + + + `\+1\� + + + + + -]- + + + + 07 -- SEPI ENGINEERING& CONSTRUCTION, INC. RALEIGH J 'NLI.W.GTON I C RLO1TE EEALFORT•SC I CHARLESTON, SO 1 CLENWOOD AVE I SURE 603 RALBCH• NC 27663 PHONE 1919.789.9977 sepino.00m DATs —�� BEFORE TOU DIG IGwuv whorl below. Co I I before you egg. LHLAEL PlOwOC• LE Ott... LE inexwir.Lciors..L.te LocErEALL, NOTICE COMMTRUOMN! SITE SAFETY E THESOIE RESPCf4S6IJ1 Y Ce THE CornRAerop NERFER THE OWNER nOR hE 9.GINEER SHALL BE E[PECTEDTo A9A.9.E AnY REPOn9INLTY FOR SAFETY Of THE WORK, Of RERIONT ENGAGED N THE NOR, Ce ANY lEARBI STRUCTURES. OR Of AM OhER PEECORTS. Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PRO.ECf: S E20.027L0 RIPARIAN BUFFER IMPACTS AREA (SF) NOTES ZONE 1 ZONE 2 ALLOWABLE UPON AUTHORIZATION 4,916 8,191 LIMITS OF DISTURBANCE (CLEARING PLUS BUILT UPON AREA) BUILT UPON AREA I PERMANENT 3,334 3,225 10' WIDE PAVED GREENWAY TRAIL NORTH 50' 25' 0 SCALE: 1'= 50' Rev. Trail Grading 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PR.'U. MGR: M. TAYI.OR DRAHN EY: S .TEf1 OURI CHECKED EY: M. TAYIOR BUFFER IMPACT AREA 5 BA-5 + + + 1 1- 1- ZONE 2 - Allowable + + + Upon Authorization + + + _972SF + + + ZONE 1 - Allowable + + + + Upon Authorization 4,284 SF RIPARIAN BUFFER- ZONE 1 (TYP.) RIPARIAN BUFFER- ZONE 2 (TYP.) + + + + + + +__ + + \+ + + .+ + + + + + + + +' + + + - + + + + + + -i+ _+_ + + + + + + + I', + / + ; EXISTING t \ } + + + + WETLAND (TYP) �' } •1 + + i1+ ` ` 1 + + \ • \ • -\ \ \ + + ,• 1 1. _ ZONE 2 - Allowable `. + Upon Authorization \\ \\ 1 + + + 4,919 SF •+`\ } 4? + EX. SANITARY SEWER + EASMENT (TYP.) PROPOSED GREENWAY TRAIL MIDDLE CREEK r y, 22 21 I2 ---'"' --,1 y =-... • 1 \ 1 /ram � ZI Il ••\ • • `, r • , ~• \ \ ••• \ r.• • I • • `+ I0 1- + + + + + + + + + + + + + + + • \ 1 �• • \� • . . • • • } • MtOOLE CREEK PIN # 0659-46-8422 i ZONE 2 - Allowable Upon Authorization 2,209 SF ZONE 1 - Allowable Upon Authorization 9,541 SF 1{ hr G • J SEP! SEPI ENGINEERING& CONSTRUCTION, INC. RAIEGH J 'NLI.IN.GTON I CFURLOi1E 9EALLFORT. SC I CHARLESTON, Sr 1 CLENWOOD AVE I SURE 603 RALBGH. NC 27603 PHONE 1919-789.9977 sepinc.corn unrs —�� BEFORE YOD DIG _r...cuin IGww what's below. Coll before you dg- +Mwc net e. HOME COf4TRUOTION sFTE SAFETY E THESCIE RESPONDS f1 Y CP THE COrnRAerop NERFER THE OWNER NOR RE ENGINEER :HULL BE E[PECTEDTO A&,tP.E ANY REPON9INLIY FOR SAFETY OF THE WOK OF PERSON:1 ENGAGED N THE PORK CP ANY HEARD} STRUCTURES. OR OF ANY OIFER PEEGOILS. Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PRO.ECf: SE2DJfl 0 RIPARIAN BUFFER IMPACTS AREA (SF) NOTES ZONE1 ZONE2 ALLOWABLE UPON AUTHORIZATION 13,825 8,100 LIMITS OF DISTURBANCE (CLEARING PLUS BUILT UPON AREA) BUILT UPON AREA I PERMANENT 5,171 2,153 10' WIDE PAVED GREEN WAY TRAIL NORTH 50' 25' 0 SCALE: 1"= 50' PE78ONE Rev. Trail Grading 4.202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09-032021 PR.'U. MGR: M. TAYIAR DRAM.' EY: S.1EYNIOIPI CHECKED EY: M. TAYIOR BUFFER IMPACT AREA 6 BA-6 • 1 Z1 RIPARIAN BUFFER- ZONE 1 (TYP.) RIPARIAN BUFFER- ZONE 2 (TYP.) x x x x x )4„'` x EXISTING jC • WETLAND (TYP) 1( x x x -I[ ZONE 2 - Allowable Upon Authorization 6,238 SF ZONE 1 - Allowable )4- Upon Authorization 4,052 SF x x x x MIDDLE CREEK 4 • �/► _off ppC7 C 'r, 0o� /.> �7. • 22 O' x PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP.) 0 )4- EX. SANITARY SEWER EASMENT (TYP.) -` ZONE 2 - Allowable Upon Authorization 948 SF 22 x )4- )(1 '` l ,1.1 x 1 x ,'`1 x ' � x )4- -2( x x x x x x EXISTING x x WETLAND (TYP) -7ti • '4 1- ZONE 1 - Allowable 1 Upon Authorization 1 7,260 5F x x x x z,? x x - )4- ZONE 2 - Allowable Upon Authorization 1,722 SF )4- )4, 7C x ZONE 1 - Allowable Upon Authorization 7,260 SF )4- )4„ x x - , immatfona WOODS �/ 4Q�� , ` x ` x x x L x )4- )4 SEP! SEPI ENGINEERINGCOHSTRUL71GN, NC- RILLSGt I HEAP 3TON I CHARLOTTE BEAUFORr. SC I GKRLESTON, SC 1 GL NWOOD AVE I SURE d00 RN.HGH, NC 27603 PHONE 1914-789.9477 sepin e.onl w AW.. [. onrs BEFORE YOU DIG Know whol3 belOW ieF nes Call before you dig- ▪ rowy --era weearrow .A.• err! oweL NORM COFORUS'R0N STE SAFETY S THESUE RESPONSBIJ1 Y CF THE CONTRACTOR NSIFER THE OWNER NOR TFE S.GIMER :HAIL BE E[PECTED TO PS0LP1E ANN REIPONSIBLTY FOR SAFETY OF THE WORK, OF PERIO: ENGAGED N THE WORK CF ANY NEARBY STRUCTURES. OR OF ANY OIFERPS00HS. Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Sheet Holly Springs, NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenwoy DATE PRO.ECf: SE20.027A0 RIPARIAN BUFFER IMPACTS AREA (SF) NOTES ZONE1 ZONE2 ALLOWABLE UPON AUTHORIZATION 12,810 8,908 LIMITS OF DISTURBANCE (CLEARING PLUS BUILT UPON AREA) BUILT UPON AREA I PERMANENT 4,332 3,619 10' WIDE PAVED GREENWAY TRAIL NORTH 50' 25' 0 SCALE: 1 " = 50' Rev. Trail Grading 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09-032021 PROD. MGR: M TAYLOR DRAM BY: 8-1EYIKlIIRI DEC® BY: M TA11OR BUFFER IMPACT AREA 7 BA-7 x x EXISTING 7C WETLAND (TYP) 1( x x 71 RIPARIAN BUFFER- ZONE 1 (TYP.) RIPARIAN BUFFER- ZONE 2 (TYP.) x MIDDLE CREEK 4 • 6/3' 042 0o. ,.> 07 0 1\ ^x za x PROPOSED r1I. GREENWAY TRAIL t 10' WIDE, PAVED (TYP.) x l l 11 .rl .0- EX. SANITARY SEWER _ l EASMENT (TYP.) l x x x �� x x ii -.� 1- — 01 LO 1 PERMANENT STREAM IMPACT 17 LF 145 SF RIP RAP PERMANENT STREAM IMPACT NOT MITIGABLE 6 LF 50 SF xe* �-1E-*�� tkj 7; ' x x 17.. x )4- x xl 7:l x x )4- x x� x .� l l x x '` )4. '� x x x A xl x '` x '� x X x X x x x x ,�.1 '` x x x x x x x x x x x x x x x x x )4- x x x x x 1 x )4,'� x x S. )4.7C x EXISTING x x x WETLAND (TYP) )4-7` x x x '` x x WOODS RIP RAP PERMANENT STREAM IMPACT NOT MITAGABLE • 22 LF x x N 11 I l IS 1{{ I I 1 x L x o. SEP! SEPI ENGINEEEINGd DOHSTIIK LION, NC. RALBM1 HEAfGTON 1 CHARLOTTE BEAUFORr. BC I CIERLESTON, SC 1 GLENWOOD AVE I SURE d00 RN.HGHH. NC 27603 PHONE 1 915..784.9477 sepin e.onn w AW.. [. unrs BEFORE TOU DIG ICnowwM1o3s Call before you dig. I3CE CONSir1.1CRLll STIE SAFETY S THESOIE RESPCNSIEIIT CF THE CONTRACTOR Ne1FER THE OWNER NOR TIE EERIER SHALL BE E[PECT®TO AELWE MN REPDISI&IIIY FCR SAFETY OF THE WORT[ OF PERSONS ENGAGED El TIE NOW CF ANY REARM STRUCTURES. OROF ANY OIFERPS0 N8. Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM STREAM IMPACTS LENGTH (LF) AREA (SF) STREAM IMPACT I PERMANENT 17 145 CULVERT STREAM IMPACT I PERMANENT I NOT MITIGABLE 6 50 RIP RAP OUTLET NGRTH 50' 25' 0 SCALE: 1"= 50' REASIONi Rev_ Trai [racing 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PROJ. AIOE IA TAILCR 0QAMF1 BT: E.1Ef1K0JRI PECKED BT: IA 'FATED? STREAM IMPACT AREA 7 5A-7 r PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP.) ALLOWABLE UPON AUTHORIZATION TEMPORARY BUFFER IMPACT BUILT UPON AREA 1 PERMANENT ZONE 2 - Allowable Upon Authorization 737 SF ZONE 2 - Temporary Buffer Impact 677SF ZONE 1 - Allowable i Upon Authorization 1,049 SF ZONE 1 - Temporary Buffer Impact 779 SF TEMPORARY BRIDGE FOR CONSTRUCTION ACCESS PROPOSED BRIDGE ZONE 1 - Allowable Upon Authorization 1,062 SF - ZONE 2 - Allowable Upon Authorization 1,031 PROPOSED BRIDGE 292.39 ZONE 1 - Temporary Buffer Impact 999 SF RIPARIAN BUFFER IMPACTS AREA (SF) ZONE 1 2,774 1,778 596 ZONE 2 2,844 1,079 ZONE 2 - Temporary Buffer Impact 402 SF NOTES LIMITS OF DISTURBANCE (CLEARING PLUS BUILT UPON AREA) FOR CONSTRUCTION ACCESS 1,092 101WIDE PAVED GREENWAY TRAIL WOODS RIPARIAN BUFFER- ZONE 1 (TYP.) RIPARIAN BUFFER- ZONE 2 (TYP.) ZONE 2 - Allowable Upon Authorization 1,076 SF - —z1 — ZONE 1 - Allowable Upon Authorization 663 SF NORTH 50' 25' SCALE: l " = 50' SEP! SEPI ENGINEERING& CONSTRUCTION, INC. RALEGH J WLMJNGTON I CHARLOTTE BEALFORT.. Sc I CHARL STON, SC 1 GLBdWDOD AVE I SURE 603 RALBGH. NC 27603 PHONE 1919.789.9977 sepinc.00m iy T+. 1wn�ace-ra'x`I J�rscaI3 BEFORE TO II DIG !Grow what's below. Call before you dg. NOTICE CONSTRUCT)ONI STIE SAFETY 6 THESOIE RESF Ot4S6M' CP THE COrnRAeroR NETIHER THE OWNER NOR TIE ENGINEER :HAIL BE EPECTEDTO ASSUME ANN REPON9INLIY FOR SAFETY OF THE WORK, OF PER.,ONS ENGAGED N THE WORK CP ANY NEARBY STRUCTURES. OR OF ANY OTHER PERSCNIS. 1 v�., R. w 12--2021 Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway PRO.ECf: ISSUE DATE SE20.021L0 Rev. Trail Grading 4.202021 Rev. New Trail 07.06202 Rev. Per Town Comments 09.03202 PROD. MGR: M. TAYLOR DRAHN R 1ErMOLI CHEpIDI M. TAYIO BUFFER IMPACT AREA 8 BA-8 N/F WOODCREEK NEIGHBORFIi. PIN # 0659-67-1324 ZONE 2 - Allowable Upon Authorization 562 SF ZONE 1 - Allowable Upon Authorization 1,797 SF N•' F O"NTON, KATHERINE PIN 4 0659-67-0193 ZONE 2 - Allowable Upon Authorization 641 SF PROPOSED BOARDWALK r I / 1 I v, I N 44) PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP.) RIPARIAN BUFFER- ZONE 2 (TYP.) RIPARIAN BUFFER- ZONE 1 (TYP.) o7 - SEP! SEPI ENGINEEEINGd CONSTRUCICOL NC. RALBGI I HEAfGTON 1 CHARLOTTE BEAUFCRr. SC I GWRLESTO3SC 1 GLENWOOD AVE I SUITE 603 R.I HGH, NC 27603 PHONE 1 915..789.9477 sepinc.com F iWnH.IV[i unxs BEFORE TOU DIG Know whars belowuint."-":. anc Ca I I before you dig. woween n elnewunt Eeoo....naEswC.M..en. FOTICE CIXUtITr1.ICTILN SITE SAFETY S THESOIE RESPONSIA IT CF THE CONTRACTORNEITFER THE OWNER nORTIE EIINffi1 SEAL BE EUECTED TO POLICE MY REPONSI91IITY FP? SAFETY CF THE WORK OF PERSONS ENGAGE CI1FE WORT( CF ANY WARM STRUCTURES. OR CF ANY OIFERPS3 NS. �, r.ca4� INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Sheet Holly Springs, NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PRO.ECf: SE20.027AO RIPARIAN BUFFER IMPACTS AREA (SF) NOTES ZONE 1 ZONE 2 ALLOWABLE UPON AUTHORIZATION 1,797 1,203 LIMITS OF DISTURBANCE (CLEARING PLUS BUILT UPON AREA) BUILT UPON AREA I PERMANENT 598 401 10' WIDE PAVED GREENWAY TRAIL NORTH 50' 25' 0 SCALE: 1" = 50' REVISIONS: Rev. Trail Grading 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PR.'U. MGR: N TAILOR DRAMA PT: S.TEEFAOIIRI CREC® PT: N TAYLOR BUFFER IMPACT AREA 9 BA-9 • • \• • • `� `, .----•,,e ■ • ■ / • \ �/ / � \ \ \ . N. • �— / . .. ________—_ • m-- \ \ • \\\• .. —_. \.. • • \\ \\\• •�• `� \ \ \ • N. • \ \ N. • •� .. . • \ • \ \ \ \ • \ \ \ \ \ . . \ \ • \ \ • _ • \ . \ \ \ \ \ \• \ . 11 • \ • N.• \•� \ \1 \• \\ \ ` — —_—\ \ •_— • 1 \ \ ._� \ \ 11 \•\• ■ •, •\ •■ \1 \ t { \ 1 • 1 t 1 • -I 1 • \ 1 1 • 1 1 •• \ \ 1 ■ I•—\ ■ t 1 1 • 1 1 1 ` `• l t 1 \ I • 1 VI ll — / - ZONE 2 - Allowable Upon Authorization 995 SF ZONE 1 - Allowable Upon Authorization / 1,228 SF T r 1 / / /1 I / 1t// I 1 1 / / ,' /' 11 1 0 / / / / 1 1 // / // // / / ,1 ' / / / ' / / / 1 1 ,; \` / 1 1 �/ // // /I 1 / 1 11 / do k ,/ // I I r r 1 + /9 / / ,�-1 / /' I f 111, / / k / 111, ff i // / '/ /� I�' + / d / / / / / 1 L I / / I / // // // /// j 11 I 1 I 7 r / / / / .' / / / / / I / I / / / / / / / ■ / / / / 1 1 . ■ / / / / r l / / / i _ I I ■ ■ / 1 1 I I � L• I2 + + PROPOSED GREENWAY TRAIL J 10' WIDE, PAVED (TYP.) RIPARIAN + BUFFER- ZONE 2 (TYP.) + I I RIPARIAN + BUFFER- ZONE 1 (TYP.) + fi fi + + 1 • PIR k 0559-77-4232 ■ ■ \ ■ 1 ■ \ • 1 1 ■ 1 ■ \ 1 •\ ■ \�• 1 1 1 1 \ • { 1 1 t 1 ■ I I I { 1 1 - N/F HASKINS, CATHERINE A !0 HASKINS. GEORGE D JR PIN # 0659-77-4-E 1 1 ' ■ \ 1 \ .7 • •\ ���� ■ \ 1 1 \ • l 1 \• ■ I\ I 1 t 1 •\ - ■ ■ 1 1 1 1 1 1 1 1\ 1 \ ■ 1� \\\` 1 11 \\ \ \'0•■ ' ZONE 1 - Allowable , \\ •; _ / Upon Authorization \\ \. •.\ • 1 { ■ \ 1,088 SF ZONE 2 - Allowable '0 - Upon Authorization f1`Thm 746 SF +' + t +' 1 �\ I� + + EXISTING + ■ + + + WETLAND (TYP) t- -t - • + + + + -- + ■• \ 1 1 . • • t I I I _ \ ■ 11 1 1 \'■ 1 t t \ _ `, • • \`\ • '\ \ • -- • • • •_ EXISTING UTILITY + EASEMENT SEP! SEPI ENGINEEEINGd D NSTtUL71ON, NC- RALBca1 I xaxr 3TGN I CHPEOTTE BEAUFORT.. BC I CJWRLSTON, SC 1 GLENWOOD AVE I SUITE WO R.IHGH.. NC 27603 PHONE 1919-789.9977 sewnc.onl BEFOE TOU DIG Know whars Call before you dig. •%RI°`r..e COW.. do.M .ow.eWlea .�enaildavasa..e+m .to..Oar ISI(PRE.fe. IeP1aK.C.H.AC80erae a.PMROPERvl a,. la ott.....termearrEAL•rdts PAWL 101%..tra NOTICE CDI6TRUCUOIf SfE SAFE( S THESOIE RESPCNSIANT CF THE CONTRACTOR NETFER THE OWNER nOR TIE EERIER SHALL BE BEECTE TO A0LN.E MY REPONSIIhLIWY FOR SAFETY OF THE WORT[ CF PERSONS ENGAGE Ff TIE NOW MANY IEARBT STRUCTURE. OR CF ANY OTFER PS0CN8. Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM m EDE RIPARIAN BUFFER IMPACTS AREA (SF) NOTES ZONE1 ZONE2 ALLOWABLE UPON AUTHORIZATION 2,461 1,790 LIMITS OF DISTURBANCE (CLEARING PLUS BUILT UPON AREA) BUILT UPON AREA I PERMANENT 691 622 10' WIDE PAVED GREENWAY TRAIL NORTH 50' 25' 0 SCALE: 1"= 50' REASIME Rev_ Trod Gradrg 4202021 Rev- New Trail 07.062021 Rev- Per Town Comments 09.032021 PROJ-AIDE IA MICR CRAM BT: S1Ef1K0JRI CPEC® BT: IA TAYIAR BUFFER IMPACT AREA 10 BA-1 0 • • • • •• •• • ▪ -▪ .--- --� ► 45 \ \ N. ' F f� _ \ \ \\ \ \• \ ▪ �- / ./-/ \ \ \ \ \ \• - — - - -. . • m.- • • \ • • 7• • \ • • • . • • •`\ �\: • • \.. • • \• \ •\•\ ••• •. - \ \ • \• •• • \ \ • \ • \ •• \ \ \\• \•\ •• \ \ •`\\•`--'• • \ \ \ \ \ —_\\ \\ \•\ \\ •- 11�'—. \ \ \ 1 \ \ \ \ \ • 1\` 1 1 ■ \ •�— 1 \ 11 \\ \\ •\ •■ 111 ■ \ 11 \ 1 • 1\ I • ,— \ \ �. ■ 1 \\ 1 I 1 ■• \ 1 I ■ ■ • \ 11 1 \ 1 1 l -• •• l 1 1 • 1 V1 ll s. • / r / / / / / / / r r / / / r / / , k I I r r� y I 1 / / // // /r / r r I I / / / r / I / I / 1 r / / I / 1 r / / / / r ./ / / / I i / r ..//r1 i 1 • RIP RAP PERMANENT STREAM IMPACT NOT MITIGABLE 12 LF 117 SF // ti PERMANENT / STREAM IMPACT wn LF f .L1 bMP+ • Z1 . I � � ' //I 4 F7~ ter. �• _11476 ki -.440 + + + PROPOSED GREENWAY TRAIL 10' WIDE, PAVED (TYP.) + RIPARIAN BUFFER- ZONE 2 (TYP.) RIPARIAN BUFFER- ZONE 1 + (TYP.) + + + / .ter tit 1 • • \• \ ! , 1 1 R I 1 I•j I r ■ 1 I I r I 1 f r lr 11 I� \ f • • . \ • \ • \ • • N. + 1 11r I I 'IIr1rIj11 .. 11 1 1 11 I I 1 1 f 1 1 11 1 f 1r1 r II ! 1 1 111111 1 III r r f 11 1r1 + I 1 1I I 1 1 1 I r r !! / r r1 r I1 1 0I r 1r 111I11 • r r 11 ! I� + I 1� ! 1 11 1 11 ! 11 ■\ \ \ ■ \ \ 1 1 ■ 1 \ 1 1 1 \/ 1 \ � \ \ 1 1 \ 1 1 1 1 1 \ \ + I I 1 1 1 \ \ 1 1 1 1 \- 1 ■\ \ 1 I1 •./_ .-- �\ \ \ 1 �— - \ \\ - 1 \ \ \ \ 1 \ t \\ •• \\ ■ \ \\ • \ • 11 •• \\ \- 1\ • • a. • • • • • -• • J ra PIR k 0559-77-4232 ▪ -- • 1 l \•L �� - \\ \ 1 1 �- — 4- I t + • •�� _ + + EXISTING - + 11 ▪ + + + + + WETLAND (TYP) K + + - • j N/F HASKINS. CATHERINE A !i HASKINS. GEORGE D JR PIN # 0659-77-4"E • • 1 1 • 1 1 V 1 1 1 1 1 1 1 1 1 1 - •\\\ \ 1 1 1 1 • • • N.•_ N. • • \ • •\ \\ •\1\\- ° .• • 0? •- \ • + + + + + + + + 40 •• \ - •• • - • • ■ • + + + + + + + + + + �+ + + SEP! SEPI ENGINEEEING& D NSTtUL71ON, NC. RALSGt1 I HEAP 3TON I CFARLOTE BEAUFORr. SC I CJWRLESIOft BC 1 GLENWOOD AVE I SURE WO R I HGH. NC 27603 PHONE 1915..789.9977 sewnc.onl . 3 WOH,Igl;1>n.s BEFOTOU DIG Knowviin,wrs belowRE Ca I I before you dig. °ia..c�...e.ar.�e.aveaea..e+m.e 14.04.00.4 IeP1aK1e.lk1080era e NOIICE CONSTRUCROII SIZE SAFETY S THESO1E RESPONSIA IT CF THE CONTRACTOR NEITFER THE OWNER nOR TFE EIINEeJ SHALL BE EV/EOTED TO A0LN.E MY REIPDISI&IIWY FP? SAFETY OF THE WORK[ Cf PERSONS ENGAGE Fl hE NOW CF ANY 1EARBT STRUCTURES. OR CF ANY OIFER PERSONS. o�Sn / _ "O 12- -2021 Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs. NC 27540 PRELIMINARY NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 09-012: Arbor Creek Greenway DATE PROEM m EallE STREAM IMPACTS LENGTH (LF) AREA (SF) STREAM IMPACT 1 PERMANENT 16 135 CULVERT STREAM IMPACT 1 PERMANENT I NOT MITIGABLE 12 117 RIP RAP OUTLET NORTH 50' 25' 0 SCALE: 1'= 50' REWSIORk Rev_ T1ai Gradrg 4202021 Rev. New Trail 07.062021 Rev. Per Town Comments 09.032021 PROJ.AIGE IA TAIICR MAMA BT: CHEC®6T: IATAT'LO? STREAM IMPACT AREA 10 5A-1 0 ATTACHNIENT F 00000000000000&O 000000000000000 Arbor Creek/Middle Creek Greenway TOWN APPROVAL STAMPS SEP! HOLLY SPRINGS, NC Construction Drawings (90% Plans) March 31, 2021 VICINITY MAP ARBOR CREEK BRIDGEWATER 0 WINDCREST r v _. CROSSWAY LN rn rn GREENWAY LOCATION RIDGE RIDGE AN GREENWAY TRAILHEAD 0 0 WOODCREEK EN TF 0' 0 a sLoer / SCALE: 1 "=500' SHEET INDEX CIVIL Co.o CO.1 C1.0 C1.1 C2.0 - C2.25 C2.26 C2.27 C2.28 C2.29 - C2.30 C3.0 - C3.25 C 4.0 C4.1 C4.2 C4.3 C5.0 C5.1 C5.2 C5.3 STRUCTURAL S-1-S-13 PTO1-PT05 S B-1-SB-9 SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UULIVTES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. COVER SHEET NOTES SHEET EXISTING CONDITIONS TRAIL ROUTING + CONSTRUCTION ACCESS PLAN EROSION CONTROL PLANS NCGO1 SELF -INSPECTION, RECORDKEEPING, REPORTING NOTES NCGO1 GROUND STABILIZATION & MATERIALS HANDLING EROSION CONTROL NOTES EROSION CONTROL DETAILS PLAN AND PROFILE PARKING AREA - EXISTING CONDITIONS & DEMOLITION PLAN PARKING AREA - LAYOUT PLAN PARKING AREA - GRADING & DRAINAGE PLAN PARKING AREA - LANDSCAPE PLAN SITE DETAILS SITE DETAILS SITE DETAILS SITE DETAILS BRIDGE PLANS PRECAST CONCRETE BOARDWALK PLANS BOARDWALK PLANS SITE DATA SITE LOCATION Along Middle Creek between Sunset Lake Rd. and Holly Springs Rd. PIN(S) SEE LISTING BELOW GROSS ACREAGE +136 AC EXISTING ZONING R-20 / R-10 / R-10 CU 1 PUD WATERSHED MIDDLE CREEK RIVER BASIN NEUSE FLOODPLAIN FIRM PANEL 0750 MAP 3720075000J DATED 5/2/2006 FIRM PANEL 0659 MAP 3720065900J DATED 5/2/2006 CURRENT USE VACANT PROPOSED USE GREENWAY PIN Real Estate ID Owner Name 0750-22-0168 0211564 T own of Holly Springs 0750-12-7235 0428$93 Arbor Creek KS LLC 0750-11-8963 0750-1 1-8876 0252467 Michelle L Bailey& Sharon Shelton 0252466 Jorge Alberto & Natalia Ortiz 0750-11-8799 0252465 Joan E Church 0750-11-8792 0252464 Emmanuel Agamloh & Jane Sekyi 0750-1 1-8685 0253667 Albert S Romero, Jr & Lavina Romero 0750-12-0529 0253662 Arbor Creek Homeowners Assoc Inc 0750-10-9923 0240773 Arbor Creek Homeowners Assoc Inc 0750-10-7721 0245383 Arbor Creek Homeowners Assoc Inc 0750-20-0554 0245349 Arbor Creek Homeowners Assoc Inc 0750-10-7683 0245377 Andrea M Daniel Beimler & John R Beimler 0750-10-7566 0245376 Susan E & Arturo L Zepeda 0750-10-7462 0245373 Michael Turner & Melissa Fenn 0750-10-7395 0245372 Rodney C & Traci L Cooper 0750-20-2087 0273525 Arbor Creek Homeowners Assoc Inc 0659-29-3556 0361283 Bridgewater Holly Springs Homeowners Assn Inc 0659-29-4300 0361284 Bridgewater Holly Springs Homeowners Assn Inc 0750-30-3969 0000365 The Math Family LLC 0659-28-7388 0036549 Town of Holly Springs 0659-47-4367 0365869 Town of Holly Springs 0659-46-8422 0058563 Sunset Ridge North Assn Inc 0659-66-6792 0049292 Margaret White Flintom 0659-57-3903 0365870 Woodcreek Neighborhood Assn Inc 0659-77-0392 0439873 Timothy & Cynthia Larson 0659-67-1324 0405171 Woodcreek Neighborhood Assn Inc 0659-47-9295 0411586 Woodcreek Neighborhood Assn Inc 0659-76-4945 0354443 Woodcreek Neighborhood Assn Inc 0659-76-8220 0102932 Town of Cary PROJECT TEAM OWNER: TOWN OF HOLLY SPRINGS PARKS AND RECREATION 128 S. Main Street Holly Springs, NC 27540 Contact: Matt Beard Park Planner PH: (919) 567-4018 matt.beard @hollyspringsnc .gov CONSULTANTS: SEPI, INC. 1 Glenwood Avenue Raleigh, NC 27603 PH: (919) 789-9977 Civil Engineer/ Project Manager: Michael Taylor, PE PH: (919) 573-9925 mtaylor@sepiinc.com Surveyor: Steve Coats, PLS Environmental: Bob Lepsic Anna Reusche S&ME 3201 Spring Forest Road Raleigh, NC 27605 PH: (919) 872-2660 Geotechnical Engineer: Kevin Nadeau, P.E. PH: (919) 872-2660 knadeau@smeinc.com STEWART 223 S. West Street, Suite 1 100 Raleigh, NC 27603 PH: (919) 380-8750 Structural Engineer: David Ruggles, PE PH: (919) 866-4717 NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. \kWIllllllrrlrrrrr cAt ssroy.y v ` SEAL 053032 �rrrrrll11111111��� 12-08-2021 '��111i111r11j1r rrr+1r111ft% \ COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR COVER SHEET c-o.o GENERAL NOTES: 1. BOUNDARY & ENVIRONMENTAL INFORMATION, EXCEPT AS NOTED, TAKEN FROM AN ELECTRONIC FILE OF A FIELD SURVEY PREPARED BY SEPI ENGINEERING & CONSTRUCTION DATED MAY 5, 2020. TOPOGRAPHIC DATA TAKEN FROM AN ELECTRONIC FILE OF AERIAL MAPPING PREPARED BY SPATIAL DATA CONSULTANTS, INC. DATED MARCH 13, 2020. ALL OTHER PLANIMETRIC INFORMATION OBTAINED FROM TOWN AND COUNTY GIS DATA. 2. HORIZONTAL AND VERTICAL CONTROL WAS ESTABLISHED BY RTK GPS AND OPUS OBSERVATIONS. COORDINATES SHOWN ARE GRID COORDINATES. ALL BEARINGS ARE GRID BEARINGS UNLESS OTHERWISE NOTED, ALL DISTANCES ARE HORIZONTAL GROUND DISTANCES UNLESS OTHERWISE NOTED. 3. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATED ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY {ONE CALL AT 1-800-632-4949, OR INDIVIDUAL UTILITY OWNER). ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED AT THE CONTRACTORS EXPENSE, 4. UNLESS EXPLICITLY SPECIFIED, THIS PROJECT SHALL COMPLY WITH THE TOWN OF HOLLY SPRINGS UNIFIED DEVELOPMENT ORDINANCE (UDO) AND ALL OTHER APPLICABLE REGULATIONS AND GUIDELINES. IN THE EVENT OF A DISCREPANCY BETWEEN THIS APPROVED PLAN AND THE APPLICABLE REGULATIONS OR GUIDELINES, THE MORE STRINGENT SHALL APPLY. 5. CONTRACTOR TO OBTAIN COPIES OF ALL PERMITS AND ENCROACHMENTS PRIOR TO CONSTRUCTION, COMPLY WITH ALL REQUIREMENTS LISTED THEREIN, AND COORDINATE AND OBTAIN ALL INSPECTIONS, INCLUDING THOSE REQUIRED FOR PROJECT CLOSE-OUT. MAINTAIN A COPY OF ALL PERMITS ON -SITE. 6. ALL ACTIVITIES SHALL COMPLY AT A MINIMUM WITH ALL STATE AND FEDERAL REGULATIONS, AS WELL AS THE APPROPRIATE COUNTY HEALTH DEPARTMENT REGULATIONS, AND TOWN AND COUNTY FIRE DEPARTMENT REGULATION FOR HAZARDOUS MATERIALS AND WASTES. 7, PROTECTION OF EXISTING VEGETATION: THE TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION ACTIVITIES AND REMAIN IN PLACE UNTIL ALL CONSTRUCTION 15 COMPLETED AND THE FINAL INSPECTION 15 SCHEDULED. NO STORAGE OF MATERIALS, FILL, OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. THE FENCING SHALL BE REMOVED PRIOR TO THE FINIAL SITE INSPECTION. 8. PROTECT ALL PROPERTY MONUMENTS AND PINS. MONUMENTS AND PINS THAT WILL BE DISTURBED DURING CONSTRUCTION SHALL BE REFERENCED AND REPLACED BY A LICENSED LAND SURVEYOR AT CONTRACTOR'S EXPENSE. 9. THE CONTRACTOR SHALL OBTAIN A RIGHT-OF-WAY PERMIT FOR ANY WORK WHICH REQUIRES THE CLOSURE OF A TRAVEL LANE(S) AND/OR SIDEWALK. MAINTENANCE OF TRAFFIC AND TRAFFIC CONTROL 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR. TRAFFIC CONTROL SHALL BE MAINTAINED IN ACCORDANCE WITH NCDOT STANDARDS AND THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, OR AS DIRECTED BY THE LOCAL MUNICIPALITY. 10. ANY DISCREPANCIES FOUND BETWEEN THESE DRAWINGS AND SPECIFICATIONS AND SITE CONDITIONS, OR ANY INCONSISTENCIES OR AMBIGUITIES IN DRAWINGS OR SPECIFICATIONS SHALL BE IMMEDIATELY REPORTED TO THE ENGINEER, IN WRITING, WHO SHALL PROMPTLY ADDRESS SUCH INCONSISTENCIES OR AMBIGUITIES. WORK DONE AFTER DISCOVER. WITHOUT ATTEMPTING TO CONTACT HE DESIGN ENGINEER, WILL BE DONE AT THE CONTRACTORS RISK. 11. IF DEPARTURES FROM THE DRAWINGS OR SPECIFICATIONS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED IN WRITING TO THE OWNER FOR REVIEW PRIOR TO COMMENCING ANY WORK. NO DEPARTURES FROM THE CONTRACT DOCUMENTS OR CLAIMS FOR ADDITIONAL PAYMENT WILL BE ALLOWED WITHOUT PRIOR APPROVAL BY THE OWNER OR ENGINEER. 12. CONTRACTOR ACCESS FOR TRAIL CONSTRUCTION SHALL BE CONFIRMED BY CONTRACTOR WITH OWNERS' REPRESENTATIVE PRIOR TO CONSTRUCTION. 13, EROSION CONTROL MEASURES AND TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO ANY CONSTRUCTION ACTIVITIES. 14, ALL DEMOLITION MATERIAL SHALL BE DISPOSED OF OFF -SITE AND IN ACCORDANCE WITH ALL APPLICABLE RULES & REGULATIONS. 15. SEWER MANHOLES LOCATED IN THE PROPOSED ASPHALT TRAIL WILL REQUIRE ADJUSTMENT TO FINISHED GRADE. 16. CONTRACTOR SHALL REVIEW TREE REMOVAL WITH OWNER'S REPRESENTATIVE AND LANDSCAPE ARCHITECT PRIOR TO TREE REMOVAL. 17. CONTRACTOR SHALL STAKE CENTERLINE OF TRAIL ACCORDING TO PLANS AN OBTAIN APPROVAL FROM OWNER'S REPRESENTATIVE AND DESIGN ENGINEER PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE RESOLVED PRIOR TO CONSTRUCTION. 18. CONTRACTOR SHALL BE RESPONSIBLE TO CONTROL AND INITIATE CLEAN UP OF LITTER AND REFUSE GENERATED BY CONSTRUCTION ACTIVITIES. THE CLEAN UP SHALL BE DONE ON A REGULAR BASIS, AND SHALL INCLUDE INITIATED ACTION AND ASSUMING ANY COST ASSOCIATED WITH CLEAN UP ACTIVITIES. ALL REFUSE AND DEBRIS SHALL BE DISPOSED OF LAWFULLY AT AN OFF -SITE LOCATION. 19. CONTRACTOR SHALL RESTORE ALL LAY DOWN AND STAGING AREAS TO ORIGINAL CONDITIONS AND TO THE SATISFACTION OF THE OWNER PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT. SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILTIIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. 0 1M11111111/0o e�_.0 Essroyf». T SEAL 053032 1/"//+++r l 1111lll‘\‘\\\\ 12-08-2021 1,111illl1111111! COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC LANDSCAPE NOTES: 1. ALL TECHNICAL SPECIFICATIONS AND GENERAL CONDITIONS APPLY. ALL GENERAL NOTES AND GENERAL CONSTRUCTION NOTES APPLY. 2. THE CONTRACTOR I5 RESPONSIBLE FOR ALL QUANTITY TAKE -OFFS AND VERIFICATION OF MATERIALS AS SHOWN ON THESE PLANS AND IN WRITTEN SPECIFICATIONS. THE CONTRACTOR SHALL NOTIFY THE LANDSCAPE ARCHITECT OF ANY DISCREPANCIES PRIOR TO FINIAL BIDDING OR INSTALLATION. 3. THE CONTRACTOR SHALL VERIFY LOCATIONS OF EXISTING AND PROPOSED UNDERGROUND UTILITIES PRIOR TO THE INSTALLATION OF ANY PLANT MATERIAL. 4. ALL LANDSCAPE MATERIALS SHALL CONFORM TO THE ACCEPTED STANDARDS ESTABLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN. 5. PRIOR TO THE END OF EACH WORKING DAY, THE CONTRACTOR SHALL PROPERLY BACKFILL ALL PLANT MATERIAL THAT HAS BEEN PLACED IN PREPARED HOLES: AND PROPERLY WATER AND MULCH ALL PREPARED GROUNDCOVER, PERENNIAL AND ANNUAL BEDS 6. ALL TREES AND SHRUBS SHALL BE SOAKED WITH WATER AND MULCHED IMMEDIATELY FOLLOWING INSTALLATION. 7. LANDSCAPE ARCHITECT OR OWNER SHALL APPROVE ANY ON -SITE PLANT STORAGE AREA. 8. ALL ROOT BALLS REMOVED FROM CONTAINERS SHALL BE SCARIFIED BY HAND PRIOR TO PLACEMENT AND BACK FILLING WITH PREPARED SOILS. HAND TOOLS ARE NOT TO BE USED TO SCARIFY ROOT BALLS. 9. ALL ROPE AND WRAPPING TWINE SHALL BE CUT AND REMOVED FROM AROUND THE UPPER PARTS OF THE ROOT BALL. METAL BASKET WIRES AND BURLAP SHALL BE PULLED BACK AND TUCKED UNDER THE EDGES OF THE SAUCER RINGS ON ALL TREES AND LARGE SHRUBS. ALL SYNTHETIC BURLAP SHALL BE REMOVED FROM PLANT BALLS PRIOR TO BACKFILLING. 10, ALL PLANTING AREAS SHALL BE EDGED WITH SMOOTH, CONTINUOUS CURVES. 11. ALL PLANT MATERIAL SHALL BE PLANTED AT HEIGHTS AS SPECIFIED IN THE PLANTING DETAILS & PLANT LIST, CONTAINER SIZES PROVIDED FOR REFERENCE ONLY. 12. TREE STAKING AND GUYING, IF NECESSARY, SHALL BE PERFORMED WITHIN A WEEK OF PLANTING, THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL TREE STAKING MATERIAL AFTER THE FIRST FULL GROWING SEASON OR ONE YEAR, WHICH EVER COMES FIRST. 13. B & B AS LISTED UNDER "ROOT' IN THE PLANT LIST INDICATES BALLED AND BURLAPPED. 14. ALL PLANT BEDS AND RAISED SAUCER RINGS SHALL BE GRADED TO PROVIDE ADEQUATE DRAINAGE AND SHALL BE MULCHED AS SPECIFIED. 15. ALL MATERIALS. PLANTING AND LANDSCAPE WORK SHALL CONFORM TO THE LOCAL OR COUNTY JURISDICTIONAL AUTHORITY'S STANDARD SPECIFICATIONS AND DETAILS. GRADING NOTES: 1. TREE PROTECTION FENCING SHALL BE INSTALLED BEFORE ANY WORK IS DONE ON THE SITE AND INSPECTED PER TOWN REGULATIONS. 2. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION PRIOR TO THE CERTIFICATE OF OCCUPANCY (CO) IS SCHEDULED. THE FENCING SHALL BE REMOVED PRIOR TO FINAL SITE INSPECTION. 3. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE, WITH NO SHARP OR ABRUPT CHANGES. 4. THE PROPOSED CONTOURS SHOWN ARE FINISHED ELEVATIONS. REFER TO PAVEMENT AND SIDEWALK DETAILS TO ESTABLISH CORRECT SUB -BASE OR AGGREGATE BASE COURSE ELEVATIONS TO BE COMPLETED UNDER THIS CONTRACT. 5, CONTRACTOR SHALL ENSURE POSITIVE DRAINAGE 50 THAT RUNOFF WILL FLOW BY GRAVITY ACROSS NEW PAVEMENT AND/OR LANDSCAPE AREAS TO NEW OR EXISTING STORM DRAIN INLETS, SWALES, DITCHES OR OVERLAND SHEET FLOW. 6. REFER TO SHEET C-2.10 FOR PERMANENT SEEDING SCHEDULE. 7. ROOT PROTECTION ZONE EQUALS ONE FOOT OF RADIUS FOR EVERY INCH OF DIAMETER OF EXISTING TREES. OR SIX FOOT RADIUS, WHICHEVER IS GREATER. NO DISTURBANCE ALLOWED WITHIN THIS AREA, AREA MUST BE PROTECTED WITH BOTH TREE PROTECTION FENCING AND WARNING SIGNS. 8. AT THE START OF GRADING INVOLVING THE LOWERING OF EXISTING GRADE AROUND A TREE OR STRIPPING OF TOPSOIL, A CLEAN, SHARP, VERTICAL CUT SHALL BE MADE AT THE EDGE OF THE TREE SAVE AREA PRIOR TO OR AT THE SAME TIME AS SILT FENCE AND OTHER EROSION CONTROL MEASURES ARE INSTALLED. THE TREE PROTECTION FENCING SHALL BE INSTALLED ON THE SIDE OF THE CUT FARTHEST AWAY FROM THE TREE TRUNK AND SHALL REMAIN IN PLACE UNTIL ALL OF THE CONSTRUCTION IN THE VICINITY OF THE TREES 15 COMPLETE. NO STORAGE OF MATERIALS, FILL. OR EQUIPMENT AND NO TRESPASSING SHALL BE ALLOWED WITHIN THE BOUNDARY OF THE PROTECTED AREA. Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR NOTES c-o.1 I= la I; 4 I; li 4' 4= / Oa or .4 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 300' 150' 0 SCALE: 1" = 300' 300' NORTH SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESEMATIV E THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. 0111111III111l,,�� .Q,oFEssro�,, • SEAL 053032 rf,Il'''��Irrl+'I'11111G \\ 12-08-2021 COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway PROJECT: ISSUE: REVISIONS: PROJ. MGR: DRAWN BY: CHECKED BY: 5E20.027.00 DATE M. TAYLOR L. SMITH, 5. TEYMOURI, E. GWIN M. TAYLOR EXISTING CONDITIONS c-1.o i TEMPORARY CONSTRUCTION LAYDOWN AREA # 1 _ r '-- .\:7------;=-1.,-;j:Q- -4. '-- '..1: ---- P '7: ::". ::' ..---F)--t- -.!,\11:-.--:: -:: :\ 'ice; tip• � ice' -,7 $ \\\ \� _ - r PROPOSED TRAIL (TYP) PROPOSED GREENWAY ASEMENT (TYP) TEMPORARY BRIDGE111 (DESIGNED, PERMITTED, & SUPPLIED BY CONTRACTOR) 414' a : TEMPORARY CONSTRUCTION ACCESS #5 AirAustik — . 0 4. rr .„,,, ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 300' 150' 0 SCALE: 1" = 300' 300 NORTH SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 919.789.9977 sepiinc.com 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTORS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. �■����+, I, I I I r rr rri���. Q l SEAL ▪ =- - 053032 triVoK 12-08-2021 00111,11f1111111f/ 1\& coVsi COPYRIGHT@ 2021 SERI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway PROJECT: 5 E20.027,00 ISSUE: REVISIONS: PROJ. MGR: DRAWN BY: CHECKED BY: EXHIBIT MAP M. TAYLOR L. SMITH. 5. TEYMOURI, E. GWIN M. TAYLOR DATE 01.26.2021 SHEET KEY & CONSTRUCTION ACCESS PLAN c-1.1 1/6/2022 1:09 PM X:\2020\SE20.027.00 ToHS - Arbor Creek Greenwoy\Lb\besign\Drawings\Plonsets\Site. Plan\SE20027 C-2.0 THRU C-2.5 EROSION CONTROL.dwg Tr& r PROPOSED TEMPORARY CONSTRUCTION ACCESS ROUTE #1 540 SQ. FT. COIR FIBER MATTING PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) 7- + ( + } LIMITS OF - DISTURBANCE (TYP.) EX. ROPERr?\ BOUNDA'Y (TYP. ;1; WETLANDS P.) EXISTING FLOODWAY `1— + + \ + '' Oo �i + // �EX/SEWER EASEMENT (TYP.) PROPOSED r SEGMENTAL \ BLOCK WALL - 45 LF (-90 SFF) EX. WLANDS (TYP. EX. BOARDWALK TO BE [REMOVED +LIMITS OF DISTURBAUFE (TYP.) EX. ROPERTY ---ty j BODARY (TYP EX. oARDWAik TO BE R VED GRE AY EASEMENT +(WIDTH VARIES, ) PROPO 10' WIDE AS HALT FAIRFORD DR 'SS - -SS - - Ss 7.0 4-_ 7 -1-77" LEGEND - EROSION CONTROL: Z1 12 _ t TPSF LD SF SF TP TP TPSF 140- 140 LD LD - SF SF TP TP TPSF TPSF ❑ ❑ ❑ ❑ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND LAMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR RS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILETS BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UHLRIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) 41. SILT FENCE OUTLET @ LOW POINTS AND EVERY —200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) 0 9, • i 1 CONTRACTOR TO PROVIDE PERMANENT r GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT s-LIMITS OF DISTURBANCE ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) �rl 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. ,\,.111111111rr1,,,�� 7,Q,DFESS/o fry• 9 SEAL 053032 NE 1 '�,+�++r111111n1��', 01-05-2021 1kit 11if11111�! `stC'�lt' & Cal& +111r* llflillll,,` COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF/ 11.12ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 SCALE: 1, = 30' 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A C2.0 3 C-2.5 EROSION CO CD 0 Drawings\PH Creek Green �', X:\2020\5E20.027.00 I 12/8/2021 10:4 —SS _ - SS _ SS ,, "t" . -7_ t 5TLI ITS UR 21 'F ANCE (TYP.) PROPOSED 10' --� WIDE ASPHALT TRAIL (TYP.) PROPERTk BeU RY (TYP. - - PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) Lu co La Q Z h a o Lid FAIRFORD DR SS S. -- SS l � U Ne U.J144 i s b Q• 547 SQ. FT. COIR FIBER MATTI N G 159 SQ. FT. COIR FIBER MATTING EX. SEWER EASEMENT (TYP.) Za Oa Z= 0 0z EXISTING FLOODWAY lz ARBOR CREEK PROPOSED 10' - 35a WIDE ASPHALT TRAIL (TYP.) \N•g• AIN NAN.****. k\x-1.‘ EX. SEWER EASEMENT (TYP.) 4'21+"r PIS 360— ARBOR CREEK RIPARIAN BUFFER/ LIMITS 0 D JURBANCE-4TY PROPOSED 10' WIDE ASPHALT ,�` TRAIL (TYF= - --� �_�'�2695Q.FT. s COIR FIBER 13s6� �` MATTING �N` EX. PROPERTY ' \ \ BOUNDARY (TYP.) \\, N\ EX/ V'VETLAN DS (TYP.) 418 5Q. FT. COIR FIBER MATTING J LEGEND - EROSION CONTROL: Z1 Z2 TPSF LD SF SF TP TP TPSF 140- 140 LD LD — SF SF TP TP TPSF TPSF 111111 11 t ❑ ❑ ❑ ❑ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE inform refs or IIVAPAPAP- X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UULBIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) 0 9, • SILT FENCE OUTLET @ LOW POINTS AND EVERY —200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT s-LIMITS OF DISTURBANCE ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) •=iirl ja III 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. ,\‘‘\U U I I,„„, ,�� coo �_.,,,oESS/o,f,�,•. 9 SEAL 053032 12-08-2021 00,�IiVIifIIIIII! Illllrlll1+00 COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF/ 11.12ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A 30' 15' 0 SCALE: 1, = 30' 30' NORTH C2.1 I r�� I 1 ./ LIMITS OF DISTURBANCE (TYP.j �7 PROPOSED STORM PIPE (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) z1—r RIPARIAN BUFFER 1 ) 4- 4- 4T N 'G ty U �T o � o°a PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF DISTURBANCE (TYP.) 4- - PROPOSED STORM PIPE (TYP.) 4T 4- 4- 4- L -ems= ,r— AEI . �.: �! �1��� �:- 3gb~ UDC � ��_'in' ��-�_ _� 41:::00._,,.:.A... ---->- ------is7- -61-r) -77 • r sue!-=k3 _ At _ �_ __,_ _ -',„-w— .7.,,,,f: ---="4" ......,..,,.„..i. ■`.'^ 4 ...,, :+1��-':�,��� 670 SCE FT _ _ f �� 1 i`�f' ¢ Q . 0. ______ MATTING �_��1 �� l p z Q cr �j, L A' ►sti AL GNMENT "B" ��_ SEE SHEET C2.1$ �� E K Tof 7 4- 4- 4- 4- f 451 SQ. FT, l l f COIR FIBER f MATTING .) / 4T 4- 4- 4- 4- 4- 4- 4- 4- -560 PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) PROPOSED GREENWAY EASEMENT (WIDTH VARIES. TYP.) 4- I .4 / . w• 40/f-, 1 1 111° 1#0,11/41 I I 414". *: 4 _1.--"t•_.4-.-.-W.s7' . 4f"`l.e ,,: lr2,1147-II 565 NJ' l Jr 4- 4- o o " EX. SEWER EASEMENT (TYP.) LEGEND - EROSION CONTROL: Z1 Z2 _ TPSF LD SF SF TP TP TPSF 14C)— 140 LD LD — SF SF TP TP TPSF TPSF ❑ ❑ ❑ ❑ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH, NC 27603 or 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACIUTIES Know what's below. CCIII before you dig. THE LocKnoNs OF EXISTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESEMAT1VE. THE CONTRACTOR SHALL DETERMINE THE IEKACT LOCATION OF ALL BUSTING Lyn LETS BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) 1r;j7j -1 VARIES • SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) fri 1 CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED \ MIXTURE OR 4" HARDWOOD MULCH. SEE ' \ PERMANENT SEEDING SCHEDULE FOR \ ADDITIONAL GUIDANCE. SHEET C-2.27. GREENWAY EASEMENT LIMITS OF DISTURBANCE s- ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) NPDES DOCUMENTATION NOTE: 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL • SEAL 01-05-2021 * COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A NORTH C2.2 12/8/2021 10:46 AM X:\2020\SE20.027.00 ToHS - Arbor Creek Greerway\LE) \besigr \Drawir gs\Plar sets\Site. Plan \SE20027 C-2.0 THRU C-2.5 EROSION CONTROL.dwg 7. If j x 'S.x Y...�J1- 'A RIPARIAN BUFFER�`�. X x X x x x x EXISTING x x xO� FLOODPLAIN _ C o-� .nr � fit--_ � 3• � �i>� ■ - ,�- �`` iit1 � �►�i� �4 '1►��►i ‘4111411 �r .. �,■_'_ �!�<j�jM��R:.lti�{,�r.._..-ail � Rrjr + +°►i��7►�;� �11ti3�'Y�s. �! , r .� 1► a s��r�%='�►•__ �•. .�.1.: A�► 1�' �i. hl �..�-i 1141 41. ' y �- Y ►' i *; rti *► ,_ ►'r►z ► 1►rs nnnn n r IkAk�..V� ._ w►,* ■ ati ■►di � ak ..'"�'1� ■i�fi��w��IVIT1V �j '11 7RI w VE itE:: -t` te141r ■:I�1�i l��l cAgraarrstalni ealib. _ZPA'IL ktelgiltr AI it►n Pa�� c350 LIMITS OF DISTURBANCE (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) \ —342 c7 I kr ( PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) crY QZ EX. SEWER EASEMENT (TYP.) 355 co 4t 444 q:0e - X V\f ARBOR CREEK \\` 4 o : 4 Q= f L Zi 12 PROPOSED STORM PIPE (TYP.) N t 7 Mink — %VA kleitititikiV hit XI fitX.V111%, ITSVVkb.�■ ■` LD % A \IA IA 1%, Vii , _ __ _ 365 _r- __ `_ _ __J- -,_ _ _ _ - - - -,- - :- - ,_ — - ---,,.._i � ___ G -.----- �e\ 4. LEGEND - EROSION CONTROL: LD SF SF TP TP TPSF 140— — — 140 LEI LD SF SF TP TP TPSF TPSF EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE info rill refs or WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH, NC 27603 sepiinc .corn ID 3 WORKING DAYS "or , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACIUTIES Know what's below. CCIII before you dig. THE LocKnoNs OF EXISTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESEMAT1VE. THE CONTRACTOR SHALL DETERMINE THE IEKACT LOCATION OF ALL BUSTING un LETS BEFORE COMMENCING WORK. AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) Ci V\\ v'\\ SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED \ MIXTURE OR 4" HARDWOOD MULCH. SEE ' \ PERMANENT SEEDING SCHEDULE FOR \ ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT LIMITS OF DISTURBANCE s- ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 511 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL SEAL 12-08-2021 * COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS NORTH PROJ. MGR: M. TAYLOR DRAWN BY: CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A C2.3 12/8/2021 10:47 AM X:\2020\SE20.027.00 ToHS - Arbor Creek Greerway\LE) \besigr \Drawir gs\Plar sets\Site. Plan \SE20027 C-2.0 THRU C-2.5 EROSION CONTROL.dwg - �� 0- EXISTING FLOODPLAIN -EX-.-SEW ER - EASEMENT (TYP:) -- 340 44. (���Gr1+ PROPOSED GREENWAY EASEMENT s� (WIDTH VARIES, TYP.) C��. PROPOSED 10' WIDE - ASPHALT TRAIL (TYP.) rass PROPOSED STORM PIPE (TYP,) PROPOSED TEMPORARY CONSTRUCTION ACCESS ROUTE #3 - -Q\Q\A% RIPARIAN BUFFER (TYP.) LIMITS OF DISTURBANCE (TYP.) cOOJ4ry b • a � X �\mit PROPOSED BRIDGE TRAIL ALIGN A ��lllll ti11111111MC WINN llilllll. ��- 1� I 1293 SQ. FT. COIR FIBER MATTING . -- — RIPARIAN BUFFER l(/ e . ,. <7 V 2 ■ LEGEND - EROSION CONTROL: ,I:: EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT Zl RIPARIAN BUFFER - ZONE 1 Z2 Try 140- 140 LD LD SF SF TP TP TPSF LD - SF SF TP TP TPSF TPSF 111111 11 t ❑ ❑ ❑ ❑ RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE infirm refs or 11► +r+elehir+r X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR TTS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILRIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) VP SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) 0 9, • ' i 1 CONTRACTOR TO PROVIDE PERMANENT r GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE r \ PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT s-LIMITS OF DISTURBANCE ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE ;st (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. jowl! III11111,0 ..,,,sFESS/O fr • . • SEAL ` 053032 /0/001, l 11111,0 12-08-2021 fl�111,! `////, lrl*\\\ lflillll COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF/ 11.12ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' SCALE: 1" = 30' NORTH PROJ. MGR: NI. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A C2.4 12/8/2021 10:47 AM X:\2020\SE20.027,00 ToHS - Arbor Creek Greenway\Lb\Design \Drawings\Plansets\Site Plan\SE20027 C-2.0 THRU C-2.5 EROSION CONTROL.dwg fi L r Jr jr jr EX. SEWER EASEMENT (TYP.) MA�p,FAM1LY 1LC1‘4 # 07 50-3 969 EXISTING FLOODPLAIN ll Jr EXISTING FLOODWAY I Jr ,- Jr `A Jr EX. WETLANDS (TYP. i Jr (I + I IJr ( ) 0 0 • LIMITS OF DISTURBANCE (TYP,) PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) r9 49 0 /4 4- 4- 4- C X. WETLANDS (TYP.)r 4t ••••- Ql 1 � \ Jr EXISTING\ FLOODPLAIN 4 1 jr + + 4 Jr ± ---,- + *4_ Jr -A- Jr + ( + 4- --j(---)jr -4- T ❑7 L r�rF MA -A PANTIE 3� 395 E P114# 0750 —1 LEGEND - EROSION CONTROL: Z1 12 _ TPSF LD SF SF TP TP TPSF 140- 140 LD LD — SF SF TP TP TPSF TPSF 111111 11 t ❑ ❑ ❑ ❑ ❑ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE iffsAr X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING Lin LETS BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) 0 9, • SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. •e1 GREENWAY EASEMENT s-LIMITS OF DISTURBANCE ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) lI I ja III 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. SE AL 053032 12-08-2021 COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A C2.5 ( EX. WETLANDS /(TYP.) .� EXISTING FLOODPLAIN PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) ` PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) l ��o a f XQ< � 1 7C a'` z Q\��1 a7 J 01 /)Y7.--)-(1 x x \ J x x X/ r J x. PROPOSED STORM PIPE (TYP.) l LEGEND - EROSION CONTROL: _ _ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT 11 RIPARIAN BUFFER - ZONE 1 12 TPSF 140- 140 LD LD SF SF TP TP TPSF LD - SF SF TP TP TPSF TPSF 111111 11 t ❑ ❑ ❑ ❑ ❑ RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE vers OA el X ([1) WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILIZES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) V ARES VP SILT FENCE OUTLET © LOW POINTS AND EVERY ---200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) • 1 CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR ADDITIONAL GUIDANCE, SHEET C-2.27. NPDES DOCUMENTATION NOTE: GREENWAY EASEMENT LIMITS OF DISTURBANCE ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE I5 SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCGO10000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000. ,111111rr,r,,�� LSS�O��I.9 SEAL 053032 F-. FNGI NE .= I/43,rII woo 01-05-2021 , 01 11111r1111! "/ 11111111ti��� COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 5. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: SE20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF / 11.12 ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A 30' 15' 0 30' SCALE: 1" = 30' NORTH C2.6 C-2.10 EROSION CONTROL.dwg 1rawings\Plonsets\Site Plan\SE20[ '.00 ToHS - Arbor Creek Greenway x ND 1 "1 I Co 1- r S's 7- N PROPOSpDe 0?) STORM N •j� 1 I ss _ L to PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) � J L EXISTING FLOODPLAIN - PROPOSED PARKING AREA (SEE SHEET C2.25) ‘47.. ZI:at ,vsp4r1 • ,yam PROPOSED STORM PIPE (TYP.) y�Oc 0 7 f RIPARIAN BUFFER 1 I EX. SEWER EASEMENT (TYP.) LEGEND - EROSION CONTROL: Z1 12 _ TPSF LD SF SF TP TP TPSF 140- 140 LD LD - SF SF TP TP TPSF TPSF 111111 11 t ❑ ❑ ❑ ❑ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE 1nf1, 1�+ff'I X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF BUSTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) 41. SILT FENCE OUTLET @ LOW POINTS AND EVERY —200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) 0 9, • CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT s-LIMITS OF DISTURBANCE ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) rlll >> Oj511 I\ \ Ill NPDES DOCUMENTATION NOTE: 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. ,0111111111rr1r,��� v1/4 4)r. .LSS/O,(r•, .9 • SEAL - 053032 I �rrnn1'``\ 01-05-2021 llifllrrr,I \\C & Tom'%; rrr+1r111f11j11 COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF/ 11.12ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' SCALE: 1" = 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A C2.7 8 watil 111111 Ink 7 EXISTING FLOODPLAIN • a .. 1393 SQ. FT. COIR FIBER MATTING N AlSP p = Py�� Rol o ��D C (TrPI • POp p,, Pip STpR op rp41 1/ 1 J 1 —350- D 541/ 7 7 k RApkixss PROPOSED 10' WIDE sa‘4si e Ric ASPHALT TRAIL (TYP.) k X C 7 \ 1 P�- 92 J1 7 (7j osx o7 —_340 �a7 345 344 LEGEND - EROSION CONTROL: TPSF 140- 140 SF SF TP TP TPSF SF SF TP TP TPSF TPSF 111111 11 EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH, NC 27603 ID 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACIUTIES Know what's below. CCIII before you dig. THE LocKnoNs OF BUSTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESEMATNE THE CONTRACTOR SHALL DETERMINE THE IEKACT LOCATION OF ALL BUSTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) • SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED MIXTURE OR 4'' HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR \ ADDITIONAL GUIDANCE, SHEET C-2.27. NPDES DOCUMENTATION NOTE: GREENWAY EASEMENT LIMITS OF DISTURBANCE ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL • SEAL 053032 12-08-2021 COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: ISSUE: TOTAL DISTURBED AREA REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A NORTH C2.8 1 -"A/71)//,))67. / 1 / r- x WIDE � � � X C � X � X� � x1 �` 1X X � 7 � X PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 1 XIXI J IX ds�Js X Y X PROPOSED STORM PIPE (TYP.) X • ax Xl X � 1 xl EXISTING JF LQ4DPLAIN X x x X x X r-- x X X X )S EXISTING FLOODWAY ]•I X 7C } X 'X X J X X� I PROPOSED STORM PIPE (T YP.) fX \C 1 X � 1 x 1 Pf LZJ � FLU w x � J N X X x \ I- X X X �� X x X X X Aso sPo X ,X / X X X x x x x x 1 x f X x/ X° X X ./ X 'I x ox '` \ ' x x Jf 1 7A' )(C 1 x A x/ rtiI X �� / x X X X/ x 1 X r x X l x x X +50.Da kfF X PROPOSED STORM PIPE (TYP.) • i" ❑1 X EXISTING FLOODWAY J X , X x RIPARIAN BUFFER _SE-NER SEMENT ()YP.) / LEGEND - EROSION CONTROL: 21 22 — TPSF SF SF TP TP TPSF 40 ID LD— — SF SF — TP TP TPSF TPSF — 11111111111111IIII IIIII II III I I II1I IIIII III . -->--->--->--->— EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH TEMPORARY CONSTRUCTION ACCESS ROUTE WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com e 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILMES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINETHE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES, NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE. SHEET C-2.27. SILT FENCE OUTLET @ LOW POINTS AND EVER" —200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) NPDES DOCUMENTATION NOTE: GREENWAY EASEMENT LIMITS OF DISTURBANCE ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCGO1 0000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS I5 ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000. '011I 1 1111111.1j/ 41? `49"\ ti5510y �1��'q�'' QR 9� SEAL 053032 -ii/':ALR. `+YLrIN4''r,*� 01-05-2021 COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 5. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway PROJECT: 5E20.027.00 DATE TOTAL DISTURBED AREA 484179 SF 1 11.12 ACRES ISSUE: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. REVISIONS: A Rev.1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH. 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A C2.9 7- CR N CR CR N x EXISTING FLOODWAY x 37 S'Y CLASS 1 RIP RAP x(27 TONS) FABRIC 00 ys FILJE ripitNia„, vato r k‘ISWiNlk* 44\ '‘‘ 7 SY CLASSIP RAP (27 TONSI 40 SY FILTER FABRIC -33z )x EXISTING FLOODPLAIN Q 74/ X X o x we S / )( ?( --- )4 )( \ )‘ ,__ z ?__' ---- z x x 7 \ )( ><--- ----- 34. --„_______ / x 7� )(, � X PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) +ti*—! � .tea►s�. ■it>�it►ttrt�11:1 ■�5�;;k t#1 ,,`. 1 \ 411111P:r' 7174-7 ....4a,,,110 EX. SEWER- --- EASEMENT (TYP.) o LIMITS OF DISTURBANCE (TYP.) 330 PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 1�f / ,2(7r. x � x0 �1 X X x X 7( )( )( ',/ )( )( )( ( * 4 , X x tctS- e m) --___ )( t 1 '' /, t� )( _ 1 t S tet$ SAND x �!!ALA'lit- ► .;r ' -- \ / vi 13171-1:*%%> AliZiliii: ■�/0 ot i Iti II r ■ dIlk )Lit. EX.W (TYP �72 19' EXISTING FLOODPLAIN 44, 19, LEGEND - EROSION CONTROL: Z1 Z2 _ _ _ TPSF LD SF SF TP TP TPSF 140— 140 LD LD - SF SF TP TP TPSF TPSF 111111 t 0 0 0 0 EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE clic,. iris or ■ A■! i■fi r■! X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) I 1 VARIES V\\ SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) d 9, CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. •e\ GREENWAY EASEMENT s-LIMITS OF DISTURBANCE ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 5 1 1 a 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. 01111IIIIrrlr�lr • SEAL 053032 .F� . FN�I NE��.= ,!'/�rrrrllllllll111� �, 12-08-2021 1,1111Ti11 111 r111! `I'III/1111111 WO' COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF/ 11.12ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A 30' 15' 0 30' SCALE: 1" = 30' NORTH C2.10 ± lr z2 IT 4 4- 4- --7------(jr 4- 4- Jr Jr ± \---Jr---- --\ 4_ \+ 4- - - + -;-- ----- PROPOSED 4 �� L 4 -_+ 4- . 1 EXISTING FLOODPLAIN 1 ►1 PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP,) I1 4- L STORM PIPE (TYP.) tirl+ RIPARIAN BUFFER 4- 4T EX. WETLAN 4- 4 H ti��Y 659�t� -4367 RIAG N IS # 0659 RIPARIAN BUFFER (TYP.) LIMITS OF DISTURBANCE (TYP.) PROPOSED 1 0' WIDE ASPHALT TRAIL (TYP.) ❑7 4- 4T 1 4- EX. W ETLI (TYP.) ti2cif/ Ar 14.14451024rAfam""m"AZ Ar __for ���i�,�_�����/I�I his. 7_T EXISTING FLOODPLAIN z2 z� • LEGEND - EROSION CONTROL: Z1 Z2 _ t TPSF LD SF SF TP TP TPSF 140- 140 LD LD - SF SF TP TP TPSF TPSF ❑ ❑ ❑ ❑ ❑ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE is -lot sot ob.0 X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILBIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) 0 9, • SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE. SHEET C-2.27. GREENWAY EASEMENT s-LIMITS OF DISTURBANCE ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) l� 1 ja III NPDES DOCUMENTATION NOTE: 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. �,01I I I I I r 1,,,,i, .Q�DF FSS�O��I.9 SEAL 053032 12-08-2021 I. \\C ccA67om'%; ++r* lltil0 \\\ COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF/ 11.12ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A 30' 15' 0 SCALE: 1" = 30' 30' NORTH C2.11 12/8/2021 10:58 AM x \2020\SE20 027 00 ToHS - Arbor Creek Greenway\ LID \ Design \Drawings\Plansets\Site Plan\SE20027 C-2.1 1 THRU C-2.15 EROSION CONTROL dwg I L EXISTING,„ FLOODW Y 'Farmimetr ImorArArmwAwar- �� airA., -r. � PROPOSED STORM PIPE (TYP.) RIPARIAN BUFFER (TYP.) LIMITS OF DISTURBANCE (TYP.) EXISTING FLOODPLAIN 12 J 7 22 Q7 PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) EX. SEWER EASEMENT (TYP.) RIPARIAN BUFFER PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) Z] xl EX. ' TLAN DS (TYP.) �> -.. EXI FL _32 l J 1> 2/� LING L� ODWAY `T 4T 4- 4- ti AsFizk 065' LEGEND - EROSION CONTROL: _ _ _ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT 11 RIPARIAN BUFFER - ZONE 1 12 TPSF 140- 140 LD LD SF SF TP TP TPSF LD - SF SF TP TP TPSF TPSF 111111 11 t — —�—� ❑ ❑ ❑ ❑ RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE infirm iris or X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) VP. 0 9, • SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) i 1 CONTRACTOR TO PROVIDE PERMANENT r GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT s-LIMITS OF DISTURBANCE ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. �_.Q�DFFSS/oCARo • fr . 9 SEAL ` 053032 NE /0/001,111111,0 12-08-2021 illifi111,'! \\CikccA67om'%; "/ 11111111ti��� COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF/ 11.12ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 SCALE: 1" = 30' 30' NORTH PROJ. MGR: NI. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A C2.12 -328 M°."Md7•1P r 1 Z2 9, `L ti Z2 I RIPARIAN BUFFER / + (TYP.) PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) -F J EXPSEWER EASEMENT (TYP.) T1. RIPARIAN BUFFER - //7r 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF DISTURBANCE (TYP.) ( EX. WTLNDS (TYP.) l L+ ' --""4":"P/ zeirop,w. , ApP PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) vIJIE LEGEND - EROSION CONTROL: _ _ _ Z1 Z2 _ _ TPSF LD SF SF TP TP TPSF 140- 140 LD — SF TP TPSF LD — SF TP TPSF 111111 11 11111 III - ❑ ❑ ❑ ❑ ❑ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE 044040440 X ([1) WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILIZES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) V AR1ES TYP. 0• SILT FENCE OUTLET © LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR ADDITIONAL GUIDANCE, SHEET C-2.27. \ ``(\ GREENWAY EASEMENT ,'LIMITS OF DISTURBANCE 1 T� NPDES DOCUMENTATION NOTE: ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCGO10000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000. j\VPII1111rr1,Il„! cAR0 �_.Q,,DFESS/O,fr,, •. 9 SEAL 053032 ,�.= ,!lllrl+rrlII1lVlil����,, 01-05-2021 \��,',Ii III11 r1111! /1/1/1rrrrl*Il+1��11 COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF / 11.12 ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A 30' 15' 0 30' SCALE: 1" = 30' NORTH C2.13 x x x 1 7 x x x x x A x x X x x x x x X X x x x / IZ x x X x x 25( x LIMITS OF DISTURBANCE (TYP.) h LIMITS OF DISTURBANCE (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) X x X x X x< ) x X x Ex W LANDS (TYP.)".., X_ �f 1x x X X x X x x EXISTING x FLOODWAY x x x �C v EXISTING x FLOODPLAIN RIPARIAN BUFFER EX. SEWER EASEM (TYP.) ,27 L1 LIMITS OF DISTURBANCE (TYP.) r ' / 'z,I% PROPOSED 30' WIDE GREENWAY EASEMENT (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) U' /�� /7;- /II 1111 / 110 11 i III( I\�\�1 \ I) EXISTING FLOODPLAIN ( LEGEND - EROSION CONTROL: __ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT Zl RIPARIAN BUFFER - ZONE 1 Z2 TPSF 140- 140 LD LD SF SF TP TP TPSF LD — SF SF TP TP TPSF TPSF 111111 11 t >--->-- - � ❑ ❑ ❑ ❑ RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE inform refs or X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) TY P • SILT FENCE OUTLET @ LOW POINTS AND EVERY —200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) 9, • CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT LIMITS OF DISTURBANCE s- ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. �_.Q�DFLSS/ofr . SEAL ` 053032 e. /0/011nI11,11,00 12-08-2021 I. 11 i 111111'! \\CikccA67om'%; "/ 11111111ti��� COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: NI. TAYLOR DRAWN BY: L. SMITH, S. TEYNIOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A NORTH C2.14 EXISTING FLOODPLAIN PROPOSED BOARDWALK " 8" ± 30.00 cV 334 0 //cQ'N ■ I 1 LIMITS OF DISTURBANCE (TYP.) 1 PROPOSED 301 WIDE GREENWAY EASEMENT (TYP.) ti iy l 1894 5Q. FT. COIR FIBER MATTING / I(I /II I o I tll ; I I I ) III ) 1aoct, '�FK EI NAF AWN � Hg RyO 1 � 5� � 1 1 1 I7 l ` I j ) ' / ' \ ' L 1 I I {{// I j RIPARIAN BUFFER 1 111 � ' 1 ti 1 (/! C I I �1 1 l � \ 1 l \ l \ 1t[I 11 f ii) 1 \1�1 I1111 1)1 (11[ 117 7 I1 � 1 111 l \ l� � 1/ 1 1 \ 1 I I f 1 I � I 1 N (I \ ( \ \ \ \ \ \ \ \ \...., \ \ \---..,,, } 1 � 1 NiF � NroA,a PC/ SCE 53 . FT 7 Asa �n Fr . COIR FIBER MATTING A • N, PROPOSED 30' WIDE GREENWAY EASEMENT (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 351, N. 45> N • LEGEND - EROSION CONTROL: AIM MEW MEW MEM MEW MEW MEW MEW AIM 140— — — — — 140 SF SF SF SF TP TP TP TP TPSF TPSF • ris refs or 11$110-110-1111- EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH TEMPORARY CONSTRUCTION ACCESS ROUTE WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH, NC 27603 ID 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES CCIII before you dig. THE LOCATIONS Of EXISTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETER/AINE THE EKACT LOCATION OF ALL EXISTING LI-FILMES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NCR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) SILT FENCE OUTLET @ LOW POINTS AND SILT FENCE (DOWNHILL SIDE OF TRAIL) fp CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE "-- \ PERMANENT SEEDING SCHEDULE FOR \ ADDITIONAL GUIDANCE, SHEET C-2.27. NPDES DOCUMENTATION NOTE: GREENWAY EASEMENT LIMITS OF DISTURBANCE ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL .....::::...., ... ;31.c11EI sl Is! /101 4,1147./......7 _.,, 12-08-2021 COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A NORTH C2.15 1/6/2022 10:12 AM X:\2020\SE20.027.00 ToHS - Arbor Creek Greenwoy\LD\Design \ Drawings \Plonsets\Site Plan\SE20027 C-2.16 THRU C-2.20 EROSION CONTROL.dwg J 7 7 pro` 7 7 �! //! // 7 7 7 7 7 7 7 7 - —1 Aar inimigrik /��rLMTS OF 1 '1/1 / ! ' DSTURBAYP1_ - 345 40NRROPOSED STORM PIPUYP.)� 328 S FT / / / COIR IBFR MI N G / / / / ///� I / / /// 7 77 !/ �'6 I 7 7// / /77 f I I p,Ss .0 \�G - R140 p p I J 7/ /.--- �� � � / I Sri / ! Jp7 ~' PRQPOSED 30-WI _ - — — — ' / REENWAY _ . EASEMENT (TYP.r- PROPOSED 10' WIDE _ ° O�e P� _ . ASPHALT TRAIL (TYP.� . y,.°SV,ALIGNMENT " - E 5EE S EET C2.22 dl - - dl d..L dl 46 - //7 / • /!!. // 7 7 7 7 ! dl 7 7 SF dl dJ. / r 1 / j J / 1 r ,0_4-\0 ,IPARfAN BUFFER EXISTIN 529 414 hall: 1.11.1'1141" MIERFAIVINIMMIMMF di 01111111!fr dl. EX. WETLANDS„._ (TYP.) bts Ob SEGMENT OF EXISTING TRAIL Ta\- EASEMENT LINE ) LEGEND - EROSION CONTROL: 140— — — — — 140 SF SF SF SF TP TP TP TP • info risers or IIVAPAPAP- EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH TEMPORARY CONSTRUCTION ACCESS ROUTE WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH, NC 27603 n) 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS Of EXISTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERAAINE THE EKACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) fp CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE "-- \ PERMANENT SEEDING SCHEDULE FOR \ ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT LIMITS OF DISTURBANCE s- ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL • SEAL 11, 01-05-2021 COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A C2.16 ----- \\ 7 z 7 - i --\ - 1 j 1 I \ \ 1 / I x • I x �.• ----- X x ,0 X P ��qab� x �—C �� obi EX15�1NC"�R �,10 i0 s�� INt. o x x x x x ( EX. WETLANDS (TYP.) x x x 1 / / — PROPOSED 10' WID utvtriS-0 TRAIL DISRBAN[TYP= i PROPOSED 3i5rWIDF, GREENWAY EASEMENT (TYP.) 332 WA- Y-. f L r ' z-- / 0Q\7\0- / --33a J — 336 `133b —334 - 334 — X .X x x x� - 7x X \ X )x x x x x x x x X x x l x X X x x x x x x- x x max\ x � X x• x I • NNN ` \ TYPICAL GREENWAY ENTRANCE PER SPECS 571 SQ. FT. COIR FIBER MATTING EXISTING x x X X FLOODPLAIN _ X X X-- �X-- X V PROPOSED TEMPORARY CONSTRUCTION ACCESS ROUTE #8 ALIGNMENT "G" SEE SHEETS C3.23 - C3.24 J J2 J 330 '33T- 329 1 LEGEND - EROSION CONTROL: Z1 12 140- 140 — LD LD LD — SF SF SF SF TP TP TP TP TPSF TPSF TPSF TPSF ❑ ❑ ❑ ❑ ❑ amyl. vers X EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH TEMPORARY CONSTRUCTION ACCESS ROUTE WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS Of EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) SILT FENCE OUTLET @ LOW POINTS AND EVERY ---200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED ` MIXTURE OR 4" HARDWOOD MULCH. SEE �\ PERMANENT SEEDING SCHEDULE FOR (35 GREENWAY EASEMENT LIMITS OF DISTURBANCE s- ASPHALT TRAIL ,\ I\ \ Ill NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL 0101 II • SEAL T. 12-08-2021 /1/111111100 COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: ISSUE: TOTAL DISTURBED AREA SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL A NORTH C2.17 1/6/2022 10:14 AM X:\2020\SE20.027.00 ToHS - Arbor Creek Greenwoy\LD\Design\Drawings\Plonsets\Site Plon\SE20027 C-2.16 THRU C-2.20 EROSION CONTROL.dwg f S - SS _ ? _ SS �xl _ f � l - ss - PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 1 � N�96LEY bAVID M & BLelAUREN WARQ �P �l Oda f0-6-7-2,6 PROPOSED TEMPORARY CONSTRUCTION ACCESS ROUTE #2 1 J 1 LIMITS OF QC) DISTURBANCE (TYP.) O 7- 1 rr �JJ �LU � � 1 1 T L EI L } \lBEIM E J + ' 'PIN # 6?50- �� PROPOSED 30' WIDE GREENWAY EASEMENT (TYP.) ( 1 EX. SEWER - EASEMENT EASEMENT (TYP.) \ d4-\ 670 5Q. FT. COIR FIBER MATTING 350 5Q. FT. COIR FIBER MATTING ) �1 N/F \ \� ZEPEDA, SUSAN E &\\ \ ZEPEDA, ART'�"LOt PIAI , (174.(L1 (L7�.#-re:� 1 �/ PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF DISTURBANCE (TYP.) PROPOSED 'STORM PIPE (TYP.), SEE SHEET C2.2 + 1 N/F ARBOR CI EEK H W N ERS ASSC 1I O�N�C PIN # 0750-2<1-0554 \ I + + + + { + RIPARIAN BUFFER I+ tv + ti + + 1~ + + + RIPARIAN BUFFER FLOODPLAIN + I EXISTING � J / 1 + + + r + + + + EXISTING - FLOODWAY - + + 1 LEGEND - EROSION CONTROL: Z1 Z2 _ Try LD SF SF TP TP TPSF 140- 140 LD LD - SF SF TP TP TPSF TPSF 111111 11 t ❑ ❑ ❑ ❑ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE info ris refs or X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UULBIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) 0 9, SILT FENCE OUTLET @ LOW POINTS AND EVERY —200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT LIMITS OF DISTURBANCE s- ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) ;3rl ja III NPDES DOCUMENTATION NOTE: 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. j\,‘,,,UIIIIIri,,,,, cAt �_.,,,oESSiO,p,,,,•. 9 SEAL 053032 1 �, G� '�, 01-05-2021 \\C & Tom'%; `I,,++�1lrl*\\\ lflillll COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF/ 11.12ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. likegoIrail Cross Slope ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 SCALE: 1" = 30' 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL B C2.18 12/8/2021 1 1 :08 AM X:\2020\SE20.027.00 ToHS - Arbor Creek Greerway\LD\besigr \Drawir gs\Plar sets\Site. Plan \SE20027 C-2.1 6 THRU C-2.20 EROSION CONTROL.dwg RIPARIAN BUFFER (TYP.) LIMITS OF DISTURBANCE (TYP.) PROPOSED TEMPORARY CONSTRUCTION ACCESS ROUTE #2 LEGEND - EROSION CONTROL: _ _ _ Z1 12 _ _ TPSF LD SF SF TP TP TPSF 140- 140 LD — SF TP TPSF LD — SF TP TPSF 111111 11 11111 III t ❑ ❑ ❑ ❑ ❑ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE X ([1) WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILIZES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR RS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) TY P • SILT FENCE OUTLET © LOW POINTS AND EVERY ---200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) 1 CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR ADDITIONAL GUIDANCE, SHEET C-2.27. \ ``e\ GREENWAY EASEMENT ,'LIMITS OF DISTURBANCE 1 T� NPDES DOCUMENTATION NOTE: ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCGO10000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS 15 ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000. j\kWIllllllrrlrrrr! cAt •.• SEAL 053032 !!rlrr 12-08-2021 1,1 ,0111111rr11!! rrr11111111ti��� COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF / 11.12 ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 SCALE: 1" = 30' 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL C C2.19 + + + + + + + + + + 1 + + + + + ;F) EXISTING + ) + FLOODPLAIN + + ( + l —N + + + + I + + + + ' \ + 1 l � + + + - 1 + \ + + + +\+ + + _1 EXISTING + FLOODW- + + + + + + + + +, + L 7 + +� I 8+ + SY CLAS,RIP R� + + 12 YFI1 12 Y FILTER FABRIC I\ + + m + + + + + NI + + PROPOSED STORM PIPE, SEE SHEET C2.9 ALIGNMENT "A" SEE SHEET C3.9 PROPOSED 10' WIDE + ASPHALT TRAIL (TYP.) L + N\ + + + + + + + + ^+ + + + + + , + I. ❑7 LD ❑7 N PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) t7 f 1 PROPOSED TEMPORARY CONSTRUCTION ACCESS ROUTE #5 N/F LANGE, TODD & LANGE, DEE PIH # nAF9-A7-AAf1A I N/F FALLON, RONALD FALLON, ERICA L PIN # 0659-47-4672 f 1 TYPICAL GREENWAY ENTRANCE PER SPECS C? C] s5- • Syr •- D 5S OD 4 5s s$. LEGEND - EROSION CONTROL: 21 22 — —140 - TPSF - I r. SF SF TP TP TPSF 140 I D �n- SF SF TP TP TPSF TPSF - 111111111111II IIII IIIII111111I II1I IIIII III • - ->--->--->--->— (ID EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH TEMPORARY CONSTRUCTION ACCESS ROUTE WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. i SUITE 600 RALEIGH, NC 27603 PHONE 919.789.9977 sepiinc.com m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILMES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERaINETHE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AN❑ AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) Ir y VARIES TYP- \\'! 1° SILT FENCE OUTLET @ LOW POINTS AND EVER" -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. 4 r NPDES DOCUMENTATION NOTE: GREENWAY EASEMENT LIMITS OF DISTURBANCE ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCGO1 0000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS I5 ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000. ``„,,H, I I I CAR I7'•• QR �tiSS/0 4 9 SEAL 053032 C�q� I�[ri`]lt'iG l� f�I,' f'�ilI1II'IIi11""'', 01-05-2021 IIIIIIIII',,lf /`f •,•IIII11 1 1 i \,\ 0%%0\ COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway PROJECT: 5E20.027.00 DATE TOTAL DISTURBED AREA 484179 SF / 11.12 ACRES ISSUE: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. REVISIONS: A Rev.1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH. 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL D 30' 15' 0 SCALE: 1" = 30' 30' NCRTI- C2.2O -2.25 EROSION CONTROL.dwg ..PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) ti 2n ss a • 0 3 ZI — ALL CONSTRUCTION TO REMAIN WITHIN EXISTING R/W fi LIMITS OF DISTURBANCE (TYP.) Z2 PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) I2 1 l>, 9 QFr MALrnn1G PROPOSED 10' WIDE CONCRETE TRAIL (TYP.) TEMPORARY CONSTRUCTION 2C)00 ACCESS BRIDGE BY PROPOSED CONTRACTOR GREENWAY EASEMENT. (WIDTH VARIES, TYP.) 4 l by .; ,i� AP/ 41111111111 4:41ririll...-1:11/ Xc �`��y:.� low--iiir....__Aw..- -.,,,4.14.74 a q TE —2004 p C iiiiiinf `ter%� .. ' . x ' 7' WIDI L (TYP .. 11141.14.,..,411ZolvftWI?k, )6.141.4144NZIIINilltel: \ it D 9 r � 0- NORTH LEGEND - EROSION CONTROL: Z1 Z2 _ _ 140— T LD SF SF TP TP IMF SF TP TPSF SF TP TPSF 111111 11 11111 1111 • 04,04410,40 EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH TEMPORARY CONSTRUCTION ACCESS ROUTE WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEPI SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH, NC 27603 sepiinc.com • 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACIUTIES Know what's below. Call before you dig. THE LocKnoNs OF BUSTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESEMATNE THE CONTRACTOR SHALL DETERMINE THE IEKACT LOCATION OF ALL BUSTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILMES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) • SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR ADENTIONAL GUIDANCE. SHEET C-2.27. NPDES DOCUMENTATION NOTE: GREENWAY EASEMENT OF DISTURBANCE ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL • SEAL 053032 01-05-2021 COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: ISSUE: TOTAL DISTURBED AREA REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL X C2.21 NORTFI 1.1 \SL2002/ C-2.2I 1111RU C-2.25 LROSION CON] ROL. :reek Greeriway\LD\Design \DrawirSys\PI 1/6/2022 10:19 AM X:\2020\2L20.02/.00 1 + + + J + + + EXISTING FLOODWAY f lj 1 l l ( / { r- \ j t o l 1 1 ( / 1\ \\ \ ) I ' / \ \ 6)) /I / k 1 1 I I l l 1 \\ \ I I \ \ -N,,.2 \ \ \ \ \ 1 \ \ ) \ \ \\ ' a 1 \\\�\ \ \ \i°\1 \\ ' ) 4 + + + ± � T1 +L' off+ + r + + + + +\ + + + + Zi \ r J "'0 z r m m z rn'CI z ` �n 0 > -‹ I A IGNNT" " r SEEM SHET C2. 61 ll I 1 1 LIMI S 0D DIS RB C8 (TY13.) \ PROPOSED 10' WIDE 'ASPH LT TRAIL\YP.) �4LIG ENT,"F",, ( EXISTING GREENWAY ,., TRAIL WITHIN PRIVATE EASEMENT i rr:o. LEGEND - EROSION CONTROL: Z1 12 Try LD SF SF TP TP TPSF 140- 140 LD LD - SF SF TP TP TPSF TPSF 111111 11 t ❑ ❑ ❑ ❑ t infirmrefso �0-10-110-411i1- X EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH TEMPORARY CONSTRUCTION ACCESS ROUTE WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS ▪ BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) 41. SILT FENCE OUTLET @ LOW POINTS AND EVERY ---200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) ci • CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT s-LIMITS OF DISTURBANCE ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) r 1 l ja III 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. \,,,,,<<III IIIrrir,, �. Q,y�F ESS/O,r�' . 9 SEAL 053032 I7,1,rhrrl1=CPl l l ``\ 01-05-2021 1,1,,,1i1Iif11���,I \\C & Tom'%; `I,,"/ 1lfl1lflilll0.0 COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF/ 11.12ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 SCALE: 1, = 30' 30' NORTH PROJ. MGR: NI. TAYLOR DRAWN BY: L. SMITH, S. TEYN1OURL E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL F C2.22 LEGEND - EROSION CONTROL: SEP! .�SL2002/ C-2.2 I I PROPOSED TEMPORARY CONSTRUCTION -ACCESS RQUTE #8 fP \ \ TYPICAL GREENWAY ENTRANCE PER SPECS - _ Id.o- rf ,} - ALIGNMF SEE SHEETS C3.23 - C3.24 7 w — 7 / EXISTING ODPLAtM PROPOSED LO' 1DE - ASPHALT TRAIL dYP.)- LIMITS" DISTU R BARtC.E_(TY P. ) • • • 338 339 `t>, ----- 6.5%Rel."---- SEt, Ok\19\\ ---- --..,_ - r r 350 J I _2—_ f� J I • 7 ter, • EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 12 RIPARIAN BUFFER - ZONE 2 140— — — — — EXISTING CONTOUR LD SF SF TP TP TPSF 140 PROPOSED CONTOUR LD LD PROPOSED LIMITS OF DISTURBANCE SF SF PROPOSED SILT FENCE TP TP PROPOSED TREE PROTECTION FENCE TPSF TPSF PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE D0000 WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH, NC 27603 ID 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS Of EXISTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETER/AINE THE EKACT LOCATION OF ALL EXISTING LI-FILMES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) (35 SILT FENCE OUTLET @ LOW POINTS AND SILT FENCE (DOWNHILL SIDE OF TRAIL) fp CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED 1 MIXTURE OR 4" HARDWOOD MULCH. SEE `--- \ PERMANENT SEEDING SCHEDULE FOR \ ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT LIMITS OF DISTURBANCE s- ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL 00111111111111,90 SEAL 053032 12-08-2021 liint COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: ISSUE: TOTAL DISTURBED AREA SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL G NORTH 2.23 " l1 _ �355 r r J � 350 -- W ! f _____ .� . — Nirgir��` ..Z+fi� PRpPC*D la 4v14 �:�7�•� 345 - :+,1 • ASPHE,�.i TRi;IL [T'.j • -- — .-� `— "1 — LIMITS o� 49 /1 ---� �r �� 7 - i6IST1 'BANCE/6P1 / �' ` `� / __ �_�— �_ J-- / Z ( / 335 - �� �� -J �� f ----- - �_� 1 l �� ____ \ --- ` / �� _` �_�J 1-7y:4:?+3r�i'r_3A� 335 _ -717-f(oi6S}GRE / ASEtNT.(Wf TH (VAR E5, TYP] ' J 1 ' � 111 � 1 1 l � I1� ' ► � \ } °?.' 4\ 1 \ ) I \\ 1 1 / \ `EXISTING ooDPLAiN 1 1 1 LEGEND - EROSION CONTROL: Z1 12 Try LD SF SF TP TP TPSF 140- 140 LD LD — SF SF TP TP TPSF TPSF 11111111 t ❑ ❑ ❑ ❑ ❑ EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH • TEMPORARY CONSTRUCTION ACCESS ROUTE X WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS Of EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) (35 SILT FENCE OUTLET @ LOW POINTS AND EVERY -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED ` MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. GREENWAY EASEMENT s-LIMITS OF DISTURBANCE ASPHALT TRAIL NPDES DOCUMENTATION NOTE: 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCG010000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS IS ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCG010000. 011111111Hrr,r,,�� ESS/o fr(.. 9 SEAL 053032 F� . FNGI H� • I����rhrn 1111�n1j1'��, 12-08-2021 01 111111r1rfi'' l+rr1111+1j11 COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: TOTAL DISTURBED AREA 484179 SF/ 11.12ACRES REVISIONS: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN TRAIL G 30' 15' 0 30' SCALE: 1" = 30' NORTH C2.24 1 PR � DI {Y�)1 O LIMITS OF STURBAN E T CI] rx 9d Dk ci 1 r- 1/ BC 346.80 BC 344.87 X. TREE LINE (TY 1088 SQ. FT. COIR FIBER MATTING X. WENDS (TYP.) �345-. RO PPOSED 10' WIDE ASPHALT TRP PROPOSED TM PE (TYP.i EXISTING — OODPLAIN -1( 7 LEGEND - EROSION CONTROL: 21 22 - TPSF - I F. SF SF TP TP TPSF 4li 40 I D LD- SF sr TP TP TPSF TPSF - 111111111111II IIII IIIII111111I II1I IIIII III . -->--->--->--->— EXISTING PROPERTY LINE EXISTING GREENWAY EASEMENT EXISTING UTILITY EASEMENT RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 EXISTING CONTOUR PROPOSED CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED SILT FENCE PROPOSED TREE PROTECTION FENCE PROPOSED TREE PROTECTION / SILT FENCE COMBINATION PROPOSED STORM DRAINAGE PIPE TEMPORARY DIVERSION DITCH TEMPORARY CONSTRUCTION ACCESS ROUTE WOODEN GUARDRAIL TEMPORARY CONSTRUCTION ENTRANCE TEMPORARY LAYDOWN AREA PROPOSED ASPHALT TRAIL CONCRETE WASHOUT PROPOSED SILT FENCE OUTLET PROPOSED CHECK DAM SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. i SUITE 600 RALEIGH, NC 27603 PHONE 919.789.9977 sepiinc.com m 3 WORKING DAYS f `I BEFORE YOU DIG /- FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINETHE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AN❑ AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK. OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NPDES STABILIZATION (N.T.S.) II1 rd \' ti. SILT FENCE OUTLET @ LOW POINTS AND EVER" -200 LF SILT FENCE (DOWNHILL SIDE OF TRAIL) CONTRACTOR TO PROVIDE PERMANENT GROUND COVER IN ALL AREAS OUTSIDE GRAVEL SHOULDER WITHIN THE LIMITS OF DISTURBANCE. PERMANENT GROUND COVER SHALL BE EITHER PERMANENT SEED MIXTURE OR 4" HARDWOOD MULCH. SEE PERMANENT SEEDING SCHEDULE FOR 1 ADDITIONAL GUIDANCE, SHEET C-2.27. NPDES DOCUMENTATION NOTE: GREENWAY EASEMENT LIMITS OF DISTURBANCE ASPHALT TRAIL 24" GRAVEL SHOULDER TREE PROTECTION FENCE (BOTH SIDES OF TRAIL) 1. THIS PAGE IS SUBMITTED TO COMPLY WITH THE NPDES GENERAL STORMWATER PERMIT NCGO1 0000. 2. THIS PAGE CAN BE APPROVED BY THE CITY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000 ONLY. 3. THIS PAGE OF THE APPROVED PLANS I5 ENFORCEABLE EXCLUSIVELY PURSUANT TO NPDES GENERAL STORMWATER PERMIT NCGO10000. ``\\\-[H, I I I CAR�I FI ri QR F_SS/O 9� i ' SEAL 053032 //9:1 P1 fllR.lIli l"'� 01-18-2021 COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway PROJECT: 5E20.027.00 DATE TOTAL DISTURBED AREA 484179 SF / 11.12 ACRES ISSUE: SEE SHEETS C-2.25, 2.26, 2.27, 2.28, 2.29 FOR EROSION CONTROL MAINTENANCE NOTES, CONSTRUCTION SEQUENCING, TEMPORARY & PERMANENT SEEDING. REVISIONS: A Rev.1 4\ Rev.2 01.05.2022 01.18.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH. 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION & SEDIMENTATION CONTROL PLAN PARKING AREA 30' 15' 0 SCALE: 1" = 30' 30 NCRTF C2.25 WIDTH VARIES 10' 2' ;reenway\LD\Design \Dr TIMBER MAT W/ NO SLOTS THRU BOLT 1' EXISTING GROUND TIMBER MAT W/ NO SLOTS MIN- WIDTH AS NECESSARY FOR EQUIPMENT -I r In - -111111III1_. 1-111E111-11 HI III III III III 111 111 111 111IE =1 I 11 111 111 I 1111-1 1-1 1-111-111I 111 111 111 i1I11I11I11I1111�1�1-1�1-111�1�1II11I11II-_ - - - - - - - - - - - - - 1 I 1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1III CROSS sEcTioN 10 MIN CONTRACTOR SHALL PROVIDE TIMBER MATS WITHOUT SLOTS WHEN CROSSING JURISDICTIONAL AREAS AS PERMITTED AND SHOWN ON THE APPROVED PLANS. MATS WITHOUT SLOTS ARE UTILIZED TO MINIMIZE SEDIMENT DEPOSITS INTO ENVIRONMENTALLY SENSITIVE AREAS. USE CAROLINA TIMBER CRANE MAT OR ENGINEER APPROVED ALTERNATIVE. PLAN VIEW COMPACTED ABC STONE APPROACH SILT FENCE OR COMBINATION TREE PROTECTION 1 SILT FENCE AS SHOWN ON ESC PLANS RIP -RAP DISSIPATOR, SEE PLANS FOR DIMENSIONS II FLOW SF ❑l AS 11 N mao.s L` re r AvAa- 44, Fr -of map, 1 1 NOTES: 1. SEE CONSTRUCTION SEQUENCE FOR EROSION CONTROL MEASURES DURING PIPE INSTALLATION. 2. FOR GRAPHIC CLARITY, THE LIMITS OF DISTURBANCE AND TREE PROTECTION FENCE LINES ARE SEPARATE FROM THE OTHER, HOWEVER FOR CONSTRUCTION, THE TREE PROTECTION FENCE SHALL BE LOCATED AT THE LIMITS OF DISTURBANCE. LIMITS OF DISTURBANCE TREE PROTECTION FENCE ASPHALT TRAIL GRAVEL SHOULDER STORM DRAINAGE PIPE, SEE PLANS FOR PIPE SCHEDULE TIMBER MAT W/ NO SLOTS SCALE: NTS 1 PIPE CROSSINGS SCALE: NTS 2 APPROVED SEDIMENT FILTERING DEVICE (SEDIMENT FILTER BAG). PROVIDE POSITIVE DRAINAGE FROM SEDIMENT FILTER BAG TO STREAM. DISCHARGEONTO STABLE RIPRAP PAD TO PREVENT SCOUR HOLE FLOVV � v Station Pipe Size (in.) Material Number of Pipes Length (LF) Invert Up Invert Down Rip Rap Area (sq. yd.) Rip Rap Tonnage Fabric Area (sq. ft.) 26+41 48 RCP 3 22 344 343.5 47 57 64 27+50 18 RCP 1 18 353 352 9 8 10 40+83 18 RCP 1 32 339 338 4 8 8 59+08 36 RCP 3 22 338.9 338.8 66 66 66 63+93 48 RCP 1 28 333.8 333.3 49 52 50 68+06 30 H D P E 1 31 342.5 339.8 11 14 17 74+04 18 RCP 2 21 339.1 338.5 7 8 12 77+31 24 RCP 4 23 331.9 331.9 37 47 57 79+92 24 RCP 4 23 330.9 330.9 37 47 57 89+62 48 RCP 1 21 327.3 327.2 28 34 38 95+06 48 RCP 1 22 325.9 325.8 28 34 38 103+30 48 RCP 2 18 323.2 323.0 28 34 38 122+07 24 RCP 1 23 344.8 344.3 7 8 12 126+61 48 RCP 2 20 323.8 323.3 50 50 63 Align.-X 19+10 15 RCP 1 21 325.25 325 7 8 12 DISCHARGE HOSES STREAM DIVERSION PUMP INTAKE HOSE IRgp,1dK j.L.7.0111 SUMP-HOLE FOR POOL (12' TO 18" DEEP, 2-FT DIAMETER) WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY TEMPORARY PUMP AROUND SEQUENCE 1- SET UP PUMP WITH SUCTION AND DISCHARGE HOSE. 2.INSTALL UP -STREAM SANDBAG DAM. 3.INSTALL DOWNSTREAM SANDBAG DAM. 4.THE PUMP MUST RUN CONTINUOUSLY WHILE WORKING IN THE STREAM- 5_ STREAMBANKS MUST BE STABILIZED AT THE END OF EACH DAY. r� NOTES: 1- SANDBAG DIKES SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA- THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIPRAP OR SANDBAGS. 2- WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A SEDIMENT BAG OR OTHER APPROVED DEVICE THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING FURTHER EROSION BETWEEN THE SEDIMENT FILTER BAG AND THE STREAMBANK- SEWN-IN CONNECTION SLEEVE FOR PUMP DISCHARGE HOSE SEDIMENT FILTER I BAG H57 STONE 7-0" MIN. (TYPICAL) I OPTIONAL LIFTING STRA PS 4 1•01,0401. I-40 .,..,..,....,...0.4 g ,.._,,,.. _-,--...._.,,,,,pip. .... ,.. -., ... neerew4., Pii441,„ -VA, Alookorgovviovioviv,-.40,4- buret AP . r.0 A PLAN VIEW 7-0' MINIMUM ■ 10'-On MINIMUM VARIES Wl GROUND SLOPE (7-0" MIN-) 1:1(TYPICAL) 7-0' MIN 14'-0' MINIMUM 2'-0' MIN EXISTING SOUND LINE FILTER FABRIC - USE #57 STONE TO LEVEL BAG FROM NATURAL GROUND LINE SECTION A -A SEDIMENT FILTER BAG GENERAL NOTES: 1- CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE SEDIMENT FILTER BAGMEN PUMPING. 2.THE LENGTH AND WIDTH OF THE TEMPORARY SEDIMENT BAG SHOWN ON THIS DRAWING MAY VARY PER VENDOR SPECIFICATIONS- THE MINIMUM 'FOOTPRINT' OF THE BAG SHALL BE 10 x 15 FEET. 3.SEDIMENT FILTER BAGS SHALL BE EQUIPPED WITH A SEWN -IN SLEEVE OF SUFFICIENT SIZE TO ACCEPT A MINIMUM 4 INCH DIAMETER PUMP DISCHARGE HOSE. THE DISCHARGE HOSE SHOULD BE EXTENDED INTO THIS SLEEVE A MINIMUM OF 6 INCHES AND BE TIGHTLY SECURED WITH A HOSE CLAMP OR OTHER SUITABLE MEANS TO PREVENT LEAKAGE. HOSE CONNECTION THROUGH A SLIT IN THE BAG WILL NOT BE ACCEPTABLE- 4- THE PUMP DISCHARGE HOSE CONNECTION SLEEVE SHALL BE SECURELY TIED OFF DURING DISPOSAL OF THE SEDIMENT FILTER BAG IN ORDER TO PREVENT LEAKAGE OF COLLECTED SEDIMENTS. 5- SEDIMENT FILTER BAG SHALL BE MAINTAINED AND REPLACED WHEN ONE HALF FULL OF SEDIMENT OR IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS- r Q 0) LL i i ASPHALT TRAIL GRAVEL SHOULDER STRAW WATTLE OVERLAP STRAW WATTLE AND SILT FENCE SILT FENCE LIMITS OF DISTURBANCE STABILIZE SLOPES PER PLAN CONCRETE APPROACH SLAB FILL FOR BRIDGE OR BOARDWALK APPROACH DIVERSION DITCH AS NECESSARY BRIDGE/BOARDWALK (SEE STRUCTURAL PLANS FOR DETAILS) STONE SILT FENCE OUTLET EROSION CONTROL AT BRIDGES / BOARDWALKS SCALE: NTS 3 SEPI SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com or3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILIZES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. e.Q�oF`�ssroy�y --.• l • SEAL 053032 I��l�lrrrlllllllltx,o` 01-05-2021 1,1 ,01 11111r1111! llllt1‘‘N COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: n Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION CONTROL DETAILS TEMPORARY PUMP AROUND DETAIL No. 04000.28 SHEET 1 OF 1 SEDIMENT FILTER BAG WITH GRAVEL PAD DETAIL No. 04000.27 SHEET 1 OF 1 C2.30 SELF -INSPECTION, SECTION A: SELF -INSPECTION PART III RECORDKEEPING AND REPORTING normal business hours in accordance with the table site conditions would cause the safety of the inspection may be delayed until the next business day on In addition, when a storm event of equal to or of normal business hours, the self -inspection shall be of the next business day. Any time when inspections Inspection Record. Self below. personnel greater performed -inspections are required during When adverse weather or to be in jeopardy, the inspection which it is safe to perform the inspection. than 1.0 inch occurs outside upon the commencement were delayed shall be noted in the Inspect Frequency (during normal business hours) inspection records must include: (1) Rain gauge maintained in good working order Daily Daily rainfall amounts. If no daily rain gauge observations are made during weekend or holiday periods, and no individual -day rainfall information is available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC Measures At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the measures inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Indication of whether the measures were operating properly, 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater discharge outfalls (SDOs) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours 1. Identification of the discharge outfalls inspected, 2. Date and time of the inspection, 3. Name of the person performing the inspection, 4. Evidence of indicators of stormwater pollution such as oil sheen, floating or suspended solids or discoloration, 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of site At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If visible sedimentation is found outside site limits, then a record of the following shall be made: 1. Actions taken to clean up or stabilize the sediment that has left the site limits, 2. Description, evidence, and date of corrective actions taken, and 3. An explanation as to the actions taken to control future releases. (5) Streams or wetlands onsite or offsite (where accessible) At least once per 7 calendar days and within 24 hours of a rain event > 1.0 inch in 24 hours If the stream or wetland has increased visible sedimentation or a stream has visible increased turbidity from the construction activity, then a record of the following shall be made: 1. Description, evidence and date of corrective actions taken, and 2. Records of the required reports to the appropriate Division Regional Office per Part III, Section C, Item (2)(a) of this permit. (6) Ground stabilization measures After each phase of grading 1. The phase of grading (installation of perimeter E&SC measures, clearing and grubbing, installation of storm drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. SELF -INSPECTION, RECORDKEEPING SECTION B: RECORDKEEPING PART III AND REPORTING deviation shall be kept on the site. The throughout the coverage under this permit. The shall be kept on site and available for inspection or 1. E&SC Plan Documentation The approved E&SC plan as well as any approved approved E&SC plan must be kept up-to-date following items pertaining to the E&SC plan at all times during normal business hours. Item to Document Documentation Requirements (a) Each E&SC measure has been installed and does not significantly deviate from the locations, dimensions and relative elevations shown on the approved E&SC plan. Initial and date each E&SC measure on a copy of the approved E&SC plan or complete, date and sign an inspection report that lists each E&SC measure shown on the approved E&SC plan. This documentation is required upon the initial installation of the E&SC measures or if the E&SC measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed in accordance with the approved E&SC plan. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair requirements for all E&SC measures have been performed. Complete, date and sign an inspection report. (e) Corrective actions have been taken to E&SC measures. Initial and date a copy of the approved E&SC plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation to be Kept on Site In addition to the E&SC plan documents above, the following items shall be kept on the site and available for inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This General Permit as well as the Certificate of Coverage, after it is received. (b) Records of inspections made during the previous twelve months. The permittee shall record the required observations on the Inspection Record Form provided by the Division a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. 3. Documentation to be Retained for Three Years All data used to complete the e-NOI and all inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] PART II, SECTION G, ITEM (4) DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need to be drawn down for maintenance or close out unless this is infeasible. The circumstances in which it is not feasible to withdraw water from the surface shall be rare (for example, times with extended cold weather). Non -surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: (a) The E&SC plan authority has been provided with documentation of the non -surface withdrawal and the specific time periods or conditions in which it will occur. The non -surface withdrawal shall not commence until the E&SC plan authority has approved these items, (b) The non -surface withdrawal has been reported as an anticipated bypass in accordance with Part III, Section C, Item (2)(c) and (d) of this permit, (c) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin. Examples of appropriate controls include properly sited, designed and maintained dewatering tanks, weir tanks, and filtration systems, (d) Vegetated, upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described in Item (c) above, (e) Velocity dissipation devices such as check dams, sediment traps, and riprap are provided at the discharge points of all dewatering devices, and (f) Sediment removed from the dewatering treatment devices described in Item (c) above is disposed of in a manner that does not cause deposition of sediment into waters of the United States. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. 2. Occurrences that Must be Reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (c) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (d) Anticipated bypasses and unanticipated bypasses. (e) Noncompliance with the conditions of this permit that may endanger health or the environment. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Department's Environmental Emergency Center personnel at (800) 858-0368. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment deposition in a stream or wetland • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. ■ If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) oil spills and release of hazardous substances per Item 1(b)-(c) above • Within 24 hours, an oral or electronic notification. The notification shall include information about the date, time, nature, volume and location of the spill or release. (c) Anticipated bypasses [40 CFR 122.41(m)(3)] • A report at least ten days before the date of the bypass, if possible. The report shall include an evaluation of the anticipated quality and effect of the bypass. (d) Unanticipated bypasses [40 CFR 122.41(m)(3)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that includes an evaluation of the quality and effect of the bypass. (e) Noncompliance with the conditions of this permit that may endanger health or the environment[40 CFR 122.41(I)(7)] • Within 24 hours, an oral or electronic notification. • Within 7 calendar days, a report that contains a description of the noncompliance, and its causes; the period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time noncompliance is expected to continue; and steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. [40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOO❑ AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc .com or 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. \\\U 111111Ifj1.1.::::..:-.Y,\\\,....7.N\ 0- f; sCi ' 0A4/R r 17.7/, ,,,,,,.., SEAL v 053032 14'�' ��iirll,11111.3, 12-08-2021 ++,I*, ,`` \• COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR NCGO1 SELF -INSPECTION, RECORDKEEPING, REPORTING NOTES C2.26 SEP! GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCGO1 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCGO1 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and perimeter slopes 7 None (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 (d) Slopes 3:1 to 4:1 14 -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed (e) Areas with slopes -7 days for perimeter dikes, swales, ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope 1 Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. 0 0 0 \ V V / 0 0> \<0 U�0 0 0 0 CONCRETE WASHOUT SANDBAGS (1YP.] OR STAPLES SILT FENCE CLEARLY MARKED SIGNAGE NOTING DEVICE (167124' MIN.) PLAN 1:1 SIDE SLOPE TYP.) ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER HIGH COHESIVE & LOW FLTRATION SOIL BERM 10' 10 MIL PLASTIC LINING SANDBAGS IYP.) OR STAPLES SECTION A -A NOTES: 1- ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MAINTAIN® WHEN THE LIOUIDANLEOR SOLID REACHES 75% OF THE STRUCTURES CAPACITY. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE. BELOW GRADE WASHOUT STRUCTURE NOT TO SCALE MIN 10 MIL PLASTIC LINING 1:1 SIDE SLOPE (TYP, SECTION B-B SANDBAGS (TYP.) NOTES: OR STAPLES CLEARLY MARKED SIGNAGE CONCRETENOTING DEVICE I1 rx24- MIN.) WASHOUT PLAN SANDBAGS (1YP.) OR STAPLES HIGH COHESIVE & LOW FITRATION SOIL BERM 1- ACTUAL LOCATION DETERMINED IN FIELD 2. THE CONCRETE WASHOUT STRUCTURES SHALL BE MANTAINED WHEN THE LIQUID ANDNOR SOLID REACHES 75% OF THE STRUCTURES CAPACITY TO PROVIDE ADEQUATE HOLDING CAPACITY WITH A MNIMUM 12 INCHES OF FREEBOARD. 3.CONCRETE WASHOUT STRUCTURE NEEDS TO BE CLEARY MARKED WITH SIGNAGE NOTING DEVICE - ABOVE GRADE WASHOUT STRUCTURE NOT TO SCALE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOO❑ AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS I BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND MIMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. 11111i111II11rl11' SEAL 053032 F. -,ENGINE' /p� -- -. - 4/� - ''��iir 111111n1�� 12-08-2021 1''111, I*, I, ``11 COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR NCG01 GROUND STABILIZATION & MATERIALS HANDLING C2.27 CONSTRUCTION SEQUENCE: GENERAL EROSION CONTROL NOTES: 2012 NCDOT ROADWAY ENGLISH STD. DRAWINGS THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" HIGHWAY DESIGN BRANCH - N.C. DEPARTMENT OR TRANSPORTATION - RALEIGH, N_C- ARE APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS: STD -NO - DIVISION 2 - EARTHWORK 200.02 DIVISION 3 - PIPE CULVERTS 300.01 DIVISION 8 - INCIDENTALS 838.01 838.80 876.01 876.02 876.04 SEEDING TITLE Method of Clearing - Method II Method of Pipe Installation - Method 'A Concrete Endwall for Single and Double Pipe Culverts - 15" thru 48" Pipe 90° Skew Precast Concrete Endwall - For Single 12" thru 72" Pipe 90° Skew Rip -Rap in Channels Guide for Rip Rap at Pipe Outlets Drainage Ditches with Class 'B' Rip Rap A. ACCOMPLISH SEEDING BY MEANS OF AN APPROVED POWER -DRAWN SEED DRILL, COMBINATION CORRUGATED ROLLER -SEEDER, APPROVED HAND OPERATED MECHANICAL SEEDER, OR OTHER APPROVED METHODS TO PROVIDE EVEN DISTRIBUTION OF SEED. B.DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY- AFTER SEEDING, ROLL AREA WITH A ROLLER, NOT LESS THAN 18 INCHES IN DIAMETER AND WEIGHING NOT MORE THAN 210 POUNDS PER FOOT OF WIDTH- UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY- C. IMMEDIATELY FOLLOWING SEEDING APPLY MULCH OR MATTING- DO NOT SEED AREAS IN EXCESS OF THAT WHICH CAN BE MULCHED ON SAME DAY. D. APPLY WATER WITH A FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED- SATURATE TO 4 INCHES OF SOIL DEPTH. E.THE AMOUNT OF DISTURBED AREA REQUIRED TO BE SEEDED IS LIMITED TO 2,000 LF OFTRAIL OR THE TIME FRAME GUIDELINES AS SPECIFIED BY NCG-010000 GENERAL CONSTRUCITON PERMIT EFFECTIVE AUGUST 3, 2011 ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY- GROUND COVER STABILIZATION SHALL OCCUR WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY, WITH THE FOLLOWING EXCEPTIONS IN WHICH TEMPORARY GROUND COVER SHALL BE PROVIDED IN 14 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY- SEE SHEET 1J FOR NPDES STABILIZATION TIMEFRAME GUIDELINES PROTECTION A.PROTECTSEEDED AREAS FROM DAMAGE BY BARRICADES, SIGNS, AND OTHER APPROPRIATE MEANS- MAINTAIN AND PROTECT SLOPES FROM WEATHER -DAMAGE TRAFFIC OPERATIONS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TRAFFIC CONTROL ASSOICATED WITH THE PROJECT AND SHALL ADHERE TO THE PROVISIONS OF THE MUTCD- WITHIN 10' OF A TRAVEL LANE CONTRACTOR SHALL INSTALL LANE CLOSURE AND/OR FLAGGING OPERATION AS PER MUTCD- CONTRACTOR SHALL NOTIFY PUBLIC WORKS DEPARTMENT AT 919-552-5920 FOR LAN CLOSURE PERMIT AT LEAST 48 HOURS IN ADVANCE SEQUENCE OF CONSTRUCTION ACTIVITIES 1- A PRECONSTRUCTION CONFERENCE MUST BE HELD PRIOR TO THE START OF ANY CONSTRUCTION ACTIVITIES A MANDATORY PRE -CONSTRUCTION MEETING WILL ALSO BE REQUIRED WITH THE LAND QUALITY SECTION OF NCDENR BEFORE LAND DISTURBING ACTIVITIES BEGIN- CALL 919-791-4200 TO SCHEDULE A MEETING. 2.INSTALL CONSTRUCTION ENTRANCES WITH CONCRETE TRUCK WASHOUT PITS PER DETAIL ON SHEET 2B AS NEEDED AT LOCATIONS SHOWN ON SHEETS 1 D AND 1 E- OTHER STAGING AREAS WILL NEED TO BE DISCUSSED WITH CITY OF RALEIGH PRIOR TO THE START OF CONSTRUCTION- CONTACT THE CITY OF RALEIGH AT (919)516-2837- 3- DETERMINE AND MARK LIMITS OF DISTURBANCE PLAN SHALL BE REVISED TO AMEND THE LIMITS OF DISTURBANCE IF TEMPORARY CROSSINGS ARE LOCATED OUTSIDE OF THE CURRENT LIMITS OF DISTUNRBANCE- 4- INSTALL TREE PROTECTION FENCING, SILT FENCE, COMBINATION FENCE AND SILT FENCE OUTLETS- SILT FENCE OUTLETS SHALL BE INSTALLED PER FIELD LOCATED LOW POINTS AND AS SHOWN ON APPROVED PLANS- CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES_ 5- CALL FOR ON SITE INSPECTION BY ENVIRONMENTAL INSPECTOR AND OBTAIN CERTIFICATE OF COMPLIANCE CALL FOR TREE PROTECTION FENCE INSPECTION BY CHRIS CRUM OF THE CITY OF RALEIGH. 919-516-2561 6- TOPSOIL REMOVAL AND/OR STORAGE AREAS SHALL BE CONTAINED WITHIN THE PROPOSED LIMITS OF DISTURBANCE 7- BEGIN GRADING, CLEARING AND GRUBBING- INSTALL PERMANENT PIPES DURING CLEARING AND GRUBBING AS NEEDED- MAINTAIN DEVICES AS NEEDED- ROUGH GRADE SITE ENSURE THAT SEDIMENT LADEN WATER 15 DIRECTED TO SEDIMENT CONTROL DEVICES. 8.THE AMOUNT OF DISTURBED AREA REQUIRED TO BE TEMPORARILY SEEDED 15 LIMITED TO 2,000 LF OF TRAIL OR THE TIME FRAME GUIDELINES AS SPECIFIED BY NCG-010000 GENERAL CONSTRUCITON PERMIT EFFECTIVE AUGUST 3, 2011 ISSUED BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY- TEMPROARY GROUND COVER STABILIZATION SHALL OCCUR WITHIN 7 CALENDAR DAYS FROM THE LAST LANDDISTURBING ACTIVITY, WITH THE FOLLOWING EXCEPTIONS IN WHICH TEMPORARY GROUND COVER SHALL BE PROVIDED IN 14 CALL R DAYS FROM THE LAST LAND -DISTURBING ACTIVITY- SEE STABALIZATION TIMEFRAME TABLE- 9- INSTALL CULVERTS AND PROTECT INLETS WITH INLET PROTECTION- INSTALL CULVERTS IN JURISDICTIONAL AREAS ACCORDING TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES MANUAL CULVERT INSTALLATIONS IN STREAMS WILL REQUIRE DEWATERING BY USE OF COFFER DAMS/IMPERVIOUS DIKES AND PUMPS TO MAINTAIN WATER QUALITY STANDARDS, PER DETAIL ON SHEET 2C. CULVERT TO BE CONSTRUCTED IN THE DRY. CONTRACTORTO COORDINATE WITH EROSION CONTROL INSPECTOR ANY TEMPORARY COFFER DAM SHALL BE CONSTRUCTED OF MATERIALS SUCH AS SHEET PILING, SANDBAGS OR CLEAN CLASS 1 RIP RAP OR LARGER STONE THAT WILL NOT CONTRIBUTE TO TURBIDITY OR SILTATION OF THE WATER BODY- A TEMPORARY SEDIMENTATION BAG SHALL BE USED PER NCDOT STANDARD DRAWING NUMBER 1630.06. SANDBAGS SHALL BE OF THE FILTER FABRIC TYPE, DOUBLE BAGGED AND INDIVIDUALLY TIED TO PREVENT SAND LEAKAGE THEY SHALL BE PLACED AND REMOVED MANUALLY TO PREVENT SPILLAGE ONLY CLEAN SAND, FREE OF DEBRIS, SILT, FINE PARTICLES OR OTHER FOREIGN SUBSTANCES, SHALL BE USED TO FILL THE BAGS- THE COFFERDAM SHALL BE ENTIRELY REMOVED IMMEDIATELY UPON COMPLETION OF WORK- DURING PERIODS OF WORK ACTIVITY, FLOW IMMEDIATELY DOWNSTREAM OF THE WORKSITE SHALL EQUAL FLOW IMMEDIATELY UPSTREAM OF THE WORKSITE- ALL OTHER OPTIONS WILL NEED PRIOR APPROVAL SEE SHEET 2D FOR DETAIL- NO DIRECT PAYMENT SHALL BE MADE FOR THE WORK OF INSTALLATION, MAINTENANCE, AND REMOVAL OF IMPERVIOUS DIKE(S) AS DESCRIBED IN THIS PROVISION- PAYMENT FOR SUCH WORK SHALL BE DISTRIBUTED AMONG THE VARIOUS PAY ITEMS. 10. ALL BANK AND CHANNEL STABILIZATION SHALL BE MAINTAINED DAILY UNTIL PERMANENT STABILIZATION HAS BEEN ACCOMPLISHED- TEMPORARY ACCESS ROADS SHALL BE PERMANENTLY STABILIZED AFTER CONSTRUCTION AND DECOMMISIONED AT THE DIRECTION OF THE LANDOWNER ALL STAGING AND LAY DOWN AREAS SHALL BE PERMANENTLY STABILIZED ONCE MATERIAL AND EQUIPMENT IS REMOVED. 11. AS AREAS ARE BROUGHT UP TO FINISH GRADE, SPREAD TOPSOIL OVER ALL AREAS TO RECEIVE TURF OR LANDSCAPING- SEED ALL AREAS WITHIN NPDES SPECIFIED TIMEFRAME OF COMPLETING ACTIVITY- PERMANENT GRASS SHALL BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON- FERTILIZE, WATER AND RESEED AS REQUIRED TO ESTABLISH AND MAINTAIN A VIGOROUS STAND OF GRASS. 12. AFTER COMPLETION OF CONSTRUCTION AND THE SITE 15 STABILIZED, REMOVE ALL ACCUMULATED SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND SPREAD EVENLY ACROSS THE SITE THEN REMOVE TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREA AND APPLY APPROPRIATE GRASS- 13. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR FINAL SITE INSPECTION BY ENVIRONMENTAL OFFICER- OBTAIN CERTIFICATE OF COMPLIANCE 14. CONTRACTOR IS REQUIRED TO MAINTAIN A WEEKLY WRITTEN REPORT OF SEDIMENT AND EROSION CONTROL DEVICES. 1. EROSION AND SEDIMENT CONTROL (E&5C) PERMIT AND A CERTIFICATE OF COMPLIANCE (COC) MUST BE OBTAINED BEFORE ANY LAND DISTURBING ACTIVITIES OCCUR. 2. OBTAIN AN ENVIRONMENTAL DEVELOPMENT PERMIT FROM THE TOWN OF HOLLY SPRINGS. 3. CALL NCDEQ LAND QUALITY SECTION AT 919-791-4200 TO SCHEDULE PRE -CONSTRUCTION MEETING AND FOR NOTIFICATION OF PROJECT START UP. 4. INSTALL TREE PROTECTION FENCE AROUND ALL TREES TO BE PROTECTED PER THE APPROVED PLANS. 5. CONTRACTOR TO KEEP A COPY OF THE RECORDED MAP WITH ALL EASEMENTS SHOWN IN ACCORDANCE WITH TOWN OF HOLLY SPRINGS STORMWATER REQUIREMENTS ON SITE AT ALL TIMES, AS PROVIDED BY THE OWNER. FAILURE TO DO 5O CAN RESULT IN SHUTDOWN OF CONSTRUCTION UNTIL A FINAL MAP 15 APPROVED AND RECORDED. 6. THE FOLLOWING DOCUMENTATION SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTIONS AT ALL TIMES DURING NORMAL BUSINESS HOURS UNTIL THE PROJECT 15 CLOSED OUT BY NC DEQ LAND QUALITY SECTION OFFICE. a. b. c. d. e. f. APPROVED EROSION & SEDIMENTATION CONTROL PLAN PLAN APPROVAL LETTER WITH ANY MODIFICATIONS OR PERFORMANCE RESERVATIONS 401 / 404 DOCUMENTATION. AS APPLICABLE GENERAL PERMIT NCG010000 CERTIFICATE OF COMPLIANCE (COC) A MINIMUM OF THE PAST 30 DAYS OF SELF -INSPECTION REPORTS 8. A RAIN GAUGE WILL BE INSTALLED ON SITE. 9. INSTALL TEMPORARY CONSTRUCTION ENTRANCE AND INLET PROTECTION (SILT SOCKS, YARD INLET, ROCK PIPE, ETC.) PER THE APPROVED PLANS. 10. INSTALL, SEED, MULCH, AND ANCHOR PERIMETER SEDIMENT CONTROLS, SILT FENCE, TEMPORARY DIVERSION DITCHES, AS SHOWN ON THE APPROVED PLANS. CLEAR ONLY THOSE AREAS NECESSARY TO INSTALL THESE MEASURES. 11. INSTALL CHECK DAMS IN TEMPORARY DIVERSIONS AND OTHER VELOCITY DISSIPATERS AS SHOWN ON HE APPROVED PLANS. 12. UPON THE COMPLETION OF INSTALLATION OF THE EROSION CONTROL MEASURES THE OWNER OR CONTRACTOR SHALL CALL THE EROSION CONTROL INSPECTOR FOR A CERTIFICATE OF COMPLIANCE INSPECTION 13. ONCE APPROVED (BY TOWN). BEGIN DEMOLITION, CLEARING, GRADING, AND CONSTRUCTION OF SITE ITEMS. CONTRACTOR TO INSTALL SILT FENCE AND SILT FENCE OUTLETS ON DOWNSTREAM SIDES OF ANY STOCKPILE MATERIAL. DISPOSAL OF ANY EXCESS MATERIAL(S) TO BE TAKEN OFF SITE, SHALL BE DONE SO IN A MANNER THAT MEETS THE CONDITIONS OF LOCAL, STATE AND FEDERAL REGULATIONS. 14. INSPECT SEDIMENT AND EROSION CONTROL DEVICES AT LEAST ONCE A WEEK, AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN A HALF -INCH (DURING A 24-HOUR PERIOD), TO INSURE THEY ARE OPERATING PROPERLY AND IF MAINTENANCE IS NEEDED. TAKE IMMEDIATE CORRECTIVE ACTION FOR ANY DEVICE FAILURE. 15. INSTALL, MAINTAIN AND ADJUST EROSION & SEDIMENTATION CONTROL MEASURES AS NEEDED DURING DEMOLITION, CLEARING AND GRUBBING, AND THROUGHOUT THE LIFE OF THE PROJECT AND UNTIL PERMANENT VEGETATION ON THE PROJECT IS ESTABLISHED. 16, STABILIZATION IS REQUIRED WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING OR INACTIVITY ON THE SITE. REFERENCE NCGO1 GROUND STABILIZATION REQUIREMENTS FOR ADDITIONAL TIMEFRAMES. 17. LIMIT DISTURBANCES TO AN AREA THAT CAN BE STABILIZED AT THE END OF THE WORK DAY. WORK SHOULD BE SCHEDULED TO BE COMPLETED IN DRY CONDITIONS IN THE SAME DAY. 18. ALL GROUND COVER TO BE APPLIED PER CONDITIONS OF THE NPDES PERMIT OR IN CRITICAL AREAS AT END OF EACH DAY. 19, SCHEDULE INSPECTION WITH NC DEQ EROSION CONTROL INSPECTOR AT (919) 791-4200 AND THE TOWN'S EROSION CONTROL INSPECTOR. IF APPROVED BY BOTH NC DEQ AND THE TOWN, REMOVE REMAINING TEMPORARY EROSION CONTROL MEASURES. 20. PERMANENT SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN 14 DAYS AFTER FINAL GRADE IS REACHED. 21. CALL THE TOWN TO SCHEDULE STORMWATER FINAL INSPECTION. 22. WHEN THE PROJECT IS COMPLETE, HE PERMITTEE SHALL CONTACT NC DEQ TO CLOSE OUT THE EROSION & SEDIMENTATION CONTROL PLAN. AFTER NC DEQ INFORMS THE PERMITTEE OF THE PROJECT CLOSE OUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT deq.nc.gov/NCG01 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (e-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE CHARGED UNTIL THE e-NOT HAS BEEN FILLED OUT. 1, ALL CONSTRUCTION ACTIVITIES ARE REQUIRED TO FOLLOW THE NCG01 PERMIT ISSUES BY NC DEQ. SEE SHEETS C-2.8 - C-2.9 FOR ADDITIONAL INFORMATION. 2. ALL E&SC MEASURES MUST BE MAINTAINED UNTIL ALL UPGRADE DRAINAGE AREAS HAVE BEEN STABILIZED WITH THE ESTABLISHMENT OF PERMANENT VEGETATION. 3. STABILIZE ALL DISTURBED AREAS WITHIN PRESCRIBED TIMEFRAMES OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND DISTURBING ACTIVITY. PERMANENT GROUND COVER SHALL BE PLACED WITHIN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT, OR AS DIRECTED BY NC DEQ TIMEFRAMES. 4. EXISTING UTILITIES ARE SHOWN FROM THE BEST AVAILABLE INFORMATION AND ARE APPROXIMATE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THESE AND OTHER UTILITIES BEFORE STARTING CONSTRUCTION. NOTIFY UTILITY LOCATING COMPANY (ONE CALL @ 1-800-632-4949) OR INDIVIDUAL UTILITY OWNERS FOR UNDERGROUND LOCATIONS AT LEAST 48 HOURS IN ADVANCE. 5, EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE MAINTAINED SO THAT RUNOFF THAT CONTAINS SEDIMENT FROM THE SITE WILL NOT ENTER STORM DRAINAGE FACILITIES. 6. PROPERTIES AND RIGHT-OF-WAY ADJOINING THE SITE SHALL BE KEPT CLEAN OF MUD OR SILT CARRIED FROM THE SITE BY VEHICULAR TRAFFIC OR RUNOFF, 7. ALL CONSTRUCTION TRAFFIC SHALL ENTER AND EXIT THE SITE VIA THE CONSTRUCTION ACCESS ROUTE AND DESIGNATED CONSTRUCTION ENTRANCE. 8. EXCAVATED MATERIAL FROM TRENCHES SHALL BE PLACED ON THE UPGRADE SIDE OF THE TRENCH TO ALLOW MATERIAL TO ERODE INTO THE TRENCH. CONSTRUCTION MAINTENANCE AND REMOVAL OF ALL EROSION CONTROL DEVICES ARE THE RESPONSIBILITY OF GRADING CONTRACTOR UNLESS OTHERWISE NOTED. 9, THE EROSION CONTROL MEASURES SHOWN ON THIS DRAWING ARE RECOMMENDED AT A MINIMUM. ACTUAL/ADDITIONAL MEASURES NECESSARY FOR CONTAINMENT OF RUN-OFF SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND BE FIELD VERIFIED. 10. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE EROSION CONTROL ORDINANCE AND 15 SUBJECT TO A FINE. 11. ALL SLOPES 4:1 OR STEEPER MUST BE SEEDED, MULCHED, AND STABILIZED WITHIN 14 DAYS. SLOPES STEEPER THAN 3:1 MUST BE SEEDED, MULCHED, AND STABILIZED WITHIN 7 DAYS. REFER NCG01 GROUND STABILIZATION REQUIREMENTS FOR ADDITIONAL INFORMATION. 12, ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE TOWN ENGINEERING DEPARTMENT AND/OR NC DEQ, 13. ON -SITE BURIAL PITS ARE NOT ALLOWED, UNLESS WRITTEN APPROVAL IS RECEIVED FROM THE OWNER AND AN ON -SITE DEMOLITION LANDFILL PERMIT 15 RECEIVED FROM THE ZONING ADMINISTRATOR. 14. NO PAINT OR LIQUID WASTES ARE ALLOWED IN STREAM OR STORM DRAINS. 15. DEDICATED AREAS FOR DEMOLITION, CONSTRUCTION, AND OTHER WASTES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. 16, EARTHEN -MATERIAL STOCKPILES MUST BE LOCATED 50' FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE. 17. CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS, OR BUFFERS. 18. ALL AREAS WITHIN LIMITS OF DISTURBANCE SHALL BE STABILIZED ACCORDING TO NCG01 GROUND STABILIZATION NOTES. 19. ANY NECESSARY DEWATERING SHALL BE DONE WITHIN LIMITS OF DISTURBANCE AND THROUGH A SILT BAG TO PREVENT SEDIMENT FROM LEAVING THE SITE. 20. TO FACILITATE IN CLEANUP OF PAVED SURFACES, PROVIDE A LAYER OF SAND, SCREENINGS OR FINES PRIOR TO PLACING ANY EXCAVATED MATERIAL ON THESE SURFACES. 21. SITE STABILIZATION 15 REQUIRED PRIOR TO FINAL APPROVAL OF STORMWATER TRACKING PERMIT AND ISSUANCE OF CERTIFICATE OF OCCUPANCY. SITE MUST HAVE 100% GROWTH AND 80% DENSITY (MOWABLE) IN ORDER TO PASS FINAL INSPECTION. SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH 1 WILMINGTON 1 CHARLOTTE BEAUFORT, SC 1 CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND LJ Th ES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UNITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. rlrlll! e•.Q�oF ASS/O1V y --. l• • SEAL 053032 lIIIlIrrrlI II1111 ,0\ 12-08-2021 1001111 r1111! +r1+11111111j11 TEMPORARY SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF AVAILABLE. 2. RIP THE ENTIRE AREA TO 6 INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS, AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4, APPLY AGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFORMLY AND MIX WITH SOIL. (SEE ADMIXTURE BELOW) 5. CONTINUE TILLAGE UNTIL A WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED 15 PREPARED 4 TO 6 INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR MULCH, 8. INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RESEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE. IF STAND SHOULD BE MORE THAN 60% DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER, AND SEEDING RATES. ADMIXTURES AGRICULTURAL LIMESTONE: MIN. 2 TONS PER ACRE (3 TONS PER ACRE IN CLAY SOILS OR PER SOILS TEST) FERTILIZER: 1.000 LBS PER ACRE - 10-10-10 SUPERPHOSPHATE: 500 LBS PER ACRE - 20% ANALYSIS MULCH: 4,000 LBS PER ACRE - SMALL GRAIN STRAW ANCHOR: ASPHALT EMULSION AT 400 GALS PER ACRE PERMANENT SEEDING SCHEDULE WHERE LIMITS OF DISTURBANCE ARE ADJACENT TO EXISTING TURFGRASS AREAS, CONTRACTOR SHALL PROVIDE A PERMANENT SEED BLEND OF TALL FESCUE & KENTUCKY BLUEGRASS OR ANOTHER SEED MIXTURE AS DIRECTED BY THE OWNER. PROVIDE SOIL AMENDMENTS IN SEEDED AREAS BASED ON SOIL TEST REPORT AND PER SPECIFICATIONS. WHERE LIMITS OF DISTURBANCE ARE ADJACENT TO EXISTING FOREST FLOOR/UNDER COVER (NO TURFGRASS PRESENT), CONTRACTOR SHALL PROVIDE HARDWOOD MULCH (4" DEPTH) OUTSIDE OF THE GRAVEL SHOULDER OF THE TRAIL. TEMPORARY SEEDING SCHEDULE SHOULDERS. SIDE DITCHES, SLOPES (FOR SLOPES BETWEEN 2:1 AND 3:11 DATE TYPE PLANTING RATE MARCH 1 - JUNE 1 CENTIPEDEGRA55 10-20 LB/ACRE (SEED) 33 BUTACRE (SPRIGS} MARCH1-JUNE1 PANICUM VIRGATUM (SWITCHGRASS1 AND 50 LBS./ACRE MARCH 1 -APRIL 15 ADD TALL FESCUE OR 250 LBS./ACRE MARCH 1- JUNE 30 ADD WEEPING LOVEGRASS OR 10 LBS./ACRE MARCH 1 -JUNE 30 ADD HULLED COMMON BERMUDAGRASS 25 LBS./ACRE JUNE 1 - SEPTEMBER 1 "''TALL FESCUE AND ""BROW NTOP MILLET OR "•SORGHUM SUDAN HYBRIDS 250 LBS./ACRE 35 LBS./ACRE 30 LBS-IACRE SEPTEMBER 1 -MARCH 1 PANICUM VIRGATUM (SWITCHGRASS] AND TALL FESCUE 70 LBS./ACRE 120 LBSJACRE NOVEMBER 1 - MARCH 1 ADD ABRUZZI RYE 25 LBS./ACRE SHOULDERS, SIDE DNCHES. SLOPES (FOR SLOPES 3:1 AND FLATTER) DATE TYPE PLANTING RATE AUGUST 15 - NOVEMBER 1 TALL FESCUE 300 LBS./ACRE NOVEMBER 1 - MARCH 1 TALL FESCUE AND ABRULLI RYE 300 LBS./ACRE MARCH 1 -APRIL 15 TALL FESCUE 300 LBS./ACRE MARCH 1 - JUNE 1 CENTIPEDEGRASS 10-20 LB/ACRE [SEED) 33 BU/ACRE (SPRIGS} APRIL 15- JUNE 30 HULLED COMMON BERMUDAGRASS 25 LBS./ACRE JULY 15-AUGUST 15 TALL FESCUE AND °""BROWNTOP MILLET OR -SORGHUM SUDAN HYBRIDS 35 LBS-/ACRE EROSION CONTROL MAINTENANCE NOTES: NPDES PERMIT COMPLIANCE REQUIRES SELF -INSPECTION, RECORDKEEPING & RECORDING PER THE NCG01 CONSTRUCTION PERMIT ISSUED FOR THE PROJECT. THESE INSPECTIONS MAY RESULT IN RECOMMENDATIONS FOR ROUTINE MAINTENANCE OF THE SOIL EROSION CONTROL DEVICES, AS WELL AS ADDITIONAL MAINTENANCE AS OUTLINED BELOW. 1. THROUGHOUT THE CONSTRUCTION PERIOD, ALL MUD/SILT TRACKED ONTO EXISTING TOWN/STATE AND PRIVATE ROADS (USED FOR CONSTRUCTION ACCESS) FROM THE SITE DUE TO CONSTRUCTION SHALL BE IMMEDIATELY REMOVED BY THE CONTRACTOR. 2. MAINTAIN THE GRAVEL PAD (CONSTRUCTION ENTRANCE/EXIT) IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP -DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. 3. INSPECT EROSION CONTROL DEVICES (SILT FENCE AND/OR WATTLES) AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE DEVICE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS ONCE ACCUMULATION HAS REACHED HALF OF THE HEIGHT OF THE DEVICE TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE DEVICE. TAKE CARE TO AVOID UNDERMINING THE DEVICE DURING CLEANOUT. REMOVE ALL EROSION CONTROL MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 4. INSPECT SILT FENCE OUTLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (Y2 INCH OR GREATER) RAINFALL EVENT. CLEAR THE WIRE FENCE AND HARDWARE CLOTH OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH OR HARDWARE CLOTH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. 5. INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 /2 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE SIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. 6. INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND LEVEL AND APPROPRIATELY STABILIZE IT. 7. INSPECT PERMANENT DIVERSIONS AFTER EVERY RAINFALL DURING THE CONSTRUCTION OPERATION. IMMEDIATELY REMOVE ANY OBSTRUCTIONS FROM THE FLOW AREA. AND REPAIR THE DIVERSION RIDGE. CHECK OUTLETS, AND MAKE TIMELY REPAIRS AS NEEDED. MAINTAIN THE VEGETATION IN A VIGOROUS. HEALTHY CONDITION AT ALL TIMES. REPAIR JUTE NET AS NEEDED TO ENSURE A GOOD STAND OF GRASS. 8. TEMPORARY SEEDING: RE -FERTILIZE IF GROWTH 15 NOT FULLY ADEQUATE, RESEED, RE -FERTILIZE, AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. 9. PERMANENT SEEDING: A. GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. INSPECT SEEDED AREAS FOR FAILURE AND MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. B. RESEEDING - IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER -SEED THE STAND, CONSIDER SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. C. IF VEGETATION FAILS TO GROW. SOIL MUST BE TESTED TO DETERMINE IF ACIDITY OR NUTRIENT IMBALANCE 15 RESPONSIBLE. D. FERTILIZATION - ON THE TYPICAL DISTURBED SITE, FULL ESTABLISHMENT USUALLY REQUIRES RE -FERTILIZATION IN THE SECOND GROWING SEASON. FINE TURF REQUIRES ANNUAL MAINTENANCE FERTILIZATION 9TABLE 6.12B). USE SOIL TESTS IF POSSIBLE OR FOLLOW THE GUIDELINES GIVEN FOR THE SPECIFIC SEEDING MIXTURE. 10.CHECK DAMS: A. INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1 /2-INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT. STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. B. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL (PRACTICE 6.31 RIPRAP-LINED AND PAVED CHANNELS OF NC DENR EROSION & SEDIMENTATION CONTROL MANUAL. C. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: THESE GENERAL NOTES ARE INTENDED TO SUPPLEMENT THE NC DEQ NCGO1 CONTRUCTION PERMIT REQUIREMENTS. WHERE CONFLICTS EXISTING, THE MORE STRINGENT REQUIREMENTS SHALL APPLY. ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION CONTROL NOTES C2.28 WOVEN WIRE FABRIC BARRICADE FABRIC MIN. 10 GA. LINE WIRES SiDE VIEW a' MAIL FRONT VIEW NOTES: 1. /IQ ORANGE SILT FENCE PERMITTED. 2. ORANGE, UV RESISTANT, HIGH-TENSIL STRENGTH, F'OLY BARRICADE FABRIC MUST BE VSED. 3. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATER/ AL. 4. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 5. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. 6. PLACE A SIGN AT EACH END OF UNEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 7. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER. PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 8. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 9. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. 10. ADDTIONAL SIGNS MAY BE REQUIRED BY CRY OF RALEIGH INSPECTIONS DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. 11. PLACE A SIGN AT EACH END OF UNEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 4. 4. MIN. 12-10 GA. INTERMEDIATE WIRES GRADE 40" --I TREE PROTECTION AREA DO NOT ENTER 18" WARNING SIGN DETAIL DRAWING NOT TO SCALE STANDARD TREE PROTECTION DETAIL TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT STANDARD DETAIL NUMBER.' HS403 DATE REVISIONS MIN, 10 GA. UNE WIRES 6' MAX EXTRA STRENGTH FABRIC WITH WIRE FENCE VARIABLE AS DIRECTED BY THE ENGINEER SI FENCE F IN ALLE] TO "'+Ti�iTW411C�iAI►itii�iAJii�Ti�ilyiiCii�ii110 i�iT=ii-ii-iijii i�ii 11-11-II-II-1111-11-11-II-11-E=11-II-II-11-1111-11-11-'11-11-II-11LL I -II' -'I I 1 1- -1 T i-1 FRONT VIEW NOTE' 1. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS or CONCENTRATED FLOW. 2. UV RESISTANT SILT FENCE FABRIC MUST BE USED BQ, ORANGE SILT FENCE PERMITTED. * FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE SILT FENCE SHOULD NOT BE USED AS INLET PROTECTION AROUND CATCH BASINS. MIN. 12-1/2 GA. INTERMEDIATE WIRES GRADE STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC PILL SLOPE GRADE 4" WIDE x B" TRENCH OVER SKIRT • ANCHOR SKIRT AS DIRECTED BY ENGINEER • SIDE VIEW DRAWING NOT TO SCALE STANDARD TEMPORARY SILT FENCE STANDARD DETAIL NUMBER: HS401 DATE REVISIONS TOWN OF HOLLY SPRINGS ENGINEERING DEPAR TMEN T 7/24/09 Holly Springs •- Disarm: Tac Scum 1,1 b STEEL POST WOVEN WIRE FABRIC SILT FENCE FABRIC IIN. 10 GA. UNE WIRES PILL SLOPE GRADE 4" WIDE x 9" DEEP TRENCH OVER SKIRT • ANCHOR SKIRT AS DIRECTED BY ENGINEER e SIDE VIEW • FOR REPAIR OF SILT FENCE FAILURES, USE No. 57 WASHED STONE. 11-11=11.=11?11=11=.1=11=11=11=1-11-11.-II-11-11.-11-11 =11-11=11-11-11-.1-11-I. I_1111= II _1 1 II SILT FENCE FABRIC INSTALLED TO SECOND WIRE FROM TOP NOTES: 1. N4 ORANGE SILT FENCE PERMITTED. 2. USE SILT FENCE ONLY WHEN DRAINAGE AREA DOES NOT EXCEED 1/4 ACRE AND NEVER IN AREAS OF CONCENTRATED FLOW. 3. ORANGE, LN RESISTANT, HIGH-TENSIL STRENGTH, POLLY BARRICADE FABRIC MUST BE USED. 5. END OF SILT FENCE NEEDS TO BE TURNED UPHILL 6. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. 7. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 8. SIGNS SHALL BE PLACED AT 50' MAXIMUM INTERVALS. 9. PLACE A SIGN AT EACH END OF UNEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. 10. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER. PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 11. ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 12. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. 13. ADDFIIONAL SIGNS MAY BE REQUIRED BY TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT BASED ON ACTUAL FIELD CONDITIONS. 14. PLACE A SIGN AT EACH END OF UNEAR TREE PROTECTION AND 50' ON CENTER THEREAFTER. ORANGE, UV RESISTANT. HIGH - TENSIL STRENGTH. POLY BARRICADE FABRIC (TYPICAL) FRONT VIEW 4. 4. a• 4. MIN. 12-1/2 CA. INTERMEDIATE WIRES GRADE TREE PROTECTION AREA 18" DO NOT ENTER WARNING SIGN DETAIL DRAWING NOT TO SCALE STANDARD TEMPORARY SILT/ TREE PROTECTION FENCE TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT STANDARD DETAIL NUMBER: HS402 DATE 4.2449 REVISIONS SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND LJ11L ES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR RS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTIUTES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. / / R`r-6:,/ / Y / / / / / / / /IT 15 ADVISABLE TO PROVIDE A SEPARATE ENTRANCE TO UMIT TRAFFIC ACROSS THE RAC AND REDUCE WEAR AND MAINTENANCE. PRESSURIZED WATER SOURCE (CONTINGENT UPON WATER MAIN INSTALLATION) THE LOCATION MUST SLOPE AWAY FROM THE STREET OR STEPS MUST BE TAKEN (GRADING, DIVERSIONS, ETC.) TO PREVENT RUNOFF FLOWING INTO THE STREET. FOUNDATION OF 6" COMPACTED CRUSH AND RUN STONE 7 PROVIDE DRAINAGE AWAY FROM THE WASH RACK TO A SEDIMENT -TRAPPING DEVICE. 11 KEEP A BROOM AND SHOVEL CLOSE TO THE RACK TO CLEAN THE STREET. WASH RACK *THE FOLLOWING IS AN EXAMPLE OF AN ACCEPTABLE WASH RACK. OTHER APPROVED METHODS MAY BE UTILIZED. ONE SECTION OF REINFORCED CONCRETE CATTLEGUARD 3" WASHED STONE UNDER AND BETWEEN SLATS TO DRAIN WATER AND SEDIMENT AWAY FROM THE RACK. GEOTEXTILE FABRIC SECTION 'A -A' DRAWING NOT TO SCALE STANDARD CONSTRUCTION EXIT WASH RACK STANDARD DETAIL NUMBER: H5416 DATE REVISIONS TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT 7,24,09 Holly Springs 1Hsrnret The Serve.. 0 6 OR 2° TO 3" STONE GEOTEX1TLE FABRIC TO STABILIZE FOUNDATION (ESPECIALLY IMPORTANT WHERE WETNESS 15 ANTICIPATED) GRADE g • DIVERSION RIDGE 15 /nr GEOTEXTILE FABRIC APPLICABLE A r ALL POINTS OF INGRESS & EGRESS UNTIL SITE IS STABILIZED) FREQUENT CHECKS OF THE DEVICE AND TIMELY MAINTENANCE MUST BE PROVIDED. Nil TES, A. TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGER TRUCKS IS TO BE PROVIDED. B.ENTRANCE(S) SHOULD BE LOCATED TO PROVIDE FOR MAXIMUM UTILIZATION BY ALL CONSTRUCTION TRUCKS. CMUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF TRAFFIC ONTO STREETS. PERIODIC TOP DRESSING WITH STONE WILL BE NECESSARY, KEEP SOME ON HAND. Di ANY MATERIAL WHICH STILL MAKES IT ONTO THE ROAD MUST BE CLEANED IMMEDIATELY. DRAWING NOT TO SCALE CONSTRUCTION ENTRANCE STANDARD DETAIL NUMBERH5432 DATE REVISIONS TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT 9/21/16 �SP llhgs Discover Tke SvorOR TOP OF SILT FENCE MUST BE AT LEAST 1' ABOVE THE TOP OF THE WASHED STONE 4' MIN. STEEL FENCE POST WRE FENCE H..... HARDWARE CLOTH FILTER OF 1" DUHA WASHED STONE BURY WIRE FENCE AND HARDWARE CLOTH FRONT VIEW 11 I STEEL FENCE POST tH SET MAX 2' APART MIN. 18" INTO SOLI GROUND u SILT FENCE 3' FILTER FABRIC ON GROUND BURY 5" OF UPPER EDGE OF FILTER FABRIC IN TRENCH SECTION VIEW 1a" MINIM HEIGHT OF STONE BURY WIRE FENCE. FILTER FABRIC, AAA HARDWARE CLOTH IN TRENCH DRAWING NOT TO SCALE SILT FENCE OUTLET STANDARD DETAIL NUMBER.' HS404 DATE REISIONS TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT fe/r7 ,�AA\II%IIIIIrlllllll e�.Q0oFESS/oy,f --y SEAL .053032 F •.ENGINE f1/431, rrrl�'111T1G \\\ '1,SAlAi1I11.I1NN''`. III1111�11fLlA>,AA\ COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC STAPLE CHECK MATTING IN DITCHES 10" -{ H4" h II II-Il 11 Il a .1 o .. 1 D"-1 I-- o' Staple r Check MATTING ON SLOPES NOTES 18" (MIN.) » BACKFILL 6" (MIN.) EXISTING GROUND STAPLES ON 1 CENTERS IN TRENCH 6" MIN MATTING SHALL BE PLACED IN TRENCH AND BACKFILLED DIAGRAM r1 Mi x Staple 3' DIAGRAM OB THIS DETAIL APPLIES TO STRAW, EXCELSIOR, COIR FIBER MAT AND PERMANENT SOIL REINFORCEMENT HAT (PSRM) INSTALLATION AND AS DIRECTED. STAPLES SHALL BE NO. 11 GAUGE STEEL WIRE FORMED INTO A "U" SHAPE WITH A MINIMUM THROAT WIDTH OF 1 INCH AND NOT LESS THAN 6 INCHES IN LENGTH. STAPLES ON 1' CENTERS IN TRENCH Staple Check Pattern Staple 1. a 4' DIAGRAM 0 0 co 1d QQ z cc 0 CI co CC Z < 1_ 1-1Zuj H 0 En cc 2 7 Ci ROADWAY STANDARD DRAWING FOR INSTALLATION Tf=II=CTI.ff.II=Ilf II�II=II =11 ll=Il =11=11 ll ll.11=11-11 L SECTION 'A -A' NOTES: L = THE LENGTH OF THE RIPRAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (inches). 3. 4. FILTER FABRIC IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" (inches) ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER 15 LESS. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. PIPE OUTLET TO WELL-DEFINED CHANNEL STANDARD DETAIL NUMBER: HS428 DATE REVISIONS TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT 7/24/09 3 TIMES 1.D. PLAN VIEW SECTION 'A -A' A NOTES: 1. L - THE LENGTH OF THE RIPRAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6" (Inches). 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL STANDARD DETAIL NUMBER.' H5427 DATE REVISIONS TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT springs oily Plen.MM OOP Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: . REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION CONTROL DETAILS NOT TO SCALE SHEET 1 OF 1 1631.01 C2.29 WIDTH VARIES 10' 2' Creenway\LD\Design\b TIMBER MAT W/ NO SLOTS THRU BOLT 1' EXISTING GROUND TIMBER MAT W/ NO SLOTS MIN- WIDTH AS NECESSARY FOR EQUIPMENT -I r In - -111111III1_. 1-111E111-111-III III III III III 111 111 111 111IE =1 I 11 111 111 I 1111-1 1-1 1-111-111I 111 111 111 i1I11I11I11I1111�1�1-1�1-111�1�1II11I11II-_ - - - - - - - - - - - - - 1 I 1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1I1 1III CROSS SECTION 10 MIN CONTRACTOR SHALL PROVIDE TIMBER MATS WITHOUT SLOTS WHEN CROSSING JURISDICTIONAL AREAS AS PERMITTED AND SHOWN ON THE APPROVED PLANS. MATS WITHOUT SLOTS ARE UTILIZED TO MINIMIZE SEDIMENT DEPOSITS INTO ENVIRONMENTALLY SENSITIVE AREAS. USE CAROLINA TIMBER CRANE MAT OR ENGINEER APPROVED ALTERNATIVE. PLAN VIEW COMPACTED ABC STONE APPROACH SILT FENCE OR COMBINATION TREE PROTECTION I SILT FENCE AS SHOWN ON ESC PLANS RIP -RAP DISSIPATOR, SEE PLANS FOR DIMENSIONS II FLOW Cs v- SF a ma`s LAvA ` re r rearm. AvAa- 1 1 -07 Ohs'. 04, 41. NOTES: 1. SEE CONSTRUCTION SEQUENCE FOR EROSION CONTROL MEASURES DURING PIPE INSTALLATION. 2. FOR GRAPHIC CLARITY, THE LIMITS OF DISTURBANCE AND TREE PROTECTION FENCE LINES ARE SEPARATE FROM THE OTHER, HOWEVER FOR CONSTRUCTION, THE TREE PROTECTION FENCE SHALL BE LOCATED AT THE LIMITS OF DISTURBANCE. c LIMITS OF DISTURBANCE TREE PROTECTION FENCE ASPHALT TRAIL GRAVEL SHOULDER STORM DRAINAGE PIPE, SEE PLANS FOR PIPE SCHEDULE TIMBER MAT W/ NO SLOTS SCALE: NTS 1 PIPE CROSSINGS SCALE: NTS 2 APPROVED SEDIMENT FILTERING DEVICE (SEDIMENT FILTER BAG). PROVIDE POSITIVE DRAINAGE FROM SEDIMENT FILTER BAG TO STREAM. DISCHARGEONTO STABLE RIPRAP PAD TO PREVENT SCOUR HOLE FLOVV � v Drainage Summary Station Pipe Size (in.) Material Number of Pipes Length (LF) Invert Up Invert Down Rip Rap Area (sq. yd.) Rip Rap Tonnage Fabric Area (sq. ft.) 26+41 48 RCP 2 22 344.0 (R) 343.5 47 57 64 27+50 18 RCP 1 18 353.0 (R) 352 9 8 10 40+83 18 RCP 1 32 339.0 (L) 338 4 8 8 59.08 42 RCP 2 22 338.9 (L) 338.8 66 66 66 63+93 48 RCP 1 28 333.8 (L) 333.3 49 52 50 68+06 30 HOPE 1 31 342.5 (L) 339.8 11 14 17 74+04 15 RCP 1 21 339.1(L) 338.5 7 8 12 77+31 24 RCP 4 23 331.9 331.9 37 47 57 79+92 24 RCP 4 23 330.9 330.9 37 47 57 89+62 48 RCP 1 21 327.3 (L) 327.2 28 34 38 95+06 48 RCP 1 21 325.9(L) 325.8 28 34 38 103+30 48 RCP 1 18 323.2 (L) 323.0 28 34 38 122+07 24 RCP 1 23 344.8 (L) 344.3 7 8 12 126+61 48 RCP 1 17 323.8 (L) 323.3 50 50 63 126+65 36 RCP 1 17 324.8 (L) 324.3 Align.-X 19+10 15 RCP 1 21 325.25(L) 325 7 8 12 DISCHARGE HOSES STREAM DIVERSION PUMP INTAKE HOSE IRgp,1dK j.L.7.0111 SUMP-HOLE FOR POOL (12' TO 18" DEEP, 2-FT DIAMETER) WORK AREA LENGTH NOT TO EXCEED THAT WHICH CAN BE COMPLETED IN ONE DAY TEMPORARY PUMP AROUND SEQUENCE 1- SET UP PUMP WITH SUCTION AND DISCHARGE HOSE. 2.INSTALL UP -STREAM SANDBAG DAM- 3- INSTALL DOWNSTREAM SANDBAG DAM. 4.THE PUMP MUST RUN CONTINUOUSLY WHILE WORKING IN THE STREAM- 5_ STREAMBANKS MUST BE STABILIZED AT THE END OF EACH DAY. r� NOTES: 1- SANDBAG DIKES SHALL BE SITUATED AT THE UPSTREAM AND DOWNSTREAM ENDS OF THE WORK AREA, AND STREAM FLOW SHALL BE PUMPED AROUND THE WORK AREA- THE PUMP SHOULD DISCHARGE ONTO A STABLE VELOCITY DISSIPATER CONSTRUCTED OF RIPRAP OR SANDBAGS. 2- WATER FROM THE WORK AREA SHALL BE PUMPED TO A SEDIMENT FILTERING MEASURE SUCH AS A SEDIMENT BAG OR OTHER APPROVED DEVICE THE MEASURE SHALL BE LOCATED SUCH THAT THE WATER DRAINS BACK INTO THE CHANNEL BELOW THE DOWNSTREAM SANDBAG DIKE WITHOUT CAUSING FURTHER EROSION BETWEEN THE SEDIMENT FILTER BAG AND THE STREAMBANK- SEWN-IN CONNECTION SLEEVE FOR- PUMP DISCHARGE HOSE SEDIMENT FILTER I BAG H57 STONE 7-0" MIN. (TYPICAL) I OPTIONAL LIFTING STRA PS 4 1•01.04.0. I-40 .,..,..,.....,.....0.4 g ,.._,,,.. _-,--...._.,,,,,pipip .... ,.. -., ....x...A044$4., Aft-4ft_ Aioaftitiovviv,-100,100,-10.0,4- buret . r.0 A PLAN VIEW 2'-OP MINIMUM ■ 10'-0" MINIMUM VARIES Wl GROUND SLOPE (7-0" MIN-) 1:1 (TYPICAL) I >� 7-0' MIN- 14'-0' MINIMUM 2'-0' MIN - EXISTING SOUND LINE FILTER FABRIC - USE #57 STONE TO LEVEL BAG FROM NATURAL GROUND LINE SECTION A -A SEDIMENT FILTER BAG GENERAL NOTES: 1- CONTRACTOR SHALL EXERCISE CAUTION NOT TO BURST OR DAMAGE THE SEDIMENT FILTER BAG WHEN PUMPING. 2.THE LENGTH AND WIDTH OF THE TEMPORARY SEDIMENT BAG SHOWN ON THIS DRAWING MAY VARY PER VENDOR SPECIFICATIONS- THE MINIMUM 'FOOTPRINT' OF THE BAG SHALL BE 10 x 15 FEET- 3- SEDIMENT FILTER BAGS SHALL BE EQUIPPED WITH A SEWN -IN SLEEVE OF SUFFICIENT SIZE TO ACCEPT A MINIMUM 4 INCH DIAMETER PUMP DISCHARGE HOSE. THE DISCHARGE HOSE SHOULD BE EXTENDED INTO THIS SLEEVE A MINIMUM OF 6 INCHES AND BE TIGHTLY SECURED WITH A HOSE CLAMP OR OTHER SUITABLE MEANS TO PREVENT LEAKAGE. HOSE CONNECTION THROUGH A SLIT IN THE BAG WILL NOT BE ACCEPTABLE- 4- THE PUMP DISCHARGE HOSE CONNECTION SLEEVE SHALL BE SECURELY TIED OFF DURING DISPOSAL OF THE SEDIMENT FILTER BAG IN ORDER TO PREVENT LEAKAGE OF COLLECTED SEDIMENTS. 5- SEDIMENT FILTER BAG SHALL BE MAINTAINED AND REPLACED WHEN ONE HALF FULL OF SEDIMENT OR IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS- r Q 0) LL i i ASPHALT TRAIL GRAVEL SHOULDER STRAW WATTLE OVERLAP STRAW WATTLE AND SILT FENCE SILT FENCE LIMITS OF DISTURBANCE STABILIZE SLOPES PER PLAN CONCRETE APPROACH SLAB FILL FOR BRIDGE OR BOARDWALK APPROACH DIVERSION DITCH AS NECESSARY BRIDGE/BOARDWALK (SEE STRUCTURAL PLANS FOR DETAILS) STONE SILT FENCE OUTLET EROSION CONTROL AT BRIDGES / BOARDWALKS SCALE: NTS 3 SEPI SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. e.Q�oF `�sS/oy• y --. l • SEAL 053032 F,93... ENGINE ...�,.= I11�t„o` 12-08-2021 1,1 ,01 11111r1111! /1/111111111‘‘N COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR EROSION CONTROL DETAILS TEMPORARY PUMP AROUND DETAIL No. 04000.28 SHEET 1 OF 1 SEDIMENT FILTER BAG WITH GRAVEL PAD DETAIL No. 04000.27 SHEET 1 OF 1 C2.30 3.5 PLAN AND PROF 380 375 370 365 360 355 350 345 340 335 330 HIGH POINT STA =12+96.73 HIGH POINT ELEV = 367.36 PVI STA =12+90Ap PVI ELEV ■ 3575B LOW POINT STA =14402.50 LOW POINT STA =,2WU40 LOW PC NT ELEV = 351.61 A'D._-9' 5% K = 256 LOW POINT ELEV =355.4E PVI STA -13+77 50 NIGHPOBJr3TA-15+40.00 HIGH POINT ELEV = 394 80 PVI STA=12+25A0 V.0 = 25AQ I PVI ELEV .355.61 PVI STA =15+90 Op tin FM ELEV. 352.74 AD. = 300'h ...1J AD. -1.75% K. 28.57 PVI ELEV = 354S5 A.D. _ 2.0576 r K=16fi7 VG =50AA YC.=50.00 K=46.75 V.C.-100.00' u �� » w1,7, 7 7- > a a - a LOW POINT 8TA=11+3G28-W POINT.419 OWSTEFV =A1348 51 Low prom ELEV = .falL9, LOW POINT FVI STA=11+48.75 $T° _„+1& "' PROPOSED GRADE AT CENTERLINE OF PVI ELraI-s4ers ono ion AK,17. 2 g x GREENWAY vc=25.00 v. � r T iii i m iX il - gi� is g 44 IL W n s.05% 1=xISTIING GRADE AT CENTERLINE OF / ~-----,� - ~ GREENWAY 10+00.00 10+50.00 W7-5 & R5-3 SIGN EXISTING RETAINING WALL TO REMAIN PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 11+00.00 PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) 1 1 11+50.00 7- 7 12+00.00 EX. WETLANDS (TYP.) LIMITS OF DISTURBANCE (TYP.) EX. PROPERTY BOUNDARY (TYP.) ARBOR COMMONS `f- T 12+50.00 13+00.00 13+50.00 14+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL PRIVATE PROPERTY SIGN EX. 20' SEWER EASEMENT (TYP.) 14+50.00 EX. BOARDWALK TO BE REMOVED ss _5S 15+00.00 15+50.00 T� LIMITS OF DISTURBANCE (TYP.) EX. PROPERTY BOUNDARY (TYP.) EXISTING FLOODPLAIN FAIRFOR 16+00.00 Z2 RIPARIAN BUFFER (TYP.) - SS 16+50.00 EX. BoARDWAtKrrO--- - -711 -- PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 380 375 370 365 360 355 350 345 340 335 330 17+00.00 - ss LEGEND: LD TP Zl Z2 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTLMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NG MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" \‘‘VI111II11111r,,�! e�.Q�oFEssr0y,,, • • SEAL 053032 fitICI 12-08-2021 1,1���,il llrlr1j11! `Illllrlrr* llflillll,,` COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW SCALE: 1" = 30' ' 11.$' 0 ' SCALE: 1" = 30' NORTH C3.0 C-3.5 PLAN AND PPClr 375 370 365 360 355 350 345 340 335 330 325 HIGH POINT STA =17+50.00 HIGH POINT ELEV=350.47 PVI STA • 17+75.00 PVI ELEV = 349.83 A.D.•-2A % K = 20.42 HIGH POINT STA =19+18 55 HIGH POINT STA • 20+77 08 Y.C. = 50.00' LOW POINT STA =18+60.00 HIGH POINT ELEV = 347.08 HIGH POINT 0.EV = 347.00 LOW PONT ELEV PVI STA=18+15A0 = 34858 PVI STA - 19+20A0 PVI ELEV = 34727 LOW PONT LOW PONT STA - e0*D4.28 ELEV = 34688 FM STA = 20F75A0 PVI ELEV. 347 [JIJ LOW POINT STA = 22*23 O8 PVI ELEY = 345.33 A.D. _ -2.90% PVI PVI STA= 20W5AO ELEV.- 34586 A.D. _ -3.00% LOW POINT ELEV = 34554 PVI STA = 22+25.00 AD.=8.25% K=8.00 K-17.24 V.C.s50A{Y �'=3 K= Y.C.=25.00 PVI ELEV = 34521 V.C. -500e V.C.=50A0 K=14.71 AD. -2.80% K-38A6 ~ r La Y.C.=100.00' NJ y f m W R TR 8g c.i . re -TON 1.25% 4.85% � - r.zs% p^ PROPOSED EXISTIING GRADE AT GRADE AT CENTERLINE OF CENTERLINE OF GREENWAY GREENWAY 17+00.00 7 21:- -SS _ -SS 17+50.00 18+00.00 ZI PRIVATE PROPERTY SIGN LIMITS OF DISTURBANCE (TYP.) PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) PROPOSED 10' WIDE ASPHALT / TRAIL (TYP.) EX. 20' SEWER EASEMENT (TYP.) -SS FAIRFORD DR 18+50.00 19+00.00 Se0I 1 �z 4 l a1 f - - -_I RIPARIAN BUFFER //1 PROPOSED 10' WID�ASPHALT TRAIL (TYP:--- ARBOR CREEK 19+50.00 20+00.00 20+50.00 21+00.00 GREENWAY PROFILE 1 " = 30' HORIZONTAL 1" = 5' VERTICAL EX. WETLANDS (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 21+50.00 22+00.00 - �. -WT--2R SIGN ARBOR CREEK 22+50.00 23+00.00 RIPARIAN BUFFER 23+50.00 EX. WETLANDS (TYP.) PROPOSED 10' (� t WIDE ASPHALT - :� TRAIL (TYP.) r I-----1-:::::-...,'"f:,''::-„,\N---§:sil,:NN:;N.,,,,,,' .-!,..:N.F% . N • \ \ \" • \ \ \ \ ` \ \\ \ \ \ \� 1 1,\\; \- r � > > \ \ \ \ \� 375 370 365 360 355 350 345 340 335 330 325 24+00.00 • • 1• LEGEND: LD TP Zl Z2 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILIZES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSFIG PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NG MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" 0111111111111r11r1/4 SS/oy f� • SEAL 053032 NE 12-08-2021 1,1‘j11i111111r111! Illrrr111111f1i1111\\� COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW SCALE: 1" = 30' ' 115i' 0 SCALE: 1" = 30' NORTH C3.1 375 370 365 360 355 350 345 340 335 330 325 HIGH POINT STA = 27+66.34 HIGH POINT STA = 27+67.50 IBC!' POINT PVI STA = CLCV • 305.51 MGM POINT ELEV 27+50A0 PVI STA = - 355.40 28+00.00 PVI ELEV A.D. - = 355-62 PVI ELEV 6.5694 = 355.32 HIGH PUIN I S 1A = lf1+27.05 HIGH POINT FI FU = +j3.0F K = A.D. -.5.I/ 0 11 K = 4.85 LOW PONT STA = 28+fi1.56 PVI STA = 29+30.00 V.C. = 40.00' V.C. = 25.00' LOW PC INT ELEV = 352.40 HVI tLhV = i3.Bv }�+( POP PVLEV=352.16 K=5.36 LO'NPOINTELEV=35126 P17RT HIGH POINT STA = 25+25.00 LOW PO PCwT NT STA = 26+40.00 y-� }LEV=3 u. = s. u0`% V.G. = 30.00 PVI STA - PVIELEV=351.50 30*0a.00 RU+EL HIGH POINT ELEV = 349.19 PVI STA - 26 15.00 PVI STA = 2fi+55.00 V.C. = 00 00 AD. = r-ypn 2.45% Au• K- r PVI ELEV = 349.13 rvl A.D. -,rr.ar EK = 5.35 . r ` V.C. = 50.00 VC, A.D. _ -0.7596 K-36.67 VC = K = 5.61 =3ODD e 8 53 1 a v "-, a V.C. = 20.00 �I M OI ^ W V �i o 8 j W 7 p .�+. Q n1 �i �� ANY Sm m e. i m m w w gi rVri [wj ogjJ 'a,, � w B.6V75 u; 8 � iJ W y $5°b 2.25°l0 3.3$% J 18" RCP CULVERT `��� _____0.9..a._ ________________ r � � � � f r r ' �--*? GRADE PROPOSED AT CENTERLINE OF 7[COUNTERSUNK GREENWAY TRIPLE 48" RCP CULVERTS EXISTIING GRADE AT I] CENTERLINE OF GREENWAY J r0 7 m 0 II 01-q• (..)w�U v7C`I -mow _ Q n w 24+00.00 Jr 24+50.00 N 25+00.00 PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) W1-2L SIGN 12 25+50.00 4- 4- 26+00.00 4- RIPARIAN BUFFER 4- PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF -i DISTURBANCE (TYP.) 26+50.00 4- t PRIVATE PROPERTY SIGN I ID-. ALIGNMENT "B" SEE SHEET C3.18 /II 4- 4- , 27+00.00 27+50.00 28+00.00 GREENWAY PROFILE 111 = 30' HORIZONTAL 1" = 5' VERTICAL -- 4- 18" RCP -1 3 4- -A- 4- -t- PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF DISTURBANCE (TYP.) �I 4- 4- 4- 28+50.00 4- 4- DLL ° ? RIPARIAN BUFFER EXISTING FLOODPLAIN W7-5 SIGN 4- 4- 4- 4- 4- 4- 4- 29+00.00 4- EX. WETLANDS (TYP.) 4- PROP❑SED - _-_ _ ■ r - � �'���� '�:��� „�������.��= �:- 4...74044%.0.,..4,444.41,4048;:e.), R1-1 SIGN PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 07 1 375 370 1- STA -3OQ TEL£2fi 00 10,31 50.00, 360 iz 355 350 345 340 335 330 325 31+00.00 4- EXISTING SEWER EASEMENT (TYP.) J 29+50.00 4- Jry 4- 4- EXISTING FLOODPLAIN PROPOSED GREENWAY EASEMENT (WIDTH - VARIES, TYP.) Jr 4- PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 1 4- 4- 30+00.00 4- 4- 4- 4- 4- 4- 4- 4- 4- 4- 4- 4- W7-5 SIGN 4T 1- 30+50.00 4- 4- 4- 4- 4- LEGEND: LD TP 21 22 LD _J TP TP %O EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. i SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com 1� �- m - FOR THE LOCATION OF UNDERGROUND FACILMES 3 WORKING DAYS BEFORE YOU DIG Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINETHE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATEAND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK. OF PERSONS ENGAGED IN THE WORK. OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STOP STOP MUTCD R1-1 18"x 18" PRNATE PROPERTY ROTREOPA55IND PRIVATE PROPERTY SIGN BIKE - HILL W 7-5 18"x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W 1-2R 18"x 18" No MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18" x 18" 24" x 24" QR 01:SS10 9� SEAL 053032 ,��rrrrl1T1111��'R. �, 01-05-2021 COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway PROJECT: 5E20.027.00 ISSUE: DAT: REVISIONS: A Rev.1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH. 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW SCALE: 1" = 30' 30' 1„ 0 SCALE: = 3C' 30 NORTH C3.2 ND PROI LL. dwy i\brawings\Plansets\Site Plar 375 370 365 360 355 350 345 340 335 330 325 HIGH POINT STA = 31+00.00 HIGH POINT ELEV=-350.60 PVI STA = 31+25.00 PVI ELEV = 350.38 AD =-485% K =10.31 HIGH POINT STA = 34+88.97 V.C. = 50.00' HIGH POINT STA = 33+93.64 HIGH POINT ELEV = 346 67 LOW POINT STA- 34+25.62 HIGH POINT ELEV PVI STA = 34+95.00 = 347A5 PVI STA = 33+80.00 LOW PONT ELEV = 346.44 RI STA- 34+3580 PVI ELEV • 347.88 PVI ELEV. 346.91 AA._-5 Q% PVIELEV=34s23 A.D. - -7.25% K=8.90 LOW POINT STA = 32+47.50 LOW PAINT ELEV - 343E3 LOW POINT STA = 32+7A58 K = g'� AD. = 4.00% K =1250 V.C. = 5091 L. LOW POINT STA = 30+00.00 LOW POINT ELEV - 344.09 LOW POINT STA = 36+6346 PVI STA = 32+3580 LOY4�PONT STA ELEV� AO V.C. � 50.OQ' V.C. = SOAO 5.00 PVI ELEV 344PVI STA• 7 28 LOW PONT ELEV • 343.76 PV1STA = 36+T5A0 'er $ PA ELEV 344A5 AA.= =344 .00 PVI ELEV = 343AA A.O. = 3.75i4 PVI ELEV = 343.53 AO.=1.95% ,� fi# K=825 - 28A0 AA7.=BOvii K-1333 V.G=50AD K=5126 mY.G V GK Y.C. • 100.001 i 513 & .ui g. m �� g$ 8 la dal � � � � "�i N. g PROPOSED GRADE AT CENTERLINE OF _25% GREENWAY _ A.25°I�r 120°Ifa EXISTIING GRADE AT CENTERLINE OF GREENWAY 31+00.00 C A 31+50.00 32+00.00 EX. WETLANDS (TYP.) 7� x PRIVATE PROPERTY SIGN 32+50.00 33+00.00 33+50.00 1.- x `1 RIPARIAN BUFFER EXISTING FLOODPLAIN LIMITS OF DISTURBANCE (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 34+00.00 34+50.00 35+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL I i = T al _c •��Z�i s. a ` yy 1L,rt►►rt� y��R� �� 1►>�+rr,�` �G�►_ 1 ►1► Ztl '.� V 'fir► „ "��.r i��j� �`•�{'�Ti� w �:' tia��li�.::►►►►►l�i��`%�++�►r�_•� i►j►ll�ilii,M ■-* r ���%��it►rim *=>..i �� �� ►►►�, �►��"Itt41?413AVIAMASSAS iti► ►►►r►►- ►��l��i����ea , .a �_- ,� cz- G7 -� \ EXISTING SEWER EASEMENT (TYP.) ocr .47 44/ 4C Q`Z �k+ cI Catzi , o) 35+50.00 PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 36+00.00 36+50.00 EX. WETLANDS (TYP.) Z2 37+00.00 375 370 365 360 355 350 345 340 335 330 325 38+00.00 37+50.00 LIMITS OF DISTURBANCE (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) EY FL, 7-..... - _ WIDG 1-2L SIGN ■ �>♦`r %YiiEXTING WOODB AND RIP RAP TO BE REMOVED � � � -- - C7 9i b ,1"aQ V LEGEND: LD TP 71 72 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING 8 CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTLTIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" r1O MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" Hlrll117! cAt LSS�0�1,.1. �9 SEAL O53032 ,, �� R. -G'�� !lllrlrr r r l l l l 111��,„\\, 12-08-2021 1,1�j,1i11111 r1111! lt\COVs7om'%; `1/1/1/lir! ilk 0%11 COPYRIGHT© 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROD. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW SCALE: 1 " = 30' SCALE: 1" = 30' NORTH C3.3 23 AM X:\2020\5E20 027 00 ToHS - Arbor Creek Greenwcay\.l ri\Design\Drawings\Plansets\Site Plan \5E20027 C-3.0 THRU C-3.5 PLAN AND PROFILE.dwg 365 360 355 350 345 340 335 330 325 320 315 c r.; o JV7 0 360 N2 " HIGH PAINT STA =39+S97 a �� HIGH POW STA = 38+22.51 HIGH POINT ELEV = 346.01 i- w HIGH POINT ELEV = 34523 PVI STA - 311+30.56 PVI STA = 39+90.16 PVI ELEV = 346 97 E E E w PVI ELEV = 345.39 AA. = -1525% g g AA. • -4..01 % K = 9.97 LOW POINT STA = 39+25.88 LOW POINT ELEV = 302,81 K - 328 V.C. • 50.00' LOW POINT STA =41+59.04 S °R g $ g S o q V.C. = 40.00' PVI STA - 39+31.38 LOW POINT STA =40+75-M LOW POINT ELEV = 342.52 FM STA =41+7154 w n + 1 + 11 a 0+ .16 PVAD10 142 LOW POINT ELEV =341.31 PV1ELEV =34271 N F F H K= 242 V.C. - 26.00 FYI STA = 40+85.01 PVI aEV= 341.12 0. 0.= 5.9016 K = 4.55 r7 > V' [n y A.D. _ 24 V.C. = 25 p0 LOW POINT STA = 44+87.53 POINT ELEV = 338.88 355 350 345 340 r r V.G=30A0 .0LOW N r 4 PVISTA=44+75.03 i ~ c , A AA V 7.00% K•3.57 "' • f I „ . oo g W oo; 2.00, BRIDGE 1 g 8?95 77s� -7 d m 4 k av ,� ,. ______ 1.50(3,0 _ ~ ~ ` l ~r 1 - 1V - r i --- - -���r-�f EXISTIING GRADE AT 'PK"-18' RCP CULVERT 1 1 -- _ ~ - --- - ____ CENTERLINE Or END APPROACH SLAB STA. 43+70.00 GREENWAY BEGIN APPROACH SLAB STA. 42+30.00 J PROPOSED GRADE 335 330 BEGIN BRIDGE #1 END APPROACH SLAB AT CENTERLINE OF END BRIDGE # 1 o GREENWAY STA. 42+40.00 100-YR WSE BEGIN APPROACH SLAB 02 STA. 43+60.00 EXISTIING SANITARY z U II SEWER EASEMENT S z O Z r. J STA. 39+26.14 TO w a < STA. 39+71.06 t" z 4 0-)�7 z DJ �� • w� Z Q �� cn w i= LV) Lei LI 325 w w a Zw � 33�� I 1 anGo 320 315 38+00.00 ' 07 r Zp\t, > >l_tic% ki, 38+50.00 1. EXISTING FLOODPLAIN 39+00.00 EX. WETLANDS (TYP.) ALIGNMENT "A" SEE SHEET C3.42 LIMITS OF DISTURBANCE (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) W7-5 & W1-2R SIGN 0 7- ohnD 39+50.00 40+00.00 41+00.00 PROPOSED 18" RCP 40+50.00 ALIGNMENT "C" - SEE SHEET C3.19 PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 41+50.00 42+00.00 GREENWAY PROFILE 1 " = 30' HORIZONTAL 1" = 5' VERTICAL --QQA% 10 ac O 0 42+50.00 22 43+00.00 RIPARIAN BUFFER (TYP.) LIMITS OF ' DISTURBANCE (TYP.) PROPOSED GREENWAY EASEMENT (WIDTH VARIES. TYP.) PROPOSED 10' f/ WIDE ASPHALT TRAIL (TYP.) x PROPOSED BRIDGE \ 11 43+50.00 APPROACH SLAB r•' EXISTING FLOODPLAIN 44+50.00 45+00.00 • , _ _ - A 44+00.00 RIPARIAN BUFFER (TYP.) LEGEND: LD TP Zl Z2 LD TP LD TP / EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND U1Th ES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UHILH1ES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSNG PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NG MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" j11111111I111111100 �_Q\oFESS/044 SEAL 053032 F,9•.. FA/CIHE43/ !llllllrrrl I l l llll��, ,,, 12-08-2021 1,1��,lilll11r1111! Illrrr111111��� COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: EXHIBIT MAP 01.26.2021 REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW SCALE: 1" = 30' ' 115 0 ' SCALE: 1" = 30' NORTH C3.4 ;N AND PROFILE.d isets\5ite PIan\5E20027 C-3.0 THRU C-• 24 AM X:\2020\5E20.027.00 ToH5 - Arbor Cree< QUJ 360 HIGH POINT STA = 50+91.73 HIGH POINT ELEV = 342.16 PVI STA O475 ,A+75.00 PVC ELEV = 34237 A.D. =-1 A.D. K - 51.18 355 350 345 340 335 330 325 320 HIGH POINT STA = 45+50A0 HIGH POINT ELEV - 338.56 = 1o9A0' PVI STA = 45+75.00 LOW POINT STA = 48+86.52 + a. PVI ELEV = 338.42 A.D. - 025% LOW POINT PVI STA = REV - 357.72 47+00.00 K = 200.00 PVI ELEV ,ara_ =2-as% = 337.49 V.C. = 50.00' K = d8E9 � � V,C, = f 00,00' $ C $ 8 l'g + 05. s PROP s AT CEOSEDNTERLINEGRADE OF Li $ GREENWAY / -0 50% k, -0.75% EXISTIING GRADE AT CEN I tRLINL OF GREENWAY r EXISTIING COLONIAL � PIPELINE EASEMENT i_ STA. 46+45.52 TO `¢ w STA. 446+96.67 a z =� Gow+ w�� Z�� w�� 315 45+00.00 L 45+50.00 LC MAIA FAMIt`f�L 969 #34# 07 50- 46+00.00 46+50.00 12, -'- EX. WETLANDS (TYP.) W 1-5 (L) SIGN EXISTING FLOODPLAIN (TYP.) RIPARIAN BUFFER (TYP.) 4- 47+00.00 47+50.00 EXISTING GAS EASEMENT (COLONIAL PIPELINE) 'Jr 48+00.00 48+50.00 49+00.00 GREENWAY PROFILE 1 " = 30' HORIZONTAL 1" = 5' VERTICAL LIMITS OF DISTURBANCE (TYP.) \ /) PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 0 + EX. WETLANDS (TYP.) \ 4- 0 0 0 0 1 EX. WETLANDS (TYP.) °7 ❑7 �r- 50+50.00 51+00.00 EXISTING FLOODPLAIN (TYP.) r 51+50.00 W1-5 (L) SIGN 1'4rF MAIA FAMIl30-395 E PIO00750 365 360 355 350 345 340 335 330 325 320 315 52+00.00 49+50.00 Q1�C77l� 50+00.00 EXISTING FLOODPLAIN (TYP.) ''C LEGEND: LD TP Zl Z2 LD TP LD TP > > > EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS Of EXISTING UNDERGROUND UTILIZES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILMES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STOP MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" No MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" .4> WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" j1���1{lllIcAtHli,l777j �.Q�DFLSS�0�7.1.9 SEAL 053032 H�- �` 12. 12-08-2021 ' 0 111111 r1rfi,/ /liT1111 WO COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW SCALE: 1" = 30' ' ll`S' 0' SCALE: 1" = 30' NORTH C3.5 JUJ 360 HIGH POINT STA = 57+78.17 HIGH POINrsD A9IAfF ELI HIGFI POINT DIV = 343a9 PVI STA =57+BBA9 1HIGH LOW POINT STA =58+72.22 PVSTA=51 PVI ELEV = 343.76 LOW POINT ELEV = 342.51 PVIELEV PVI STA= 58+74.53 A 0 - -61 A.D. - tiI.10% K = 32.26 342 Mil ELEV =342A3 K=4,3 LOW POINT STA = 55+08.7fi • A.D, - 3. V.C. = 30. K=815 355 LaT�POINAELEV33964 V.C.=2a.OD M... PVI ELEV = 339.46 A.D.-2.50% K = 40.00 1+1 NJ mZ q v 350 345 340 335 330 325 320 � R O s � R. Rsg W W w rel n.J PROPOSED GRADE R. AT CENTERLINE OF GREENWAY 4, '� -f.25°% 2.00% - F -0.65% ��-��a- �,, 6� EXISTIING GRADE AT CENTERLINE OF GREENWAY POWER }9 315 52+00.00 52+50.00 N. • D { • • o>♦ 53+00.00 53+50.00 EX. WETLANDS (TYP.) X X ! 54+00.00 EXISTING FLOODPLAIN (TYP.) 54+50.00 LD EXISTING FLOODPLAIN (TYP.) PROPOSED 10' WIDE ASPHALT / TRAIL (TYP.) 55+00.00 55+50.00 56+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL 56+50.00 X X EX. WETLANDS (TYP.) 57+00.00 57+50.00 (31 -1ai PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) EXISTING DUKE POWER EASEMENT RIPARIAN BUFFER -\ I 58+00.00 X/ EXISTING GAS EASEMENT (COLONIAL PIPELINE) X �X 07 58+50.00 365 8.75 EV=343.03 +15.00 343.24 6% 355 350 345 340 335 330 325 320 315 59+00.00 �� ■ LEGEND: LD TP Zl Z2 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STOP MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" .4> WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" ,����1111IIIlrrlr,,�� SS/oy.�. SEAL 053032 ..FNGI H� 1\. 12-08-2021 �rlrl111 WO COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW SCALE: 1" = 30' 30' 15' 0 30' SCALE: 1" = 30' NORTH C3.6 365 360 355 350 3 34 335 330 325 320 315 HIGH POINT STA =54+[1A 7E HIGH POINT ELEV = 343.03 PVI STA - 59+15.00 PVI ELEV = 343.24 A.O. = -6.86% LOW POINT STA = 59+75.00 K - 4.37 V.C. = 30.00' LOW POINT !LEV - 340.88 PVI STA= 59+65.00 PVI ELEV = 340.81 A a = 3 54% LDW POINT STA = 60+97-91 HIGH POINT STA = 64+27.31 HIGH ➢OI DLT ELEV = 339.60 K = 5.66 LOW POINT CLEV - 330.74 PVI STA = 60+72.91 LOW POINT STA = 52+47N PVI STA = 64+30.54 LOW POINT STA = 65+16.11 1 !NN FEINT FI FV ='i:i7 Sr V.G- - 2D.Otl 6' o ..I PVI ELEV = 338.91 a = 5 am . LOW POINT ELEV PVI STA = 62+i5.00 • 337.74 PVI ELEV = 333.63 A 0 -1 35% PVI STA = 65.35.86 � A K K=35.71 PVI ELEV = 331.71 A n = 1 ?!I� . PVI ELEV - 337.74 A.O.=8.10°% F3 cn e-i II V.C. - 34.IXY K=20.82 V.L. L!7-UIT K= 6.17 yr =Fnm' g W r r e 4 m V.C.-23.6W -_ W '- N W V wi ¢¢ ^1 w 7 7W m w - v i ii rr� W Cel v "1 `- CO ec V w LlJ a cc �� �Q ,� 3 .� n 1 �-, o . u, rn ifs N� ' N T S? i CO m , u U U w 86a m m W" m T �5°+° nn� 1.32% -2.10% - 4.... TRIPLE 3V RCP CULVERTS -0.70%1 �� 0.50% , -0.85% (COUNTERSUNK 17 e ^� �. r �� `� ____ --__ ____- - 1 1 )_1----- L 46 RCP CULVERT I PROPOSED ICOUNTERSUNKI} GRADE AT CENTERLINE OF / GREENWAY J �TGRADE Z AT I z D ERLINE OF p w GREENWAY IL o LD �) Qlz 1 1 2 co nQo LL ZQ WI Cl-o 1- d� ,L) W+ I- W+ w+ c•o 0 WI + )w C7u' ❑LL.I -i ❑� Z< - .„ xwr Lu-p- o0 CL v) IZ LU - N 1 Li] W V] LLJ [/7 V7 I 59+00.00 59+50.00 EX. WETLANDS (TYP.) �I I 60+00.00 60+50.00 LD �1 LD EXISTING DUKE POWER EASEMENT EXISTING GAS EASEMENT (COLONIAL PIPELINE) 61+00.00 ` ss RIPARIAN BUFFER , L❑ Ss - LD PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 61+50.00 L❑ 1 62+00.00 62+50.00 63+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL EXISTING - LD - LD FLOODPLAIN PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 63+50.00 PROPOSED 48" RCP PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) �.D 64+00.00 d 64+50.00 65+00.00 EX. WETLANDS (TYP.) 65+50.00 EXISTING FLOODPLAIN PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) T- 365 360 355 350 345 340 335 330 325 320 315 66+00.00 RIPARIAN BUFFER J T-- LEGEND: L➢ LU Lil TP 21 22 TP TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com 0 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILMES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STOP STOP MUTCD R1-1 18" x 18" PRIOATE PROPERTY NOTRESPASSING PRIVATE PROPERTY SIGN BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W 1-2L MUTCD W1-2R 18" x 18" I4a MOTOR EHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24"x24" WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18" x 18" 24"x24" �■�����I I I I lrrrr��7j�,. ,���RpFLSSrpy �4 /7-, Q l SEAL =. 053032 =.,,Fq 'GIH ,I,,7''7rrlRlilllN��■■■ 01-05-2021 Y.. 11.■■ 1111111 COPYRIGHT© 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027,00 ISSUE: REVISIONS: A Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH. 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW SCALE: 1 " = 30' 30' 15' 0 SCALE: 1" = 30' NORTF- C3.7 LAN AND PROFILE.dwg ti 375 370 365 360 355 350 345 340 335 330 325 HIGH POINT STA - 67+22.64 HIGH POINT ELEV = 347.89 HIGH POINT STA - 67.51.02 HIGH POINT ELEV = 347.76 PVI STA = 66+79.09 PVI ELEV = 348.12 PVI STA = 67+66.02 A.D. _ -7.75% PVI R EV = 347,69 A.D. _ -6.72% K - 12.90 V.C. =100 00 K = 4.46 V.C. HIGH POINT STA = 69+74.44 QVCS 68+g9.09 • 30.00 HIGH POINT ELEV • 344.10 N. ~ LOW POINT STA = 66+48.60 PVI STA -6 3i9.44 PVI ELEV = 34425 LOWPOI LOW POINT VTSTA =71+29.53 ELEV - 342.78 LOW POINT ELEV = 342A7 PVI STA - 68+40A0 A.O. _ .2.50°6 PVI STA = 71+04.53 PVI ELEV. 342.32 K . 20.00 V.C. = 50.00 PVI 40. L= . 342.80 D. = 0 5096 8 g A.D. - 8.72% K=2.87 K=160.00 C. Si i, R - V.C. = 25A0' V • A.OR Z.g R 1 04 -0. 1 PROPOSED GRADE AT CENTERLINE OF / W GREENWAY r��% / -� -f - 9 -0.50% �- J ` y -- EXISTIING GRADE AT 30•IiOPECULVERT CENTERLINE OF GREENWAY 66+00.00 LD LD LD 66+50.00 EXISTING ]� FLOODPLAIN (TYP.) LD 67+00.00 .. 67+50.00 CONNECTOR TO TRAILHEAD PARKING STA 66+55' 68+00.00 68+50.00 \.D PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 69+00.00 69+50.00 70+00.00 GREENWAY PROFILE 1 " = 30' HORIZONTAL 1" = 5' VERTICAL W1-2R SIGN LIMITS OF DISTURBANCE (TYP.) PROPOSED 30" HDPE - CFI LD LD EX. WETLANDS (TYP.) ❑T -- cn (p k X k x x X k � X PLAN VIEW X 07 k EXISTING FLOODPLAIN (TYP.) 70+50.00 �C Oj 71+00.00 71+50.00 OF ,0,1_S\a b L�� ,\o e..\, l0 N LIMITS OF DISTURBANCE (TYP.) W1-2L SIGN PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 07 of 07 07 72+50.00 72+00.00 4) o] L 375 370 365 360 355 350 345 340 335 330 325 73+00.00 07 LEGEND: LD TP Zl Z2 LD TP LD TP > > > EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTIL111ES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING LiTIL111ES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STOP MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NO MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" .4> WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" 77jrl1111 COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A C3.8 SCALE: 1" = 30' SCALE: 1" = 30' NORTH 365 360 355 350 345 340 335 330 325 320 315 HIGH POINTSTA HIGH POINT EL&! = 73+46.26 = 341.69 PVI STA = 73+96/6 PVI ELEV - 341.44 A.D. =-3.93% K=28.57 V.O. - 100 00' LOW POINT STA • 76+9i00 HIGH POINT STA = 78+07.86 LOW POINT ELEV • 33524 LOW POINT STA= 77+31.02 HIGH POINT E78= 334.90 LOW POINT STA = 80+18 57 w PVI STA= 75+45.00 PVIELEV= 336.49 LOW POINT ELEV - 334.69 PVI STA • 77+31 A2 PVI STA = 78+15 00 PV1 ELEV = 334.98 LOW PO NT ELEV = 333.44 AO. = 3.50 K = 28.57 . PVI ELEV • 334.56 A 0_= 1009E AD. = -1 AO% PVI STA PVI = 60+04.39 ELEV = 333.25 V.C.=100W K=10000 35.71 vC.=5000' AD.=/AO% K=7I4I m . W _ V.C.-100.00 V.C.=100A0' Om .11 5 W it.W s o g PROPOSED GRADE q � . AT CENTERLINE OF y w GREENWAY R VD 15' RCP CULVERT J ~ -Q 00 m Li,ku (COUNTERSUNK61 m -0.50% 0.50% ®-- EXISTIING GRADE AT CENTERLINE OF f --� 1 _ GREENWAY y k J - - r - Or r , ___--_xettefri FOUR 3V RCP CULVERTS w FOUR 30' RCP CULVERTS 6') (COUNTERSUNK (COUNTERSUNK r) b (V B _ c+7 z o 0 II • ~z� U Wi U iQwwZ QVI w 73+00.00 73+50.00 74+00.00 ALIGNMENT "D" SEE SHEET C3.20 74+50.00 75+00.00 75+50.00 EXISTING FLOODPLAIN (TYP.) W1-2L SIGN PROPOSED 10' WIDE CONCRETE TRAIL (TYP.) 76+00.00 76+50.00 77+00.00 GREENWAY PROFILE 1 " = 30' HORIZONTAL 1" = 5' VERTICAL " EX. WETLANDS (TYP.) c7< qa� 77+50.00 .1 x PROPOSED 24" (x4) RCP PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF j[ DISTURBANCE (TYP.) 78+00.00 x C11- 01 , 01-- x 78+50.00 EX. WETLANDS (TYP.) xn 79+00.00 79+50.00 365 360 355 350 345 340 335 330 325 320 315 80+00.00 \7x %, �� ■ 5+00.00 75+50.00 7 00 j .00), 77+00.I I - N ■'■ ■ ■ +50.0o T8+U0.00 78+50.00 79+00.00 x ' 79+50.00 •• I II ([,0 :1*"• • _ �/ / ...WC v r1 r.. J'FOC x x PROPOSED 15" RCP x x EXISTING FLOODPLAIN (TYP.) x n x x x x [DTP. TPF �Tx�x o I EL) x Lx LD TPP .. x x PROPOSED EXISTING • FLOODPLAIN (TYP.) RIPARIAN BUFFER LEGEND: LD TP Zl Z2 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEP! SEPI ENGINEERING & CONSTRUCTION, INC. • 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CCIII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR RS REPRESEHTATIVE. THE CONTRACTOR SHALL DETERKAINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND MURES. CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NCR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STOP MUTCD R1-1 PRIVATE NO TRESPASSING PRIVATE PROPERTY SIGN BIKE - HILL W7-5 CURVE MUTCD W1-2L MUTCD W1-2R MOTOR VEHICLES NO MOTOR VEHICLES R5-3 .4> WINDING ROAD MUTCD W1-5L MUTCD W1-5R • SEAL 053032 12-08-2021 II/1111111 WO COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW NORTH C3.9 3 3 .]J HIGH POINT STA = 82+15.00 50 45 35 30 25 20 15 10 HIGH POINT ELEV = 334.23 PW STA - 82+25A0 PVI ELEV = 334.38 A.D. _ -125°ti K MOOLOW LOW PONT STA POINT ELEV = 85+99.52 -331.85 U.. = 100.00' Pl l STA = 85+99 52 PVI ELEV= A.D. =1.50% 33157 a. K =100.00 VC -150.00' r r � met e6 2 PROPOSED GRADE ATCENTERLINE C]F a GREENWAY 0.50% —__, I—=0 - -0.75% - $ �ti �_ 1- — 1 - 1 ~� r �' f EXISTIING GRADE AT CENTERLINE OF GREENWAY >- ry Z i- Q� z� cil 0w 1 �w ? w cn� • - ten wit ,./) u_1 � Zwca W w� w w ZZ w mv,� I- w�� 05 3 3 3 3 3 3 3 3 80+00.00 80+50.00 1 LIMITS OF DISTURBANCE (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) 81+00.00 x 81+50.00 PROPOSED 24" (x4) RCP X X EX. WETLANDS (TYP.) X 82+00.00 X 82+50.00 EXISTING FLOODPLAIN (TYP.) X X X 83+00.00 83+50.00 84+00.00 GREENWAY PROFILE 1 " = 3Q' HORIZONTAL 1" = 5' VERTICAL EX. WETLANDS (TYP.) ,_ X X 84+50.00 EXISTING SEWER EASEMENT . RIPARIAN BUFFER (TYP.) X x X 85+00.00 85+50.00 86+00.00 86+50.00 )( )( )( %44g).01. )( )( )( OP#.4 ‘14) Ault ,Atit:i01A/it:06$;;,* •'i 411t��iiTi--�% 0 Vittigg 05;441-10 •�11 r 11�I o EXISTING FLOODPLAIN (TYP.) ti9' 355 350 345 340 335 330 325 320 315 310 305 87+00.00 LEGEND: LD TP Zl Z2 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STOP MUTCD R1-1 18" x 18" PRIVATE 'RD'ERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" .4> WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18" x 18" 24" x 24" 01111111111r1r�7� cAt • SEAL 053032 12-08-2021 ','�1111i111rl�rrr'r1 r+1r1111 WO COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW SCALE: 1" = 30' 30' 15' 0 30' SCALE: 1" = 30' NORTH C3.10 1 /12/2022 3:49 PM X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Design\Drawings\Plansets\5ite Plan\SE2r 355 350 345 340 335 330 325 320 315 310 305 HIGH POINT S TA • 88+09.99 HIGH POINT STA = 91+83 20 HIGH ELEV=99293 LOW POINT STA=88+97.88 HIGH POINT ELEV=332.93 PVISTA STA V PVI ELEV = 333 99 = 333 GS LOW POINT ELEV =.8833 PVI STA = PVI ELEV 91+99.86 = 333.10 A.O. _ -1.25% PVT STA= �+97.88 PN ELEV = 332.09 A.D. _ -1.50% K = Vf:=1nnno, KMAD. =1. K-'moo ]0% K = ebb/ V.C_= IM.nn' v.c. =1 00A0' 10.- ma fai eg0. �' -0.50% 4.50% 0 O.T°P% _4, — a a -f.UO% ---___ 4_, w___ 48" RCP CULVERT NG (COUNTERSU1) PROPOSED GRADE AT CENTERLINE OF GRADE EXISTIING AT CENTERLINE OF GREENWAY GREENWAY cE 1- z <1 0 uJ � LLJ 07, ww�-I- ce o LLL.I Ll mv,� 87+00.00 2.2 87+50.00 88+00.00 22 88+50.00 89+00.00 2j z 89+50.00 EX. WETLANDS (TYP.) Z1�� 90+00.00 90+50.00 91+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL 4-• +. ± A- * A-- A- ��� I_ i! `zmw_ rrA 0) mew PLAN VIEW SCALE: 1"=30' C 91+50.00 EXISTING FLOODPLAIN PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) - PROPOSED GREENWAY EASEMENT {WIDTH VARIES, TYP.) LIMITS OF DISTURBANCE (TYP.) 92+00.00 Z2 92+50.00 DOf - WN 1N # 165 4367 4- EXISTING �11 FLOODPLAIN (TYP.) . -Z1 93+00.00 4- 4- 4- 4- EX. WETLANDS (TYP.) Jr �12 Z2 355 350 345 340 335 330 325 320 315 310 305 94+00.00 4- 93+50.00 4- 4- 4- 4- 4- LEGEND: LB TP zl 22 LB TP LB TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING 8 CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ® 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES, NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK. OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NOTRESPRSS6IG PRIVATE PROPERTY SIGN BIKE - HILL W7-5 18" x 18" 24" x 24" 4..<& CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NO MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18' 24"x24" 111111111IIfrl1111,1 J [Z�H cARo Q�oF • E5sIo*: - q SEAL 053032 GIN 01-05-2021 1/1,1 rrlrl* li1Lj11',,` COPYRIGHT© 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: SE20.027.00 ISSUE: REVISIONS: Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' SCALE: 1" = 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A C3.11 c r v 1 /12/2022 4;40 PM X:\2020W5E20.027.00 ToHS - Arbor Creek Greenway\LD\Design\Drawings\Plansets\5ite PI( 355 350 345 340 335 330 325 320 315 310 305 HIGH POINT STA = 94+79.713 LpW PORT STA. 94+40.32 LW/ POINT ELEV. 330.88 HIGH POINT ELEV = 330.96 111011 POINT STA • 95 HIGH POINT ELEV = 330.82 16.47 HIGH POINT STA = 98+68.23 +31. PVI STA = 94+31.99 FM STA = 94+82.05 PYI FI FV = 331 03 PN STA = 95+41.47 PVI ELEV - 330.B7 LOW Pf71NT STA == 1 HIGH POIN I LLLV = 33U.31 PVI STA =1.75% 94 PVT ELEV = AD.=1.5095 A.D. = -1.10% A.D. = -0.65% 329 3 LOW POINT ELEV = 329.30 PVI ELEV = 330.64 K= { V.Cr50.OIY K=d5.45 V.C.=50AG' K=76.92 V.0 •FiD.00' PVISTA-9B+B9.7T PVT ELEV •329.07 A.D._-1.75% K=8571 AD.=zoG� K=�� V.O.=150.00 V.C.=100A0' ~ ` T. um R II .*v ai .i L.*j.- PROPOSED GRADE CENTERLINE OF GREENWAYAT -� 0.5p°lo -0.6a% `�� 0.75% • --„,______________Z_ _ _ _ - -___ _ ....... ......_ _ ____ - .........,.... kS ,,, RCP CULVERT (COUNTERSUNK 1) EXISTIING GRADE AT CENTERLINE OF GREENWAY 94+00.00 07 ------~ Z2 94+50.00 95+00.00 95+50.00 96+00.00 PROPOSED STORM PIPE (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF DISTURBANCE (TYP.) EXISTING FLOODPLAIN RIPARIAN BUFFER 22 96+50.00 97+00.00 97+50.00 98+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) Zl ❑7 P k P10 4 065Nl N o HOLLY SPRt�C" �7 4367 RIPARIAN BUFFER (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) - EXISTING SEWER EASEMENT PLAN VIEW SCALE: 1"=30' 98+50.00 EX. WETLANDS (TYP.) 99+00.00 RIPARIAN BUFFER 99+50.00 100+00.00 41, 100+50.00 355 350 345 340 335 330 325 320 315 310 305 101+00.00 LEGEND: LB TP 21 22 LB TP LB TP A EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING 8 CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ® 3 WORKING DAYS pBEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE- THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK. OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NOTRESPASSHG PRIVATE PROPERTY SIGN BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NO MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18" x 18" 24"x24" SEAL O �'' ',,�,\1111111ff7111j,'I FAR% �-.•.- OESSIo4 • 1' 053032 +❑j ��'�11rr,111111'1���, 01-05-2021 ,1� COPYRIGHT© 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: SE20.027.00 ISSUE: REVISIONS: Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' SCALE: l" = 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A C3.12 Lek Greenway\LD\Design\Drawings\Plansets\5ite Plan\SE20027 C-3.11 THRU C-3.15 PLAN AND PROFILE.dwg 0 1/12/2022 4;43 PM X:\2020\SE20 102+00.00 103+00.00 103+50.00 355 350 345 340 335 330 325 320 315 310 305 HIGH POINT STA =1 04+c4.64 HIGH POINT ELEV = 329.17 PVI STA 104+3U2B LOW POINT STA-105+67.61 HIGH POINT STA=,05+90.28 LLOWPPOINT PVI ELEV = 32929 LOW A WSTA �� E106►1I.41 HIGH POINT ELEV = 3e PVI STA = 1LI6+40 29 ,29 LDWPOINTSTA-176�' LDW PRINT = 32I ELEV' 327.733 PVI STA=101+8T.36 _ A.D. -2.06% K=27.31 PVI ELEV=326.66 .61 PVI ELEV =328.04 PNELEV=32755 A.D..04 =1� V.C. = 5fI.0O' AU.=I].;SI14n K = 329.B'1 A.D._-0.43% K = 77n 36 PVI STA=1OV PVI ELEV. 326.36 K=66.67 V.G=1{10.0[P I V.C.=100.00 0.K • 16 74� I V.C. • 16Q.00 r. M1 m ccn V rr1 y F V.C.=50A6' r n I I ,ter 1- 1- 1...j w , w n� env mm $� W oy� W..m PROPOSED GRADE AT CENTERLINE OF m Ywmw m w 1 GREENWAY al 3 g 1 zs% , ate A a.5D% �� -- _ � �1 -_v I -OE94%D.sa% �- _._._ _ ___ _____ _______ ` �- - 10 1 EXISTIING GRADE AT CENTERLINE OF DUEL 48'RCP CULVERT GREENWAY_....) [COUNTERSUNK 1') %� >- N TY Q I_ Z CV Q Z ",Z 00 w II N + 1-z oWo,�CV W O O. Q xQ� LLJ W NO wU aQ w w-+ wez w1-~ wZw� r. 0 • W V, V),LZ m n cn'oC 1 J Q ZRriw 101 +00.0Q -1- 101 +50.00 ALIGNMENT "E" SEE SHEET C3.21 `�- 102+50.00 4- EX. WETLANDS (TYP.) 72 104+00.00 104+50.00 105+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL n RIPARIAN BUFFER (TYP.) PROPOSED 48" (X2) RCP PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF `! DISTURBANCE (TYP.) 7� I 2 PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) RIPARIAN BUFFER PLAN VIEW SCALE: 1"=30' 105+50.00 106+00.00 EX. WETLANDS (TYP.) 4_ EXISTING SEWER EASEMENT RIPARIAN BUFFER (TYP.) 106+50.00 107+00.00 107+50.00 LLYSPR1 59_NIF PAN #-647 4.367 r Z2 - -+ 355 350 345 0.89 .52 340 335 330 325 320 315 310 305 108+00.00 -I- LEGEND: LD TP zl 22 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ® 3 WORKING DAYS BEFORE YOU DIG / - - FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE- THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NOTRESPASSHG PRIVATE PROPERTY SIGN BIKE - HILL W7-5 18" x 18" 24" x 24" 4.<& CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NO MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18' 24"x24" 011111111111r11110 ,,'IfJ .•' 0V..SSlpyq;.q SEAL 053032 GIPI �Q:- fi',„, rR'IITinl�''kP'� 01-05-2021 * COPYRIGHT© 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: SE20.027.00 ISSUE: REVISIONS: Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' SCALE: l" = 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A C3.13 46 AM X:\2020\SE20.027.00 ToHS - Arbor Creek Greenway\LID\Design\brawir gs\Plar sets\Si' Et) 3 3 3 3 3 3 3 3 3 JJ 50 340 a HIGH ' GINT STA • 114+8331 HIGH POINT ELEV = 334A8 HIGH POIN STA=113+60.81 STA-114+58.31 ELEV = 333 67 II• w HIGH PO PVI ST ELEV = 33227 LOW PONT STA -113+53.08 LOW POINT ELEV -113+91 AT = 332.09 A.D. _ -1.104E PVI EV = 332.42 PVI STA • 113+97.65RI ' K = 45.37 V.C. = 50 OD ' E Sw Li LOW PaNrSTA=111+9x91 t.l POI T STA=112+04.54 E112 = 97 A.0 • _ �75% 3, =1818 1 % r r 45 o A - L. u " c ,� o q L PVT • 111+B6Afi PN .54 A=172+5454 V.I.=5DD0 V.C. G • .W - F U�uJi '- n FNELEV=329.5B AD PVI LEV=33065 D,=oa4% LOW FOIHTSTA•108+5332 , r M �8A7190 v .421.39 -100.00 PUIST �ia�e+a PVI ElEV 327 80 „ - " aII '( a v.e. - sa as ao.=4.®oss z ui w _ jy 35i 25 IC = 5.5.10 i7 pp 6 g R co crI8 � YS .el,G=25U0' IN.e3 w Y1 236% ---- P iu 1 m 2400M a a BOARDWAL , !" ` .00% i.84°h - I.95' el ��� g E .. fag sel° ' �100 YR WSEL - 330.37' a •� • CH SLAB END APPRO STA. 1 1 1+47 20 15 I0 ,- DQ PROPOSED GRADE AT CE TERLINE OF EXISTIING GRADE AT CENTERLINE OF GREENWAY GREENWAY END END B ARDWALKA' BEGIN APPROACH SL B Q BEGIN APPROACH SLAB STA. 109+37. i I z STA. 11 1 +37 el Q N w c•-) z LO BEGIN B0ARDWALK'A' 1-1-1 + END APP • OACH SLAB x STA. 109 47.00 o w w I- 05 108+00.00 108+50.00 x X x X x X X 109+00.00 X X x o� X X x X X X �`�� <'kkk4P *434* 4.11 .410144444, X W1-2L & W7-5 SIGN /- x 109+50.00 110+00.00 X x X X X X X X x X X X x X APPROACH SLAB 75. RIPARIAN BUFFER 0 Cr 6 �s o b Tjh x X X X X X X X X X X X x PROPOSED BOARDWALK "A" X X X \re,x_oaC33r X 110+50.00 \ 111+00.00 X X X X X x X X EX. WETLANDS (TYP.) 111+50.00 112+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL X X X X X X X X X x X X X APPROACH SLAB X X , BEGIN STA 11 1 +37 END STA 1 1 1+47 EXISTING FLOODPLAIN (TYP.) L£ iNkL X RIPARIAN BUFFER (TYP.) 112+50.00 EXISTING FLOODPLAIN 113+00.00 W7-5 SIGN PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) i LIMITS OF DISTTURBANCE (TYP.) fi cr cr- 113+50.00 114+00.00 Z2 114+50.00 Z1 355 350 345 340 335 330 325 320 315 310 305 115+00.00 4)I7") OA S/G,41 EXISTING FLOODPLAIN (TYP.) RIPARIAN BUFFER (TYP.) LEGEND: LD TP Zl Z2 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com m 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UIILfI1ES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSFIG PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" HG MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" ,011,111 I I I I I I I I.91j e._.Q�oFEss/oy f�.'�-y •SEAL - � 053032 - . ENCINE��.= f,'1r/I�rrl�l'I „ I11' , 12-08-2021 1,++�+111111111111! 1 ,,III/lir!'11+0%11 COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: EXHIBIT MAP 01.26.2021 REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A 0 CV CV PLAN VIEW SCALE: 1" = 30' 30' 15' 0 30' SCALE: 1" = 30' NORTH C3.14 12/8/2021 :48 AN', X:\,2020\SL20.027.00 lo 375 370 365 360 355 350 345 340 335 330 325 HIGH POINT STA=119438.92 HIGH POINT ELEV = 354.37 N I STA=119419.03 HIGH POINT STA=120i86.80 PVI ELEV = 354,52 HIGH POINT ELEV - 353.42 P1STA =121+11.80 AO._ K = 711 PVI ELEV = 35326 V.C. _ 50.00' A.D. • -62$Yo K=8.03 LWPrsrA.122*08.14 1INTREV V.C.=50.00 PROPOSED '� PVISTA.1214 506 ovi GRADE AT CENTERLINE OF EtEYt 347.53 Ap.:904gL GREENWAY Uc , suer g 111 M LOW POINT STA - 115+44.22 LOW PONT ELEV = 337.61 m w��' PVISTA•11646922 PVI ELEV = 339.10 w �m S + "; SLAB rn i • v.c 35A6 T 6 rt X BEGIN APPROACH STA. 1 15+2r.DD II II w �' �- '~ -0.65% g 8 8 IIT ,, II si _ E E E E . E 8 8 S / 2.oa%A M M T. � 66 _ r II n R ‹ II $- w co IL uo d rn W fl g wnc„ n IIfL J lI gW i . E E .."`" E E 60° EXISTIING GRADE AT 2.000o "F. BIPARDWAL 4 'B' 100�2.0096 CENTERLINE OF •- -.7. GREENWAY cf _ a - SLAB END APPROACH STA. 115+97.00 _ J 'B' END END BOARDWALK BEGIN BOARDWALK'S' END APPROACH SLAB BEGIN APPROACH SLAB STA. 1 15+37.00 STA. 115-87.00 115+00.00 115+50.00 APPROACH SLAB 116+00.00 PRIVATE PROPERTY SIGN W1-2R SIGN ti 116+50.00 RIPARIAN BUFFER (TYP,) EXISTING FLOODPLAIN (TYP.) ■ APPROACH SLAB PROPOSED BOARDWALK "B" i 117+00.00 B' W1-2R SIGN LIMITS OF DISTURBANCE (TYP,) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) RIPARIAN BUFFER (TYP.) 117+50.00 118+00.00 118+50.00 119+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 111 = 5' VERTICAL W1-2L SIGN W°°OCREEIC NEIGHBORHOOD '°�N # 06 9QORH°oo 3903 gSSN ANC FLlNTOM N/p P'N # 659 6667y2 R� �'kIT E PLAN VIEW SCALE: 1" = 30' 07 % W7-5 SIGN 119+50.00 PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 120+00.00 W7-5 SIGN PRIVATE PROPERTY SIGN 120+50.00 07' 121+00.00 121+50.00 375 370 365 360 355 350 345 340 335 330 325 122+00.00 18d' CP4£ Ei4sE MFNr LEGEND: LD TP Zl Z2 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILIZES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSNG PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NG MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" j011111111rr1,Il„! e._.Q�oFEss/044 •.'�-•y SEAL 053032 - NE��.= ,r/ Cap• !//"rlrrrrl I I I 11ll�'�0 12-08-2021 1,1���1i11111r1111! `1/1l*11 01j COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: EXHIBIT MAP 01.26.2021 REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' SCALE: 1" = 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A C3.15 HIGH POINT STA=122+89.1 1/12/2022 4;50 PM X:\2020\5E20,027.00 ToHS - Arbor Creek Greenway\LD\Design \Drawings\Plansets\5ite Plan\SE20027 C-3.16 THRU C-3.20 I 365 360 355 350 345 340 335 330 325 320 315 HIGH POINT ELEV = 349.12 HIGH POINT ELEV = 349.03 Ova PVI STA=122+73,58 PVI ELEV = 349.22 PV15TA = 123+35.30 PVI ELEV = 348.91 AD.=-2.65% A.D.• -5.55% K•18,84 V.C. = 50.00 K-9,p2 V.C. = 50.00' - r 360 a8 $ � 1 �1 6 7.w dd' r 355 i'j W 'L II II - RI II N W iJL cn w to- _ -0.50�- a ®-_ E E 350 z,� f 1R�,, LOW POINT STA=128+18,39 HIGH pOIA-1�� _ ""� _ L PVI STA • 125'88.39 }{}T POINT ELEV = 329 63 1 �� RCP PVI LL.EV=333 HITH POINT STA=17fi+9d j11} �� ELEV = 329.73 345 (24n COUNTCULVET 6 (aauNTeRsuNK sy EXISTIINC�GRADE AT CENTERLINE OF p K=as.oe LDYYFOIHTSTA•,2s+TT.27 LOWPOIHTELEV=326.1fi HIGH POINT ELEV aK_�� GREENWAY ♦ v.c ='°°.°° PVI sTA PVI ELEV =128+s2z7 = 328.38 PVI STA=127+19.81 PVI ELEV = 327.78 LOW POINT STA=128+27.01 V-C, 20-00' _ _ r A.D.=5.80% A.D.=-1.90% LOW POINTSTA=127+£1A0 LOW POINT ELEV = 32E.98 LOW POINT ELEV=32E65 PVI STA=128+3951 r� �]PVI V.C•= =50A0' 50. K = 26.29 V.D.50.00 PVI STA=127+90.17 PVI ELEV = 32G94 A.Dr 320% `r ELEV • 325.81 AD. =5.10% 340 335 330 ~ . . K = 4.90 V.C-•25M V.C. = 25.00' W'CL��, _ m W �m i' gL A24 �++ W b S50% zUal .� say O ~ "i J PRSE❑ GRADE AT CENTERLINE OF U L`I v U r 1 n z `v GREENWAY D _ LT CD ¢ LU A, ¢ C N 325 320 315 J Z¢ c 7 w comer RCP CULVERT ICOU RER31 H +) O n J CA Z gip• ZQO N Illin-iiikOJnN wO�v cv Ua �zT Lu Z • cn3Q-Q �`n¢w wvw)< ; ?wri w 122+00.00 122+50.00 EXISTING -\N FLOODPLAIN z' 123+00.00 123+50.00 124+00.00 124+50.00 125+00.00 125+50.00 126+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL 1 1 1 ALIGNMENT "F" PROPOSED SEE SHEET C3.22 24" RCP co�e NN'k PROPOSED GREENWAY ("\ EASEMENT (WIDTH OAS\\4\VCS VARIES, TYP.) 0"sc' \" G I,"' PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF DISTURBANCE (TYP.) r 4 AIL EXISTING FLOODPLAIN RIPARIAN BUFFER PLAN VIEW SCALE: 1"=30' d i tiryH�tE 60- 7 126+50.00 RIPARIAN BUFFER 12 zl 127+00.00 PROPOSED 48" (X2) RCP 127+50.00 PRIVATE PROPERTY SIGN k k k 128+00.00 fI r 128+50.00 k EX. WETLANDS (TYP.) [!1 129+00.00 k k O- Gp'� 65 0�220 LEGEND: LB TP 21 22 LB TP LB TP A EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING 8 CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ® 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE- THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK. OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NOTRESPRSSHG PRIVATE PROPERTY SIGN BIKE - HILL W7-5 18"x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NO MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18" x 18" 24"x24" \01111111f11111/0. pFE50325lpy9( SEAL 053 R. 01-05-2021 COPYRIGHT© 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: SE20.027.00 ISSUE: REVISIONS: Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' SCALE: l" = 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A C3.16 IS - Arbor Creek Greenway\Lb\besign\b 3 3 3 3 3 3 3 3 3 au. 50 45 340 g il 35 30 25 20 15 10 M1 1 10 COST f) HIGH POINT STA=129+17,84 ii 11 11 H 7 HIGH POINT ELEV = 329.39 PVI STA =129+228 HIGH POINT STA = 131+30.9D HIGH POINT STA - 132+17.84 HIGH POINT ELEV = 328.77 ¢ • N W F N -1 -- PVl ELEV = 32926 'H POINT �� _ 36 PVI STA=131+18_40 PVI STA=132+33.59 LOW POINT STA=132+asA0 v) A.D. - 3.70% K = 5A 1 LOW POINT STA =1 �+07 53 LOW PONT STA=130+45afi PVI ELEV = 328.3q PVI ELEV - 323.87 A.D. _ -2.70% LOW POINT ELEV PVI STA=132+94.73 - 327.73 V.C. = 2D.00' LOW POINT ELEV = 326.31 PVI STA 129+92as LAW POINT ELEV - 326.71 PVI STA=130+70.56 A.D. _ -220°k K =11 36 K = 18.51 V.C. = PN ELEV = 321.53 D &D = B 12% 01 �p. - PVI ELEV = 326A7 PVI ELEV = 327,01 AK' V.C.= 2590' r �a.ao �� = .08 0.K=813% ~ - V.C. = 25.ar L= J PROPOSED GRADE v.c.=50.02 _AT 0.00' V.C.- 50.00 CENTERLINE OF GREENWAY - ,_ A NN c V �! -I.zsx J 0.50% J -4.95% z.To°�o a 2.20% J r 1 NO EXISIIING GRADE Al ro CENTERLINE OF Z i9 8 II GREENWAY O z ULI-I + 0 v)Z,_ - z Q n ET] 05 129+00.00 129+50.00 X 130+00.00 130+50.00 131+00.00 EXISTING DUKE POWER EASEMENT EXISTING GAS EASEMENT (COLONIAL PIPELINE) LIMITS OF DISTURBANCE (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) X X X X X x x X X x k EXISTING FLOODPLAIN (TYP.) x 131+50.00 X x 132+00.00 132+50.00 133+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL X x x x EX. WETLANDS (TYP.) X x X X X X X X x x x x x x x x x x x x x x x x 133+50.00 Y' PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) W1-L2SIGN o`` ZO F\b X x x x X EXISTING FLOODPLAIN (TYP.) • 134+00.00 134+50.00 135+00.00 R5-3 SIGN W1-2R SIGN 661 X X X X x X X X X X x X 135+50.00 C,q R1-1 SIGN ALIGNMENT "G' SEE SHEETS C3.23 THRU C3.24 355 350 345 340 335 330 325 320 315 310 305 136+00.00 LEGEND: LD TP Zl Z2 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR NS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILRIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NCR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE SRDSERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" .4> WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18" x 18" 24" x 24" 11 11111 I II III/ III e�.Q„oF�ssroy�(• .y SEAL ` 053032 F FNGI H� I//;„ i i R'I 1 \\\ 12-08-2021 0011111 r+rri,, 11/1111111110% COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL A PLAN VIEW SCALE: 1 " = 30' 30' 15' 0 30' SCALE: 1" = 30' NORTH C3.17 3.20 PLAN AND PROI ILL.cdwg 10+50.00 395 390 385 380 375 370 365 360 355 350 345 HIGH POINT HIGH PODIT STA = 12+60.50 ELEV = 37165 PN STA =12+53.00 FM LLLV A D .S11.51.1 =-55.34% K=2.81 V.C.5X 1 h n Q W PROPOSED GRADE In W AT CENTERLINE OF g 2 GREENWAY 4,- t e1 H n F ,may 200% . [!y Li Li _ � �- _ oo EXISTIING GRADE AT ^CENTERLINEOF GREENWAY V_-y7 -� 1 5 LIJ _ / 2.8Q%„ ERE L _ J -\-- ---- ------ ssei /....� �i A 10+00.00 s_ SS -SS —Z1 11+00.00 11+50.00 N/F MOBLEY, DAVID M & MOBLEY, LAUREN WARD PIN # 0750-10-6796 PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) R1-1 SIGN 12+00.00 12+50.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL W1-5 (R) & W7-5 SIGN N/F R5-3 SIGN DANIEL BEIMLER, ANDREA M & BEIMLER, JOHN R PIN # 0750-10-7683 N/F ZEPEDA, SUSAN E & ZEPEDA, ARTURO L OIAI 4, f17ffL1 fL74..4 395 390 385 380 375 370 365 360 355 350 345 12+77.41 1 PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF DISTURBANCE (TYP.) PROPOSED 18" RCP RIPARIAN BUFFER 1 EXISTING N/F FLOODPLAIN ARBOR C EEK HOEOWNERS ASSOC INC I PIN # 0750-20-0554 4 + 4 4 4 4 4 LEGEND: LD TP Zl Z2 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSFIG PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NG MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" 0111111111rrlrllr! cAt SS/oy f� • SEAL 053032 0rlrrrlllllVli11�1,, 01-05-2021 1,1�j11111111rr111! `Illrrrrlf11lfli1111\'` COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: n Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL B PLAN VIEW SCALE: 1" = 30' 30' 15' 0 30' SCALE: 1" = 30' NORTH C3.18 LEGEND: r sefs\Sife Plan \SE20027 C-3. 56 AM X:\ 2020\SE20.027.00 ToHS - Arbor Creek Creeriw. -- ' 07 0 7- ohnD ry EXISTING FLOODPLAIN EX. WETLANDS (TYP.) PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) acr 370 365 360 11 is 370 W Cr) 8 0 355g 350 345 340 335 PRCPOSFD GRADE AT CFNTFRI INE OF GREENWAY 11 I I 2.00% EXISTIING GRADE AT CENTERLINE OF GREENWAY 10+00.00 R1-1 SIGN ALIGNMENT "C" SEE SHEET C3.19 PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 10+50.00 PROPOSED 18" RCP R1-1 SIGN 11+00.00 11+50.00 GREENWAY PROFILE 1 " = 30' HORIZONTAL 1" = 51 VERTICAL --QQA% W7-5 & R5-3 SIGN Vo 365 360 355 350 345 340 335 11 +95.38 22 RIPARIAN BUFFER (TYP,) 1 1 LIMITS OF DISTURBANCE (TYP.) PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) A. bQ 44. A.;"' � c) EX. WETLANDS (TYP.) — — — ❑1 APPROACH SLAB O PROPOSED BRIDGE EXISTING FLOODPLAIN z) Allirt New • { _\ � � of 0 0 RIPARIAN BUFFER (TYP.) f 7.1 LL1 LD TP TP —Zl Z2 LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSFIG PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NG MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" ssroy f» • SEAL 053032 !!rlrr 12-08-2021 00j0111111r1111! rr/IIr1111+ti%%' COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL C PLAN VIEW SCALE: 111 = 30' 30' 15' 0 30' SCALE: 1" = 30' NORTH C3.19 1/12/2022 4;55 PM X:\2020\5E20 ' '7.00 ToHS - Arbor Creek Greenway\LD\Design \Drawings\Plansets\5ite Plan\SE20027 C-3.16 THRU C-3.20 PLAN AND PROFILE,dwg + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + EXISTING FLOODPLAIN (TYP.) + i I + + + + + + + +� EX. WETLANDS (TYP.) 365 360 355 350 345 340 335 330 325 320 315 HIGH POINT STA=11+93.98 HIGH POINT ELEV = 344.28 PV1 STA=11+B5A0 LOW POINT STA=10+20.00 LOW POINT ELEV = 341.00 PVI ELEV = 344.50 PVI STA=10+30.00 PVI ELEV= 341.20 LOW LOW POINT BTA=11+05,42 PRINT ELEV = 342.12 A.D. = 4.65% K = 9 69 AD. - 2.00% PN STA=11+19A0 PVI ELEV= 342 06 V.C. - 45.00' K -10A0 V.G=20.00' AD.-5.10 — —.Icn 1` �n• HVISIA=1U+UU.UU 1 PVI ELEV= 340.60 Na O 0 BVCS:10+20.00 It BVCE:341A0 a EVCB:10+40.00 S - w: i1..+4e.5u 341.90 BVCE: 241.73 V.G.=20A0' X II n .0 - a (- oo W POINT STA=10+72A8 I POINT ELEV 342.30 ti e E E 'l1 STA=1D+60.00 fi PVI ELEV=342.40 A.D.•-4.67% $ gi n1 �+ �i g K=7.49 w �S m V.D.=35.00' M 1A -1.40% -0.67% EXISTIING GRADE AT CENTERLINE OF GREENWAY N. PROPOSED GRADE AT CENTERLINE OF GREENWAY 10+00.00 10+50.00 + PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) 11+00.00 11+50.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL PROPOSED 18" RCP R1-1 SIGN uI ------- 07 ALIGNMENT "A" SEE SHEET C3.9 EX. WETLANDS (TYP.) + + + + + + + + PLAN VIEW SCALE: 1" = 30' 12+00.00 N/F HEIN, JOSHUA & HEIN, BETHANY PIN # 0659-47-3595 N/F LANGE, TODD & LANGE, DEE P1N1 # f1.4S9—d7—AArh 365 360 355 350 345 340 335 330 325 320 315 12+47.38 N/F FALLON, RONALD FALLON, ERICA PIN # 0659-47-46/2 R5-3 SIGN i4D\ ss- S5 - 55 ss 5S . s- LEGEND: LD TP 21 22 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com 0 3 WORKING DAYS r- BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK. OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSING PRIVATE PROPERTY SIGN BIKE - HILL W7-5 18"x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NO MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" WINDING ROAD MUTCD W 1-5L MUTCD W1-5R 18" x 18" 24"x24" ,,00,11111111I111111114, [Z\ 1 CARD 'Q�oF E551pq� +.1 SEAL 053032 GIN �• ''7rr1r1l1ntnl�'' 01-05-2021 , f`,•�r171r* IliILj11',,` COPYRIGHT© 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: SE20.027.00 ISSUE: REVISIONS: Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' SCALE: l" = 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL D C3.20 LEGEND: Creek Greer way\LD\Design\Drawings\Plansets\Site Plar \SE20027 C-3.21 THRU C-3.25 PLAN AND PROFILE.dwg 350 345 340 335 330 325 320 315 0 N 0 En A u1 J W -. HIGHPOLYTSTA=12F2000 LOM4F'aNI LON SIA=11+►O.UI] POINT ELEV = 33641 HIGH POINT ELEV = 335.41 PVI STA=11+60.00 PA - PVI STA=12+30.00 PVI ELEV = 33 71 ELEV 33&61 A.D. • 2.75% A.D. a 2 7990 V.0 . 90' V C = 207 00' W _ w e $ Low F'(NN I S I A. 1Jf39d11 LOW POINT ELEV = MOM 87% m g �Gii `EW w PVI STA =13+23 02 m m PVIELEV-330.79 AD. = 3.75% K=8.00 V.C. =30.60' 2,00% N. 53 g 1 BEGIN APPROACH SLAB 0 STA 1 1 +60.00 -4.75% g m �1 J ` r - �' _ BEGIN BOARDWALK l j END APROACH SLAB STA 12+30.00 STA 1 1 +7Q.00 1 /\ END BOARDWALK STA 12+20.00 TO SPAN ENTIRE STREAM BOARDWALK 10+00.00 2` 0 PROPOSED 5' WIDE CONCRETE SIDEWALK (TYP.) ■ tin 10+50.00 ha). PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) LIMITS OF DISTRURBANCE (TYP.) R1-1 SIGN 11+00.00 20' OFFSET TEMPORARY CONSTRUCTION EASEMENT 11+50.00 12+00.00 12+50.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 111 = 5' VERTICAL APPROACH SLAB PLAN VIE • 13+00.00 13+50.00 14+00.00 12_2 LD TP Zl Z2 LD TP LD TP > EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILIZES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR TI'S REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" r1O MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" LSS�O�.I.9 • SEAL 053032 =.,,F,9`3... FN_CI NE 4„1 0 r l 111 I1w,‘-'°, 01-05-2021 \,1j, I11111111111! "/1 11111f1ti1'� COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL E SCALE: 111 = 30' 30' 15' 0 30' SCALE: 1" = 30' NORTH C3.21 LEGEND: -3.25 PLAN ANC) PROFILE dwg risefs\Sife Plari\SL2002i 20.027.00 TQHS - Arbor HIGH POINT STA=18+42.09 HIGH POINT ELEV= 335.99 PVI STA =16+35.00 AD.=-8.87% K = 2.91 VC =20.0R VS Q Q Lj Lj r en LOW POINT STA-14*94.98 LOW POINT ELEV = 329.11 F w w II 11 ii -IGHPOINT STA =18+04.99 NK3H POINT ELEY = 33d 3B PN STA =15F 12.70 PVIELEV=32890 F3., 8 E E -k Q I- w w w7 PVI STA=18+14.99 AD.=8.87°k cNc� i-1 E W a'f PVIELEV=i34.Id AA =•706% K-728 K=2.83 I.v.c=sonG V.C. ■ 20.00' ..I x n LOW PONT LOW POINT STA =19+15.1# ELEV 328.79i1 m K 05 PVI • STA=19+08.14 a, c7 •n S g 4 00% •1 00% i m PVI A.O..8.OS% ELEV = 328.99 II I. tgl e K'3.29 ~i ' w iii' I V.�PI}.O I E E _+ 5�1° BEGIN BEGIN BRIDGE END BRIDGE APPROACH SLAB STA.16+67.50 STA.17+92.50 q STA. 16+57.50 � 4 f.U096 L „MOYR WSEL-329A0' 4‘ END APROACH SLAB STA. 18+02.50 - TZ. 1 ` , r / �� 14+00.00 14+50.00 15+00.00 F � SS �A. w o �as5o i o pGP G ' TRAJL p �r 2 13 i404 G-- `Z1 I. 15+50.00 16+00.00 L2 16+50.00 17+00.00 GREENWAY PROFILE 1" = 30' HORIZONTAL 1" = 5' VERTICAL • 17+50.00 18+00.00 18+50.00 19+00.00 350 345 340 335 330 325 320 315 19+27.32 x k 1 k o'S'ti x ALIGN s�� sN�Er C3' 13/3.14 LD TP Zl Z2 LD TP LD TP / EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILIZES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSFIG PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NG MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" ,��,\111111111rllllll 4)r..Q�oF ASS/oyf». T SEAL 053032 _ = <(:5/i3.•. ENGINE f,''lllllr r l l l• 1 l V l C-',, ‘,,,,`` 01-05-2021 1,1j111i11111r1111! `1/1 II/ rlfl*11111111 COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL E PLAN VIEW SCALE: 1" = 30' 30' 15' 0 30' SCALE: 1" = 30' NORTH C3.21a 365 365 370 370 LEGEND: 14+5OEOO ;TING 'LAIN W7-5 SIGN 1 360 355 350 345 340 335 330 325 320 315 HIGH POINT STA = 17+56. HIGH POINT ELEV= 339.2 PVI STA=17438.67 PVI ELEV =339.18 A.D. = 325% K=1231 V.G. = 40.00' 7 Zvi 1I II fl7 0.50% r 17+00.00 17+50.00 18+00.00 360 355 350 345 340 335 330 325 320 315 18+50.00 GREENWAY PROFILE - TRAIL E (CONT) 1" = 30' HORIZONTAL 1" = 5' VERTICAL EXISTING FLOODPLAIN 'y-9 iF p14' :1111/-q 'In/'/-1A.. R1-1 SIGN PLAN VIEW - TRAIL E (CONT) SCALE: 1" = 30' rn - rn Zz 0 olcoz V R5-3 SIGN 365 360 355 0, a co oq A0, ul J II E g + 0 350Q 345 340 335 330 325 320 365 w 0 '1 e- u�f 2 46% 110 1.26% 10+00.00 • • \ 10+50.00 11+00.00 11+50.00 GREENWAY PROFILE - TRAIL F 1" = 30' HORIZONTAL 1" = 5' VERTICAL 1 1 1 1 1 1 \ N. RIPARIAN BUFFER , \ ' -\ \ 1 \ \ \• � \ \ 1 N - \' \, \ - \ '\ --. /0 \ \ — /o PROPOSED 48" & 36" RCP PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) PROPOSED GREENWAY EASEMENT (WIDTH \ \ / VARIES, TYP.) PLAN VIEW - TRAIL F SCALE: 1 " = 30' 360 355 350 345 340 335 330 325 320 11+93.80 Lll LD TP TP —Zl Z2 LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEP' SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILIZES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSFIG PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" NG MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" jOM!! II11111111j 7Q�oF Essroy, f� y • SEAL 053032 lllllllrrrllllllll��',, 01-05-2021 1,1���lilII11r1111! Irlr1r111l,%%\\ COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL E (CONT.) & F SCALE: 1" = 30' NORTH C3.22 12/8/2021 12:08 PM X:\2020\SE20.027.00 ToHS 365 360 355 350 345 340 335 330 325 320 315 HIGH PONT STA • 16+41.06 HIGH POINT ELEV = 344.60 PVI STA=16+61-as HIGH POINT STA=15+4427 HK-H POINT ELEV=-345.57 PVI ELEV= 344.15 PVI STA=15+19.70 A.Q. _ -1 K=31.90.90 HIGH HIGH POINT STA=14+34.92 POINT ELEV = 343.69 PVI ELEV = 345.72 AD.= ' I % V.C. = 40.00' PVI STA=14+09.92 K = 25.88 r PVI ELEV = 343.09 V.C. = 75.00. K=20.41 r Y.L. = 50.00' r Hai PONT STA=15t86.51 HIGH POINT ELEV = 345.39 -PVI STA=16+11.51 PVI ELEV = 345.26 E Rg AK•z8.57% g LOW POINT STA=12+55.76 LOVYPOINT ELEV =33588 w 1 V.G=50(q w� ra PVI STA=12+S0.76 - ~ LOW POINT STA=11+0656 LOW PaNT9TA=11+3851 LOW PONT STA-11'""" LONE POINT ELEV = 334.11 E+t_ A.D. =1.1a% c LDW POINT ELEV • 333.75 PVI STA =10►81.85 LOW PONT ELEV PVI STA= = 33383 11+50.00 PVI STA=12+17.34 PVI ELEV = 334.44 K = 45.45 V.C. = 50.00' _ `2 _ ,, (0 PA ELEV = 333.88 AD. = 2.10% PVI ELEV. AD. -1.85% 33353 A.D. = 2.40% 1-y NJ�o K=2381 V.C. =-50.00' K•27A3 K • 20.83 V.C. • 50 07 �.�Jil°� 6 i 7 LLI V.C.- 50.00 J 7n W rJ R M 2.4% - -- CO el ftX w f� 0 t 11. v 1 Y sq 11..i -0.500% i.3596 10+00.00 a 10+50.00 11+00.00 ALIGNMENT "G" SEE SHEETS C3.23 THRU C3.24 11+50.00 rn - EXISTING FLOODPLAIN 12+00.00 12+50.00 AAA, (7t 13+00.00 - • 13+50.00 14+00.00 GREENWAY PROFILE 1 " = 30' HORIZONTAL 1" = 5' VERTICAL SUNSET FAIRWAYS DR PLAN VIEW SCALE: 1" = 301 PROPOSED 10' WIDE ASPHALT TRAIL (TYP.) PROPOSED GREENWAY EASEMENT (WIDTH VARIES, TYP.) LIMITS OF DISTURBANCE (TYP.) 14+50.00 15+00.00 -(17 • ❑11 15+50.00 365 360 355 350 345 340 335 330 325 320 315 17+00.00 16+00.00 - w- --- - `11.; 16+50.00 EXISTING FLOODPLAIN LEGEND: LD TP Zl Z2 LD TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND U ILNIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STO P MUTCD R1-1 18" x 18" PRIVATE PROPERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" HG MOTOR VEHICLES NO MOTOR VEHICLES R 5-3 18" x 18" 24" x 24" 41. WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" 011111111111111j1j .QgypFESS/oy,((' • SEAL 053032 43- FNGI //04 lrrrl 11111111�'�`,, 12-08-2021 1,1��IIill111rllll! `Illlrlrrr* llflill` COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS 30' 15' 0 30' SCALE: 1" = 30' NORTH PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL G C3.23 365 360 355 350 345 340 335 330 325 320 315 LOW POINT STA =17+69.06 LOW POINT ELEV = PVI STA =17+43A8 340.62 LOW POINT 5 A=19+25.00 LOW POINT STA=18+82.81 HIGH POINT STA-19+15.58 HIGH POINT ELEV = 339.72 PVI ELEV = 341,21 EL A.D. = 4.91 % LOW POINT PVI STA EV = 33953 18+00A0 LOW POINT ELEV = 33928 PVI STA=19+2121 K=55.D4 PVIE =339.80 PV1 STA-18+65.04 PVI ELEV =339.11 PVI ELEV - 339.81 A.D.=5.73% V.C.=50.00' AD.-1.55% K=32a5 A.D.=230% K=21.74 K=349 V.C. = 50.00' V.C. = 50.0 V.C. = 20.00'0' o e cn 4 r ry� cn 11 Q > n 4 ul 1.05% 1.25% ---\1111_ -----\\I 17+00.00 EXISTING FLOODPLAIN 17+50.00 18+00.00 18+50.00 GREENWAY PROFILE 1 " = 30' HORIZONTAL 1" = 5' VERTICAL 19+00.00 365 360 355 350 345 340 335 330 325 320 315 19+50.00 0 -a SS LEGEND: LD TP Zl Z2 LD TP LD TP > — > > EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UIILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILRIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STOP MUTCD R1-1 18" x 18" PRIVATE SRDSERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" MO MOTOR VEHICLE$ NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" .4> WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" j1���1{111111111l710 e�_.•0Essroy,�• y • SEAL ` 053032 eNcin 12-08-2021 /+1r11111ti0\ COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL G PLAN VIEW SCALE: 1" = 30' 30' 15' 0 30' SCALE: 1" = 30' NORTH C3.24 365 365 LEGEND: SEP! 360 355 350 345 340 335 330 325 320 315 10+00.00 Z2 10+50.00 1 tit 11+00.00 m 11+50.00 12+00.00 12+50.00 GREENWAY PROFILE 1 " = 30' HORIZONTAL 1" = 5' VERTICAL 13+00.00 13+50.00 1 360 355 350 345 340 335 330 325 320 315 13+83.46 i SS - R ss- S5- LD LD TP TP -Zl Z2 LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL EXISTING SANITARY SEWER EASEMENT EXISTING SANITARY SEWER (APPROXIMATE LOCATION) EXISTING WATER LINE (APPROXIMATE LOCATION) PROPOSED SWALE WOODEN GUARDRAIL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ID 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILRIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. STOP MUTCD R1-1 18" x 18" PRIVATE .RD.ERTY NO TRESPASSING PRIVATE PROPERTY SIGN HLL BIKE - HILL W7-5 18" x 18" 24" x 24" CURVE MUTCD W1-2L MUTCD W1-2R 18" x 18" MOTOR VEHICLES NO MOTOR VEHICLES R5-3 18" x 18" 24" x 24" .4> WINDING ROAD MUTCD W1-5L MUTCD W1-5R 18"x 18" 24" x 24" e�.Q�oF,SS/ofr •. SEAL ` - fl53032 <'" •.,..FNGI N. 12. 12-08-2021 ���+lrlllflti��� COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PLAN AND PROFILE SHEET TRAIL H PLAN VIEW SCALE: 1" = 30' 30' 15' 0 30' SCALE: 1" = 30' NORTH C3.25 :: QNI _I EMD.dwg Q 1 D k Z'S \:)1.` cAt ss . a1• a1 1 1 1 / 1 / I 1 I. ss� L tsZN I I 1 1 1 l l / i I I I ' I' 1 1211 i i 1 rstrIVINigki r 0 1 07 07 -EE LI IE f E3C LINE �345— 7 _ 7 7 • X C 7 7 J 7 7 1 EXISTING EXISTING WETLANDS LEGEND: LD TP TP LD TP LD TP LD TP TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 SEPI SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH, NC 27603 sepiinc.com or 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACIUTIES Know what's below. Call before you dig. THE LocKnoNs OF BUSTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESEMATNE THE CONTRACTOR SHALL DETERMINE THE IEKACT LOCATION OF ALL BUSTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILMES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. • SEAL 053032 12-08-2021 I II COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PARKING AREA EXISTING CONDITIONS & DEMOLITION PLAN 20' NORTH C4.0 :�f:\Sife Plan \SL2002/ C:-4.1 PARKING ARLA - LAYOUT.dwg MATCH FLUSH TO EXISTING SIDEWALK —MATCH-FLUSH T EXISTING CURB & GUTTR— EX. FIRE HYDRA , TO REMAIN UNDIS RBED ,�47/5/\°` 44/ �'<. 0, Q 30" CURB & GUTTER, SEE TAILS C5.2 5' WI CONC. SIDEWA�K, SEE DETAILS C5.2\ RANSITION FROM 30" TO 24' CURB & GUTTER 1 k Z'S 5' WIDE CONC. SIDEWALK' SEE b'ETLS C5.2 30"CURB &GtLTTER. SEE DETAILS C5.2 �TRANSITIO 'FROM 30" T 24" CURB & GUTTER ct _s_ 30" CURB & GUTTER, Q$ i SEE DETAILS C5.2 WOOD FE CE, C.):D SEE DETAIL 5.1 b c , Qa 5' WID CONC. SIDE ALK, ���e •� SEE DETAIL C5.2/11 A LCH F USH TO ( NG URB &GUTTER n / s ' ss.EXt§TI alb°1 D 1 I C FLUSH TO IDEWALK al 1 W00D FENCE, SEE DETAIL CONCRETE -APPROACH SLAB WITH BOLLARDS, SEE DETAlt--05,1 HEAVY DUTY ASPHALT FOR DRIVE AISLE, SEE DETAILS C5.0 N;. vAss, "AVON. & GUTTER, AILS� N>GE, SEE DETAILS' )(/ )6\ • 40 ce EXISTING EXISTING WETLANDS LEGEND: L D LE TP LD TP EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL PROPOSED CONCRETE SIDEWALK PROPOSED HEAVY DUTY ASPHALT SEPI SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH, NC 27603 sepiinc.com ID 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACIUTIES Know what's below. Call before you dig. THE LocKnoNs OF BUSTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR ITS REPRESEMATNE THE CONTRACTOR SHALL DETERMINE THE IEKACT LOCATION OF ALL BUSTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. • SE AL 053032 12-08-2021 COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PARKING AREA LAYOUT PLAN 20' NORTH C4.1 *( c ‘°‘ EG 347.67 zIZJ bi 3:1 MAX SIDE SLOPE 6" TOPSOIL BIORETENTION SOIL MEDIA ASTM C-33 WASHED SAND #8 WASHED STONE #57 WASHED STONE TOP ELEV*: 340.2' *TOP ELEV. SHOWN AT OUTLET. MIN. PIPE SLOPES & MIN. MATERIAL DEPTHS SHOWN TO BE MAINTAINED THROUGH BODY OF CELL. OVERALL BIORETENTION WIDTH VARIES NATURAL FIBER EROSION CONTROL MATTING ALONG ENTIRE SLOPE AROUND BIORETENTION AREA TRIPLE SHREDDED HARDWOOD MULCH (3" LAYER) HI III III=111- 4'' PERFORATED PVC PIPE UNDISTURBED SUBGRADE PONDING • CONTRACTOR TO SCARIFY BOTTOM OF INFILTRATION PRIOR TO INSTALLATION OF WASHED STONE BIORETENTION CELL SECTION VIEW I SCALE: NTS GEOTEGKE FABRIC 2-1 PROVIDE END CAP EE II ,1 II III III 4' WIDE CURB CUT AND R_UME STONE "DISSIPATOR" SUE 6"-14", WASHED STONE ICOLOR: MEDIUM GRAY RIVER ROCK PVC CLEAN -OUT TOP 4' SCUD PVC CLEAN-0111 MIN 4" DIA PERFORATED Acp 'EXISTING „ FL?9DPLAN (TYP.) EXISTING WETLANDS (1XP. 717"1--' .rrilElsr4111—Irillr(11, GROUT 4" PVC TEE AND BIORETENTION CELL SECTION VIEW SCALE: NTS LEGEND: EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL PROPOSED CONCRETE SIDEWALK PROPOSED HEAVY DUTY ASPHALT FG FINAL GRADE EG EXISTING GRADE TC TOP OF CURB BC BOTTOM CURB SEP! SEPI ENGINEERING &CONSTRUCTION, INC. RALEIGH, NC 27603 sepiinc.com la 3 WORKING DAYS , BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACIUTES Know what's below. Call before you dig. THE LocKnoNs OF EXISTING UNDERGROUND UTKMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDEWLY VERIRED BY THE OWNER OR ITS REPRESEMAT1VE THE CONTRACTOR SHALL DETERMINE THE IEKACT LOCATION OF ALL EXISTING UTILMES BEFORE COMMENCING WORK. AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UilLMES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. 1. BOTTOM OF BIORETENTION AREA SHALL BE 2 FEET OR MORE FROM SEASONAL HIGH WATER TABLE. IF DURING CONSTRUCTION SEASONAL HIGH WATER IS FOUND TO BE WITHIN 2' OF BOTTOM OF BIORETENTION AREA, THEN ENGINEER SHALL BE NOTIFIED IMMEDIATELY FOR DESIGN MODIFICATIONS. 2. THE SCM SHALL BE CONVERTED TO A BIORETENTION AREA ONLY AFTER THE SITE HAS BEEN STABILIZED. 3. BIORETENTION AREA MEDIA SECTION TO COVER ENTIRE PLANTING SURFACE. BIORETENTION MEDIA TO BE COMPRISED OF THE FOLLOWING: ENGINEER APPROVED EQUIVALENT. • 8% - 12% FINES (CLAY & SILTS) • 3% - 5% ORGANIC MATTER • PHOSPHORUS INDEX (P-INDEX) SHALL BE NO GREATER THAN 30. • THE DESIRED MEDIA INFILTRATION RATE IS 2 IN/HR. THE ACCEPTABLE RATE SHALL BE NO LESS THAN 1 IN/HR AND NO MORE THAN 6 IN/HR. 4. CONTRACTOR TO PROVIDE SOIL TEST DATA AND SAMPLES FROM AN APPROVED TESTING LABORATORY, TO THE ENGINEER PRIOR TO CONSTRUCTION. 5. THE BIORETENTION MEDIA SHALL BE PLACED IN 8" LIFTS THAT ARE WALKED ON OR WATERED TO CONSOLIDATE AND ALLOW SHAPING OF THE MEDIA'S SURFACE. THE MEDIA SHALL NOT BE MECHANICALLY COMPACTED. 6. IN -SITU INFILTRATION TEST(S) (POST -CONSTRUCTION) WILL BE REQUIRED TO DETERMINE WHETHER IF THE DESIGN INFILTRATION RATE HAS BEEN MET. THE CONTRACTOR SHALL PROVIDE TEST RESULTS TO THE ENGINEER FOR CERTIFICATION. IF TEST RANGES INDICATE THAT THE INFILTRATION RATE ARE NOT WITHIN THE ACCEPTABLE RANGE, THE BIORETENTION MEDIA SHALL BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE. 7. THE MULCH SHALL BE TRIPLE SHREDDED HARDWOOD MULCH THAT IS FREE OF FINES OR OTHER CONTAINMENTS. WASHED ROCK MAY BE USED IN LIEU OF MULCH AT THE DISCRETION OF THE OWNER AND AS APPROVED BY THE ENGINEER. 8. NO FERTILIZER SHALL BE ADDED. 9. ALL MATERIALS SPECIFIED AS WASHED SHALL BE WASHED AND FREE OF FINES. • CAST INTO BOX STORMWATER OUTLET CONTROL STRUCTURE • • SEAL 053032 12-08-2021 COPYRIGHT 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PARKING AREA GRADING PLAN C4.2 NORTH LEGEND: SET ' C-4.3 PARKING AREA - LANDSCAPE ings\PIancets\S ` w J U 0 cV i 1 r .� / / \ � \ r \ - ❑7 J — \ r ti - ti - MULCH AREA SF -` Co EXISTINS- PCOOJDPLAIN (TYP.) - - r - - - J �r-Cz^��---- J ----- - / r / r / / / / / 7 7 7 7 7 ---- 7 \ - - - - _ - J 7 7 7 •• 5c/ EXISTING WETLANDS (TYP.) ❑] — - 1 — - N. _ - 1... \ \ N.\ 7 _ N. \ ❑ / \ \\ �^ ❑] / _ 7 � .,., - 7---� — — 7 - _ ▪ _ ... . r - - r J — — __ 1 i LDLD LDL➢LDLD — TP TP TP TP TP TP — LANDSCAPE PLAN NOTES 1. LOCATE ALL EXISTING UTILITIES PRIOR TO INSTALLATION OF PLANT MATERIAL. NOTIFY OWNER OF ANY DISCREPANCIES BETWEEN FIELD CONDITIONS AND THOSE SHOWN ON THE PLAN. 2. VERIFICATION OF TOTAL QUANTITIES AS SHOWN ON THE PLANT LIST SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND THE TOTAL QUANTITIES SHALL BE AS SHOWN ON THE PLAN. 3. ALL PLANT MATERIAL SHALL CONFORM WITH THE STANDARDS SET FORTH BY THE AMERICAN ASSOCIATION OF NURSERYMEN AND THE WRITTEN SPECIFICATIONS. 4. ALL PLANT GROUPINGS SHALL BE MULCHED AS ONE BED. 3" OF DYED BROWN DOUBLE SHREDDED HARDWOOD MULCH SHALL BE USED AROUND ALL PLANTINGS. 5. APPLY PRE -EMERGENT HERBICIDE TO ALL NEW PLANTING BEDS AT MANUFACTURERS RECOMMENDED RATE PRIOR TO INSTALLATION OF MULCH. 6. ESTABLISH POSITIVE DRAINAGE IN ALL PLANTING BEDS AND AWAY FROM BUILDINGS. 7. DO NOT INSTALL PLANT MATERIAL IN IMPERVIOUS SOILS, (i.e. HOLES WHICH, WHEN FILLED WITH WATER, DO NOT COMPLETELY DRAIN WITHIN TWO HOURS.) SEE SPECIFICATIONS FOR TOPSOIL REQUIREMENTS. 8. CONTACT THE LANDSCAPE ARCHITECT FOR INSPECTION 48 HOURS IN ADVANCE OF THE SCHEDULED SITE VISIT AND AT THE FOLLOWING INTERVALS: 8.1. REVIEW OF GRADING PRIOR TO PLANT INSTALLATION 8.2. REVIEW OF PLANT MATERIAL PRIOR TO INSTALLATION. 8.3. ONE SUBSTANTIAL COMPLETION MEETING FOR PLANT INSTALLATION. 8.4. ONE FINAL INSPECTION FOR ALL PLANTING OPERATIONS. 9. THE TREE PROTECTION FENCE SHALL BE MAINTAINED ON THE SITE UNTIL ALL SITE WORK IS COMPLETED AND THE FINAL SITE INSPECTION PRIOR TO THE CERTIFICATE OF OCCUPANCY (CO) IS SCHEDULED. THE FENCING SHALL BE REMOVED PRIOR TO FINAL SITE INSPECTION FOR THE CO. 10. LANDSCAPE SUB -CONTRACTOR {UNDER GC CONTRACT} SHALL BE RESPONSIBLE FOR WATERING ALL PLANTS AT HIS COST FROM HIS OWN WATER SOURCE INCLUDING DURING PERIODS OF DROUGHT UNTIL THE PLANTS AND LAWN MEET FINAL COMPLETION. PLANT MATERIALS WHICH PERISH SHALL BE RE-ESTABLISHED BY THE CONTRACTOR AT NO EXPENSE TO THE OWNER. 11. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ALL EQUIPMENT & SUBCONTRACTORS AWAY FROM PLANTED AREAS. IF DAMAGE OCCURS, THROUGH NO FAULT OF THE OWNER, AREAS SHALL BE REGRADED AND REPAIRED IMMEDIATELY AT NO ADDITIONAL COST TO THE OWNER. CONTRACTOR SHALL WATER AND MAINTAIN THOSE AREAS UNTIL THEY ARE AT 95% COVERAGE AT FINAL COMPLETION. 12. SUBSTITUTIONS OF PLANT MATERIAL SHALL ONLY BE ACCEPTED 60 DAYS PRIOR TO COMMENCEMENT OF PLANTING OPERATIONS. SUBSTITUTION REQUESTS MUST BE IN WRITING AND WILL ONLY BE ACCEPTED FOR LACK OF AVAILABILITY REASONS WHICH CAN BE SUBSTANTIATED OR FOR SUPERIOR STOCK SUBSTITUTIONS. 13. IF CONFLICTS OCCUR BETWEEN WRITTEN SPECIFICATIONS AND THE DRAWINGS, THE WRITTEN SPECIFICATIONS SHALL PREVAIL. PLANT LIST QTY SYM BOTANICAL NAME COMMON NAME SIZE (min.) ROOT REMARKS DECIDUOUS CANOPY TREES 2 GB Ginkgo biloba MAIDENHAIR TREE 2 " CAL./10'-12'HT B&B Trunk 6' clear DECIDUOUS SHRUBS 8 HV Hannannelis virginiana COMMON WITCH HAZEL 18" CONT. EVERGREEN SHRUBS 14 IG Ilex 'Shamrock' SHAMROCK INKBERRY HOLLY 18" CONT. glabra TONS LANDSCAPING REGULATIONS TYPES OF LANDSCAPE SCREENING (UDO TABLE 7.01-A) 5' TYPE A-20 BUFFER (Open Landscape Screen with a Plant Unit Value of 20 points.) Type A: Open 60 °A. Large Deciduous Trees Proposed 5 Large Deciduous Trees (-200LF = 40PUV) *Minimum Requirements do not total 100°/0. Any remaining plant unit value is left to the discretion of the landscape design professional. CALCULATION OF PLANT UNIT VALUES (UDO TABLE 7.01-B) Small Deciduous Tree 1" caliper (4 PUV) & 1 'A" caliper (5 PUV) Large Deciduous Tree 2" caliper (6 PUV) & 2 'A" caliper (8 PUV) (1) Type / Size / Spacing of Trees: a) Minimum size at planting shall be: Large Deciduous Tree: 2" caliper, and small Deciduous Tree: 1" caliper. b) Spacing of trees shall be: Large Deciduous Trees: a minimum of 40' from center of trunk; maximum 60' from center of trunk. Small Deciduous Trees: a minimum of 30' from center of trunk; maximum 45' from center of trunk. c) Distance from the following site conditions shall be adhered to: Intersections: All trees shall be located a minimum of 50' from the point of tangency of curb radii at street intersections and outside of site distance triangles in accordance with the Town of Holly Springs' Engineering Design & Construction Standards. Street Lights: All trees shall be located a minimum of 25' from the base of all street light poles d) Location of Trees: Trees shall be located within 5' from the right-ofLivay line on the private property side. Where above locations are not deemed feasible and practical; refer to UDO sub -section 7.01, P. INTERIOR PARKING AREA LANDSCAPING (UDO 7.01-14) 1 interior landscape island for every ten (10) parking spaces; Shall contain at least one (1) large or small deciduous tree or one (1) large evergreen tree (provided, however, loblolly pines or other trees which drop branches as they grow shall be prohibited in interior landscape islands), plus four (4) shrubs/hedge plants. Parking island: Proposed 2 Large Deciduous Trees & 8 Large Deciduous Shrubs PARKING AREA SCREENING A compact row of shrubs/hedge plants planted 3' on -center (3' o.c.) and a min. of 24" in height at the time of planting Shrubs/hedge plants in combination with ornamental fence/ decorative fence/ masonry wall/ earthen berm, provided that the total combined plant unit value equals or exceeds 35 PUV points. Parking Screening: Proposed 35 Large/Medium Deciduous Shrubs (Large/Medium Deciduous Shrub: 36" high(1 PUV) EXISTING PROPERTY LINE EXISTING UTILITY EASEMENT EXISTING CONTOUR PROPOSED LIMITS OF DISTURBANCE PROPOSED TREE PROTECTION FENCE RIPARIAN BUFFER - ZONE 1 RIPARIAN BUFFER - ZONE 2 PROPOSED ASPHALT TRAIL PROPOSED CONCRETE SIDEWALK PROPOSED HEAVY DUTY ASPHALT SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH, NC 27603 sepiinc.com • 3 WORKING DAYS FOR THE LOCATION OF UNDERGROUND FACIUTIES Know what's below. Ccill before you dig. THE LoaknoNs OF EXISTING UNDERGROUND UTILMES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR RS REPRESENTATIVE TFIE CONTRACTOR SHALL DETERMINE THE EtCACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE RJLLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO ESACTLY LOCATE AfT:0 PRESERVE ANY AND ALL UNDERGROUND MMES. NOTICE: CONSTRUCTION SITE SAFETY'S THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. • • SEAL 053032 SERI ENGINEERING & CONSTRUCTION, INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE 5E20.027.00 ISSUE: REVISIONS: ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR PARKING AREA LANDSCAPE PLAN NORTH C4.3 1/12/2022 5:13 PM X:\2020\5E20,027.00 ToHS - Arbor Creek Greenway\LD\Design \Drawings\Plansets\5ite Plan\SE20027 C-5.0 THRU C-5.2 SITE DETAILS.dwg ® DOGIPOT ! S ! p 1 SEPI ENGINEERING 8 CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC CHARLESTON, SC GLENWOO❑ AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 919.789.9977 St31711FIC.0 017i IIIr c g / 5340 YOUNG PINE ROAD, SUITE 6 ORLANDO, FL 32329 \ MOUNT SIGN TO FREE:1 8iia3fi47681 11 TOLLPOST PHONE: (407) 888-4627 TRASH RECYCLING RECEPTACLE, PER NCDOT SPECS. ALL FAX: (407) 888-8526 .4/4.SEE The Si -not Solution to Da® Pallut on. miAv.doglpotcam SPECIFICATIONS FOR MANUFACTURER & MODEL BENCH, SEE SPECIFICATIONS FOR HARDWARE TO BE GALVANIZED ANDI INCLUDES: MANUFACTURER S. MODEL FILED TO PREVENT THEFT/REMOVAL. MOUNTING -ALUMINUM DOGIPOT HEADER 5Q1 AKTH BAG DISPENSER -ALUMINUM DOGIPOT HEADER PAIL JUNIt3R BAG DISPENSER (ITEM #1�2HP4), ( , WFFHMOUNTINGHARI7IARE 2 �, ASPHALT GREENWAY. ASPHALT GREENWAY, � 1 BLACK POWDER I -TWO KEYS FOR DISPENSER LOCKING FRONT ACCESS PANEL �,�� — SEE TYPICAL SECTION 2 �, SEE TYPICAL SECTION COATED U-CHANNEL -FOUR HEADER Prix$ OF DOGIPOT UTTER PICKUP BAGS I� (ITEM 41402 HP) INSTALLED IN DOGIPOT HEADER PAKJUNIOR BAG DISPENSER -10 GALLON ALUMINUM TRASH RECEPTACLE (ITEM #12DS-14 WITH ATTACHED ihr ASPHALT GREENWAY HINGED LID AND TRASH LINER BAG RETAINER BANDS, WITH MOUNTING 4 00' 4.00' HARDWARE 1. •, FINISH GRADE FINISH GRADE / 3.0' -ONE DOGIPOT LINER TRASH BAGS (ITEM 414041 -2'X7X4'-8' GALVANIIED STEEL TELESCOPIC MOUNTING POST, WITH LI 1 "i = �B�� _ — —� — — — — J KNISH GRADE r , .. ;, ( 1 Know what's Ca 11 before C r / below. 3WORKING DAYS -BEFORE YOU DIG - FOR THE LOCATION OF UNDERGROUND FACILRIES you di y g- INSTALLATION HARDWARE -III -1 � 1 I� I-1 — � — =III= — W DOGIIPOT PET SIGPI (ITEM #I2D�1 = 111 111 111 I I —I 111 I I— = —III— — III —I 1=T III 111=111-III III=III- -III=II III=III1 -I III= = = = - = _ _ - -H:18-XW:11.5° -14 GAUGE REFLECTIVE ALUMINUM WEIGHT: 1.35 LBS —III— ICI -III _ 4. • • I III— —III-III _ — 4" CONCRETE PAD, I —III —III= - — I1I-III - - — 4" CONCRETE PAD, —III III _ 4'Wx8'L -III-III= 1 —III-I 5' -III —III -P . .' _ _ _ _ _- =III— ' 1 III 1 I 1 111 III 1 I 1 -II -III- 11 II Ll III— -FOREST GREEN ON WHITE {Bf DOGIPOT HEADER PAKJUNH)R BAG DISPEM$ERifFEHI #14#02HP 4J: p =III- III —II—III- 4' W x 6' L _ 8 _ =III- —III—III—� _ I IIII , CONCRETE FOOTING =III —I II 3000 PSI @ 28 DAYS -H: 15.5" X W: 9.4° X D:4. s" -12 GAUGE POWDER COATED FOREST GREEN ALUMINUM "' __ -III- I I —III- i .II I -III- —III= "' ___ —III-� I I —III - - —III—II= _ - —III- = _ -WEIGHT:7 Les -III- G-� 1 -III- -III-I 1 - - =- - - #57 WASHED STONE 1 BAG CAPACITY CONCRETE FOOTING, 3000 P51 28 CONCRETE FOOTING. 3ooa PSI 28 DAYS. -III I 1=111-11 1- THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. -CLEARLY POSTED INSTRUCTIONS _ I I-III-1 -III=III=III=III=III= _ _ 11-1 1 1-III-I _ _ RECOMMENDATIONS I-IIIIII-III-I 1 I-1 I j •0 COMPACTED SUBGRADE IC) STEEL TRASH RECEPTACLE WITH LE {ITEM i112{IB-L: =III=III-III= -III- -H:23"X 11-5'DIAMETERr 16 GAUGE PDWDEFi COATED FOREST GREEN STEEL (D) m 1.00' 1.00' WEIGHT: 14.8 LBS. 10 GALLON CAPACITY WITH INTERIOR TRASH LINER BAG RETAINER BANDS ATTACHED STAINLESS STEEL HINGED LID -ONE BOK5000UNT DOGIPOT LINER TRASH BAGS (ITEM 41404) (0]TELESCOPIC GALVANIZED STEEL MOUNTING POST (ITEM #1301•P):• r ; r `�I' •,• • ► NOTES: l . SEE PLANS FOR SIGN 2. SIGNS ASSOCIATED ROADWAYS SHALL TYPE AND DIMENSIONS. WITH VEHICULAR TRAFFIC AND ALONG MEET NC DOT AND MUTCD SIGN REQUIREMENTS. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER -2'X 2" G -11 GAUGE GALVANIZED STEEL INSTALL SIGNS PER NC DOT STANDARD DRAWING 904.50. SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. -WEIGHT:15 LBS. HOLE: 1F8" -0: 10'X W: 8" ELEVATION -FILL WITH 4D LBS. °READY TO USE: CEMENT N BENCH FOOTING ,.` :_� -'.-r ,7, ti� : ��: _ f//f �"""'""''���� ���„,,, t 6 �I� f�i O C+ `1.,.f OC/ '�, �'• �pF v_ssroiy • 4 �.._ . Q / SEAL 053032 l0r ••GN •'',. R. r ��-�' Ilf•7l ,�1fIrI�IIIit1l� '',,` 01-05-2021 if , t I 1 i III �' \CV BC'"•46 //i GQ ,�,...Tj �r \ ; • RpOR4'•. j SEAL ; _ C-2197 •••••• `\`titi ''• # •'\ '��+�rllly+���' . INS 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. RECEPTACLE FOOTING &PLACEMENT &PLACEMENT TYPICAL TRAIL SIGNAGE INSTALLATION 2. DO NOT SCALE DRAWING. 3- THIS DRAWING 15 INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS FOR PLANNING PURPOSES ONLY. THIS DRAINING MAY NOT BE USED FOR CONSTRUCTION. 4. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST AND DESIGN PROFESSIONALS BE REVIEWED AND APPROVED BY SCALE: NTS 4 SCALE: NTS 3 SCALE: NTS 1 THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. 5. CONTRACTOR'S NOTE: FOR PRODUCT ANDCOMPANY INFORMATION VISIT www.CADdetals.mrNiifoAND REFERENCE NUMBER 2635-005. PET STATIONS ENTER END POST ("CHAMFER AT 45° DOGIPD1 HEADERPAKPETSTATION (1003HP-L] 2635-006 REVISION DATE 0410520113 I o.ao' o.c. 1" CHAMFER AT 45° PROTECTED BY COPYRIGHT C110 CADDETAILS.CCAI LTD. CADdetails.wrn . 1- ilN`.\ w I 1"x6"TIMBER VERTICAL FASCIA; .... PETSTATION EXTEND 1" BELOW BOTTOM RAIL \ iY] SCALE: NTS 6" x 6" TIMBER POST 6" x 6" TIMBER POST Romp 1"x 6'x 10' TIMBER RAIL FINISH GRADE 1 RASH GRACE —11=11—I' 11=1=1: IIII1. "11-11 II= 1= I_11 II= II II-' 1= -11 T. . -L , - I"x 6" x 10' TIMBER RAIL - _ 1= - 11 1 -II Ik "• - - - 1 = 1_=1=1 IIII=1. I = - 1_= - I 1=11 ZIT -A 11= . =1= 1" x 6"TIMBER VERTICAL FASCIA • =iEll 1 1 COPYRIGHT{ 2021 SEPI ENGINEERING & CONSTRUCTION, INC FENCE STATIONING 1=1: II=II=1, = : 1=11Ii=11= 1=1: • :. CONCRETE FOO11NG I1 1 c,,; = 3000 P51 @ 28 DAYS -1-1 o e -1 .11 11= 1 1�= 1.:.. • �_ =1 ALIGN END OF RAILS AT 1 1 ' 111 CENTERLINE OF POST = =11= 1-1 1 1. T� 1 1 1 Arbor Middle Greenway Town Parks PREPARED Town 128 Holly Springs, of and of S. Creek Creek Holly Springs Recreation FOR: Holly Springs Main Street NC 27540 =1� FOOTING 11 ' '' I III' �� 1, CONCRETE I' -II-II -T- 11 11-11= =' II II �-�:_�-�:_�-' 11 11= 3000 P51 @ 28 DAYS � I �6� � ' / Fence Stationing Alignment B I.00' 1.00' 1.00'/ Left =enc:e Right Fence. SECTION FRONT ELEVATION Start Station Stop Station Start Station Stop Station AlignmentA . NOTES: LOT Fen:e. Right Fence 17+04 12-77 10+16 12+77 Start Stat-o•i Slop Stet-o:c S:arLStat-o•i S:n:] Stet-o•i 1. COLOR STAIN TO BE SELECTED BY OWNER. 10+00 18+18 Alignment C 2. FRONT OF FENCE SHOULD FACE GREENWAY TRAIL 7 SIDEWALK. 2419 2/i68 24+9 7/178 Left ence Right Fence 28+05 32+40 Start Station Stop Station Start Station Stop Station 39+25 12+15 39+9 42++15 10107 11.88 43+`,.3 58+89 44180 59+22 431°,.3 58+89 44183 59+22 _ - _ Alignment E FENCE 63+7L. 108169 64+08 1091.51 63+77 E5+50 108169 64+08 E8+32 109L.51 - Left'enc:e Start Station Stop Station - 11+77 12-53 Right Fence Start Station Stop Station 11+74 12-55 SCALE: NTS 7 111+34 111+75 111+34 111+72 13+26 13-78 13+26 13-75 115+14 115+40 115+16 115+40 115+81 117+08 115+81 116+56 Alignment G 133+28 134+47 133+28 134+40 left:ence Right Fence _ Start Station Stop Station Start Station Stop Station 17144 19.46 NOT FOR BID CONSTRUCTION SET 90% REF 21-012: CONSTRUCTION DRAWINGS Arbor Creek Greenway TRAIL �t'�' CR0551NG NO PRIVATE STOP ® MOTOR PROPERTY TRAIL X-LNG 500 FEET 500 FT VEHICLES NO TRESPASSING HILL DATE STOP YIELD TURN CURVE WINDING ROAD COMBINED BIKE - PED TRAIL CROSSING TRAIL CROSSING DISTANCE - FEET DISTANCE - FEET BIKE - HILL NO MOTOR VEHICLES PRIVATE PROPERTY PROJECT: SE20.027.00 MUTCD R1-1 MUTCD R1-2 MUTCD W 1-1 L MUTCD W1-2L MUTCD W1-5L MUTCD W 1 1-15 MUTCD W 1 1-15a MUTCD W 1 1-15P 2-LINE MUTCD W16-2aP W7-5 R5-3 SIGN ISSUE: 18" x 18" 18" x 18" x 18" MUTCD W 1-1 R MUTCD W 1-2R MUTCD W 1-5R 18" x 18" 24" x 24" 18" x 12" MUTCD W 16-2 24" x 12" 18" x 18" 18" x 18" 18" x 18" 18" x 18" 18" x 18" 24" x 24" 30" x 30" 24" x 18" 18" x 12" 24" x 24" 24" x 24" 24" x 24" 30" x 30" 24" x 18" . . • REVISIONS: I,, Rev. 1 01.05.2022 TRAIL SIGNAGE SCHEDULE • - SCALE: NTS ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L- SMITH, S.TEYMOURI.E.GWIN CHECKED BY: M.TAYLOR SITE DETAILS C 0 0- 1/12/2022 5:16 PM X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Design\Dra .1-c I I I 1 PLAN Il Il II ly Ir OPTIONAL [bN9TR11CTId1 JOINT ELEVATION OONEL PLACE GROWS CR SELL END CP PIPE TO FADE 13F WALL FOOTING (IF MINT. JOINT 19 USED) GROUND i' 1-111 11. 11 }III Illy PROJECT LOCATION TEX PROJECT LOCATION TEXT, Town of Holly Springs Engineering Department 919-5 7-3938 .erhamrw..+. 5. + t DESIGNED BY: E W.4-rmm.x CONSTRUCTED BY: COROIA2 en FYm NAIh La¢ Hare 36» NOTES: 1. 35' X 48' X ?" MDO SIGN 14TTH U-CI-IANNEL POSTS. 2. INDIVIDUAL PANELS TO BE SECURED WiiH WEATHER RESISTANT SCREWS AND WING NUTS, �l11�111�I BLACK J PO DER COATED U-CHANNEL(2) S" MI 1I W III 11 1I1 1 SUPPORT DEPTH AS NECESSARY DRAWING NOT TO SCALE PROJECT IDENTIFICATION SIGN STANDARD DETAIL NUMBER: HS005 DATE REVISIONS TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT DAAD/T3 a1 lf HOLLY SPRINGS Duey.. ife Soem. u2•Q7NNMUNMOOT % 'V aNNEHAY8YORLEBS i 5MDt-Milf 1%4S' NM MICA ESS 70 MACCOF SIDEWALK Ir CONCRETE ATLPEw4YAPRON 5, 6' • 12,16 ARK 7W.. 4 DRIVEWAY SY DMA' KY MAX. REaa•I• o c+varaE SCORED OR s 5i61E7N4CK �C ;471r1 ///''''''isiasviesicauarAm n1eciRE1P 'POSE �� - ARTCI DRIVEWAY �,alarra �:� -� ,-ir 1- PAINT % 15• Haar .5-�3 EIPAAAppA JPIv7s �' s• Ea .: MICR Gi7/6g4C7En SCORED OR s BACKFILL t199411LSICA'JOIN! AO EDROSION COSMOS CURD AND GUMS? AUNT SIONDKM SSY{77A15 CLYT9 AND OUIIB7 AY BOTYSUMS CF DarliTNAO TYPICAL SECTION PLAN VEW - TRADffIONAL CURB N0 1. CURB SHALL BE TAPERED TO FINISH FLUSH WITH SIDEWALK. 1/1.14R4ASEwJOINE V �DRLIZENt1YHT07AETTs .57GTiN4LA' 2. BEGINNING RADIUS SHALL NOT ENCROACH ON ADJACENT PROPERTIES BASED ON A PROJECTION OF THE PROPERTY LINE FRGIH THE RIGHT OF WAY TO THE CURB LINE. 3. RESIDENTIAL DRIVEWAYS TO BE 12' - 16' IN WIDTH. 4. COMMERCIAL AND INDUSTRIAL DRIVEWAYS TO BE A MAXIMUM OF 36' WIDE. SEEMED OR 12=I6•1I4A' -1MZDrr CONCRETE 1 "s 5. ALL CONCRETE SHALL BE 3000 P51. 5. 12' MAX. FOR 1 CAR GARAGES. ammo Y APRON 7. 16' MAX FOR 2 OR 3 CAR GARAGES. L �•I ,..._,LiL {II �f2 i B. COMMERCIAL AND INDUSTRIAL DRIVEWAYS TO BE MAX OF 36' a�a6nvr u�ra� wu�Y��a/ 2. STREET TYPES TURNOUTS SHALL BE USED WHEN DRIVEWAY ADT IS GREATER THAN 50D VEHICLES. PLAN VEW - VALLEY CURB DRAWING NOT TO SCALE STANDARD DRIVEWAY APRON 0 STANDARD DETAIL NUMBER. H B32Holly )SprinSprings Mac=7M'� ris DATE REV151ON5 TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT 1° A VARIES PLAN VEW NOTE& 1. SIDEWALK SHALL BE 6" DEPTH AT ALL DRIVEWAYS. 2. SIDEWALK SHALL BE 6" DEPTH AT ALL HANDICAP RAMPS. 3. TRANSVERSE EXPANSION JOINT TO BE A MAX OF 50 FEET. * VARIES - SEE APPROVED PROJECT PLANS EVSTYG 2.-6" CURB AND WHEW GRASS U711JTY S7RAP PRCPDSFD SIDEWALK ,/2" / ft- \ -.______ ,/4. / (CONC. 3000 P I) CCOPAC7ED SLdLL 10 A DENSITY OF NO LESS 77VAN 95 TYPICAL SECTION JOINI FILLER TRANSVERSE EXPANSON JONT DRAWING NOT TO SCALE STANDARD CONCRETE SIDEWALK STANDARD DETAIL NUMBER: HI 327 DATE REVISIONS TOWN OF HOLLY SPRINGS ENGINEERING DEPAR LAMENT 2/8/1U 14rHolly 8pgs 1lrleam'T� Em1eL SEP! SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ® 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: CONSTRUCTION SITE SAFETY I5 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. SCORE RILL NIW N C(H(S AND GLITTER PLAN FRONT END DRAWING NOT TO SCALE STANDARD METHOD OF ENDING CURB AND CUTTER TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT 1�1 SLOPE A8 ISDICATED MI PLANO END ELEVATION 84-11ARS DOWEL BAR-"X" DOIELS IN elNiNALL OITH N0INP08Gls TOI6NET8 PIPE LING• PIPE DIA. SINGLE PIPE DOUBLE PIPE 15" 18' 24• 30" 38" 42" 411" 15- 1e" 24" 10" 38' 42• 48" BARN "X" "X" "x" "X" "X" "x" Y• '2' V. .x" '2' .3. "x,r "2" "x" Y. "x" Y• 8 OTT. 2 2 8 3 4 4 2 5 - u- 2 2 2 3 3 4 4 2 5 e 5UM.TOTAL 2 r STY. - - - - - - 1 1 2 2 2 2 0 4T7. 2 2 3 3 4 4 2 2 3 3 4 4 L. 9 9 14 1A 19 55 85 12 12 19 19 23 77 92 OIDENEIOR6 AND CONCRETE OOMITITIE8 USIS3 ODNCRETE PIPE COMM DIIENSIONS SINGE PIPE 1:4011RLE PIPE D HBO T 9 L TDa r L YDa 15" 3'-3" 1'-9" 2'-9" 214" CI" 5'-8" 0.7 2'-2" 7'-8' 1.0 1S" 3'-7" 1'-10' 3'-2' 21.¢" 10" a'-4" 1.0 2'-7" 9'-11" 1.3 24" 4'-2" 2•-1" 4'-0" 3" 10" 0'-0' 1.5 3'-6" I1'-5" 2.0 30' S'-0' 2'-B' 4'-7" 41A" I11¢' 9'-2" 2.3 4'-3" 13.-5" 3.1 38' 5'-8" 2'-S" 5•-8" 4kq" 11fj' 11'-0" 3.4 5'-0' 1Sr-0" 4.5 42" 8'.5' 3'-1" 0'-4" 514' 111 t" 12'-D• 4.5 5'-10" 18'•8' 8-0 48" 8'-0" 3'•6" 7'-2. OW I11•¢" 14'-4" 8.0 8'-8" 21'-0" 0.0 SEE SHEET 3 SHEET 1 OF 3 838.01 PLAN 0 UPTI011AL CCNSTiLLTI011 JDINT ELEVATION STANDARD DETAIL NUMBER: H8323 DATE FOOTINO REVISIONS MAKE AS IODINATE➢ CN PLANO (IF O➢YST. JOINT I9 115E01 END ELEVATION u eAPs� DOWEL BAR-"X" 00aLLE IN lNOIALL EON G. 5. PIA'! LOG. PIPE DIA. SINGLE PIPE DOLELE PEPE 15' 18" 24. 80" 36" 42" 4B' 15" 18" 24" 30" SG" 42- 48' ems 'x" .,x. "X. "2" 'x' 'X' V. "X' Y• "X" "X" .x' .x. "X" "x" Y. "x" T.- 0 MY. 2 2 3 3 4 4 2 6 - 5 2 2 2 3 3 4 4 2 5 2 5 2 A Orv. - - - - - - 1 1 1 2 2 2 G DIY. 2 2 3 3 4 4 2 2 3 3 4 4 TOTAL LB3. 9 9 14 14 19 53 102 12 12 16 19 23 73 25 L]IE2I011f AND CONCRETE 2OAITIT7111 USING CC119UGATED STEEL PIPE COINESI SINGLE PIPE DOIDLE PIPE D H S 0 L YDO N L YIP Ir. 3'-4" 1•-e" 2'-2" 5'-0" 0.7 1'-11" S'-11" 1_D IS" 3'-7' 1'-10" 2•-11" 5'-10' 1.8 2'•8" 8'-1' 1.2 24" 4'-1" 2'-1" 3'-8" 7'-4' 1.4 3'-0" 10'-4" 1.9 30" 4'-7" 2'-4" 4'-6" 6'-10' 2.0 3'-9" 12'-7" 2.7 36" S'-1" 2'•7" 3'-2" 10'-4" 2.8 4'-E" '4'-10" 3.11 42' 5'-7" 2'-10" 5'-11"11'-10' 3.8 5'-3' 17'-1" 5.0 48' 8'-1" 3'-1" re-8" 18'-4- 4.9 C-0" 19'-4' 7.5 SEE SHEET 3 A 1/2" 7/E' R. " 2'-0' If2' R 1/$" R. 6" + + Linwr FILLER g' -4-- 12Ilk 7' A J 21 5" _7_ FRONT EXPANSION ELEVATION Le JCNT la' SECTION A -A ME ELEVATION 13fAMDAFO CLINE 1 1 1 1 9" g" 9. yew 10' T' 8' i' -IF- IF 12 6 3/4" VALLEY CURB AND °UFTFER i BCE ELEVATION NOTES I _8. 1 1. CONCRETE SHALL BE 3,000 P.S.I. 2. CONTRACTION JOINTS SHALL BE SPACED AT 10' INTERVALS. (15' SPACINWILL MEDIAN BE ALLOWED WHEN A MACHINE IS USED) 3. REMOVAL OF ANY PORTION OF CURB AND GUTTER SHALL REQUIRE FULL REMOVAL AND REPLACEMENT SO THAT NO LONGITUDINAL SEAMS ARE CREATED. 4. MAINTAIN 50' MAX. BETWEEN JOINTS OR AT ALL RIGID OBJECTS. CURB WO N1lTTER 1p W1G DRAWING NOT TO SCALE STANDARD DETAIL NUMBER:HMI VElolly Springs Too Imo ii STANDARD CONCRETE CURB AND GUTTER TE REWSYONS TOOF HOLLSPRINGS ENGINEERING DEPARTMENT WN Y wD Z 6u, I -a aQ 1,06 a0= I-mnOYx CCA 1- , f oCOcc w I- CI SHEET 2 OF 3 838.01 GENERAL NOTES: CHAMFER ALL CORNERS 1" OR HAVE A RADIUS OF 1". PLACE 2 II& "Y" BARS IN THE TOP OF ALL ENDWALL FDR PIPE CULVERTS 42" AND OVER WITH A MINIMUM OF 3" COVER AND A LENGTH OF 6" LESS THAN ENDWALL LENGTH. CONSTRUCT BOTTOM SLAB WITH FORKS. DO NOT INTERPRET WALL THICKNESS (T) SHOWN FOR THE THICKNESS ACCEPTABLE, BUT IS USED IN COMPUTING ENDWALL QUANTITIES. WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE, PLACE BAR "X" DOWELS IN THE BASE AS SHOWN ON PLANS. SPACE BARS APPROXIMATELY ON 12' CENTERS UNLESS OTHERWISE DIRECTED BY THE ENGINEER. WHEN THE CONTRACTOR ELECTS TO USE A CONSTRUCTION JOINT AT THE BOTTOM OF THE PIPE AND POUR THE BASE SEPARATELY LEAVE THE POUR ROUGH. USE CLASS "B" CONCRETE. SHEET 3 OF 3 838.01 A ATIETIY�r s1xL� NNW: 441LTf Gin K GREW E.•• l Rl 77Ei1 ✓ J ECNZ rrr rrrrr�� r r rr I METRIC VIEW 0 A 15144E x e EP 00 SW sr ALP 1 art ar ar Lr•• r 43T 24' 73. a0'r r oa' dr 7s Sr- i 2.0' 7.11 7017 LL' 6' 2.31 Li 1L1' 4.0' E da 18' RE 4.4' F 3r ma" 0.4' 4.,' 5 40 LE AS Ar r 4d' 10.5' a.r 3.5' IT MO' 183 Ir 1L1' e - B - 0x- FR011 FRONT EDGE OF 240,99LN TO E4C1C POINT OF 1211 M3310 SLOPE: • 91CX OF EOEITALK DROP FOR ALL SIMMSLOPES 4• B KSIDE/AAIC CROP RE0ll#EO FOR SDENAIR SLOPES D.04 1NSLI A 01900190014991490 0 • 0 0 • 0 0 •0as** RAID FLOOR DETAIL SEE NOTE 7 NOTES: 1. BE WALKING SURFACE SHALL BE SNIPE NE56TANr. DETECTABLE WARNING DOMES SHALL COVER THE RILL 11111H AND DEPTH OF TIE I151P FIDOR. THE OETECTABE 1FARNIH6 SWILL 222156T DF RINSED TRJICA1ED DIMES PBTH A OIAIEIEK OF ry014NAL 09•. A 4ELHO OF 0.2" AND 12011ER-10-CERIER SPAON0 OF N00111AL 2.36'. RE RAMP SHALL EE SLAC>C N COLOR. 2. Cf818SD N WIDTHS AND OONFOLEAT1II 1888, 1BET CONFORM TO TRAFFIC 0131011 STANDARDS. 3. THE B EIDE PEDESTRIAN CROSSWALK LINES BHTLL BE SET 140 CLOSER IN THE HNTERSECTON THEN WOULD BE ESTABLISHED BY EIBECTs1C THE NTE8ECRON RADA. BM NOTE 14 4. ALL RENEW imam 9RAL1 BE 1N ACCORDANCE AIM THE LATEST calm OF TIE LWIIIL OF UNIFORM TREFFNC CONED. comes Q4UTCOj PLBLT1HED BY THE F'ED5RLL 18248W1Y ADENISTRATION AND THE NORTH CONCERN UPTO SPLEMENT ACE Yuan. • c-BpA WIRY SEEP B' A 9 A� Q 4047R78M9 R e" ant? AYAA®'A1TAI FZVElikiX TKM 17.' 1 MAX. RAMP SEE 81CSEr A SECTION B-B 6 r Taus r._,41 MAM aABANSDCS R 755 OF CIAO 441814444.E SLOE Ler n7 ENCEEO 1217 AL. ENPAMBI08 .CANT 54" NOTES $ I7 & 17 DES PATRON OF RAI. AST PAIL OMEN OIESSO OARS I SEE 0O77' 110 24171FR SECTION A -A HOT0 A PORTION OF ONE OR EON SOUPS MAT EOM OUESIOE 11E RETURN. SealIKIX EAPAAD7TIV ,ADO' Vf PLAN HEW DRAWING NOT TO SCALE OPAWKW SIDERNIX STANDARD WHEELCHAIR RAMP STANDARD DETAIL NUMBER: HS331 DATE REVISIONS TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT 2/8/70 Wally Spring: armem1 JSm9A ISOIYETRIC NEW 0 A RAW x e r LE u' De' L11'" e. SS La' IN aa« r ds' 7r 7r a4• r at 14' 7Y aa•• r or 7.5' 7r S.C' 5' La' as L1' 4r a' J' ar 0.7 ►A' a' 3,4' s,5' re 4.1' B. 4.d' ar De' ar 0' 44' HDd AY 3.4. B. 13' tar SAP dr 6 - Od'1448E ROW FRONT fIDE 11F SOE*ILK TO HACK PONT CF 1&1 8.3:LOPE • EEESEM( SCIENALN SH DROPFOR ALL •• SACK CF SEEABLE DROP REQUIRED FOR SI1EM8LX SEWER AM NOTES: I. RE 8841W6 SURFACE SHALL HE SLOPE RESISTANT. DETECTIBLE WRUNG 301ES STTALL COVER THE HELL ROTH AIM DEPTH OF TIE RA4i MICR. TIE DETECTABLE WASHING SWILL O1N.8LST OF RAISm TRIIN2LTE0 DORIES XAIVI A DNIIETER OF KNOW/ SS'. A HEIGHT OF 0.2• AAR CENTER-TD-CERIER SPADIN OF NOININ41 2.3E". 111E RAMP SWILL If BACK N COLOR. 2: 020854AU( NAD1H5 AIO C91FO1A4ATON DAIRY: MUST OONKRIJ TO TNIAFEIC CESON S,ANDAR0S. A THE INSIDE PEDESTRIAN CROSSWALK U1E8 SHALL BE SET NO CLOBER N THE NTERSEC5011 THAN MOULD BE ESD191EHED En' EMCEE TIE DREFSECIION FADE COM NOTE 14) 4. ALL RAVEIENT MURKINCS SHILL BE 1N ACCOROAWCE WITH THE LATEST ED4RON OF THE WEAL OF UNMAN TRAFFIC CONTROL NEMER (N11791] FIBILKHED ET TIE FEDERAL 1rO11a7 ADMINSTSAT15N AND T11E IERTi CARDUNA SUPPLEMENT TO THE MRITCO. 3• F sorarur (5' S'w 65.415 0' Q1 SECTION B-B 1 MAIL RAID" SiE. IVSET A 4+1110 3'-0• craaE 78AM1L9'DDO41 A451 DROP IRANSAW CORN NH OF n8a8 IpRE493E surf ROT RP DAZED 1A.1 (CM SECTION A -A PLAN VIEW DRAWING NOT TO SCALE w77DT NOTE: A PORTION CF CIE OR EOTHI RAMPS NAY EXTETC OUTSIDE THE RETURN. EI'PAAC41011 JOHT SINGLE RAMP RESIDEN 17AL FOR MINOR SUBDI I4'SION ROADS STANDARD DETAIL NUMBER.- 1-113330 DATE REVISIONS TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT 2A9/10 I1NIIew Tings INlarce. ,,,,���lllillllllllr1111II 4% 41 SEAL 053032 L /IIIIIfrr1111111U11�,' 01-05-2021 \',,[17* 84 Il li l llll'i DIA f`I711jrl1111}1ijl1',,` COPYRIGHT ® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M.TAYLOR DRAWN BY: L, SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR SITE DETAILS C5.2 SIDEWALK OR ! p 1 SEPI ENGINEERING 8 CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com _ 8' MAX. SO PAVEMENT DO NOT PRUNE LEADER. PRUNE OR CUT ONLY DEAD �� STEEL POST VARIABLE AS DIRECTED BY THE ENGINEER -� ' OR UNHEALTHY BRANCHES ❑RANGE SAFETY FENCE ° • . , PROVIDE STAKING IF SPECIFIED. IF STAKING IS I"� ATTACHED TO WOVEN WIRE FABRIC BACKING SIGN \ TIGHT BEVELED /j �\• •�`� PROVIDED, PROTECT TREE WITH BROAD STRAP OR d �_ : FLEXIBLE TUBING. ALLOW FLEXIBILITY IN STRAPS TO -- —WARNING fl ''--- :�-- I ■ `-- MIN. 12-112 GA. JOINTS � /\/\ 4 DEVELOP TRUNK TAPER. PROVIDE TURN BUCKLE AND WARNING SIGN -- -- -;�--= ��/\\\ • f WARNING FLAGS. REMOVE ALL STAKING AND ;.�_....-_-.-; INTERMEDIATE WIRES AMENDED \\ ACCESSORIES WITHIN ONE YEAR FROM PLANTING. GRADE MIN. 10 G -- ;; ■I ■ ,•- SOIL �/. • A :. Know what's Call before -L� r �, below. 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES you dig. ..... ... i . .....? . LINE WIRES :� REMOVE SOD NETTING.. `� /• t` GRADE 40" PRIOR TO SOD THE ROOT FLARE SHALL BE PLANTED AT GRADE, NO cl �_..__.__. __. _- a ' $ ; INSTALLATION INSTALLATION •- HIGHER THAN 2" ABOVE GRADE, AND NEVER BELOW "/`" [v a /C�j�j�'� Y �j�j�jY Y/Y �j�jY Y/Yj� �jy �/ r "" V ►v�`� 1 GRADE. REMOVE EXCESS SOIL TO EXPOSE THE ROOT FLARE AT GRADE. TREE SHALL BE SET PLUMB TREE PROTECTION AREA _• > ORANGE UV RESISTANT HIGH -TENSILE STRENGTH, POLY DO NOT ENTER ZONE DE PROTECCION PARA `� � °. MULCH DEPTH 3". KEEP MULCH 3" FROM ROOT FLARE >�� SIDE VIEW BARRICADE FABRIC (TYP) , A ARBOLES - NO ENTRE T AND DO NOT CONTACT STEM THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE- THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILUREiOEXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. 44, . FRONT VIEW A HIGH QUALITY SOIL MIX AS SPECIFIED WARNING SIGN DETAIL 2" LETTERS / \ WATER SAUCER SHALL BE NO MORE THAN 3"ABOVE (TYP) AI111P11•IICOMPLETELY GRADE REMOVE TOP HALF OF BURLAP, LACING CONSTRUCTION SITE SAFETY IS THE SALE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER .n,,,,,,,,,,,,,,,,,, • AND WIRE BASKET AND DISCARD FROM HOLE MULCH BE 4" TRENC —11 ?'.:..a �a1,� ;�: ;` ; •.::!.F.::.j:` -0 ' z,. ��' �' y ,1' J SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK. OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. NOTES: p" `' O • `,, ROOT BALL SHALL BE PLACED DIRECTLY ON GRAS •: , I I II 1" Ai COBALMPACTED SUBGRADE. HANDLE TREE BY THE ROOT ',,��«T"Illff+ii,,,. ���`lL�� CAR�(�f`'%,, _:�� 'Q4ESSlp4,,4 q == SEAL 053032 . ` ., 9 •. GII� ,�. ��''pC R ,,, 'l'i'Ifl+Iliiik\o\‘, 01-05-2021 ,,ow I' I"',,, �, �'�j1L� & T / ,'% = ��,;.•Rp pR Ti _ ` _ SEAL ', C-2197 N.C. ,I, 1. ALL PLANTS DESIGNATED TO BE SAVED SHALL BE PROTECTED BY FENCING, AS ILLUSTRATED. 2. INSTALL TREE PROTECTION FENCE AT A MINIMUM OF 1' FROM THE TREE DRIP LINE OR AT EDGE OF DISTURBED AREA, AS SHOWN ON . : �_ PLANS, PRIOR TO COMMENCEMENT OF CONSTRUCTION. 3. SPACE TREE PROTECTION ZONE SIGNS A MAXIMUM SPACING OF 150 FEET. THE SIZE OF EACH SIGN MUST BE A MINIMUM OF 2' x 2' AND BE VISIBLE FROM BOTH SIDES OF THE FENCE. THE SIGN MUST CONTAIN THE FOLLOWING LANGUAGE IN BOTH ENGLISH & SPANISH: "TREE PROTECTION AREA, DO NOT ENTER ZONE" f� f f �� /\/�\/�\/�\�\\\/\ �\�\�\�\\�\�\�\�\ /\�\�\�\�\�\\\\\�\\�\\�\\� �� \�� NOTES: ROOTBALL DIAMETER / 4. THERE SHALL BE NO STORAGE OF MATERIAL WITHIN THE BOUNDARY PF THE TREE PROTECTION FENCING. 5. TREE PROTECTION FENCING SHALL BE MAINTAINED THROUGHOUT THE DURATION OF THE PROJECT, 6. INSTALL TREE PROTECTION FENCING PRIOR TO PERFORMING ANY CLEARING OF THE SITE. /////////////// TO /// /// BE APPLIED TO ALL PLANTING PLANTING BED /// /// /// //\ BEDS 1. CONTRACTOR IS RESPONSIBLE FOR ADEQUATE DRAINAGE OF ALL PLANTING PITS. (POSITIVE DRAINAGE AWAY FROM PIT) 2. STREET TREES MUST BE 3" CALIPER AT INSTALLATION WITH A 5' MINIMUM FIRST BRANCH HEIGHT. 7. WARNING SIGNS TO BE MADE OF DURABLE, WEATHERPROOF MATERIAL. EDGE 8. LETTERS TO BE 3" HIGH MINIMUM, CLEARLY LEGIBLE AND SPACED AS DETAILED. 9. SIGNS SHALL BE PLACED AT 100' MAXIMUM INTERVALS. PLACE A SIGN AT EACH END OF LINEAR TREE PROTECTION AND 100' ON CENTER THEREAFTER. 10. FOR TREE PROTECTION AREAS LESS THAN 200' IN PERIMETER, PROVIDE NO LESS THAN ONE SIGN PER PROTECTION AREA. 1 1 . ATTACH SIGNS SECURELY TO FENCE POSTS AND FABRIC. 12. MAINTAIN TREE PROTECTION FENCE THROUGHOUT DURATION OF PROJECT. 3. PLANTING SEASON OCTOBER - APRIL. 4. A TREE IMPACT PERMIT IS REQUIRED. 5. ELECTRICAL OUTLETS AND OTHER UTILITIES ARE PROHIBITED IN THE PLANTING AREA IMMEDIATELY SURROUNDING THE TREE. TEMPORARY TREE PROTECTION FENCE PLANTING BED EDGE I SOD INSTALLATION TYPICAL TREE PLANTING DETAIL 1 SEPI ENGINEERING I&CON 2UCnON, INC COPYRArbor SCALE: NTS SCALE: NTS SCALE: NTS Middle Greenway Town Parks PREPARED Town 128 Holly Springs, of and of S. Creek Creek Holly Springs Recreation FOR: HollySprings Main Street NC 27540 - LIME & SCHEDULE PRUNE TO REMOVE DEAD OR BROKEN BRANCHES. SLOPE AWAY FROM BLDG. 2� OR > APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS, OR APPLY A MINIMUM 3 TONS/ACRE GROUND AGRICULTURAL LIMESTONE AND A MINIMUM 500 LB/ACRE 10-10-10 GREATER MAINTAIN SOIL LEVEL AT OR SLIGHTLY HIGHER FERTILIZER, AS NEEDED TO ESTABLISH 95% COVERAGE (AS DETERMINED ON A PER SQUARE YARD BASIS) PRIOR TO SUBSTANTIAL COMPLETION. CONTRACTOR TO SUBMIT A COPY OF ALL SOIL REPORTS TO OWNER UPON RECEIPT. PLANT SPACING PER o PLAN 0 THAN EXISTING GRADE, TO ALLOW FOR Q SETTLEMENT o o r PINE STRAW OR HARDWOOD MULCH A5 SPECIFIED (3" - 4" SURFACE STABILIZATION REQUIREMENTS 3" MULCH INSTALLED BEFORE PLANTING r` 0 DEPTH). DO NOT PLACE MULCH IN DIRECT CONTACT ��4 WITH TRUNK. \ 6" SOIL MIX. SEE SPECIFICATIONS FOR ti, U PERMANENT OR TEMPORARY GROUND COVER SHALL BE PROVIDED OVER ALL DISTURBED AREAS OF THE SITE PER NPDES PERMIT. DETAILS. a� C^� a FORM CONTINUOUS 4" HIGH GROUND STABILIZATION WILL BE APPLIED WITHIN 14 DAYS FROM LAST LAND DISTURBING ACTIVITY. FOR STEEP SLOPES, THAT AREA MUST BE STABILIZED WITHIN 7 DAYS. y.':y .:i1.,1, 1:'':'`•:.;'1:,1::1:, :.:y. y ;<::,:,:,:,<, : '°. •'1, .:i :. y' SAUCER "'•O 0 `4 ."..?:y. • y.::' ::,:,:<:; ; <::, : ..?' INCORPORATE SOIL MIX INTO TOP 6" OF :,:; :; • .<:: y:,:,:; <, : • .:.' :' ' • ::,+!?. �• tt� FINISHED GRADE PERMANENT GROUNDCOVER SHALL BE ESTABLISHED IN 15 WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER I5 SHORTER. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. :',:",::,:,:,.,:,,:,:,:,,,:: •:;:,' :;..:' .,:,: ,: ,',: • UNDISTURBED SOIL AT A 1:1 RATIO. ,..,..,::,.;.,.;.,.,.,.;,;,.'.,;.,.,.;;;.,.;.,..,.;;;;:,.;: .;.,;.,.• 1:1 •1... ... 1 1 1 • 1 ••• 1 •1 1 •1... •1 ..: �/ ��� :. ,. ,`� ti,:ti E. E:ti:ti:ti:` •. f:t ::t :•: USE EXCELSIOR MATTING OR OTHER APPROVED CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS. \��\\��� " UNDISTURBED SOIL. eti e:e:e:• �: i. . . ;•: . . is .`. ... • APPLY 4000 LB/ACRE GRAIN STRAW AND ANCHOR STRAW WITH ASPHALT TACKING AT A RATE OF 400 GALLONS/ACRE. . ROOT MASS - REMOVE CONTAINER AND LOOSEN ��;:�;-�;��;•,•,•,•,•,•�;•�;��:: •� ter 'i ROOTS OF POTBOUND PLANTS BY SCORING OR 4 MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES AND CLOG DRAINAGE DEVICES. �� � �,�� ,�� ,�� �� � � � , ��� i� /` PULLING. ,.. o � /f %f�` / / �� SOIL MIX. SEE SPECIFICATIONS FOR DETAILS. WATER AND TAMP TO REMOVE AIR POCKETS. NOTES: UNDISTURBED SOIL. IF SOIL HAS BEEN DISTURBED, TAMP NOT FOR BID CONSTRUCTION SET 1. ALL TECHNICAL SPECIFICATIONS AND GENERAL CONDITIONS APPLY. 2. LOOSEN ROOTS OF POTBOUND PLANTS BY SCORING OR PULLING. SOIL FOR FIRM BASE UNDER ROOT BALL. PROVIDE DRAINAGE AS NECESSARY. NOTES: 3. REMOVE ALL TAGS, TWINE OR OTHER NON -BIODEGRADABLE MATERIALS ATTACHED TO PLANT OR ROOT MASS. 1. ALL TECHNICAL SPECIFICATIONS AND GENERAL CONDITIONS APPLY. 2. REMOVE ALL TAGS, TWINE OR OTHER NON -BIODEGRADABLE MATERIALS ATTACHED TO PLANT OR ROOT MASS. 90% REF 21-012: CONSTRUCTION DRAWINGS Arbor Creek Greenway GROUNDCOVER PLANTING SHRUB PLANTING DATE PROJECT: 3E20.027.00 SCALE: NTS 4 SCALE: NTS 2 ISSUE: REVISIONS: I,, Rev. 1 01.05.2022 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PRAWNBY:OJ. : MSMITH, R DRAWN BY: L. SMITH, S. TEYMOURI, E. GWIN CHECKED BY: M.TAYLOR SITE DETAILS r I I L r VAN ACCESSIBLE SIGN OF RK11RE0] 12" n N_ PARKING SPACE FACE OF CURB PRECAST CONCRETE WHEELSTOP; CENTER WITHIN PARKING SPACE PAINT STRIPING 60° PARKING SPACE PLAN VIEW — 8 3/4" #3 REBAR. OR PER ® MANUFACTURER'S RECOMMENDATIONS PAVING IIIIIIIIIIIIIIIIIIIIIIIIII 1 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII � I —IC I —IC I —IT T—� I —IC I —IC I —I � 1=1 � 1=11 I -I 11=111 =1 1-1 T UiI 11=1 1=1 1-I IIII=11'=1 =1 SECTION \ L II 1 0 l J SIGN R7-3OR R7-OA 51GN 97A0 FIN69113) GRADE LT7 • I— _I \ 621 /37' • VAN ACCESSIBLE VAN ACCESSIBLE SIGN 12" MAXIMUM PENALTY $250 G8 2037 6 8 SG- 3,000 PSI CONC. FOOTNG R7-EID COLORS (ALL SIGNS): LETTERING AND BORDER: BACKGROUND: ARROW [OPTIONAL]: RGURE: 12" RESERVED PARKING ED GREEN WHITE GREEN WHITE ON BLUE FIELD R7- A NOTES: 1. R7- 0 PENALTY SIGNS ARE REQUIRED TO ACCOMPANY ALL R7-3 OR R7-BA PARKING SIGNS ERECTED AFTER DECEMBER 31, 1990. 2 ALL SIGNS APPROVED FOR USE UNDER GENERAL STATLTE'A37b 3- REFER TO MANUAL ON UNFORM TRAFRC CONTROL DEVICES IMUTCD} CONCRETE WHEELSTOP SCALE: NTS 2 ADA SIGNAGE SCALE: NTS 1 .DOE S4MES SNAIL LESS THAN .RT MA) \\WI ESS O7NERNIAE WOICA TEO ON LANOLIT PLANS CUT AND Fx.L SLLWE5 37MALL 17E PRO DIVING SLOPES TO CREATE AN EIEz R 7RAN31700k s-e" SHOWER iziiiAL ir_ 9 42 SAFETY RAk ?FROM EDGE OF PAVEMENT IFSIDE SLOPE EXCEEDS 8' OF DROP AT01UNLESS SHOULDER rS S OR MORE. 77LQ r9..56SURFACE COURSE if 22' MAX CROSS SLOE STAVE SHOULDER (Sa=0 OVER STOW I ■ ■ NDTEI§ 1. CROSS SLOPE DIRECTION VARIES. SEE LAYOUT PLANS FOR DIRECTION OF SLOPE. 2, CONTRACTOR IS RESPONSIBLE FOR RE—ESTABLISHING ALL SLOPES DISTURBED BY CONSTRUCTION. "AGGREGATE VASE COURSE GEOTEX771EFABRIC TO UNOERLINEABC AND SLIOUWOR WHERE SOILS ARE POOR COMPACTED SL9GRAOE DRAWING NOT TO SCALE 1a ASPHALT GREENWAY TRAIL TOWN OF HOLLY SPRINGS ENGINEERING DEPARTMENT STANDARD DETAIL NUMBER.• E 3A0 DATE REVISYONS 7/syTe 10 O' ry COC ENCASED CONCRETE LOCK PIN VIEW A - A STEEL SLEEVE CONCRETE NOTE: BOLLARDS CAN BE SQUARE OR 4" ROUND. ASPHALT Ay}I ENCASED 6' CONCRETE CONCRETE CURB CENTER DOLARO REMOVEABLE 8 - 5,0 LOCKABLE CURB .10,0' PLAN VIEW A {31 STEEL BOLLAROS ENCASED W2774 CONCRETE 40' ABOVE GROUND CURB DEPRESSED CORO NEW 8-B DRAWING NOT TO SCALE BOLLARD POSTS DETAIL STANDARD DETAIL NUM8E1HS341 DATE REVISIONS TOWN OF HOLL Y SPRINGS ENGINEERING DEPARTMENT R/4/17 SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH i WILMINGTON i CHARLOTTE BEAUFORT, SC i CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE 1919.789.9977 sepiinc.com ■a 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND LIVERIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIRED BY THE OWNER OR RS REPRESENTATIVE THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILMES. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. 50 CM (19.7") 16.7 CM (6.6") 25 CM (9.8") ENLARGEMENT SPECIFICATIONS UNIT SIZE — 50 CM X 50 CM X 2.5 CM OR 1 MX1 MX2.5CM (20" X 20" X 1" OR 40'X 40'X 1') AVAILABLE IN 9 STANDARD ROLL SIZES UNIT WEIGHT — 510 GRAMS (18 OZ. OR 2.0 KG (4,5 POUNDS STRENGTH — 1121 KG/CM (15,940 P51) COLOR — BLACK RESIN — 100% RECYCLED HDPE PLAN GRASSPAVE2 SQUARES ADJACENT GRASSPAVE2 UNITS SEE ENLARGEMENT BELOW HYDROGROW MIX BELOW RING SUPPLIED FREE BY MANUFACTURER FINISH GRADE 4 p991VI 111I11111I11111I II II II II II II II II II BOARDWALK DECK 1 0' CONCRETE 1 III r 11-1-11 1 1 1 I =1 11= II I I I=I I III I =1 II III III PROVIDE EXPANSION JOINT AT 5' INTERVALS HEAVY DUTY CONCRETE PAVING ASPHALT GREENWAY HEAVY DUTY LIGHT DUTY ASPHALT ASPHALT ` TYPE S-9.5B SURFACE COURSE 1-IN 2-IN TYPE I-9.5B BINDER COURSE 3-IN N/A AGGREGATE BASE COURSE 6-IN 6-IN COMPACTED SUBGRADE TYPICAL HEAVY / LIGHT DUTY ASPHALT SECTION SCALE: NTS 4 BOARDWALK / BRIDGE APPROACH SLAB SCALE: NTS 5 RINGS FILLED WITH CONCRETE SAND (CLEAN, SHARP SAND) _COMPACTED SANDY GRAVEL ROAD BASE 95% MODIFIED PROCTOR DENSITY — 6 INCHES TO 12 INCHES (DEPTH OF BASE COURSE TO BE DETERMINED BY ON —SITE ENGINEER) —SEE FULL TECHNICAL SPECIFICATIONS FOR COMPOSITION COMPACTED SUBGRADE, SECTION TOOGRASS ROOT MASS 6 MM (1/4")ABOVE TOP OF RING GRASSPAVE2 ATTACH WITH SNAP —FIT FASTENERS RINGS FILLED WITH CONCRETE SAND (CLEAN, SHARP SAND) OMPACTED SANDY GRAVEL BASE COURSE —SEE FULL TECHNICAL SPECIFICATIONS FOR COMPOSITION NOTE: GRASS/PLANT TYPES SHALL BE SPECIFIED BY A LANDSCAPE ARCHITECT OR LANDSCAPE DESIGNER. TYPICAL GRASSPAVE2 DETAIL NOT TO SCALE Ill Invisible Structures, Inc. CHOOSETHIS PRODUCT FOR REINFORCING GRASS WEARING SURFACES \ 1 OF 1 16265 E. 33RD DR., SUITE 20 AURORA, COLORADO 80011 800-233-1510 OR 303-233-8383 FAX: 800-233-1522 OR 303-233-8282 WNW, invisib lestru ctu res,cam rev. 1/18 STOP SIGN, SEE SHEETC5.1. PERMANENT BOLLARD, INSTALL PER TOWN'S STANDARD DETAIL H5341, SEE SHEET C5.0. TIE TO EXISTING SIDEWALK FLUSH EXISTING CONCRETE SIDEWALK REMOVABLE BOLLARD, INSTALL PER TOWN'S STANDARD DETAIL H5341. SEE SHEET C5.0. PERMANENT BOLLARD, INSTALL PER TOWN'S STANDARD DETAIL HS341, SEE SHEET C5.0. CONTRACTION JOINT, 5' SPACING (TYP) HEAVY-DUTY CONCRETE, SEE SHEET C5.0. 5' RADIUS. UNLESS OTHERWISE NOTED EXPANSION JOINT INSTALL WHEELCHAIR RAMP ONLY IN LOCATIONS SHOWN ON PLANS, AND IN ACCORDANCE WITH TOWN'S STANDARD DETAIL H5330, H5331, AS APPLICABLE. SEE SHEET C5.2. EX. BACK OF CURB 9' x 2' DETECTABLE WARNING vco11111 11111I,,, �.QoFEssroy•�• y --. l • SEAL .� 053032 67,llrrrll I11I��,‘\�, 12-08-2021 01111111r1111, //,,+Tlrlrl*lfli1110.0 COPYRIGHT® 2021 SEPI ENGINEERING & CONSTRUCTION. INC Arbor Creek - Middle Creek Greenway Town of Holly Springs Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 BID SET NOT FOR CONSTRUCTION 90% CONSTRUCTION DRAWINGS REF 21-012: Arbor Creek Greenway DATE PROJECT: 5E20.027.00 ISSUE: REVISIONS: GREENWAY APPROACH SLAB SCALE: NTS 6 ALL CONSTRUCTION SHALL CONFORM TO TOWN OF HOLLY SPRINGS ENGINEERING DESIGN AND CONSTRUCTION STANDARDS PROJ. MGR: M. TAYLOR DRAWN BY: L. SMITH, 5. TEYMOURI, E. GWIN CHECKED BY: M. TAYLOR SITE DETAILS C5.0 — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Data Shared \Sent\To Stewart\SE20027 - TLB.dwg NOTES: 1■ ASSUMED LIVE LOAD = 90psf AS PER AASHTO LRFD GUIDE SPECIFICATIONS FOR DESIGN OF PEDESTRIAN BRIDGES,2nd EDITION. 2. THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE WITH THE AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES 2ND EDITION. (AASHTO H5 S --- P I SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH.NC29 603 PHONE I 919,789.99.9977 HONE sepiinc.com LOADING INCLUDING AMBULANCES AND OTHER VEHICLES/EQUIPMENT UP TO 10,000 LB.) 3. CONTRACTOR SHALL LOCATE ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO CONSTRUCTION. ALL UTILITIES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR. 811 m 3 WORKING DAYS BEFORE YOU DIG FOR THELOOATON OF UNDERGROUND FACILITIES Know what's below. C a II before you dig. C TRAIL A 4. FOR EROSION CONTROL MEASURES, SEE EROSION CONTROL PLANS. h 5. FOR SUBMITTAL WORKING, SPECIALSEE V SHOWN IN AN THE LOCATIONS OFEXISTING NLYA ANDOTBEEN INDEPENDENTLY APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE ENACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT ■ BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND 4'-0" MINIMUM RAILING 10'-D" M N■ CL AR WIDTH PRESERVE ANY AND ALL UNDERGROUND UTILITIES. Ili 01 NOTICE: 6. FOR FALSEWORK AND FORMWORK. SEE SPECIAL PROVISIONS■ 5'-0" 5'-O" PREMANUFACTURED PEDESTRIAN CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF BRIDGE THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER 44 7. FOR CRANE SAFETY, SEE SPECIAL PROVISIONS. SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. a REINFORCED a GRADE 3 POINT a r 0.01 alia0.01 CONCRETE DECK C E ` c c 8■ FOR GROUT FOR STRUCTURES, SEE SPECIAL PROVISIONS. 9. FOR PREMANUFACTURED PEDESTRIAN BRIDGE 51,5EE SPECIAL PROVISIONS. FABRICATOR PREMANUFACTURED PEDESTRIAN INDICATE THE �� mr 10. OF BRIDGE 51 SHALL LOCATION P • P • - P - .A• - P ❑ • P • - P ❑ • P • - P - ❑ • OF DRAINAGE HOLES FOR THE BRIDGE TUBULAR MEMBERS IN THE SHOP DRAWINGS■ ,•" ��,`..•• 5 R.°4/ .. 11. CONCRETE DECKS SHALL BE CLASS AA CONCRETE AND ADHERE TO NCDOT SPECIFICATIONS. .� �. a SEAL r t 1 11725 : 12. BRIDGE LOADINGS ARE ESTIMATED. AFTER SHOP DRAWINGS FOR THE PREMANUFACTURED PEDESTRIAN BRIDGE ARE SUBMITTED, THE ENGINEER OF RECORD WILL CHECK THE END BENTS FOR ACTUAL BRIDGE LOADINGS. SHOP DRAWINGS SHALL BE FORWARDED TO ENGINEER OF o=;.F �::h 9G■'•.;�;GI�NE;`'•' �� R, gl1 RECORD UPON RECEIPT■ Pea S /3/2021 13. THE PROJECT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE NCDOT STANDARD FOR TYPICAL SECTION ROADS AND STRUCTURES, JANUARY 2018. ALL MATERIALS MUST MEET THE REQUIREMENTS OF PREMANUFACTURED PEDESTRIAN BRIDGE THE STANDARD SPECIFICATIONS OR SHALL BE NCDOT-APPROVED. -zraura z.22 . 2WEST ST. rJ 23S.RALEIG7E0a RALEIGH. NC 27603 ST EWART T(919)380-8750 BRIDGE NO. CHAIN BEGIN STATION END STATION 14■ FOR APPROACH RAILS, SEE SPECIAL PROVISIONS■ BRIDGE LENGTH COPYRIGHT ©2021 SEPI ENGINEERING &CONSTRUCTION. INC S1 -A- 42+38.92 43+61■08 120' 15. FOR REINFORCED CONCRETE DECK SLAB, SEE SPECIAL PROVISIONS■ 16. FOR CONSTRUCTION OF SUBSTRUCTURE, SEE SPECIAL PROVISIONS. NOTE: BEGIN STATION AND END STATION INCLUDE ONE FT 17■ FOR CONCRETE APPROACH SLAB, SEE SPECIAL PROVISIONS■ WIDE BACKWALL AND 1 INCH EXPANSION JOINT AT EACH END. 18. FOR OTHER DESIGN DATA AND GENERAL NOTES, SEE SHEET SN. Arbor Middle Greenway Town Parks PREPARED Town 128 Holly Springs, of and of S. Creek Creek Holly Springs Recreation FOR: Holly Springs Main Street NC 27540 - CONSTRUCTION DRAWINGS REF #: 09-012 DATE PROJECT: SE2C.027.00 ISSUE: TYPICAL SECTION AND GENERAL NOTES FOR BRIDGE 1 REVISIONS: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COvPLETED PALL DAVIDRHPHELPSPE CONSTRUCTION SHALL BE IN ACCORDANCE DRAJWN BY: DRAWN BY: ELI2ABETH PHELPS, PE WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE STANDARDS AND SPECIFICATIONS S 1 30' 15' 0 30' SCALE: 1"=30' NORTH 42+00 42+50 43+00 - L P O F I L E DATA 43+50 44+00 S io p 1 SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC VPI STATION ELEVATION GRADE IN X GRADE OUT I. 1 GLENWOOD AVE. I SUITE600 RALEIGH, NC 27603 42+40.00 347.00 +2.0000 0.0000 PHONE 1919.789.9977 43+60.00 347.00 0.0000 -2.0000 FILL FACE AT END BENT 1 FACE AT END BENT 2 sepiinc.com I.I.IFILL W.P. 1 STA. 42+38.92 -A- W.P. STA. 43+61.08 -A- GRADE POINT ELEV. 347.00 GRADE POINT ELEV. 347.00 END APPROACH SLAB APPROACH RAIL SET E111. PREMANUFACTURED [TYP.] STA.42+29.92 -A- GRADE PEDESTRIAN BRIDGE 1`-0"BERM END APPROACH SLAB 3w WORKING DAY BEFORE YOU DIG POINT ELEV. = 346.80 (TYP. FOR THE N OF _ 355 EA. END) NISTA• 43+70.08 - A - LJ O I1 GRADE POINT ELEV. = 346.80 UNDERGROUNDFAACILTIES Know what's below. Call before dig. you — — — 350 — _ — — 7 C C — — _ PROPOSED TRAIL THE LOCATIONS OF EXISTING UNDERGROUND UTILTIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. t N N7 NOTICE: 345 _ 2 SLOPE FIX, CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF EXP. :1 THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER _ _ — _ _ _ _ _ _ ~ ~ y r-' }rmaeme r (TYP. P. EA. END) - • 'IK\ FILL (TYP. EA. END) SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR - + . + 339 _ SAFETY OF THE WORK. OF PERSONS ENGAGED IN THE WORK, 3 42 340 f -- / �• / •' -' OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. 339± i o — — — — 339± ~� cL -----__- 335 - HP 12X53 STEEL PILES (TYP.) ■ - CLASS II RIP RAP (TYP. EA. END) 335± + 335 - END t SENT EXISTING GROUND 2 rr CAR _ SEAL - END BENT 1 11725 SECTION ALONG C 3RIDGE 51 h �Doc•r 6Y'R, RAG V d 11Fr/. r 2/3�2oz1 — C462768DF412422.-. 223 S.WEST ST. SUI1100 SUITE raRALEIGH, NC 27603 ST E WA R T T (919)380-8750 COPYRIGHT© 2021 SEPI ENGINEERING & CONSTRUCTION, INC Arbor Middle Greenway Town Parks of and Creek Creek Holly Springs Recreation - CLASS II RIP RAP r,. (TYP. EA. END) o FILL FACE AT END BENT 1 �n o �°� .O° o jO r W.P. 1 STA. 42+38.92 -A- o! % �' � Coc o +•�o • FILL FACE AT END BENT 2 PREPARED FOR: BEGIN APPROACH SLAB *..Oo/ DO[� �n I an�Q W.P. 2 STA. 43+F1.08 -A- Town of Holly Springs STA. 42+29.92 -AE :'. a►�� D� ° • . D O�o %Q�� ° goo END APPROACH SLAB 128 S. Main Street p E 1•9�► •� — � STA. 43+70.08 -A- Holly Springs, NC 27540 = W EDGE OF PAVEMENT 1 _��i °ce- i 42+50 J f 43+00 -A- 43+50 44+00 CONSTRUCTION DRAWINGS � frE4EN i -o i REF #: 09-012 T DATE ■ EDGE OF PROJECT: 5E20.027.00 °■ PAVEMENT ASPHALT TRAIL C BRIDGE STA. ISSUE: 43+00.00 -L- 90°00'00"(TYP.) ��°°��'.� OF BRIDGE � LENGTH BRIDGE APPROACH - BRIDGE APPROACH (FILL FACE TO FILL FACE) = 122'-2" 0 o RAIL SET REVISIONS: RAIL SET DOCUMENT NOT CONSIDERED • FI\AL UNLESS ALL • SIGNATURES COvPLETED • 3RIDGE S 1 PLAN PROJ. MGR: DAVID RUGGLES. PE ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ELIZABETH PHELPS, PE NOTE: BRIDGE LENGTH INCLUDES 1 FT. WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE WIDE BACKWALL AND 1 INCH EXPANSION JOINT AT EACH END BENT. LENGTH OF PREFABRICATED BRIDGE IS 120 FT. STANDARDS AND SPECIFICATIONS 30' 15' 0 30' " S 2 41 SCALE. 1"= 30' NORTH — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Data Shared \Sent\To Stewart\SE20027 - TLB.dwg 14'-0" OMB S=PI SEPI ENGINEERING & CONSTRUCTION, INC. 5._0„ 5._Q.. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC E 600 GLENWOOD AVE. SUITE „ 1 0 ANCHOR BOLTS A5 PER BRIDGE MANUFACTURER (TYP), ANCHOR BOLTS TO BE C ANCHOR r INi ■ i i ° IN1 2'-6" * x DIMENSIONS MARKED WITH AN ASTERISK ARE TO BE ADJUSTED BYRALEIGH. STEWART ENGINEERING AFTER PREMANUFACTURED BRIDGE IS DESIGNED. DIMENSIONS, CONCRETE AND REINFORCING STEEL AC 2I PHONE l 919.789.9977 DRILLED AND GROUTED BOLTS 90 -001-00" Isepiinc.com (TYP.) QUANTITIES ARE SUBJECT TO CHANGE UNTIL AFTER SHOP DRAWINGS 12x53 PILES & •HP LL"" , - a 1 . o_ )_ '" 1 ' CD - , N ARE REVIEWED AND APPROVED. NO ADDITIONAL PAYMENT WILL BE MADE FOR ANY ADJUSTMENTS TO QUANTITIES. UPON RECEIPT OF BRIDGE SHOP DRAWINGS, CONSTRUCTION ADMINISTRATOR SHALL 811. 3WORKINGDAYS BEFORE YOU DIG C END SENT CAP 1 _____________ __"- _—_—_—_—_—_—_—_ T[ CV * OF UNDERGROUNDFACILITIES UNDERGROUNDFACILIiIES -------- ------- -� -- -1 --------------------------�F------------------ 0 --- T -� _ FORWARD DRAWINGS TO STEWART ENGINEERING AFTER WHICH Know what's below. Call Cn STEWART WILL ISSUE UPDATED BRIDGE PLANS. before you dig. - .--1 I `~ O I "y T HE LOCATIONS OFEXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE ENACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. �` _ A - `� FILL FACE NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER �� 5 -1 0 /2 * I �� 5 -1 0 V2 * SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, .41 �i i ' OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. 5._0" 2._0„ 5._0" 5._0" 2._0" 5._Q" r ►r ►r sir 24._0„ ' rpi- \ .,,c‘ 11 ..AR PLAN OF ND BENT C BRIDGE & W.P.1 1 �:�oF�55�04, 9 a SEAL r •t 11725 A �j 24'-0" I ip •••......•. GC.1 �DacuSignc -.- R• q� � S 2/3/2021 223UITS.E W1100ESTST. 5' - 0 " 2' - 0 " 5' _ 0" 5' - Q " 2' - O" ■ 51 _ Q ■■ rj LEIGH. NC S STEWART R{919 380-87507603 r 5-85 1" BARS 014-84V1 r ►Ir ►Ir OR #4V2 BARS Cal 1'-0"CTS (EA. FACE OF BACKWAL) rIlCOPYRIGHT© 2021 SEPI ENGINEERING &CONSTRUCTION, INC 12" CTS. (TYP. EA. WING EA. FACE) ~� 14-#4U1 OR #4U2 #5B9 BARS 0 1'-0" CTS. B ,_ „ 1 0 (EA. FACE) A. EL. 347.00 �•-) 2 CL. Arbor Creek _ WING) BEARING EL. H = 2" CL. r 6„ 6.. 344.08 (TYP.) LEVEL #5B8 Middle Creek • I EL. 347.00 85B7 EA. FACE TYP') EA. FACE IN EA. WING EL. 346.17 1-#5B8 EA. FACE Greenway + = ■� \5B6 EA. FACE 2 CL (TYP.) ► 1-#5B7 EA. FACE \\1_ 1 Town of Holly Springs '" I Parks and Recreation 7-#4U3 0 6" . OC ! ► 1-#5B5 EA. FACE ' • (TYP. EA. BRG.) EL. 343.96 '�,1 * _ I I I ■ 1-#5B6 EA. FACE 1 ~ `° °p ~ o -#8B1 • CONST. JT. PREPARED FOR: of Hol T� I "L" g - 1r7 — rt —T1r—i r—T+r-1 r—T1r-1 �— �� #5 BARS 8 S. Main 5tps eewn • . . ■ • . 27540 I 1'1 1 ,, 1 r1 I .I. 1 I 1 1'1 I .I. I 1 FILL FACE Holly Springs, NC •.I. I II I •I * 1 1'I 1 . • 1 1'1 I T ■ r T�~ A. 1 111 1 ■ ■ 1 111 1 ■ A - 1 111 1 ■ r�3" 111 i; 5 SPACES 111 1i! _# 4 4B3 BARS III ( 1 au) �W HIGH 3.B. u PILES 1i1 4B4 UNDER 4B3 ca Q BOTTOM OF CAP 41/2" 4" 0 8"CTS. q'• OVER ,i, OVER PILES ( 4'-0" #5B5 BARS �, `_'� CONSTRUCTION & WING EL. 340.96 * ~ �!i ~ r (TYP. EA. BAY) ~ '1 #5B2 EA. FACE jli CTS. (4 REQUIRED) EA. FACE IN WING m �= EXTEND MIN.18" Q @ w DRAWINGS 3" HIGH B.B. 0 i4'-0" CTS_ii 3" INTO CAP) Nn REF #: 09-012 2 SPACES Cal 6" r SECTION B - B DATE (TYP. EA. END) I l B PROJECT: SE2C.027.00 #551 n552 ISSUE: 18 - & STIRRUPS SPACED A5 SHOWN TYPICAL FOR BOTH WINGS 2._0.' 5._0" 5•_Q" 2._0" t 12 X 53 STEEL PILES REVISIONS: F F tr DOCUMEJT NOT CONSIDERED A FINAL UNLESS ALL SIGNATURES COvPLETED ELEVATION OF END BENT 1 FOR CROSS SECTION A -A, SEE SHEET 5-5 PROJ.MGR: DAVID RUGGLES, PE ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ELIZABETH PHELPS, PE CONCRETE COLLARS FOR STEEL PILES NOT SHOWN IN PLAN AND ELEVATION VIEWS FOR CLARITY. WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE SEE "CORROSION PROTECTION FOR STEEL PILES DETAIL", SHEET 5-5. STANDARDS AND SPECIFICATIONS S 3 3RIDGE 51 30' 15' 0 30' SCALE: 1"=30' NORTH — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Data Shared \Sent\To Stewart\SE20027 - TLB.dwg SEP! BRIDGE , C & ll P. 2 41 _ 0 " SEPI ENGINEERING &CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC 1 CHARLESTON, SC ._ .. 5x 2'-0" 5._0.. 5._0.. 2'-0" 5._0.. D DIMENSIONS MARKED WITH AN ASTERISK ARE TO BE ADJUSTED BY 1 GLENWOOD AVE. I SUITE600 RALEIGH. NC 27603 F Al ~~ ~1~ IF 5'-101/z" 5'-101/z" MI IF 41 IM STEWART ENGINEERING AFTER PREMANUFACTURED BRIDGE I5 DESIGNED. DIMENSIONS CONCRETE AND REINFORCING STEEL PHONE 1919,789.9977 QUANTITIES ARE SUBJECT TO CHANGE UNTIL AFTER SHOP DRAWINGS sepiinc.com FILL FACE ARE REVIEWED AND APPROVED. NO ADDITIONAL PAYMENT WILL BE MADE FOR ANY ADJUSTMENTS TO QUANTITIES. UPON RECEIPT OF 811 m 3 WORKING DAYS tD I *l +N - 0 +' •--I a T l BRIDGE SHOP DRAWINGS, CONSTRUCTION ADMINISTRATOR SHALL FORWARD DRAWINGS TO STEWART ENGINEERING AFTER WHICH BEFORE YOU DIG FOR THE LOCAT ON OF Know what's below NDERGROUNOFACILITIES r— 1 a + STEWART WILL ISSUE UPDATED BRIDGE PLANS. Call before you dig. 0 THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN pp__mayy HP 12x53 PILES ___-___-___-___-__ .--.-___ ___� 1 .--i APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE CX-'-'-'-'-'-'- j' END BENT LAP I -'-'1'-'-'-'-'-'-'-'-"+• Q c - I N - -'- I O ' +' OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE ENACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. T� NOTICE: 1" 0 ANCHOR BOLTS AS PER CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF I THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER BRIDGE MANUFACTURER 1 (TYP) ■ 9 0 ° - 0 0' - Q 0" I 2' — 6" * SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR ANCHOR BOLTS TO BE C ANCHOR i (TYP.) SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. DRILLED AND GROUTED BOLTS L i 5._0" i 5._o" 'i'p. 14'-0" - Ir - PLAN OF END BENT 2 ock,,,CAR°••�. : SEAL m 1 11725 24'_0.. r— A 9G'•• NG I NE I4 •••.....••. v� R . —DocuSlgned e: /3/2021 � c:•z raura • z•zz. . 223UITS.E W1100ESTST. lJ 5'-0" 2'-0" V 5'_0" 5'_0" 2►_O" ■ 5._0" `� V r® S RALEIGH. NC 27603 T 919380-8750 STEWART { t _ ■ " 5 5 t BARS [� 14 - 1� 4V1 # ' - 0R 4V2 BARS Cal 1 0 I.. CTS [EA. FACE OF BACKWALL) COPYRIGHT©2U21 SEPI ENGINEERING & CONSTRUCTION. INC 12" CTS. (TYP. EA. WING EA. FACE) ~� 14-#4U1 OR #4U2 #5B9 BARS 0 1'-0" CTS. _ 0„ (EA. FACE) EL. 347.00 �•� z CL. Arbor Creek _ (EA. WING) BEARING EL. H CL. 6.. 6., 344.08 (TYP.) LEVEL #5B8 Middle Creek • I EL. 347.00 85B7 EA. FACE \TYP.) EA. FACE IN EA. WING EL. 346.17 1-#5g8 EA. FACE + = ■� \5B6 EA. FACE 2 CLGreenway (TYP.) T 1-#5B7 EA. FACE Town of Holly Springs '" �l Parks and Recreation 1 7 #4U3 ( 6"O.C. ! CT] ' ► 1-#5B5 EA. FACE _ 'N m �_� [TYP. EA. BRG.) I EL. 343.96 =N► * ■ 1-#5136 EA. FACE F• 1 o :N f ,"Kro ~ 4-#8B1 i ■ CONST. JT. PREPARED FOR: Town of Holly Springs ' 1 "L" '� r-Tr->I r-T+r-I r-Tir-1 �- �— #5 BARS 128 S. Main Street • ■ • ■ • ■ 27540 1.1 .I. 1 I 1 r1FILL I .I. I I .I. I FACE Holly Springs, NC • I 1.1 1 * ,, 1 1.1 1 � � 1 1.1 I T ■ r TA 1 11,1 11 1 A • 1 III 1 A 1 III I A'1 111 .1 5 SPACES III 1i! 4_# 4B3 BARS 111 1;1 (lam # # , a �W 3"HIGH 3.B. u PILES 464 UNDER 4B3 02 'A Q BOTTOM OF CAP 4%2" 4" ~ 0 8"CTS. 4" OVER :I; OVER PILES 0 4'-0" 85B5 BARS �, `_-'Li_ CONSTRUCTION IN & WING EL. 340.96 * II: r [TYP. EA. BAY) '1 #562 EA. FACE iji CTS, �4 REQUIRED) EA. FACE IN WING m Lo �_ e— (EXTEND MIN. 18" Q @ w DRAWINGS 3" HIGH B.B. Cal 4'-0" CTS 3" INTO CAP) r REF #: 09-012 2 SPACES 0 6" E �� I 1 SECTION B —B DATE (TYP. EA. END) i � Bl PROJECT: SE2CO27.00 #5S1 8552 I ISSUE: 18 - & STIRRUPS SPACED A5 SHOWN TYPICAL FOR BOTH WINGS 2'-0" 5._0" 5._0i 2,_0„ 12 X 53 STEEL PILES REVISIONS: F F ` DOCUMEJT NOT CONSIDERED A FINAL UNLESS ALL SIGNATURES COvPLETED ELEVATION OF END BENT 2 FOR CROSS SECTION A -A, SEE SHEET 5-5 PROJ.MGR: DAVID RUGGLES, PE ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ELIZABETH PHELPS, PE CONCRETE COLLARS FOR STEEL PILES NOT SHOWN IN PLAN AND ELEVATION VIEWS FOR CLARITY. WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE SEE "CORR05ION PROTECTION FOR STEEL PILES DETAIL", SHEET S-5. STANDARDS AND SPECIFICATIONS S 4 3RIDGE 51 30' 15' 0 30' SCALE: 1"=30' NORTH — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenwa"LID \Data Shared\Sent\To Stewart\SE20027 - TLB.dwg 0 3A TYPES BILL OF IVATEPIAL NOTES: ❑ 0 STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO CLEAR ANCHOR BOLTS. ° O TO Ig F V f� ONE END BENT S.?! 5�I2 2'_8. 5�Iz —I) 3AP NO° SIZE TYPE LENGTH WEIC�HT THE TOP SURFACE OF THE CAP EXCEPT THE BRIDGE SEAT BUILDUPS SHALL BE .I��. 1 SEPIENGINEERINGBCONSTRUCTION,INC. HK. HK° SLOPED TRANSVERSELY FROM THE BACKWALL TO EDGE OF CAP AT THE RATE OF 2%° B1 8 #8 1 15'-6" 331 TOARI CHARLOTTE RALEIGHEI �I�I� SC SC **ELEVATIONS BETWEEN BRIDGE SEAT BUILDUPS ARE SHOWN AT THIS POINT° : 3ACK GOUGE __ 1 ,I DETAIL A a� Lii"ii13 „B HK° HK° 6 #4 ST 13'-8" 51 GLENWOOD AVE. SUITE 60U THE TOP SURFACES OF ALL END BENT CAPS SHOULD RECEIVE EPDXY PROTECTIVE 45° -8 11 B3 4 #4 STD 13'-8" 37 RALEIGH,NC27603 F 41 F 4 COATING° A PILE V E T I C A L B4 a #4 STR �'-8" PHONE 1919.789.9977 ANCHOR BOLTS SHALL BE SET BY DRILLING HOLES AND GROUTING AFTER THE CAP HAS B5 ' 45 STR 6'-4" 79 sepiinc.com BEEN POURED AND CURED. EMBEDMENT DEPTH OF ANCHORS SHALL BE AT LEAST 15 INCHES.WHEN PLACING MAIN CAP STEEL, ENSURE THAT FUTURE DRILLING FOR ANCHOR DETAIL o A ' B6 L #� STR 23'-8" 99 BOLTS WILL BE AT LEAST ONE INCH CLEAR FROM EDGE OF REINFORCING BAR. • = _ 1 3 LAP B72 45 STR 20'-10" 43 POSITION OF PILE DURING WELDING. NO ADDITIONAL PAYMENT IS MADE FOR REINFORCING STEEL OR CONCRETE. THE ENTIRE 1 / B8 4 45 STR 5'-O" 21 81t 3WORKING DAYS COST OF THIS WORK TO BE INCLUDED WITH THE PAY ITEM "12O' BRIDGE 600 10 ° 39 4 #5 STR 1'-9" 7 BEFORE YOU DIG -O° - 1 FOR THE LOCATION OF ION OF SUBSTRUCTURE". UNDERGROUND BACK GOUGE : Know what's below FOR RILES, SEE SECTION 450 OF THE STANDARD SPECIFICATIONS (2018). ,-----16/ DETAIL B S1 8 #5 3 8'-10" 166 Call before you dig. o 1191 THE SUBSTRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH THE LATEST AASHTO , , .J S2 #5 3'-7il 67 THE LOCATIONS OF EXISTING UNDERGROUND UTILRIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE N NG UTILITIES BEFORE WORK, AND ALL SIBLE GUIDE SPECIFICATIONS FOR DESIGN O F PEDESTRIAN BRIDGES. ['NG 5 3 # 4 r 6' — " 2 6 AGREES TO BE FEXACT ULLY RESPONSIBLE RESPONFOR ANY AND ALLDAMAGESWHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. PILES SHALL BE DRIVEN TO A MINIMUM CAPACITY OF GO TONS.REFER TO Mitt NOTICE: GEOTECHNICAL ENGINEERING REPORT FOR ARBOR CREEK GREENWAY DATED APRIL 9, 20z1° 0" TO ��8" U1 4 #4 6 6'-2" 16 CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF ���r_ THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER 0 21-8 .� 1 _ 8 " LJ 1 O # 4 , _ ,� O SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK. OF PERSONS ENGAGED IN THE WORK, I— U 3 14 # 4 r, 5' - 8 " 5 3 OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. PILE HORIZONTAL i U1 & U2 8" DETAIL 3 OR VERTICAL U3 `'-8" L1 4 45 STR 4'-5" 18 .4 45 L2 4 STR 4'-8" 19 Ir ■ 1 L3 4 45 STR 4'-11" 21 .H CARo PILE SPLICE DETAILS ,,. = =D L4 4 45 STR 5'-2" 2? ��;pF�551❑,% 1 16 L5 4 45 STR 5'-6" 23 _ a SEAL r 1'-0„ 1'- - 11725 - 1 T � T 9'• F �`' BOTTOM OF .■ ■■ ~ V1 8 44 STR 4'-10" ��: ��': ...................G� V2 20 4 STR 4 -1 55 /D APPROACH SLAB �. , TYP.) E r 6y 41/�� 5 * ANTICIPATED LOCATION OF �DocuSignca --- /3/2021 1" 0 ANCHOR BOLTS REINFORCING STEEL 1221 L35° �s I SEE NOTES ON 5-3 AND 5-4 ALL BAR DIMENSIONS ARE OUT TO OIJT. TOTAL CLASS A CONCRETE 8°5 C.Y. �C462768DF412422.-. 223 S. WEST ST. 1 ra SUITE110NC HP 12 X 53 STEEL PILES 1 *5B7 27603 (EA. FACE) END BENT 41 NO: 3 LIN. FT°= 105 STEWART T(919)380-8750 Q END BENT # 2 NO: 3 N. FT°= 105 LIN SEPI ENGINEERING & CONSTRUCTION, INC 2'-21/2" (POUI @ Arbor Creek - #5B6 SEE NOTES (EA. FACE) #4 "V" (n w U - - Middle Creek BARS Cal 1'-0" CTS° #4 "U" BARS 2 1'-0" CIS. ► �' #4U3 2 6"CTS° reenway #5B6 • (" T " CL° (TYP• Cal BRG.) I --I (EA. FACE) T r r #5 52 I �, Town of Holly Springs Parks and Recreation -•►►,. •,►►•• I .,►►•- .►►•- 444 B3 2 4" CTS. #4 OVER PILES B2 (EA. FACE) 4 34 �� .-__-,,_- ._-_-�_. H ■� ♦ if �t -0" (POUR 1) #4 o (':0'. #q 531 ■ ■ ■ 1 Si tCONCRETE—) PREPARED FOR: #q t ► Town of Holly Springs B2 (EA. FACE) ga _ _ z„: ' ir ■ LI'D'i COLLAR BOTTOM OF CAP 128 S. Main Street *_ 'n"'� % i — — ■`, PILES & ■�� — — Holly Springs, NC 27540 -- ,'■ .' ,!■ 1 . - .._', CONCRETE COLLARS CONCRETE IY] _ 1 #4 B2 (EA. FACE) ,c/ 1 a ► I II\ Ir-) FILL FACE 4.� - T I _1 CONSTRUCTION ' �- - #8B1 _.►►,_ _.,►,� �� _.►►._ _.►►,_ �' - #8B1 1 � FILL FACE '� DRAWINGS 2 �,,,, ,,,,- ,,,,- ,� 2 2'-0" 0 CONCRETE COLLAR C HP 12 X 53 REF #: 09-012 ■ J r T ■ ■ (TYP. EACH PILE) STEEL PILE DATE _ 2 -O„ PROJECT: 5E20.027.00 y F ISSUE: 8" 8" PLAN ELEVATION - - 3" HIGH B.B. �� ~ - COOSIO\ PROTECTION FCR STEEL PILES DETAIL CHP12X53 1 .3/2/Z4Z4 STEEL PILE (END BENT No. 1 SHOWN, END BENT No. 2 SIMILAR 3Y ROTATION) REVISIONS: 1._6.' 1,_6„ - - �� DOCUMENT NOT CONSIDERED • FI\AL UNLESS ALL • 3'-0" SIGNATURES COvPLETED • SECTION A-4 PROJ. MGR: DAVIDRUGGLES.PE ALL CONSTRUCTION SHALL BE IN ACCORDANCE 3RIDGE 5 DRAWN BY: ELIZABETH PHELPS, PE (CONCRETE COLLAR NOT SHOWN FOR CLARITY° 1 WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE SEE "CORROSION PROTECTION FOR STEEL PILES DETAIL°") STANDARDS AND SPECIFICATIONS 30' 15' 0 30.01 0'" 4 - 5 SCALE. 1"= 30' NORTH — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Data Shared \Sent\To Stewart\SE20027 - TLB.dwg NOTES: 1■ ASSUMED LIVE LOAD = 90psf AS PER AASHTO LRFD GUIDE SPECIFICATIONS FOR DESIGN OF PEDESTRIAN BRIDGES,2nd EDITION. 2. THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE WITH THE AASHTO LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES 2ND EDITION. (AASHTO H5 S --- P I SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH.NC29 603 PHONE I 919,789.99.9977 HONE sepiinc.com LOADING INCLUDING AMBULANCES AND OTHER VEHICLES/EQUIPMENT UP TO 10,000 LB.) 3. CONTRACTOR SHALL LOCATE ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO CONSTRUCTION. ALL UTILITIES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. ANY UTILITIES DAMAGED DURING CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR. 811 m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. C a II before you dig. C TRAIL -X-4. FOR EROSION CONTROL MEASURES, SEE EROSION CONTROL PLANS. h 5. FOR SUBMITTAL WORKING, SPECIALSEE V SHOWN IN AN THE LOCATIONS OFEXISTING NLYA ANDOTBEEN INDEPENDENTLY APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE Emu LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT ■ BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND 4'-0" MINIMUM RAILING 10'-D" M N■ CL AR WIDTH PRESERVE ANY AND ALL UNDERGROUND UTILITIES. NOTICE: 6. FOR FALSEWORK AND FORMWORK. SEE SPECIAL PROVISIONS■ 5'-0" 5'-O" PREMANUFACTURED PEDESTRIAN CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF BRIDGE THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER No( Vris �A wit ION. C 4� 7. FOR CRANE SAFETY, SEE SPECIAL PROVISIONS. SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. a REINFORCED a GRADE 3 POINT a r 0.01 ,. CONCRETE DECK C E ` c c 0.01 E 8. FOR GROUT FOR STRUCTURES, SEE SPECIAL PROVISIONS. 9. FOR PREMANUFACTURED PEDESTRIAN BRIDGE 51,5EE SPECIAL PROVISIONS. FABRICATOR PREMANUFACTURED PEDESTRIAN INDICATE THE ,� FARO 10. OF BRIDGE 51 SHALL LOCATION tN P • P • P IA . P ❑ • P . P ❑ . P . P - ❑ • OF DRAINAGE HOLES FOR THE BRIDGE TUBULAR MEMBERS IN THE SHOP DRAWINGS■ 0. 0.55/0 • 4/ 11. CONCRETE DECKS SHALL BE CLASS AA CONCRETE AND ADHERE TO NCDOT SPECIFICATIONS. te _ � SEAL r•: 11725 1 • 12. BRIDGE LOADINGS ARE ESTIMATED. AFTER SHOP DRAWINGS FOR THE PREMANUFACTURED PEDESTRIAN BRIDGE ARE SUBMITTED, THE ENGINEER OF RECORD WILL CHECK THE END BENTS FOR ACTUAL BRIDGE LOADINGS. SHOP DRAWINGS SHALL BE FORWARDED TO ENGINEER OF yG.FNO1��`�; /o' • R...�ci(I �pacu5igned6. RECORD UPON RECEIPT■ 44 S /3/2021 � • 13. THE PROJECT CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE NCDOT STANDARD FOR TYPICAL SECTION ROADS AND STRUCTURES, JANUARY 2018. ALL MATERIALS MUST MEET THE REQUIREMENTS OF PREMANUFACTURED PEDESTRIAN BRIDGE THE STANDARD SPECIFICATIONS OR SHALL BE NCDOT-APPROVED. c:•r:z raura z•zz. . 2WEST ST. rJ 23S.RALEIG7E0a RALEIGH. NC 27603 S T E WART T(919)380-8750 BRIDGE NO. CHAIN BEGIN STATION END STATION 14■ FOR APPROACH RAILS, SEE SPECIAL PROVISIONS■ BRIDGE LENGTH COPYRIGHT ©2021 SEPI ENGINEERING &CONSTRUCTION. INC S2 -X- 16+55.42 17+93.58 125' 15. FOR REINFORCED CONCRETE DECK SLAB, SEE SPECIAL PROVISIONS■ 16. FOR CONSTRUCTION OF SUBSTRUCTURE, SEE SPECIAL PROVISIONS. NOTE: BEGIN STATION AND END STATION INCLUDE ONE FT 17. FOR CONCRETE APPROACH SLAB, SEE SPECIAL PROVISIONS. WIDE BACKWALL AND 1 INCH EXPANSION JOINT AT EACH END. 18. FOR OTHER DESIGN DATA AND GENERAL NOTES, SEE SHEET SN. Arbor Middle Greenway Town Parks PREPARED Town 128 Holly Springs, of and of S. Creek Creek Holly Springs Recreation FOR: Holly Springs Main Street NC 27540 - CONSTRUCTION DRAWINGS REF #: 09-012 DATE PROJECT: SE2C.027.00 ISSUE: TYPICAL SECTION AND GENERAL NOTES FOR BRIDGE 2 REVISIONS: DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COvPLETED PALL DAVIDRHPHELPSPE CONSTRUCTION SHALL BE IN ACCORDANCE DRAJWN BY: DRAWN BY: ELI2ABETH PHELPS, PE WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE STANDARDS AND SPECIFICATIONS S 6 30' 15' 0 30' SCALE: 1"=30' NORTH — X:\2020\SE20.027.D0 ToHS - Arbor Creek Greenway\LD\Data Shared\Sent\To Stewart\SE20027 - TLB.dwg 16+50 17+00 -X- P 0 F I L E 17+50 DATA 18+00 18+50 s ip p I SEPI ENGINEERING & CONSTRUCTION, INC. VPI STATION ELEVATION GRADE IN Z GRADE OUT I. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 16+67.50 335.75 -1.0000 -1.0000 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 FILL FACE AT END BENT 1 17+92.50 334.50 -1.0000 -1.0000 PHONE 1919.789.9977 W.P. 1 STA. 16+66.42 -X- FACE AT END BENT 2 GRADE POINT ELEV. 335.76 END APPROACH SLAB .4FILL W.P. 2 STA. 17+93.58 -X- GRADE POINT ELEV. 334.49 sepiinc.com PREMANUFACTURED APPROACH RAIL SET STA.16+57.42 -X- GRADE POINT ELEV. = 335.85 PEDESTRIAN BRIDGE 1'-0" BERM (TYP.) END APPROACH SLAB 811. (TYP. EA. END) 3WORKING DAYS STA. 18+02.58 -X- GRADE POINT ELEV. - 334.40 BEFORE YOU DIG FDROR R0UNDFAE NpF UNDERGROUND FACILITIES 340 Know what's below. Call before you dig. _ - -1 I' 7- Ell C �i= = [PROPOSED TRAIL THE LOCATIONS OF EXISTING UNDERGROUND UTILRIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR OM ENCING WE ORK, E%ACi LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND — 335 ` - �I AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE i0 EXACTLY LOCATE AND X P EXP. PRESERVE ANY AND ALL UNDERGROUND UTILITIES. - . C/, 100 YR. WSEL. 329.40 FIX. T NOTICE: 330 gib �i C] 2:1 SLOPE ■' 1 CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF — •.�•�O■ 327 ± - (TYP. EA. END) ;+ �•! FILL (TYP. EA. END) THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER — — * ■/ •sue.: 326 ± ♦ • %s •J�! +�-• •■�' .../— 1 SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, — ►� �! -- ■� +r OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. HP 12X53 STEEL PILES _ �TYP.I 320 L__o _I EL323± tiv _Q .� EXISTING GROUND - - END r(-) SENT 1 1— CLASS II RIP RAP (TYP. EA. END) END BENT• -N CAR° _; . 5510,4/ y SEAL r' SECTION ALONG C 3RIDGE 52 �DocuSignc=- V �C462768DF452422 1,0 I. �s 11725 R ......... ciCi _• 1+ 2/3/2021 223 S.WEST ST. SUI1700 rola SUITE RALEIGH, NC 27603 ST E WA R T T (919)380-8750 COPYRIGHT© 2021 SEPI ENGINEERING 8, CONSTRUCTION, INC Arbor Middle Greenway Creek Creek - CLASS II RIP RAP -•� Town of Holly Springs FILL FACE AT END BENT 1 ��O�oO (TYP. EA. END7 D p o 0° Parks and Recreation W.P. 1 STA. 16+66.42 -X- ;o�� O� o a �, Q° Da Qo FILL FACE AT END BENT 2 BEGIN APPROACH SLAB �•�, oOQ� W.P. 2 STA. 17+93.58 -X- STA. 16+57.42 -X- �, °�1 Oo END APPROACH SLAB _ _ oo� 0° • STA.18+02.58 -X- f PREPARED FOR: 1 41 0r Town of Holly Springs �pG E �F EMEN p P� 16 50 Am i 17+00 al w U 17+50 1' -x- I VEENr ASPHALT TRAIL 18+00 ,. 128 S. Main Street Holly Springs, NC 27540 c 0 1 oT I 1 of ED MEND FPv� 00 - I 90 ° 00'00" (TYP.) BRIDGE STA. 17+30 -X- - p of =VEMEN7- CONSTRUCTION DRAWINGS REF #: 09-012 orN jO LENGTH OF BRIDGE • ��Qo (FILL FACE TO FILL FACE) = 127'-2" ~ BRIDGE APPROACHDATE PROJECT: SE2Co2�-ao BRIDGE APPROACH — RAIL SET /a� n0� RAIL SET `C5 n r oo Doh oo o o REVISIONS: DOCUMENT NOT CONSIDERED FI\AL UNLESS ALL 3RIDGE S2 PLAN SIGNATURES COvPLETED NOTE:BRIDGE LENGTH INCLUDES ONE FT WIDE BACKWALL AND 1 INCH EXPANSION JOIN AT EACH PROJ.MGR: DAVID RUGGLES, PE END. LENGTH OF PREFABRICATED BRIDGE IS 125 FT. ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ELIZABETH PHELPS,PE WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE STANDARDS AND SPECIFICATIONS 30' 15' 0 30' S 7 414 SCALE: 1"=30' NORTH — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Data Shared \Sent\To Stewart\SE20027 - TLB.dwg 14'-0" ... S = P I SEPI ENGINEERING & CONSTRUCTION, INC. 5._0„ 5._0" RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC GLENWOOD AVE. SUITE 600 1., 0ANCHOR BOLTS AS PER BRIDGE MANUFACTURER (TYP). ANCHOR BOLTS TO BE C ANCHOR r IN ■ i i ° IN 2'-6" * x DIMENSIONS MARKED WITH AN ASTERISK ARE TO BE ADJUSTED BY STEWART ENGINEERING AFTER PREMANUFACTURED BRIDGE IS DESIGNED. DIMENSIONS, CONCRETE AND REINFORCING STEEL 2I RALEIGH. PHONE l 919.789.9977 DRILLED AND GROUTED BOLTS 90 -00'-00" Isepiinc.com (TYP.) QUANTITIES ARE SUBJECT TO CHANGE UNTIL AFTER SHOP DRAWINGS HP 12x53 PILES &miwaria ",___ "I - a ________________ ' • '" 1 • CO - .--1 o .2 N ARE REVIEWED AND APPROVED. NO ADDITIONAL PAYMENT WILL BE MADE FOR ANY ADJUSTMENTS TO QUANTITIES. UPON RECEIPT OF SHOP DRAWINGS, CONSTRUCTION ADMINISTRATOR SHALL 811. 3WORKING DAYS BEFORE YOU DIG C END SENT CAP -H- -- _____________ __" I--_ O fOCATIPNOF UNDDERGRERGR OUND FACILITIES —1 _ — 0 T —_ _ FORWARD DRAWINGS TO STEWART ENGINEERING AFTER WHICH Know what's below. Call STEWART WILL ISSUE UPDATED BRIDGE PLANS. before you dig. - .--1 I `~ O I "y T OF HE LOCATIONS EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE ENACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. _ X _ FILL FACE NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER - "6 " i, - SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, IP i ' OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. 5'-0" 2._0„ 5'-O" 5'-0" 2._0" 5'-0" r ► r ►Ir sir 24'-0" r r r r \ iv sk,..... PLAN OF END BENT C BRIDGE & W.P. 1 1 �0• /0.ssioy;/ :•�° A.SEAL r •' 11725 i,0 • ......... ... R� (ICI A1 24'-0„ lDacuSignc s" /3/2021 ' 223ESTST. W1100 5'-0" 2'-0" 5'-0" 5'-0" 2►-0" ■ 5._0" rSUITS.E RALEIGH. STEWART 919380-8750760 3 r 5-85 't" BARS 0 r ►Ir 14-84V1 ►Ir OR 84V2 BARS Cal 1'-0" CTS (EA. FACE OF BACKWALL) r r r COPYRIGHT© 2021 SEPI ENGINEERING &CONSTRUCTION, INC 12" CTS. (TYP. EA. WING EA. FACE) ~� 14-#4U1 OR #4U2 #5B9 BARS 0 1'-0" CTS. B 1 , _0„ (EA. FACE) EL. 335.76 (•) „ 2 CL. Arbor Creek _ (EA. WING) BEARING EL. CL. H = 6„ 6.. 332.85 (TYP.) LEVEL #5B8 Middle Creek • I EL. 335.76 85B7 EA. FACE (TYP.) EA. FACE IN EA. WING EL. 334.93 1-#5B8 EA. FACE Greenway + = EA. FACE 2 CL Cl- Nff5B6 (TYP.) ► 1-#5B7 EA. FACE 1 Town of Holly Springs '" I Parks and Recreation 7-#4U3 ( 6" 0.C ! ► 1-#5B5 EA. FACE '�, � (TYP. EA. BRG.) EL. 332.72\i_ '�,1 - _ I I I ■ 1-#5B6 EA• FACE i ~ `° °p ~ o -#8B1 CONST. JT. PREPARED FOR: of Holn T� I "L" - '� — rt -Tir->I r-Tir-I r-Tir-1 .4- �� #5 BARS 5tps eeSring aiwn 8 S. Mainly • ■ • ■ • ■ 27540 I I'I IiI 1 1• r1 I III I 1 III I III 1 FILL FACE Holly Springs, NC I II I * 1 I'I 1 • • I III T ■ r T�~ A I III I■ ■ I III I■ A - 1 III 1■ r73" III i; 5 SPACES III el 4_84B3 BARS III " ( 1 a W HIGH 3.B. � PILES 4B4 UNDER 4B3 m Q BOTTOM OF CAP 41/2" 4" 08"CTS. q'• OVER m OVER PILES ( 4'-0" 85B5 BARS in_` � ' CONSTRUCTION & WING EL. 329.72 * ~ i!l (TYP. EA. BAY) '1 #5B2 EA. FACE )i CTS. (4 REQUIRED) EA. FACE IN WING co c\J_ (EXTEND MIN. 18" Q @ w DRAWINGS 3" HIGH B.B. ( i4'-0" CTS 3" INTO CAP) I� REF #: 09-012 2 SPACES Cal 6" r SECTION B - B DATE (TYP. EA. END) l B PROJECT: SE2C.027.00 #551 8552 ISSUE: 18 - & STIRRUPS SPACED A5 SHOWN TYPICAL FOR BOTH WINGS 2._0., 5._0" 5._0" 2._0" 12 X 53 STEEL PILES REVISIONS: F F � DOCUMEJT NOT CONSIDERED A FINAL UNLESS ALL SIGNATURES COvPLETED ELEVATION OF END BENT 1 FOR CROSS SECTION A -A, SEE SHEET 5-5 PROJ.MGR: DAVID RUGGLES, PE ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ELIZABETH PHELPS, PE CONCRETE COLLARS FOR STEEL PILES NOT SHOWN IN PLAN AND ELEVATION VIEWS FOR CLARITY. WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE SEE "CORROSION PROTECTION FOR STEEL PILES DETAIL", SHEET 5-5. STANDARDS AND SPECIFICATIONS S 8 3RIDGE 52 30' 15' 0 30' SCALE: 1"=30' NORTH — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Data Shared \Sent\To Stewart\SE20027 - TLB.dwg SEP! BRIDGE , c & ll P. 2 4 ' _ 0.. SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC 1 CHARLESTON, SC ._ .. 5x 2._0.. 5._0.. 5._0.. 2._0.. 5._0.. D DIMENSIONS MARKED WITH AN ASTERISK ARE TO BE ADJUSTED BY 1 GLENWOOD AVE. I SUITE600 RALEIGH. NC 27603 F Al ~~ ~1~ * 6 -� ' 6 -��� STEWART ENGINEERING AFTER PREMANUFACTURED BRIDGE I5 DESIGNED. DIMENSIONS CONCRETE AND REINFORCING STEEL PHONE 1919,789.9977 -i• - QUANTITIES ARE SUBJECT TO CHANGE UNTIL AFTER SHOP DRAWINGS sepiinc.com FILL FACE ARE REVIEWED AND APPROVED. NO ADDITIONAL PAYMENT WILL BE MADE FOR ANY ADJUSTMENTS TO QUANTITIES. UPON RECEIPT OF 811 m 3 WORKING DAYS tD I1.'''.•--i *l +• N - 0 -' a T l BRIDGE SHOP DRAWINGS, CONSTRUCTION ADMINISTRATOR SHALL FORWARD DRAWINGS TO STEWART ENGINEERING AFTER WHICH BEFORE YOU DIG FOR THE LOCAT ON OF Know what's below NDERGROUNOFACILITIES -t '; a - STEWART WILL ISSUE UPDATED BRIDGE PLANS. Call before you dig. 0 THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN HP 1 5 3 PILES & _ _ _ _ _ — _ _ _ — _ _ _ — _ _ _ — _ _ -• i'_—' _ 1 _ - ' APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE x j'1 END BENT LAP —' — —' _ c —_' —' —' —' —' —' —' — - - Q c — i N — " —' - — -r - I O + OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE ENACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. T� NOTICE: 1" 0 ANCHOR BOLTS AS PER CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER BRIDGE MANUFACTURER 1 (TYP). 90° _D0._04" I 2'-6" * SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR ANCHOR BOLTS TO BE C ANCHOR i (TYP.) SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. DRILLED AND GROUTED BOLTS L 5._0.. i 5._0" rota 14'-0" ow CA.•R1`/. PLAN OF END BENT 2 �.H.• =a 0FE551p / scr SEAL r ' 11725 • 24'_0.. A,-0acuSigned r- i4 R. v ......... r_C3 by ++ - /3/2021 223ESTST. W1100 5'-0" lJ 2'-0�� 5._0" V 5'_0" 2►_0" ■ 5._0" `� V nil SUITS.E RALEIGH. NC 27603 T 919380-8750 STEWART { t _ ■ " 5 5 t BARS [� 14 - .41 4V1 # ' - OR 4V2 BARS Cal 1 0 I.. CTS [EA. FACE OF BACKWALL) COPYRIGHT©2U21 SEPI ENGINEERING & CONSTRUCTION. INC 12" CTS. (TYP. EA. WING EA. FACE) ~� 14-#4U1 OR #4U2 #5B9 BARS 0 1'-O" CTS. B _ 0„ (EA. FACE) A. EL. 334.4 �•� „ 2 CL. Arbor Creek - WING) BEARING EL. H CL. �. 6.. 6.. 331.58 (TYP.) LEVEL #5B8 Middle Creek • I EL. 334.49 85B7 EA. FACE (TYP.) EA. FACE IN EA. WING EL. 333.66 1—#5g8 EA. FACE Greenway + = ■� \5B6 EA. FACE 2 CL (TYP.) T 1-#5B7 EA. FACE Town of Holly Springs '" I �l Parks and Recreation 1 #4U3 0 6"O.C. ! CT] '► 1-#5B5 EA. FACE _ 'N In[TYP. �_ EA. BRG.) EL. 331.45 =N► * ■ 1-#5B6 EA. FACE • � 1 o I zN f ~ o 4-#8B1 ■6 CONST. JT• PREPARED FOR: Town of Holly Springs ' 1 "L" '� r-Tir->I r-T+r-I r-Tir-1 �- �— #5 BARS 128 S. Main Street • . • ■ • . 27540 ICI .I. I I ,, 1 rI I .I. 1 I 1 II I .I. I 1 FILL FACE Holly Springs, NC • I 1' I 1 • 1 I' I 1 . • 1 1' 1 I T ■ r TA I III I JI I III I JI I III 1 1 JI. 11 III I; 5 SPACES III Ii! _# 4 4B3 BARS III (l- 1 # # Q'A �W 3" HIGH 3•B• u PILES 1i1 464 UNDER 4B3 m Q BOTTOM OF CAP 41/2" 4" ~ [7 8"CTS. 4" OVER :I; OVER PILES ( 4'-0" #5B5 BARS �, `_'1� CONSTRUCTION IP & WING EL. 328.45 * 'I' r [TYP. EA. BAY) '1 #562 EA. FACE _ji; CTS, (4 REQUIRED) EA. FACE IN WING m �_ `-' (EXTEND MIN. 18" a w DRAWINGS 3"HIGH B.B. Cal 4'-O" CT5 3" INTO CAP) REF #: 09-012 2 SPACES Cal 6„ I SECTION B-� DATE (TYP. EA. END) i 0 B � PROJECT: SE2C 027.00 #5S1 8552 I ISSUE: 18 - & STIRRUPS SPACED A5 SHOWN TYPICAL FOR BOTH WINGS 2'-0" 5._0" 5._0i 2,_0„ 12 X 53 STEEL PILES REVISIONS: F F ` DOCUMEJT NOT CONSIDERED A FINAL UNLESS ALL SIGNATURES CDvPLETED ELEVATION OF END BENT 2 FOR CROSS SECTION A -A, SEE SHEET 5-5 PROJ.MGR: DAVID RUGGLES, PE ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ELIZABETH PHELPS, PE CONCRETE COLLARS FOR STEEL PILES NOT SHOWN IN PLAN AND ELEVATION VIEWS FOR CLARITY. WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE SEE "CORROSION PROTECTION FOR STEEL PILES DETAIL", SHEET S-5. STANDARDS AND SPECIFICATIONS S 9 3RIDGE 52 30' 15' 0 30' SCALE: 1"=30' NORTH — X:\2020\SE20.027.D0 ToHS - Arbor Creek Greenway\LD\Data Shared\Sent\To Stewart\SE20027 - TLB.dwg ° 3A TYPES SILL OF MATERIAL NOTES: ❑ 0 STIRRUPS IN CAP MAY BE SHIFTED AS NECESSARY TO CLEAR ANCHOR BOLTS. II o C TO /g FOR V N E END BENT --) 5I2 -8 4 I2: 3AR NO. SIZE TYPE LENGTH WEIGHT THE TOP SURFACE OF THE CAP EXCEPT THE BRIDGE SEAT BUILDUPS SHALL BE SEPIENGINEERINGiCONSTRUCTION,INC. HK. HK° SLOPED TRANSVERSELY FROM THE BACKWALL TO EDGE OF CAP AT THE RATE OF 2%. B1 8 # 8 1 ,_ .. 15 6 331 RALEIGH 1 WILMINGTON 1 CHARLOTTE �I�I� BEAUFORT,SC 1 CHARLESTON,SC **ELEVATIONS BETWEEN BRIDGE SEAT BUILDUPS ARE SHOWN AT THIS POINT° : SACK GOUGE _ 1 " FJ DETAIL A a� ,� HK° HK° B 6 44 STR 13' - 8 1 GLENWOOD AVE. SUITE 6iJU THE TOP SURFACES OF ALL END BENT CAPS SHOULD RECEIVE EPDXY PROTECTIVE 45° III 11 13 -8 11 c ) B3 4 44 STR 13'-8" 37 RALEIGH, NC276Q3 4 COATING. PILE V E T I C A L 34 a #4 STR �'-8" PHONE 919.789.9977 ANCHOR BOLTS SHALL BE SET BY DRILLING HOLES AND GROUTING AFTER THE CAP HAS B5 45 STR 6'-4" 79 sepiinc.com BEEN POURED AND CURED. EMBEDMENT DEPTH OF ANCHORS SHALL BE AT LEAST 15 INCHES.WHEN PLACING MAIN CAP STEEL, ENSURE THAT FUTURE DRILLING FOR ANCHORDETAIL o A l B6 L # STR 23'-8" 99 BOLTS WILL BE AT LEAST ONE INCH CLEAR FROM EDGE OF REINFORCING BAR. • = - 1 3 LAP B7 2 *5 STR 20'-10" 43 POSITION OF PILE DURING WELDING. NO ADDITIONAL PAYMENT IS MADE FOR REINFORCING STEEL OR CONCRETE. THE ENTIRE 1 / B8 4 *5 STR 5'-O" 21 811 m 3WORKING DAYS COST OF THIS WORK TO BE INCLUDED WITH THE PAY ITEM "12O' BRIDGE 60° 10 ° 39 4 *5 STR 1'-9" 7 BEFORE YOU DIG -O ° 1 FOR THE LOCATION OF SUBSTRUCTURE". UNDERGROUND FACILITIES ------*/ BACK GOUGE :NElb Know what's below FOR PILES, SEE SECTION 450 OF THE STANDARD SPECIFICATIONS (2018). , S1 *5 3 8'-10" 166 Call before you dig. 4DETAILB 60° 0 THE SUBSTRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH THE LATEST AASHTO , , 1 �� #5 �,—�" F THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN OWNERC T IS REPRESENTATIVEHIHECONRRACTflRSHALIDETERMINEIHEBYTHE NG WORK, AND LOCATION FRESPONALL SIBLEFORANYANDALLLDAMAGSNG UTILITIES BEFORE IWHICHMIGHT GUIDE SPECIFICATIONS FOR DESIGN OF PEDESTRIAN BRIDGES. ) S3 #4 —6 2 AGEESTOBEFFULLYEXACT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. PILES SHALL BE DRIVEN TO A MINIMUM CAPACITY OF 60 TONS° REFER TO Mitt NOTICE: GEOTECHNICAL ENGINEERING REPORT FOR ARBOR CREEK GREENWAY DATED APRIL 9, 2021° 0" TO ��g" ___,/ 111 4 #4 6 6'-2" 16 CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF ���� THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER i 2 . - 8 .� 1 _ 8 " LJ 7 O 1 # _ „ CJ O SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK. OF PERSONS ENGAGED IN THE WORK, I— U 3 14 # 4 r, 5' - 8 " 5 3 OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. PILE HORIZONTAL i u1 & u2 8" DETAIL 3 OR VERTICAL u3 -1 L1 A*5 STR 4'-5" 18 *5 L 4 STR 4'-8" 19 +f A ■ t L5 4 #5 STR 4'-11" 21 ��H�°CAR° a PILE SPLICE DETAILS L4 4 #5 STR 5'-2" � =•-,k. 5��,--7• SEAL = 1 6 L5 4 45 STR 5'-5" 23 : 1,_0„ 1,_2., 1 11725 o.; % r-, 10„ T T T yG'°:...........GI N`°:.= BOTTOM OF ' V1 8 44 STR 4'-10" 26 i� 2" CL° nI r-} V2 # 4 _ 4 1 55 •`" APPROACH SLAB �. (TYP.) > > > r—DocuSlgned:. _ ilr __ z�37zaz� _ 4�/z 6., * ANTICIPATED LOCATION OF Vomie' �s C 1" 0 ANCHOR BOLTS REINFORCING STEEL 1221 L35° n T I *SEE NOTES ON S-3 AND S-4 ALL BAR DIMENSIONS ARE OUT TO OLJT. TOTAL CLASS A CONCRETE 8°5 C.Y. \—C462768DF412422.-. 223 S. WEST ST. 1 ra SUITE 1100 HP 12 X 53 STEEL PILES 1 #5B7 �� LEIGH,NC (EA. FACE) END BENT 41 NO: 3 LIN. FT°= 40 07603 STEWART TR 0 END BENT #2 NO: 3 LIN. FT°= 40 CONG&CONST U SEPI ENGINEERING 8, CONSTRUCTION, INC 2'-21/2" (POUI @ Arbor Creek - #5B5 SEE NOTES (EA. FACE) #4 "V" w C) cp Middle Creek BARS Cal 1'-0" CTS° #4 "U" BARS 2 1'-0" CIS. ► L77 #4U3 C) 6" CTS° z reenWay # , �" t 2,. CL° (TYP° c� BRG.) H 5B6 (EA. FACE) a� 52 N ly Springs Town of IRecreation r#5 Parks and 0I ►•� -4,:-/ 04 *4 B3 C) 4 " CTS. #4 OVER PILES B2 (EA. FACE) #4 B4 z C'' a _ _ - -., _ __. 1-1 �..•-- / `�._ ♦ f ♦ -0" (POUR 1) �� ♦■ 1i4 — #q 53 — ■ — — ■� Si 1 PREPARED FOR: T 1 - CONCRETE #4 C.] a Town of Holly Springs B2 (EA. FACE) �, '� ti ■ 1 ■ ■ I 1 COLLAR BOTTOM OF CAP 128 S. Main Street °� % i .`, '� _ PILES & .. •' Holly Springs, NC 27540 .' ~'--____--�� '� T __ '.� CONCRETE COLLARS `�' _ #4 B2 (EA. FACE): , ■ I 2" CL. (TYP°) --- T� FILL FACE �� • 0 1 CONSTRUCTION 2 - #8B1 or,..:. _•►►•� _.►►._ _.►►,_ �' 2 - #8B1 _I � FILL FACE '� DRAWINGS 2'-O" CONCRETE COLLAR C HP 12 X 53 REF #: 09-012 ■ J T T >> TYP° EACH PILE? ■ STEEL PILE DATE _ 21-0" PROJECT: SE2C.027.00 y F ISSUE: 8" 8" PLAN ELEVATION . 3" HIGH B.B. �� - C005IC\ POTECTIO\ F u R STEEL PIES DETAIL C HP 12 X 53 1 ,2,2020 STEEL PILE (END BENT No. 1 SHOWN, END DENT No. 2 SIMILAR 3Y ROTATION) REVISIONS: 1._6.. 1._6,. - - DOCUMENT NOT CONSIDERED FI\AL UNLESS ALL 3'-0" SIGNATURES COvPLETED SECTION A-4 PROJ.MGR: DAVIDRUGGLES,PE ALL CONSTRUCTION SHALL BE IN ACCORDANCE 3RIDGE S 2 DRAWN BY: ELIZABETH PHELPS, PE (CONCRETE COLLAR NOT SHOWN FOR CLARITY° WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE SEE "CORROSION PROTECTION FOR STEEL PILES DETAIL°") STANDARDS AND SPECIFICATIONS 30' 15' 0 30' " — 0 S SCALE: 1"=30' NORTH NOTESs . p 1 " ""' -' "' . • ALL SCREWS, BOLTS, NUTS AND WASHERS ARE TO BE HOT DIPPED GALVANIZED. THE LOCATION OF POST FOOTINGS AND END BLOCKS ARE TO BE FIELD VERIFIED.DEVIATIONS FROM PLAN DIMENSIONS ARE TO BE APPROVED BY THE ENGINEER. END OF APPROACH RAIL SHALL BE AT LEAST 2'-0"FROM EDGE OF GREENWAY WITH A MINIMUM ANGLE OF 15 DEGREES. THE APPROACH RAIL SET BID ITEM INCLUDES (4)FOUR RAILS FOR A PARTICULAR INSTALLATION AT EACH STRUCTURE AND INCLUDES CONCRETE POST SUPPORTS. FOR APPROACH RAIL SET,SEE SPECIAL SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I I SUTE60U RALEIGH, NC 27603 PHONE 1919.789.9977 sepihc.com . - • PROVISIONS. APPROACH RAIL SETS ARE REQUIRED AT EACH CORNER OF BRIDGE 1 & BRIDGE 2 FOR THIS PROJECT81 (2 SETS TOTAL). 811 m 3 WORKING DAYS BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. Call before you dig. THE LOCATIONS OF EXISTING UNDERGROUND UTILTIES ARE SHOWN IN AN VERIFIED BY THE APPROXIMATEITS WAY ONLY AND HAVE NOT BEEN OR SHALT DETERMINE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT r 1 BE OCCASIONED BY THE CONTRACTOR'S FAILURE PRESERVE NNT AND ALL UNDERGROUND 11LRIES,TO E7fACTLY LOCATE AND ■ ■ n n SEE TYPICAL RAIL PLAN NOTICE: CONSTRUCTION SITE SAFETY I5 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK. OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES. OR OF ANY OTHER PERSONS. 1 I Ill TYPICAL TYPICAL [ a1�..:••�AROl,` . 0.5510 %., , END RAIL MATERIALS AND BENT END BENT RAIL MATERIALS AND �' -� �; �° 4-7- SPACINGS TO MATCH SPACINGS TO MATCH0 r SEAL r 's r PRE -MANUFACTURED BRIDGE RAILING (TYP.) PRE -MANUFACTURED \\ BRIDGE RAILING 00 o 00 1' ` 11725 • o'= F ��.' `' 11 /3/2021 CAST -IN -PLACE �Dacusigned. -_ _- CONCRETE PcuaS ''.— C462768DF412422 . -`� 1 - 6 0. • * F 223 S. WEST ST. ro SUITE 1100 RALEIGH, NC 27603 ST E WA R T T (919)380—B750 COPYRIGHT© 2021 SEPI ENGINEERING 8• CONSTRUCTION, INC . - --•-•--...•-•� .....-.--•--�- DETAIL 1 Arbor Creek _ PLAN Middle Greenway Town of Creek Holly Springs • • RAIL Ar 'J Parks and Recreation PREPARED FOR: Town of Holly Springs 128 S. Main Street MATCH APPROACH RAIL MATERIALS AND RAIL SPACING TO PRE -MANUFACTURED BRIDGE STEEL PEDESTRIAN Holly Springs, NC 27540 ` RAILING AT BRIDGE APPROACHES i+k 1 POSTS & 11-6"0 CONCRETE ►■ I 1 15 ° POST SUPPORTS (TYP.) CONSTRUCTION BOARDWALK#I.MIN)DRAWINGS , ° a , A. aRAILINGREF 15 • sI. #: 09-012 q. A i� 4 A ›— DATE END 0 F b PROJECT: SE2C.027.00 SEE DETAIL 1 BRIDGE 1" �CC ISSUE: TYPICAL RAIL PLAN T BRIDGE APPROACH RAIL SETS SHALL BE MADE OF THE SAME- U MATERIALS AND FOLLOW THE SAME CRITERIA AS THE PRE -MANUFACTURED BRIDGE RAILS• - REFER TO SPECIAL PROVISION FOR PREFABRICATED BRIDGE• REVISIONS: SECTION A -A 3IDGE APP CACH SAIL ELEVATIO\ SHOWING BACK FACE OF RAILING DOCUMENT NOT CONSIDERED FI\AL UNLESS ALL - SIGNATURES COvPLETED PRAWN DAVID E ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: BY:: ELI2A6ETH PHELPS, PE TH PHEL S, WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE 3 IDGE APPROACH RAIL DETAILS STANDARDS AND SPECIFICATIONS 30' 15' D 30' 411 SCALE: 1 " = 30' NORTH — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Data Shared \Sent\To Stewart\SE20027 - TLB.dwg PREMANUFACTURED S=PI SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC #4 1 GLENWOOD AVE. I SUITE 600 BARS 212" CTS■ PEDESTRIAN BRIDGE CONSTRUCT END OF RALEIGH. NC 27603 PHONE 1919.789.9977 10" APPROACH SLAB G•• sepiinc.com ,� RADIAL TO CURVE 7. �•;,.F :a.';H 1 •:yr.7•• is t :�N•, 7' � f ;..{� ::: •-1=.�.:i •:: �„�'�iif-. TRANSITION (SEE SECTION B-B) sa. �.;:i.i1`'3.r.?•sa'i�'...s=•':'�:: { .: i•-'�'r.:i.::.: i�':. - d! . �.5.� •a 1~I 811 m 3 WORKING DAYS BEFORE YOU DIG * +�r.:i{ + .: � ti i 1 1 1 fpR THE LOCAT pN OF UNDERGROUND FACILITIES .+'f'- 1 Know what's below Call before dig. COMPACTED ABC , you • '- " APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE COMPACTED SUBGRADE ROOFING FELT TO OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND GEOTEXTILE FABRIC AROUND STONE :—. PREVENT BOND b AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT EXACTLY LOCATE AND BE OCCASIONED BY THE CONTRACTOR'S FAILURE PRESERVE ANNT AND ALL UNDERGROUND UTILITIES. I_ FILL FACE CO 1O-*4 BARS 12" CTS. I 1O'-O" ASPHALT TRAIL NOTICE: # 7 8 M Lf CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF STONE THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER 1 — 0 1 1-0" SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR BRIDGE \ & W.P. END APPROACH SLAB SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. SECT I O\ TH RU SLAB --------- „ /90O_00I_00// *4 2._011 B 0 I SEAL 11725 0':1c %. 9G•''........�.. •'�� BARS (7 12" CTS■ �'�� COMPACTED AGGREGATE REINFORCED BASE COURSE (ABC) �f]acu5ignc�.•� _ _ i�--�3�Z021 CONCRETE 3" CL■ Peuud. cs .:zraura zz . 211 2" ASPHALT T , S. GEOTEXTILE FABRIC T T.,SUS EW00T5T. 1 I RALEIGII• NC 27603 S T EWART T{919]360-8750 � r � ■� o � � ■� � � � . n `�T _ -I—I' COPYRIGHT© 2021 SEPI ENGINEERING & CONSTRUCTION. INC FOR CURVED ALIGNMENT — —CC1C� A A11=1 _III EDGE OF APPROACH 1 �rSLAB TO BE CONCENTRIC TO _# . CTS. vs p 6"FORM Arbor Creek - C #4 BARS 2�II ALIGNMENT (TYP■ EA. SIDE) 12" CTS■ ' 10'-0" Middle Greenway Creek COMPACTED SUBGRADE APPROACH 5LA 3 AT END BENT Town of Holly Springs Parks and Recreation SECTION B-3 (END BENT 1 SHOWN, END BENT 2 SIMILAR) ABC EXTENDS 2 FT. BEYOND APPROACH SLAB (ALL SIDES) NOTE: IF APPROACH SLAB LIES ON A HORIZONTAL CURVE MEASURE 10' ALONG -X- FROM FRONT FACE OF BACKWALL AND SPLAY REINFORCEMENT AT 12"MAX. SPACING ACCORDING TO RADIUS■ PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 101-0" APPROACH 6"F #4 BARS 212" CTS. 6" SLAB ELEVATIONS CONSTRUCTION CONCRETE APPROACH SLAB BRIDGE END BENT 1 LOCATION ELEVATION END BENT 2 LOCATION ELEVATION DRAWINGS -A- STA. 42+28.92 346.80 -A- STA. 43+61.08 347.00 REF #: 09-012 z . DATE I --I Iz st4 BARS @ 12" CTS■ 51 —A- STA. 43+70.08 PROJECT: SE2CO27-00 U -A- STA. 42+38■92 347.00 346.80 ISSUE: MT III1III I= IIHI 10 - - - - - - - - • I -X- STA. 16+57.42 335.85 -X- STA. 17+92.58 334.50 11 1 11 o UU o" D UU o` CCU a`, 0 UUOU111= IIII S 2 -X- STA. 16+67.42 -X- STA. 18+02.58 III 111 11,I, ail i i i i— i —ii —i i � i i i i— i I,;,II1 i i i i i i— i—i — i i— i i �= i i —o=11 i— i-1— 335.75 334.40 ,;,IEll „III,;,I ,;,III,;,III,;,III,;,III,;,II REVISIONS: ABC DOCUME JT NOT CONSIDERED 6" COMPACTED FINAL UNLESS ALL SIGNATURES COvPLETED COMPACTED SUBGRADE PROJ.MGR: DAVIDRUGGLES, PE SECTION AA ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ELIZABETH PHELPS, PE WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE CENTER STEEL IN SLAB (2"CLR■ MIN. EXCEPT AS NOTED) TYPICAL DETAILS FOR BRIDGE APPROACH SLABS STANDARDS AND SPECIFICATIONS S 1 2 30' 15' 0 30' SCALE: 1"=30' NORTH — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenwa"LID \Data Shared\Sent\To Stewart\SE20027 - TLB.dwg STA\DARD \OTES S=PI SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH, NC 27603 PHONE I 919.789.9977 sepiinc.com DESIG\ DATA ALLOWA\CE FOR DEAD LOAD DEFLECTION, SETTLE v E\T9 HA` DRAILS ADD POSTS AA5•HTO• (CURRENTi ETC. I\ CASTI\G S�PERSTRUCT,RESa METAL STANDARDS AND FACES OF THE CONCRETE END PO5T5BEFOREYOUDIG 811.SPECIFICATIONS LIVE LOAD SEE PLANS BRIDGES SHALL BE SLABS, CURBS AND PARAPETS BUILT FOR THE METAL ON THE GRADE OR VERTICAL CURVE SHOWN ON PLANS. RAIL SHALL BE SET NORMAL TO THE GRADE OF THE CURB, UNLESS SHALL CONFORM TO THE GRADE OR CURVE. OTHERWISE SHOWN FOR THE LOCATION OF UNDERGROUNDFACIUnES Icnowwl,Call ab below. before you dig. IMPACT STRESS IN STRUCTURAL ALLOWANCE EXTREME SEE A•A•S•HJT•O• ALL DIMENSIONS WHICH FIBER OF DEFLECTIONS ARE DIMENSIONS STEEL - AASHTO M270 GRADE 36 - - 20,000 LBS• PER SO.IN. ON PLANS. IN SETTING FORMS ARE GIVEN IN SECTION AND ARE AFFECTED BY DEAD LOAD ON PLANS. THE METAL RAIL AND TOPS OF CONCRETE POSTS USED WITH THE ALUMINUM AT CENTER LINE OF BEARING UNLESS OTHERWISE NOTED RAIL SHALL BE BUILT PARALLEL TO THE GRADE OF THE CURB. FOR STEEL BEAM BRIDGES AND PRESTRESSED CONCRETE THE LOCATIONS OF EXISTING UNDERGROUND UTILRIESARE SHOWN INAN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWCTLOCAIONOER OR ITS FALLEXISTINGUTILITIES ECONTRA0RECCTOR MMELL NCINGWTERMINE HE AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT AGREES HT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TOIDACTLYLOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. GIRDER BRIDGES, ADJUSTMENTS - AASHTO M270 GRADE 50W - - 27,000 LBS• PER SO.IN. FOR THE ELEVATIONS SHOWN. SHALL BE MADE DUE TO THE DEAD LOAD DEFLECTIONS METAL HANDRAILS SHALL 3E IN ACCORDANCE WITH THE PLANS. WHERE BLOCKS ARE SHOWN OVER BEAMS FOR BUILDING RAILS SHALL BE NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER UP TO THE SLAB, THE VERTICAL - AASHTO M270 GRADE 50 - - 27,000 LBS• PER SO.IN. BETWEEN BEARINGS TO COMPENSATE ORDINATE, AND ACTUAL BEAM DIMENSIONS OF THE BLOCKS SHALL BE ADJUSTED AS MANUFACTURED FOR BRIDGE RAILING.THE CASTINGS SHALL BE OF A FOR DEAD LOAD DEFLECTIONS, VERTICAL CURVE UNIFORM APPEARANCE. CAMBER. WHERE BOTTOM OF SLAB I5 IN LINE WITH FINS AND OTHER DEFORMATIONS RESULTING FROM CASTING OR SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR INTTHERERWONRK S FETYOFF ANYARBTHE YISOTRUCOTURES ONSENGOF AGED REINFORCING CONCRETE IN STEEL IN TENSION - GRADE 60 - - - 24,000 LBS•PER SO. IN• BOTTOM OF TOP FLANGES, TO COMPENSATE FOR DEAD COMPRESSION 1,200 LBS•PER SO. IN• ACTUAL BEAM CAMBER. DEPTH OF SLAB BETWEEN BEARINGS SHALL BE ADJUSTED OTHERWISE SHALL BE LOAD DEFLECTION, VERTICAL CURVE ORDINATE, AND REMOVED IN A MANNER SO THAT A UNIFORM COLORING OF THE COMPLETED CASTING SHALL CONCRETE STRUCTURAL COMPRESSION IN SHEAR SEE A•A•S•H•T•O• IN SETTING FALSEWORK ALLOWANCE SHALL BE MADE AND PERMANENT CAMBER TIMBER - TREATED OR UNTREATEDMETAL EXTREME FIBER STRESS - - - 1,800 LBS• PER SO. IN• ELEVATIONS SHOWN. AFTER SHALL CONFORM TO THE PERPENDICULAR TO GRAIN CONSTRUCTION ELEVATIONS OF TIMBER 375 LBS• PER SO.IN. WHICH PROFILE BE AND FORMS FOR REINFORCED CONCRETE SPANS, AN COLORING FOR DEAD LOAD DEFLECTIONS, SETTLEMENT OF FALSEWORK, SHALL BE PROVIDED FOR IN ADDITION TO THE NOT REMOVAL OF THE FALSEWORK, THE FINISHED STRUCTURES AND ELEVATIONS SHOWN ON THE PLANS AND FURNISHED BY THE ENGINEER• SPECIAL OBTAINED•CASTINGS BE RAILS ACCEPTED•CERTIFIED WILL AND NOTES: POSTS. WITH DISCOLORATIONS OR OF NON -UNIFORM MILL REPORTS ARE REQUIRED FOR Div Z� ARv a It-, ... •,:k• s/py9•� - SEAL 11725 os;F iN.;� �di4.......... � EQUIVALENT MATERIAL FLUID AND PRESSURE WORK OF ANSHIPo EARTH DETAILED DRAWINGS 30 LBS• PER CU• FT• AND ANY STRUCTURE OR (MINIMUM) BE SUBMITTED TO THE ENGINEER FALSEWORK OR FORMS IS PARTS STARTED. FOR FALSEWORK OR FORKS FOR BRIDGE SUPERSTRUCTURE OF A STRUCTURE AS NOTED ON THE PLANS SHALL GENERALLY, IN CASE OF DISCREPANCY, THIS STANDARD SHEET FOR APPROVAL BEFORE CONSTRUCTION OF THE OF NOTES SHALL GOVERN OVER THE SPECIFICATIONS,BUT THE REMAINDER OF THE PLANSVENOTESSHALGOVERN OVER HEREON, AND SPECIAL PROVISIONS SHALL GOVERN OVER R. 0 r—DacuSigned II/3/2021 4 d��S \—C462768DF412422.. S23S.WESTST. �� suITE:17Da LEIGH, NC REI\FORCING STEEL ALL. SEE SPECIFICATIONS ARTICLE STEWART TT(919)380-87076U3 EXCEPT PROVISIONS, A5 MAY OTHERWISE BE SPECIFIED ON PLANS OR IN THE SPECIAL ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH ALL 105-4• REINFORCING STEEL SHALL BE DEFORMED. DIMENSIONS RELATIVE TO COPYRIGHT©2p21 SEPI ENGINEERING &CONSTRUCTION, INC THE N. C• BE O 2018 DEPARTMENT STEEL HOT \ C ROLLED. R "STANDARD E SHEET T SPECIFICATIONS FOR ROADS AND STRUCTURES"OF THE PLACEMENT OF TRANSPORTATION• IN THE PLANS. TO OUT AS PILING FOR PERMANENT OR TEMPORARY APPLICATIONS SHALL WIRE INDICATED E D LINES, THEY BE LAPPED OF REINFORCING ARE TO CENTERS OF BARS UNLESS OTHERWISE INDICATED DIMENSIONS ON BAR DETAILS ARE TO CENTERS OF BARS OR ARE OUT INDICATED ON PLANS. BAR SUPPORTS SHALL BE PROVIDED FOR REINFORCING STEEL WHERE ON THE PLANS. WHEN BAR SUPPORT PIECES ARE PLACED IN CONTINUOUS SHALL BE SO PLACED THAT THE ENDS OF THE SUPPORTING WIRES SHALL TO LOCK LEGS ON ADJOINING PIECES• Arbor Middle Greenway Creek Creek - UNLESS USED FOR OTHERWISE REQUIRED ON PLANS, CLASS A CONCRETE SHALL BE ALL PORTIONS OF ALL STRUCTURES WITH THE EXCEPTION THAT: S T lJ C T , R A L STEEL Town of Holly Springs Parks and Recreation CLASS ABUTMENT BE CO USED \l C AA CONCRETE FOR E BACKWALLS, T SLOPE E C H A SHALL PROTECTION VI AND F E BE USED IN BRIDGE SUPERSTRUCTURES, APPROACH SLABS; AND CLASS B CONCRETE SHALL AT THE CONTRACTOR'S OPTION, HE MAY SUBSTITUTE 7/8"0 SHEAR STUDS FOR THE AND RIP RAP. Y4"0 STUDS SPECIFIED ON THE PLANS. THIS SUBSTITUTION SHALL BE MADE AT THE RATE OF 3 - 7/3" 0 STUDS FOR 4 - / ui 0 STUDS, AND STUD SPACING CHANGES S o SHALL BE MADE AS NECESSARY TO PROVIDE THE SAME EQUIVALENT NUMBER OF 7//" 0 STUDS ALONG THE BEAM AS SHOWN FOR /4 0 STUDS BASED ON THE RATIO OF 3 - /� UNLESS STRUCTURES TOP CORNERS INTO CURB STUDS FOR 4 - 3/4" 0 STUDS. STUDS OF THE LENGTH SPECIFIED ON THE PLANS MUST OTHERWISE NOTED ON THE PLANS, ALL EXPOSED CORNERS ON BE PROVIDED. THE MAXIMUM SPACING SHALL BE 2'-0"• SHALL BE CHAMFERED Y4"WITH THE FOLLOWING EXCEPTIONS: OF CURBS MAY 3E ROUNDED TO 11/2"RADIUS WHICH IS BUILT EXCEPT AT THE INTERIOR SUPPORTS OF CONTINUOUS BEAMS WHERE THE COVER FORMS; CORNERS OF TRANSVERSE FLOOR EXPANSION JOINTS PLATE IS IN CONTACT WITH BEARING PLATE, THE CONTRACTOR MAY, AT HIS OPTION, PREPARED FOR: Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 SHALL ON PLANS; AND TOPS BE ROUNDED WITH A '/4"FINISHING TOOL UNLESS OTHERWISE REQUIRED SUBSTITUTE FOR THE COVER PLATES DESIGNATED ON THE PLANS COVER PLATES OF THE AND CORNERS OF EXPANSION JOINTS IN THE ROADWAY FACES EQUIVALENT AREA PROVIDED THESE PLATES ARE AT LEAST 5/6"IN THICKNESS AND OF CURBS AND SIDEWALKS SHALL BE ROUNDED TO A '/4"RADIUS DO NOT EXCEED A WIDTH EQUAL TO THE FLANGE WIDTH LESS 2"OR A THICKNESS WITH DOWELS: A FINISHING STONE OR TOOL UNLESS OTHERWISE REQUIRED ON PLANS. EQUAL TO 2 TIMES THE FLANGE THICKNESS• THE SIZE OF FILLET WELDS SHALL CONFORM TO THE REQUIREMENTS OF THE CURRENT ANSI/AASHTO/AWS "BRIDGE WELDING CODE". ELECTROSLAG WELDING WILL NOT BE PERMITTED. CONSTRUCTION DRAWINGS WITH THE SOLE EXCEPTION OF EDGES AT SURFACES WHICH BEAR ON OTHER REF #: 09-012 DOWELS WHEN INDICATED ON PLANS AS FOR CULVERT EXTENSIONS, SHALL SURFACES,ALL SHARP EDGES AND ENDS OF SHAPES AND PLATES SHALL BE SLIGHTLY DATE BE EMBEDDED AT LEAST 12"INTO THE OLD CONCRETE AND GROUTED INTO ROUNDED BY SUITABLE MEANS TO A RADIUS OF APPROXIMATELY /6INCH OR PROJECT: 5E20.027.00 PLACE WITH 1:2 CEMENT MORTAR. EQUIVALENT FLAT SURFACE AT A SUITABLE ANGLE PRIOR TO PAINTINGS GALVANIZING, ISSUE: OR METALLIZING. . APRIL 12,.2019 REVISIONS: DOCUMENT NOT CONSIDERED • FI\AL UNLESS ALL • SIGNATURES COvPLETED • PALL DAVIDRHPHELPSGGLES, PE CONSTRUCTION SHALL BE IN ACCORDANCE DRAJWN BY: DRAWN BY: ELI2ABETH PHELPS, PE WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE STANDARDS AND SPECIFICATIONS " S 13 30' 15' 0 30' 410 SCALE. 1"= 30' NORTH ARBOR CREEK GREENWAY GENERAL NOTES 1. This structure has been designed in accordance with the project architects plan layout and guidelines. Suitability for access and intended usage shall be the responsibility of the architect. 2. Vehicular access larger than the design live load shall be limited by permanent physical means_ 3. Prior to construction the contractor shall verify all elevations through the project architect_ 4_ Only PermaTrak North America may provide the precast structure shown on these plans. DESIGN DATA 1. Boardwalk shall be designed in accordance with the AASHTO LRFD bridge design specifications and the LRFD guide specification for the design of pedestrian bridges. Design Live Load: Pedestrian Loading - 90 psf Uniform Vehicular Loading - H-5 Truck (10,000 Ibs) 2. Foundation design shown on these plans have been base upon the geotechnical recommendations provided by S&ME Inc. in a report dated April 9, 2021 & November 18, 2021 3. Abutments and piers shall be designed for lateral earth pressure, live load surcharge and structure loads. Allowable bearing pressure for Structures A & B - on partially weathered rock : 6000 psf. Allowable bearing pressure for Structure C - on structural fill: 2500 psf. 4. Railing shall be designed in accordance with LRFD Guide Specification For The Design Of Pedestrian Bridges. MATERIAL 1. All bolts, nuts, washers, and hardware shall be hot dipped galvanized after fabrication in accordance with ASTM A153. 2. Handrail posts will be Timber. See architectural drawings by Stewart for design information. 3. Connection/splices of posts and rails shall be welded and protected with galvanizing paint per ASTM A780. 4. Cast -in -place concrete shall have a 28-day concrete compressive strength of 4000 psi. 5. All foundation reinforcing shall be Grade 60 conforming to ASTM A615. PROJECT COMPONENTS SUPPLIED BY PERMATRAK PRECAST CONCRETE TREADS PRECAST CONCRETE BEAMS PRECAST CONCRETE CAPS RUBBER LEVELING PADS 3/4" DIAMETER THREADED BARS WITH NUTS AND WASHERS (BEAM TO PIER CONNECTION) 4X6 TIMBER POST BRACKET AND CONNECTION TO TREAD HARDWARE CLIP ANGLES AND CONNECTION HARDWARE SUPPLIED BY CONTRACTOR SHIMS AND NON -SHRINK GROUT (LEVELING FOR PRECAST COMPONENTS) RAILING AND CONNECTION HARDWARE CAST IN PLACE CONCRETE 3/4" DIAMETER x 12" LONG H.D_ GALVANIZED HEXHEAD LAGSCREW (CAP TO PILE CONNECTION) BOARDWALK STRUCTURES - APPROXIMATE NUMBER OF COMPONENTS REQUIRED* BOARDWALK ID ALIGNMENT STARTING STATION ENDING STATION BOARDWALK LENGTH PERMATRAK BEAM PROFILE #BEAMS # OF PIERS ALLOWABLE BEARING CAPAC[LY FOUNDATION DESIGN' # CLIP ANGLES RAILING LF BEGINING T/DECK El. END TIDECK EL A A 109+47 111+37 190.00 FT +- 10" x 1'-2' 20 22 6000 PSF 'A 96 380.00 FT +- 332.00 332.00 B A 115+37 115+87 50.00 FT +- 10" x 1' 2" 6 8 6000 PSF 'A 26 100.00 FT +- 335.00 335.00 C X 11+70 12+20 50.00 FT +- 1'-0" XI-2" 6 8 2500 PSF *B 26 100.00 FT +- 336.41 335.41 'Numbers shown in the table above are approximate and site conditions (such as existing utilities to be avoided) may cause variation in quantities shown Note: Footings to Bear on Competent Soil required to meet the bearing pressure listed in the above table *A- Per the Geotechnical Report, Partially weathered rock is anticipated within 5-6' below the existing grade - footings are to bear on this competent rock with an assumed allowable bearing capacity of 6000 psf - Per the Geotechnical Report, Footings are to bear on structural fill material anticiapated around elev. 325.0. Contractor is to confirm that soil is competent and can meet the required bearing pressure of 25130 psf Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 ©2014 by PennaTraka this drawing contaMs information Mat is proprietary to and property of PennaTrak® and hall be kept confidential. No duplication or distribution of this drawing may be made without. the express written consent or PermaTrak® except for the limited purposes set forth in the contract between PermaTrak® and party for whom this drawing was made. 6 5 4 3 PREPARED FOR: Stewart Engineering 2 1 NO. DATE DESCRIPTION EY: FOR BIDDING ;!`iiitfi��~*~ii•�� PermaTra The Concrete Boardwalk Company www.permatrak.com TEL: 877-332-7862 OFFICE LOCATIONS FLORIDA TEXAS LOUISIANA NORTH CAROLINA OHIO PROJECT TITLE: ARBOR CREEK GREENWAY Holly Springs, NC JOB NUMBER: 2020-1484 DATE: 12/01/2021 DESIGNED BY: CAP DRAWN BY: CAP CHECKED BY: KAS SHEET NO. PTO 1 Varies - see table on sheet PT01 5 1/2' Thick x 1'-11 7/8' Wide x 11-3" Long Precast Concrete PermaTrak Treads Plus Joints @ 1/8"+- Per Joint PermaTrak Beam (Typ.) r TBDRailing By Others (Typ-) Timber Railing [Typ.] See Architectural Drawings by Stewart for more details DETAI 1 Vx1-2' PermaTrak Beam (Typ-) DETAI 18"0 Pier Concrete Pier (Typ-) x 3'-0' Square Footing (TYp-) 0 r r PermaTrak Pedestal Cap 10" Dia- Timber Pile 1'-0' 1-0" 1, 10'-0" Clear .1 .I l�n I li n '\ I 5 1/2"x2'-11 7/8' PermaTrak Tread Approximate Grade Line TYPICAT SECTION - FOUNDATION DESIGN A Scale =1/2"=1'-0" Structures A & B - max 20'-0' spans 0 } 0 BOARDWALK PLAN Scale = 1/4' = 1-0' Note: Overhang May Vary- However, Maximum Overhang From Center Line of Beam To Edge Of Tread Shall Not Exceed 2-0"- r 0 0 -- 0 0 ='r 0 NOTE: Plan View Is Shown For Preliminary Discussion Purposes Number of Precast Components And Number of Piers Shown In Plan View Are Preliminary And Subject To Change Due To Site Conditions, Field Conflicts and/or Curved Alignment. Timber Railing (Typ-) See Architectural Drawings by Stewart for more details DETAI 12' X 1'-2' PemlaTrak Beam (Typ-) DETAI 18"0 Pier Concrete Pier Typ-j - 5'-0' x 5'-0' Square Footing (Typ-) TYPICAL SECTION 1'-0' 1'-0" 1, 10'-0" Clear 1 Lik �. ill IIn .�n-\ n '\` 1 V I f Boardwalk 5 1/2' X 2' 11 7/8" PermaTrak Tread Approximate Grade Line - FOUNDATION DESIGN B Scale =117=1'-0" Structure C - max 25'-0' Spans Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 ©2014 by PermaTrak® this drawing oontais information Nat is proprietary to and property of PennaTrak® and hall be kept confidential. No duplication or distribution of this drawing may be made without the express written consent or PermaTrak® except for the limited purposes set forth in the contract between PermaTrak® and party for whom this drawing was made- 6 4 3 PREPARED FOR: Stewart Engineering 2 1 NO. DATE DESCRIPTION EY: FOR BIDDING PermaTra The Concrete Boardwalk Company www.permatrak-com TEL: 877-332-7862 OFFICE LOCATIONS FLORIDA TEXAS LOUISIANA NORTH CAROLINA OHIO PROJECT TITLE: ARBOR CREEK GREENWAY Holly Springs, NC JOB NUMBER: 2020-1484 DATE: 12/01/2021 DESIGNED BY: CAP DRAWN BY: CAP CHECKED BY: KAS SHEET NO- PT02 Top Of Pier Elevation If Greater than 6'-0', contact PermaTrak for confirmation and a possible redesign Approximate Grade Line - • J #5 @ 1'-0" o-c- a 1 Top & Bottom .' 1.4 ly T-- U in 4 1'-0" Hook Rotate Hook as required 3'-0" x 3'-0" 'Note - Per the Geotechnical Report, Footings are to bear on competent soil required to meet bearing pressures listed on page PT01 #3 @ 1'-0' o-c- (1'-0" Lap) 6 - #6 Vertical Equally Space 4 - #5 Top & Bottom 3^ CIT. (TyP•) 7. FOOTING REINFORCEMENT DETAIL - FOUNDATION A Scale: 'I" = FOUNDATION TYPE A - Structures A & B only 'A - Per the Geotechnical Report, Partially weathered rock is anticipated within 5-6' below the existing grade - footings are to bear on this competent rock with an assumed allowable bearing capacity of 6000 psf PermaTrak Tread (Typ-) PermaTrak Beam 118" Rubber Leveling Pad (Supplied By PermaTrak) "Shim & Non -Shrink Grout As Required "Note: Due to tolerances and variance in precast production and installation accuracy, shimming and grouting may be required- Where required the entire bearing area and void shall be shim and grouted with non -shrink grout TYPICAL SHIM/GROUT DETAIL 2 SECTION PT03J Scale: 1 1/2" = 1-0" Scale: Not To Scale (UNDER TREAD) Top Of Pier Elevation If Greater than 8'-0", contact PermaTrak for confirmation and a possible redesign ffi Approximate Grade Line - 4 d� 18'0 C-I-P- Pier d c . #5 @ I-0" o-c- Top & Bottom T 4 a 5 -#5 Top & Bottom 1'-0" Hook Rotate Hbok as required 5-0" x 5"-0" FOOTING REINFORCEMENT DETAIL - FOUNDATION B Scale: I. = 1'-IT FOUNDATION TYPE B - Structure C only 'Per the Geotechnical Report, Footings are to bear on strutcural till anticiapated around elev_ 325_0_ Contractor is to confirm that soil is competent and can meet the required bearing pressure of 2500 psf PermaTrak Tread (fyp-) 118' Rubber Leveling Pad (Supplied By PermaTrak) PermaTrak Beam TYPICAL TREAD SPACING DETAIL Scale: Not To Scale Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 ©2014 by PermaTrak® this drawing °entails information Mat is proprietary to and property of PennaTrak® and hall be kept confidential. No duplication or distribution of this drawing may be made without the express written consent or PermaTrake except for the limited purposes set forth in the contract between PermaTrak® and party for whom this drawing was made. 6 5 4 3 PREPARED FOR: Stewart Engineering 2 1 NO. DATE DESCRIPTION EY: FOR BIDDING ■ i i�.� PermaTra The Concrete Boardwalk Company www.permatrak-corn TEL: 877-332-7862 OFFICE LOCATIONS FLORIDA TEXAS LOUISIANA NORTH CAROLINA OHIO PROJECT TITLE: ARBOR CREEK GREENWAY Holly Springs, NC JOB NUMBER: 2020-1484 DATE: 12/01/2021 DESIGNED BY: CAP DRAWN BY: CAP CHECKED BY: KAS SHEET NO. PTO Notes: 1. Threaded Bar Shall Be Set In Epoxy Adhesive Anchoring System. 2. Threaded Bar Shall Be Embedded A Minimum of 3" Deep. 3. Drilled Hole Shall Be 7/8' In Diameter. 4. Completely Cover The Threaded Bar, Nut and Washer And Fill The Void Around The Threaded Bar With Epoxy Adhesive Or Non -Shrink Grout. Beginning Or Ending Of Boardwalk Concrete Approach Slab 45° \-)1' 'II' #4 Hook Bar @ 1 B" o.c. Each Face (2) Rows of 2-#4 Bars 114' PL (Galvanized) Note: Curb And/Or Railing Not Shown For Clarity. *See Site Drawings For Dimensioning, Reinforcement, And Concrete Material Requirements Of Approach Slab. 1/2" Expansion Joint Material CL314" Dia. Threaded Bar With Nut & Washer PermaTrak Tread (Typ.) 1/4" Minimum m & Non -Shrink Grou As Required For Uniform Bearing I I L--- J Cast -In -Place Pier TYPICAL APPROACH DETAIL Scale: 1" = t4x6 Post Bracket Gat. Note: Nominal Timber Post Size Is 4x6. Actual Opening Between Vertical Plates Is 3 10" x 5 10" 10" Dia. Galt'. Bolt W/ Washer & Nut (Typ.) DETAIL Scale: 1 1/7 = 1'-0' 1/8' Rubber Leveling Pad (Supplied By PermaTrak) Approximate Ground Line Notes: 1. Connection Hardware & Preformed Holes Supplied By PermaTrak (Typ_)_ 2. Railing Supplied By Others (Typ.). 114' PL (Galvanized) 4x6 Post Bracket Galy. 3/8" Dia. Galt'. Bolt W! Washer & Nut (Typ.) 1/2" Dia. Galt'. Bolt WI Washer & Nut (Typ.) 5/8" 4x6 Post Bracket Galt'. SECTION Scale: 3' = 1'-0' Beam Bearing Requirement: Beam Shall Bear A Minimum Of 6" On Foundation System. Contact PermaTrak Engineering If This Bearing Distance Is Not Achieved. `Note_ Curb And/Or Railing Not Shown For Clarity_ 114' Mini Grout As Notes: 1. Threaded Bar Shall Be Set In Epoxy Adhesive Anchoring System. 2. Threaded Bar Shall Be Embedded A Minimum of 3' Deep. 3. Drilled Hole Shall Be 1" In Diameter. 4. Completely Cover The Threaded Bar, Nut and Washer And Fill The Void Around The Threaded Bar With Epoxy Adhesive Or Non -Shrink Grout. m Shim & Non-Shrink For Uniform Bearing Nut. 200 L6x6x318x0'4" (Composite) i1 Q 3/4' Dia. Threaded Bar With Nut & Washer PemlaTrak Tread (Typ.) 1/8" Rubber Leveling Pad (Supplied By PermaTrak) I I I I L J Cast -In -Place Pier TYPICAL PIER CONNECTION DETAIL Scale: 1'= 1'-0" Vanes CE 314"0 All Thread Fiberglass Rods With Secure With HIT-HY- Epoxy Adhesive Anchoring System. Required Embedment Into Precast Oft 3/4". Indicates Supplied By Boardwalk Manufacturer and Installed by contractor PermaTrak Tread* Angle May Be Installed On Opposite Side of Beam If Site Conditions require PermaTrak Beam' Notes: 1. All holes shall be drilled by contractor. 2. One (1) Clip Angle is required on each end of any tread with a handrail post attachment. Two (2) Clip Angles total per individual tread U.N.D. in plan view. TREAD TO BEAM CONNECTION Scale: Not To Scale Patented Product: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 ©2014 by PennaTmk® this drawing °entails information Mat is proprietary to and property of PennaTrak® and hall be kept confidential. No duplication or distribution of this drawing may be made without Cre express written consent or PermaTrak® except for the limited purposes set forth in the contract between PermaTrak® and party for whom this drawing was made. 6 4 3 PREPARED FOR: Stewart Engineering 2 1 NO. DATE DESCRIPTION EY: FOR BIDDING PermaTra The Concrete Boardwalk Company www.permatrak.com TEL:877-332-7862 OFFICE LOCATIONS FLORIDA TEXAS LOUISIANA NORTH CAROLINA OHIO PROJECT TITLE: ARBOR CREEK GREENWAY Holly Springs, NC JOB NUMBER: 2020-1484 DATE: 12f0112021 DESIGNED BY: CAP DRAWN BY: CAP CHECKED BY: KAS SHEET NO. PT04 ELEVATED PRECAST CONCRETE BOARDWALK PROJECT SPECIFICATIONS V4-0 UPDAI'hl) AUGUST 2020 PRECAST CONCRETE BOARDWALK SYSTEM PART 1-GENERAL 1-1 SUMMARY A These specifications are for a precast concrete boardwalk and shall be regarded as minimum, standards for this project- These specifications are based upon products designed and supplied by: PermaTrak North America LLC Ph: (864) 351-4870 Ph: 877-332-7862 www-peimatrak-com Contact: Mr John Pyle jpylenmatrak-con This item shall also include the design, specification, and construction of a railing and foundation system that is attached to the proposed boardwalk system_ 1-2 ALTERNATE REQUIREMENTS: Alternates are allowed provided that the following minimum standards and these "Precast Concrete Boardwalk System" specifications are net - A "Minimum Standards' as outlined in section 1-3 below must be met- B- A fully engineered drawing of the precast boardwalk system (including tread layout, structural details designed for the design loads shown on the contract documents, foundation design, full elevation view and layout) must be submitted 2 weeks before the bid date and signed and sealed by a Professional Engineer licensed in the state of the above named project. Approved alternates will be notified by addenda prior to the bid date- Only pre -approved alternates will be considered C. Submission of complete design calculations that are signed and sealed by a licensed Professional Engineer in the state of the above named project The design computations shall include references to all applicable AASHTO code references, documentation of computer programs (including design parameters), and a clearly detailed reinforcement rebar submittal (including sketches of all precast concrete components- D- Submittal must meet the requirements set forth in section 1-6a_ 1-3 MINIMUM STANDARDS: The selected boardwalk shall have the following minimum chardrtenstics: A The precast system shall be designed as a modular flexible system allowing a prescribed settlement at pia locations- Joints shall be designed for such movement to occur without damage to the structural integrity of the system B. Boardwalk system (beams, treads, and curbs if applicable) must be reinforced precast concrete. A material change, inchuding cast -in -place concrete, is not considered an equal to the design shown on the bid documents- C- Walking surface (treads) shall be made of reinforced precast concrete, and supported by reinforced precast concrete beams- Where applicable, edges of treads will receive precast concrete curbs- 7. Connectors for curbs (if applicable) to treads shall not be visible to boardwalk users while viewed 1.5 from the top of the walkway- K All tread -to -beans connectors shall be non -corrosive, and hidden from view- Metallic tread -to -beam connectors are not acceptable for this project- L. Boardwalk supplier shall provide a field representative on site for a minimum of 2 days. Field representative shall be knowledgeable in the installation of precast concrete boardwalks. 1.4 QUALITY ASSURANCE D. Walking surface (finish) of top surface of treads shall have a forraliner finish with one of PermaTrak's standard textures- Texture must be integral with the concrete and shall not be an applied post pour wearing surface- E_ Precast concrete treads shall be structural load bearing elements and shall interlock with one another via a "tongue and groove" connection- F. All precast shall consist of integrally colored concrete in a color selected by the owner from one of PermaTrak's "standard colors"- G- DESIGN LOADS: See PTO1 for pedestrian and vehicular design live loads H. Treads shall maintain a "boardwalk appearance", specifically meaning each tread shall have a width length ratio ranging from a minimum of 3:1 to a maximum of 14:1- Width is defined as the tread dimension perpendicular to the normal direction of travel- Length is defined as the tread dimension measured in the direction of travel L Tread width shall be as noted on the contract drawings- Alignment should follow the horizontal and vertical alignment shown on the contrail plans. A The contractor performing the installation of the pile foundations shall have installed piles of size and length similar to those shown on the plans fora minimum of three (3) years prior to the bid date for this project- The contractor shall submit a list containing at least three (3) projects completed in D- the last three (3) years on which the contractor has installed piles of a size and length similar to those shown on the plans- The list of projects shall contain names and phone numbers of owner's representatives who can verify the Contractor's participation on those projects- B- Manufacturer Qualifications: Not less than 10 years experience in the actual production of precast products as described below. 1. Components shall be factory fabricated and engineered by single entity- This entity shall be registered to do business in the State of the project location_ 1 6 2- Boardwalk supplier (Pura meter) for the boardwalk shall have in-house color mixing facilities for color pigmentation_ 3_ Boardwalk supplier (Pua.asta) shall have either a minimum experience of 5 years or 50 boardwalk projects in design, production, and field consultation- 4- Boardwalk supplier (Prra.asta) must be certified by PCI or NPCA 5. Precast components must be manufactured with the use of hot rolled steel skin in reinforced steel forms- Temporary (ie-, Timber) and/or single use forms are unacceptable unless approved in writing by the Boardwalk Engineer. C. AcceptablilityCritena for Treads and Curbs (if applicable): The finished visible (in the final installed position) surface shall have no obvious imperfections other than minimal color or texture variations from the approved samples or evidence of repairs when viewed in good typical daylight illumination with the unaided naked eye at a 20 ft- viewing distance Appearance of the surface shall not be evaluated when light is illuminating the surface from an extreme angle as it tends to accentuate the minor surface irregularities. The following is a list of finish defects that shall be properly repaired, if obvious when viewed at a 20 ft. distance- Patching (by a trained skilled concrete repair person) is an acceptable repair method. 1. Ragged or irregular surfaces- 2- Excessive air voids (commonly called bug holes) larger than Y. in_ evident on the top surface of the tread or curbs (if applicable). 3. Adjacent flat and return surfaces with greater texture and/or color differences than the approved samples or mockups- 4- Casting and/or aggregate segregation lines evident from different concrete placement lifts and consolidation_ 5_ Visible mold joints or irregular surfaces- 6_ Rust stains on exposed surfaces- 7- Units with excessive variation in texture and/or color from the approved samples, within the unit or compared with adjacent units- 8- Blocking stains evident on exposed surfaces- 9- Areas of backup concrete bleeding through the facing concrete. 10.Foreign material embedded in the surface. 11_ Visible repairs at a 20 ft- viewing distance. 12_ Reinforcement shadow lines- 13- Cracks visible at a 20 ft- viewings distance- D- Installer Qualifications: Firm with 3 years experience in installation of systems similar in complexity A to those required for this Project- B E. Mock -Up: Provide, if required by Architect` Engineer, a mock-up for evaluation of the boardwalk showing the surface preparation techniques and application workmanship- 1. Finish areas designated by Architect 1 Engineer. 2. Do not proceed with remaining work until mock-up is accepted by Architect / Engineer. 3. Refinish mock-up area as required to produce acceptable work DESIGN A For applications requiring mininnvn disturbance due to tree roots or other existing objects specified by the Owner to be avoided during construction, the Boardwalk Manufacturer requires the Contractor or Engineer/Architect to provide a survey of the proposed boardwalk location identifying items of interest inehuiing tree roots that cannot be dishubed per the Owner- B- The designer of the boardwalk, foundation and railing system shall be a qualified registered Professional Engineer licensed in the State of the project location and having a minimum of 20 years of experience in the design of concrete structures, foundation and railing systems- C. The foundation design shown on the boardwalk drawings are based recommendations found in the geotechnical report entitled referenced on PTD 1 (if applicable). DESIGN CRITERIA The design of the boardwalk and railing system shall comply with the following guidelines: 1_ AASHTO LRFD Guide Specifications for The Design of Pedestrian Bridges, 2nd Edition_ 2. AASHTO LRFD Bridge Design Specifications, 8th Edition- 3- American Concrete Institute - Building Cluck and Commentary, ACI 318-19 and ACI 318R 19- 4- In addition to the dead loads of the system, the structure shall be designed for the live loads defined in Section 1-3.G above. SUBMISSIONS: Prior to the start of fabrication or construction, the Contractor shall subunit to the Engineer a design package, which shall inuhide, but is not limited to, the following: FOR APPROVAL SUBMISSIONS: Prior to the start of fabrication or construction, the Contractor shall submit to the Engineer a design package, which shall include but not limited to the following: 1. DETAILED PLANS: a REGISTRATION / SEAL: Sealed by a licensed Professional Engineer in the state of the project location_ b- PLAN VIEW: Full plan view of the boardwalk, foundation and railing system drawn to scale The plan view must reflect the proposed horizontal alignment as shown on the desigaPam- c- ELEVATION VIEW: Full elevation view of the boardwalk, railing and foundation system drawn to scale which retlect the actual vertical alignment- Elevation views shall indicate the elevation at the top and bottom of the boardwalk and foundation system components, horizontal and vertical break points, and location of the finished grade- d DETAILS: Details of all boardwalk and railing system components and their connections such as the length, size and where changes occur; onnections; etc- e- CODE REFERENCE: Design parameters used along with AASHTO references. 2. DESIGN COMPUTATIONS (IF REQUIRED): computations shall: a- Be stamped by a licensed Professional Engineer in the State of the project location_ b. Clearly refer to the applicable AASHTO provision- s- Include documentation of computerprograms including all design parameters- d Clearly show that all reinforced precast treads and beams meet AASHTO requirements for the loading per Section 1-3-F- e- Include sketches of reinforcement in treads and beams, shear and moment diagrams, and all equations used shall be referenced to applicable code. 3- CONSTRUCTION SPECIFICATIONS: a- Construction methods specific to the boardwalk vendor chosen- Submittal requirements such as certification, quality and acceptancelrejection criteria shall be included. Details on connection of boardwalk units and foundation system such that assurance of uniform load transfer shall be checked. FINALSUBMISSION: Once a boardwalk, foundation and railing systems design has been reviewed and accepted by the Owner, the Contractor shall submit the final plans- The designer of the boardwalk, foundation and railing system is responsible for the review of any drawings prepared for fabrication_ One set of all approved shop drawings shall be submitted to the Engineer's permanent records- C- SUBMITTALS: Product Data: Submit Manufacturer's technical product data for railing components and accessories- Manufacturer to supply submittal drawings for approval to include the following: 1- Section-thru details. 2. Mounting methods. 3.Typical Elevations. 4- Key plan layout. D. SHOP DRAWINGS: Shop drawings shalt a- Be stamped by a licensed Professional Engineer in the State of the project locatio b- Show actual field conditions and true elevation and location supplied after field verification_ c- Clearly detail reinforcement in beams, treads and curbs including clear dimension from concrete edge, size and amount of retar- d- Clearly state concrete compressive strength, steel type and strength, and a listing of all component weights including lifting locations- 1-7 DELIVERY, STORAGE, AND HANDLING A. Store products in manufacturer's unopened packaging until ready for installation_ B. Field Measurements: Where handrails and railings are indicated to fit to other construction, check actual dimensions of other construction by accurate field measurements before fabrication; show recorded measurements on final shop drawings: 1- Where field measurements cannot be made without delaying the railing fabrication and delivery, obtain guaranteed dimensions in writing by the Contractor and proceed with fabrication of products so as not to delay fabrication, delivery and installation C. Coordinate fabrication and delivery schedule of handrails with construction progress and sequence to avoid delay of railing installation- e- Air entrained composed of Portland cement, fine and course aggregates, admixtures and water- The air -entraining feature may be obtained by the use of either an air entraining Portland cement or an air entraining admixture. The entrained air -content shall be not less than four percent or more than seven percent- 1-8 WARRANTY: A. Contractor will be responsible for installation defects associated with the boardwalk and abutment components, foundation system, and railings for a period of 12 calendar months from the date of final acceptance by the Owner. B. Boardwalk manufacturer shall warranty all precast concrete components against defects in material and workmanship for a period of 10 years- C- Railing manufacturer shall warranty the railing against defects in materials and workmanship for a period of 12 months- 1-9 MEASUREMENT AND PAYMENT A. Precast concrete boardwalk, railings, and foundations shall be paid for at the contract hump sums price as listed in the bid proposal for "Precast Concrete Boardwalk". This price shall include all materials, equipment, labor and work necessary for and incidental to the design, construction, delivery, unloading, assembly, and placement of the boardwalk and foundation as shown in the contract plans including all railings on the superstructure. PART 2-MATERIALS & TESTING 2.1 PRECAST CONCRETE shall conform to the following: a- The minimum compressive strength of the concrete shall be 4000 psi measured at 28 days- b- All precast concrete shall contain structural steel reinforcement as designed by the Engineer of record- s- All precast concrete components shall be air entrained composed of Portland cement, fine and course aggregates, admixtures and water- The air -entraining feature may be obtained by the use of either an air entraining Portland cement or an air entraining admixture The entrained air -content shall be not less than for percent or more than seven percent d- All reinforcing steel shall be standard uncoated steel conforming to ASTM A615 PART 3- FXFCUTION 1-1 PRECAST CONCRETE BOARDWALK A. Installation of the precast concrete boardwalk system and railings, if applicable, shall be performed in accordance to the approved plans and manufacturers installation instructions Boardwalk manufacturer shall provide a field iepresentative to review installation instructions with the Contractor and Engineer and to certify that the installation has been perfomed according to the approved drawings and manufacturer's instructions. PatentedProduct: U.S. Patent #5,906,084 #8,302,362 #8,522,505 #8,839,588 #9,096,975 ®2n14 by Perm aTraksi this drawing contains i formaion Nat is proprietary to and property of PennaTrak® and hall be kept confdenual. No duplication ordisiribution of Nis drawing may be made without N e express written consent of Pennarrake except for the limited purposes set forth in the contract between PermaTrak® and party for whom this drawing was made- 6 5 4 3 PREPARED FOR: Stewart Engineering 2 1 NO. DATE DESCRIPTION EY: FOR BIDDING PermaTra The Concrete Boardwalk Company www-permaTrak-com TEL: 877-332-7862 OFFICE LOCATIONS FLORIDA TEXAS LOUISIANA NORTH CAROLINA OHIO PROJECT TITLE: ARBOR CREEK GREENWAY Holly Springs, NC JOB NUMBER: 2020-1484 DATE: 12i01/2021 DESIGNED BY: CAP DRAWN BY: CAP CHECKED BY: KAS SHEET NO PrecastSpecs — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Data Shared \Sent\To Stewart\SE20027 - TLB.dwg GENERAL NOTES: OEM S=PI SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH. NC 27603 PHONE 1919.789.9977 sepiinc.com 10'-0" MIN. CLEAR WIDTH 1. BOARDWALKS ARE TO BE SUPPORTED ON 9" MIN. TIP DIAMETER PILING AND CONCRETE CAISSONS. 2. ALL TIMBER DIMENSIONS ARE BASED ON NOMINAL TIMBER SIZES. 3. ALL EXPOSED CORNERS OF 2X8 TOP RAILS SHALL BE FINISHED WITH 3/4" MINIMUM RADIUS. 3 WORKING DAYS 811 m BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. CaII before you dig. 2x8 RUB RAIL CANTED 2X8 TOP RAIL PROVIDE 4. PRE -DRILLED HOLES MAY BE NECESSARY TO PREVENT SPLITTING OF TIMBERS DURING CONSTRUCTION. 2X6 (� DECKING TO BE ATTACHED TO JOISTS USING 3"X0/" GALVANIZED DECKMATE STAR FLAT HEAD WOOD DECK 30° TO HORIZONTAL $ PROVIDE 3/4" RADIUS CORNERS (TYP.) SCREWS (BEIGE COLOR). DECKING SHALL BE ATTACHED WITH TWO GALVANIZED OR STAINLESS STEEL SCREWS THE LOCATIONS OFEXISTING ANDHERGROUNDUTILITIESARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE E THE Emu OVs`NERORITI REPRESENTATIVE. THECONTRACTORCOMMENCIHALL NG WORK, AGRESTOBEIONOFALLOISTINGFORANBAND CDAMEGESW WORK,AND AGREES TO 8E FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT R'S FAILURE TO EXACTLY LOCATE AND BE OCCASIONED BY THE PRESERVE ANY AND ALL LJNDERGROUDND UTILITIES. (TYP.) 36" BLACK VINYL COATED CHAIN LINK o T T ■ AT EVERY JOIST. NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NOR THE IOASSUMEEITHER THEO FENCE PANEL I I 5. ALL BOLTS, NUTS, WASHERS, ETC. SHALL BE HOT DIPPED GALVANIZED AFTER FABRICATION IN ACCORDANCE SHALL BEEXPECTED ANY RESPONSIBILITY FORER BETWEEN POSTS 4 X6 POSTS @ _ = WITH ASTM A153 UNLESS OTHERWISE NOTED. SIMPSON STRONG TIE CONNECTORS (WHERE USED) SHALL BE GALVANIZED. SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. (TYP.) 2"x4" BOTTOM BAND 2X6 DECKING (SEE NOTE 4) � �� 5'-0" O.C. 00 `y } * 6. TREATED TIMBER AND LUMBER SHALL BE USED AND SHALL BE IN ACCORDANCE WITH 2018 NCDOT STANDARD SPECIFICATIONS, SECTION 1082 AND SHALL BE SOUTHERN PINE, GRADE 1 OR BETTER. ■ �'q R 7. ALL WORK SHALL BE ACCOMPLISHED AS DIRECTED BY THE ENGINEER. ANY DISCREPANCIES FOUND ON THIS 4i L 3 DRAWING SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER BEFORE PROCEEDING. a..'........... �:�oF� s5/oy� SEAL r 's Q , I 0 1 8. BASIS OF PAYMENT FOR THE BOARDWALK WILL BE AT THE CONTRACT UNIT PRICE PER LINEAR FEET FOR TIMBER BOARDWALK, PER EACH FOR BOARDWALK POST AND FOOTING, AND WILL BE FULL COMPENSATION FOR 11725 o .... •F %•;• 9G SIMPSON LSTA12 FLAT ° STRAP 45 ANGLE CONNECTING BLOCKING @ PILE LOCATIONS TO PILE CAP (TYP.) FURNISHING ALL MATERIAL, LABOR, TOOLS, AND INCIDENTALS NECESSARY FOR INSTALLING IN PLACE. 9. X-BRACE TIMBER PILES IN THE TRANSVERSE DIRECTION IN ALL BAYS WHEN TOP OF BOARDWALK EXCEEDS 7-0 IN HEIGHT FROM TOP OF DECK TO GROUND SURFACE. ATTACH X-BRACING TO POSTS Wl 5/8" DIA. HEX BOLT AT 3/4"+ GALVANIZED CARRIAGE EACH END. FOR BRACING DETAILS SEE DWG. SB-4. NO ADDITIONAL PAYMENT WILL BE MADE FOR BRACING. BOLTS (TYP.} BRACING COST SHALL BE INCLUDED IN THE VARIOUS PAY ITEMS. 10. 2X4 BOTTOM BAND TO BE INSTALLED 3" ABOVE DECK SURFACE. ••://GIN-1:•• I� • ••.....• • ciC3 �DocuSlgnc R . ++ - /3/2021 P a ' . S .:zraura z•zz . 223WESTST. rjUITS.E 1700 S T E WA R T RALEIGH. NC 27603 T (919)380-8750 ,� ' , 51MPSDN LT512 TWIST -COPYRIGHT '1 STRAP (TYP. EA. JOIST} 9" MIN. TIP PILING 11. VINYL COATE❑ CHAIN LINK FENCE SHALL BE CLASS 2B FUSE❑ AND BONDED MATERIAL AND BE KNUCKLED AT SEPIENGIN ERING8CON RU CTION,INC ' I FOR CIP CONCRETE FOOTING, SEE SHEET SB-2 (TYP.) -iv- __ 1 '. TYPICAL SECTION �- BOTH ENDS. 12. THE NOTCHED AREA ON TOP OF THE TIMBER PILES MUST BE TREATED WITH A WATERPROOFING SEALANT MATERIAL APPROVED BY THE NCDOT MATERIALS AND TESTS UNIT. 13. UNO = UNLESS NOTED OTHERWISE. 14. FOR SUBMITTAL OF WORKING DRAWINGS, SEE SPECIAL PROVISIONS. Arbor Middle Greenway Creek Creek - SECTION A -A 15. FOR APPROACH RAILS, SEE SPECIAL PROVISIONS. 16. FOR TIMBER BOARDWALK, SEE SPECIAL PROVISIONS. 17. FOR CONCRETE APPROACH SLAB, SEE SPECIAL PROVISIONS. 18. STRUCTURAL FACTORED LOADS USED IN THE BOARDWALK DESIGN ARE AS FOLLOWS: 10 FOOT SPAN ADJACENT TO 10 FOOT SPAN: Town of Holly Springs Parks and Recreation PREPARED FOR: BOARDWALK LOCATIONS COMPRESSION 9.1 KIPS PER PILE (DEAD + LIVE) Town of Holly Springs BOARDWALK # CHAIN BEGIN STATION ELEVATION END STATION ELEVATION LENGTH 20' SPAN 25' SPAN LATERAL 0.9 KIPS PER PILE 128 S. Main Street A -A- 109+47.00 332.0 111+37.00 332.0 190.00' YES - Holly Springs, NC 27540 B -A- 115+37.00 335.0 115+87.00 335.0 50.00' YES - 10 FOOT SPAN ADJACENT TO 20 FOOT SPAN: COMPRESSION 14.2 KIPS PER PILE (DEAD + LIVE) C -X- 11+70.00 336.41 12+20.00 335.41 50.00' - YES LATERAL 1.4 KIPS PER PILE NOTE: AT LEAST ONE TWENTY FT SPAN IS REQUIRED FOR EACH BOARDWALK. CONTRACTOR CAN CONSTRUCT 15 FOOT SPAN ADJACENT TO 25 FOOT SPAN: REMAINING SPANS AT 10 FT OR 20 FT. SUPPORT LOCATIONS SUBJECT TO THE APPROVAL OF THE ENGINEER. COMPRESSION 18.0 KIPS PER PILE (DEAD +LIVE} LATERAL 2.6 KIPS PER PILE CONSTRUCTION DRAWINGS REF #: 09-012 19. FOR FOUNDATION NOTES, SEE SHEET SB-2. DATE PROJECT: SE2C.027.00 ISSUE: DESIGN LOADS PEDESTRIAN LIVE LOAD 90 PSF REVISIONS: VEHICLE LIVE LOAD AASHTO H5 10,000 LBS. WIND LOAD ON DOCUME JT NOT CONSIDERED SUPERSTRUCTURE 35 PSF FINAL UNLESS A L L SIGNATURES COvPLETED PRAWN DAVID PE ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY:: THRUPHEL S, ELIZABETH PHELPS, PE WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE TYPICAL BOARDWALK DETAILS STANDARDS AND SPECIFICATIONS 30' 15' 0 30' sB.1 SCALE: 1"=30' NORTH — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Data Shared \Sent\To Stewart\SE20027 - TLB.dwg FOUNDATION NOTES:S Pi FOOTINGS FOR BOARDWALKS A AND B SHALL BEAR ON WEATHERED ROCK AND ARE DESIGNED FOR .= AN ALLOWABLE PRESSURE OF 6000 PSF. SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE j -- Z 9" MIN. TIP DIAM. TIMBER PILE IF THREE FEET OF FOOTING EMBEDMENT CANNOT BE OBTAINED, USE ALTERNATE FOOTING DETAIL 3" MIN. ON SHEET SB-4. BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE60D C 27603 PHONE RALEIGH.NATURAL 19N9,7899977 UNDISTURBED GROUND FOOTINGS FOR BOARDWALK C SHALL BEAR ON MATERIAL THAT WILL SUPPORT A MINIMUM BEARING PRESSURE OF 2500 PSF. sepiinc.com Q 1 WI Me% CO Z IZ 811 u). �1— _ _ m 3 WORKING DAYS 3 -#4B1 (PROJ. 6" MIN.) BEFORE YOU DIG wCO1 � 5 - #4K1 TIES a@ EQ. • _ BILL OF MATERIAL FOR THE I IND IONFAC OF UNDERGROUND FnCILITIES Know_ below. T —II I� II I� II — C a II before you dig. III —I I AVM /� �' THE LOCATIONS G UNDERGROUND AN THE LOCATIONSSHOWN UN � I� A `J o _ ■ T TIFF- A j�j C 0 N FOR C. POST ONE 2 FOOTING — �J A ONLY HAETBE INDEPENDENTLY WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE EN RI OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE FAILURE PRESERVE ANNY AND ALL UNDERGROUDND UTILITIES.TO EXACTLY LOCATE AND 4 - #4A 1 BARS NOTICE: COlu —11=11=11= EQUALLY SPACED 11III-I BAR NO. SIZE TYPE LENGTH WEIGHT CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF I CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER A 1 4 #4 STR 2'-9" 7THE SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR o ■ II 3 - #5 B2 BARS f WSAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, i C^r) CD B 1 3 #4 STR 11-8" 3 OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. * _ B2 6 #5 STR 1'-5" 9 1'-3" MIN. LAP 3" CLR. i — I I I I I I III —I I 1,_6„ O K1 5 #4 1 6'-0" 20 3 - #5B2 BARS1- \— �� @ 1,_0„ O.C. STANDARD MASONRY BRICK REINFORCING STEEL 39 LBS. a..H••55 R°za, goy 2'-0" DIA. - ALL SPANS BOARDWALK A AND B SUPPORT PLACED IN ALL BAR DIMENSIONS �; 0 •; 7 -7 - ROWLOCK POSITION (TYP.) ARE OUT TO OUT CLASS AA CONCRETE 0.4 C. Y. A.. 1--. 1--.'s 11725 9 Nc1t4 :. 3'-0" DIA. - 25 FT SPAN BOARDWALK C BILL G F MATERIAL Gio'•- •'� V 2'-6" DIA. 10 FT & 15 FT SPANS BOARDWALK C ■ ■ (Docusigne.•,: -R R. 3/2021 CONCRETE POST FOOTING DETAIL FOR O N E -6�� P`u'" i- / 1 s ��r�aDra z•zz NOTES:; CONC. POST FOOTINril EW00T5T. TEMPORARY DEWATERING AND TEMPORARY CASING MAY BE REQUIRED BAR NO. SIZE TYPE LENGTH WEIGHT STEWART RALEIGH, NC 27603T(919)380-8750 DURING DRILLING OR EXCAVATION OF HOLES FOR POST FOOTING. Al 4 #4 STR 2'-9" 7 COPYRIGHT ©2021 SEPI ENGINEERING 8, CONSTRUCTION. INC B1 3 #4 STR 11-10" 4 11-3" MIN. LAP B2 6 #5 STR 1'-11" 12 Arbor Creek 2'-0" O Kl 5 #4 1 7'-6" 25 - Middle Creek c TIMBER [44 N CONCRETE PILE & POST FOOTING REINFORCING STEEL 48 LBS. Greenwa y ALL BAR DIMENSIONS 3 #5B2 6" O.C. ARE OUT TO OUT CLASS AA CONCRETE 0.6 C. Y. Town of Holly Springs - @ Parks and Recreation 6„ 6„ BILL OF MATERIAL 9" MIN. TIP DIA. TIMBER PILE - 3-#4B1 (PROJ. 6" MIN.) FOR ONE 31 01! CONC. POST FOOTING 4 - #4-Al BARS PREPARED FOR: EQUALLY SPACED ilp 3 CL. TO CLOSED BAR NO. SIZE TYPE LENGTH WEIGHT Town of Holly Springs CIRCULAR TIES (TYP.) Al 4 #4 STR 2'-9" 7 128 S. Main Street i ► B 1 3 #4 STR 2'-0" 4 Holly Springs, NC 27540 � A5 1'-3" MIN. LAP B2 6 #5 STR 2'-3" 14 T #4K1 TIES .� W - @ 2'-6" 0�I K1 5 #4 1 9'-2" 31 EQ. SPA. 41 CONSTRUCTION ► ► REINFORCING STEEL 56 LBS. DRAWINGS d ALL BAR DIMENSIONS REF #: 09-012 m D ARE OUT TO OUT CLASS AA CONCRETE 1.0 C. Y. DATE (.0 PROJECT: SE2C.027.00 cf, g ISSUE: i P''C� 2 %4"X4%2" SCREWS, SCREW 2 - 3X12 PILE FROM CAP MEMBERS - OPPOSITE FACE AT ADJACENT / �r�N SET OF SCREWS REVISIONS: 2'-0" DIA. - ALL SPANS BOARDWALK A AND B {" o DOCUMEJT NOT CONSIDERED 3'-0" DIA. - 25 FT SPAN BOARDWALK C - o FINAL UNLESS A L L SIGNATURES COvPLETED 2'-6" DIA. 10 FT & 15 FT SPANS BOARDWALK C 24" PROJ. MGR: DAVID RUGGLES, PE SECTION A -A ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ELIZABETH PHELPS,PE DOUBLE 3X12 TIMBER CAP NAILING PATTERN WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE TYPICAL BOARDWALK DETAILS STANDARDS AND SPECIFICATIONS 30' 15' 0 30' SB-2 SCALE: 1 " = 30' NORTH FULL DEPTH BLOCKINGs AT EA. POST AND MIDSPAN LOCATIONS (TYP.) ip p 1 SEPI ENGINEERING & CONSTRUCTION, INC. CHARLOTTE RAGEAUFORT,ISC SEE DETAIL C BOARDWALK DECKING 3X12X1'-6" SPLICE BLACK BOARDWALK APPROACH SLAB I CHOARLESTON, SC SEE DETAIL B (SEE SHEET SB-6 FOR APPROACH '°' SLAB DETAILS] 3X12 JOIST 1 GLENWOOD AVE. 1 SUITE 600 N a 3X12 JOIST 3X12 SPLICE BLOCK RALEIGH. NC 27603 PHONE 1 919.789.9977 . JI JI 1 y JI sepiinc.com I � Is I 6" MAX. —„ 3X 12 0o _Al .4,410 1 tr (TYP.} JOIST r I 1 I t 2 I 9" MIN. TIP DIAMI. TIMBER I I PILES CJ i 3X12 PILE CAP ER N ,1 �/2A 8 m 3 WORKING DAYS BEFORE YOU DIG FOR THELOCATION F FII°IES I AMEMB Know what's below.U.NDERGROUN0 I I I I I D I I Call before you dig. I I 3X12 PILE CAP MEMBERS b THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN I I (TYP. } (>J w, (7V{1 1 1 1 I I 1 I 1 APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT 1 1 1 1 1 _ I _ _ I BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND 1 1 1 1 1 I _ - I PRESERVE ANY AND ALL UNDERGROUND UTILITIES. _ D z I MIN. _ ,_ _ I j-3/4I!� THRU BOLTS NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF t �4 (TYP.) 1 _ _ _ — _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ I THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER c SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR 1 I I 1 N I I SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, 1 1 1 1 I OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. I "' I 81-3" 1 1'-7" 3X12 PILE CAP MEMBER ♦� ~I� 01 A _— — 1 1 1 1 1 i Tr _— -L — �7 I r 1 1 11 (TYP. EACH SIDE OF PILE) I I I J , % O THRU BOLTS .,k II II r 1 h 3X 12 - — 111 CAR°! 1 '"' 1 � I I 4 JOIST rWI. - I TIMBER PILES '\N'' ice_ i�__ 21/2" NOTCH TREATED I� q �� 0...0.ssip• 4, _ — _ __ — KM II. - - - - - - - - - - - - - - - 1 li I I WITH WATERPROOFING 1 SEALANT MATERIAL {TYP.} I ELEVATION r • SEAL �• c 11725 ? ;••sA A END VIEW % 2X6 TIMBER DECKING '� 3X12X11 -6 WING WALL BOARDS 3X12 SPACER 4 X 6 RAIL (3 REQUIRED} 2- s/"o THRU BOLTS POST (TYP.) BEAM CONNECTION TO TIMBER PILES G�'•• 1��••• (3 R . �\ ne.: ii /3/2021 PLAN VIEW — BOARDWALKS (SEE DETAIL B)(TYP.) (TYPICAL 10' SPANS) ,_>:„r,,aura • 2422. rw..i 223S.WEST ST. SUITE 1100 SECTION A -A, SEE SHEET SB-1 STEWART T(919 )380-87 07603 RAEIFOR 4-NO. 10X31/" STAINLESS STEEL COPYRIGHT© 2021 SEPI ENGINEERING 8 CDNSTRUCTION.INC RAIL SCREWS PER RAIL PER POST (TYP.) Arbor Creek - Middle Creek - - - - - Greenway 2X8 TOP RAIL A 36" BLACK VINYL COATED CHAIN LINK FENCE (TYP.) TENSION BAR (FROM DECK SEE DETAIL A FOR CHAIN LINK TO POST TO TOP RAIL) (VINYL ATTACHMENT DETAIL DETAIL A ATTACH COATED TO MATCH FENCE) USING GALVANIZED FENCE STAPLES SPACED AT 18" O.C. MAX. TOP AND BOTTOM RAILS TENSION BAR TO POST NO. 10X3 STAINLESS STEEL Town of Holly Springs Parks and Recreation rCANTED 5'-0" 5'-0" 5'-0" 5'-0" ATTACH 2X8 TOP RAIL Wf(2) #10x3" SCREWS (TYP.) 36" BLACK VINYL COATED CHAIN LINK FENCE 4X6 RAIL POST (TYP) WOOD SCREWS @ 12" CTS. PREPARED FOR: .:t•=•=•=•ot , •••=•'•'•=•=• o..t.st• t•st•=•=•'•' •st ':::•:. ❖•••••❖:❖::❖::•::•,. i❖•❖:❖:•••:❖:❖••••:❖:❖:❖: t i, ••••:❖:❖:❖•❖••:❖ •.••4.•••4_. S I M PSO N B P �/ - 3 TYP. 1- { } Town of Holly Springs :�:�•::�:�•� , :::• •:•::�:�4: i' :�•�:�:�:�:4 .❖.•.•.❖.❖.❖.,•s•.•❖.❖.•.❖., •❖•:4 •❖:❖:❖•❖:❖:❖:❖:❖: •...•...►...•.....•....•.•.❖.,, �:❖:❖:❖:❖:❖:❖:❖:❖:❖:❖:-: ►❖.❖.•>•—• ::,❖:❖:❖:❖:❖:❖:❖:❖:❖:❖4 ►•.,.•.•.❖.❖.❖.•.❖.•.❖.❖.•t•St 2X8 RUB RAIL ATTACHE ❑ TO POST WI MIN. 8 ' c�v 128 S. Main Street ,•.•.❖❖. •.❖.❖.•.❖❖.•.❖.,, . !� .:❖:❖:❖: , .t.- ❖-❖;•- 7.7❖:❖:❖;❖:❖:•;❖:4 �At..�At.J. T•T• •04•000.2iToo •2. o • •• • • .•....•....•..❖.❖.4- .....................� �►❖:❖:❖;❖:❖:❖:❖:❖:❖:❖-v AA. ►�:❖:❖:❖:❖:❖;❖:❖:❖:❖:❖:; e., ..•..•..•..•.•.. „ O F 4-N O. 10X3 / STAINLESS STEEL Holly Springs, N C 2 754D , ...._.... ------- ........i _...... ... ---------=----=--=-=-. S«SOS..oSOS..oSot...vt.►-1 .,•.•...•.t•- .4%. .6. .4%..6. . =-=-_-==-=--=-=--:-:-, . ..t.•.•..A•.•.•.� -::-:-:--:-::-:-::-_-� GALVANIZED ':':':':':':=: • :::• :::::::::::::::::; :::::::::::::::::; ►::::::::::; :::::::::::; SCREWS (TYP.) s/ "O FENCE STAPLES „ ❖❖:❖:• ,j.�o.�.�.�.� .❖.❖.❖.• •❖:':❖❖❖:❖:❖:❖:❖:❖:❖ti ••,,..,.�.�,�.�.�,�.�,�.�,�.�.�,�.�• •4 •.❖.❖.❖•,.❖.❖.❖.❖.❖.❖.❖� :❖❖:❖❖❖❖:❖:❖:❖:❖:•: •..,,.,.•�.�•�,�.�.�,�.�.�•�.�,�.�,�� .❖.❖.❖.❖.❖.❖.❖.❖.❖.❖.•, ':❖:❖:❖:❖:❖:❖:❖:❖:❖:❖:ti ,..,.,.�.�,�.�,�.�,�,�.�,�.•�,�.�• •4 .❖.❖.❖.❖.❖.❖.❖.❖.❖.❖.•� ':❖❖❖:❖:❖❖:❖:❖:❖:❖:•4 •,.,..,•.�,�,�.�,�.••,�.�,�•�,�.�..� REINFORCED CONCRETE APPROACH 3X 12 JOIST � - - - 2- s THRU BOLTS 5 PA. @ 18 O.C. .�.❖.•.�.• •.�.❖.�.❖.•.,�.❖�.•�.❖.�.•.•� .❖.�.•.�.•.�.�•.�.❖.�.•.�.❖.�.•.�.•. ,•,•.•,•.•,•,•.•,•.•,•,•.•,•.•,•,•.•,•.•.•,� �.❖.❖.❖.❖.❖.❖.❖.❖.❖.❖.•� ,•.•.•,•.•,•,•.•,•.•,•,•.•,•.•,•,•.•,•.•,•,� (SEE SHEET S B-6 FOR PAVEMENT ,. - - - WI WA5 H E R5 TYP. - WASHERS(TYP.) •• ��•�,4.4•�•,4•6••4•� ••••••••••i•••i•••••i•••••••••i•••••NNN1 ,'• • ••• • •••••••••••••N•••••••••N• • ••• • •N• ••AN••N••� N••�•�•�:N4.•.44 MAX. TOP AND ( BOTTOM} (TYP.} ,...5,••:•••.• ;•;.;.;.;.;.;. , 44,•••••;�, ;.;.-•;.;.;.;.;.;.;.;.;.-.;.;.;.;.;.;.;.;.; �44;44;.•e;.•�e;.•4X4X44:4�)4. : ►:❖:❖:❖e"weme" —*:❖:•A • 4,❖:❖:❖:❖:❖:❖:❖:❖:❖:❖� DETAILS) = CONSTRUCTION N DRAWINGS 3X12 SPLICE BLOCK • 3X12 JOIST REF #: 09-012 El I DATE ' II ' 3X12 SPACER PROJECT: SE2C 027.00 2- %"O THRU BOLTS ; ABC STONE ISSUE: 3 „O THRU BOLTS /4 4 3X12 PILE CAP 2 2" NOTCH IN (SEE DETAIL B)(TYP.) DETAIL B - MEMBERS (TYP.) TIMBER PILES �� 3X12X12'-0" WING WALL BOARDS - WI WASHERS TO PROVIDE 9" MIN. TIP DIAM. (2 REQUIRED) (ABOVE AND SIMPSON BP 5/8 - 3 (TYP.) (TYP.) FULL BEARING (TYP.) TIMBER PILES BELOW CAP} ' 1 =1 11—�— - --1 1= 1= -I 11- !� I -111-4 - 1 I-1TI—ll 51J 11—'L_ I 1 fnA �^I������� REVISIONS: 11 l I � 1 E5-L 11 ICI 11-111�11 2X4 BOTTOM I BAND s�"O A � 2- THRU BOLTS• 10'-0" 10'-0" 10'-0" 1 7/4„ 3X12 JOIST -- W/ WASHERS(TYP.) DOCUME JT NOT CONSIDERED FINAL UNLESS ALL ELEVATION VIEW SIGNATURES COvPLETED —BOARDWALKS CV FOR SECTION A -A, SEE SHEET SB-1 PROJ.MGR: DAVID RUGGLES, PE 3X12 JOIST ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ELIZABETH PHELPS, PE WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE TYP I CAL BOARDWALK D ETAI LS 3X12 SPACER STANDARDS AND SPECIFICATIONS (SEE SHEET SB-1 FOR SECTION A -A) DETAIL C 30' 15' 0 30' s B.3 SCALE: 1"=30' NORTH 10'-0" CLEAR WIDTHs op p 1 mil 1 (6 E SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH. NC 27603 PHONE 1 919,789.9977 sepiinc.com 811 m 3 WORKING DAYS FORE YOU DIG 4'i� rl' I 1� !< � 4PJ�j iTr'I i��V III '1 i� ,fie o C' ,���� ► %" 0 HEX BOLT FOR THE LOCATION OF Know what's below NDERGROUND FACILITIES ] [ ((�� 0 [ Qp�a CaII before you dig. I O 1 U 1 i I r�j 0J� THE LOCATIONS OF EXLSTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE 2 X X X X-BRACING OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE +I ■ 0� �� [� 5 6 I `�, EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. rT �,�� O `�' I '* T3J NOTICE: • CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. %" 0 HEX BOLT TYPICAL 2 X 5 X-BRACING USE TRANSVERSE BRACING WHEN THIS HEIGHT EXCEEDS 7'-0"(SEENOTE9 ON SB-1) iv ,��,••CAR0`i / ' 21/2" MIN. Z�/2" MIN. =a1.0FE551p r • r SEAL • TIMBER PILES F I• FI 11725 TIMBER PILES �j = F ��.� • C- — PILE CUT-OFF SPACER rT DETAIL D�Docuslgn'...� �o •.... �� R, R _ _ 11i _-/3/2021- if �i r "�"� �S 3-n7_ ILL-_1I�f - i I + - - t�V1 =�� TYPICAL BOARDWALK BRACING CONNECTION DETAIL FOR ZO' SPANS \ 1 I j �C,LE276EDF4'2422.. WEST 5T. ��SUITE � I / CONCRETE FOOTER NOT SUITEE 1700 rw..i RALEIGH. NC 27603 S T E WART T(919)360-8750 _ _ _ SHOWN. SEE SHEET SB-2 COPYR SEPI ENGINEERING R�CTIoN.INC TRANSVERSE BRACING DETAIL (TYP.) Arbor Middle Greenway Creek Creek - Town of Holly prings 9" DIAM. TIMBER PILE #5 10" 51-0" 5'-0" 5'-0" 5'-0" @ 9"DIAM. TIMBER PILE Parks and Recreation .. I Az— EACH WAY o . 1-4-- ■ %a #4B1 ►•ttt•••te•W•Sttts•tM AS .Z _ . •t t•••• v....v. +. A41::41 -*St•St v v - -..-; , •t❖ ♦tttttt►• A� AS > tt t tttf t♦♦ ♦ttttttft♦4 AAS AAA. AAA A� A• • AM A• t t t•�C•!t�t�t�t+t�t�i�t�t�t�t�t*t�t*• • t i t_ t t'. ♦".4 t +t;t+t;•�.., tttt+.+t� 4::::244:47:4;11.;:44'......:**-4 �4.4: t•..- ++++•+++++t+++•++t+++•+++ / •�t�t�•� - t� .- .- v +++•.++++•.++- t t�t�•Z. ■ • UJ++►++++++++•++++..6... tttttt • I t t tt t f t t t t. t ta ��ti+tA+t��AA�14 -..- «.... ................... ....... - - - - - E LLI _ •■ CI) PREPARED FOR: tt..... �AAAAA ♦tttttttttttttttttttt ►...................tt AAAt�AAAAAtAAAAAAtAAA tt•tt•tt+t.•�t�t�t�t�t�t�•A .... .----._ -r t t t.. t t ~ .tt......t-..+.t.t.ttt ... «......._. «...........,_._. �ttt�tttt��tt�tt♦ ♦tttt♦ N ��A 3-#4B1 ~K - - o �nTown . t t t. t. ii.ii..«.a«.�.�.� ;•;;;;;;;- ***••••ta ~•-t-i-tt�1�t�t�t+t+•�t����t♦ti♦ itttttttttttttttttttt♦ tttttttttttttt ttt... ♦�ttt�♦......�:�:�:�:�:�:�:�:�:�:�:�:�:�:�:�:�:�:�:�:�:�: • ' of Holly Springs »»> •tt•t•tt•t• tttttt• ••iitiiii ..•.... --------------------- t+t•tt+t+t•t•t+•t•tt•• •t•t+•t•t• t+•t+t••t •►tttttttttttttttttttt•♦ ►•iiiiiiiiiiitiiiiiii+iii ..........•..•........t ;;;4 ::::+:t«•:•: t t•+tit+t• 0t *O* 14 Ot t • ♦ i •♦t•♦•,•••t•t•tttt•♦t♦t .••ii.it t t• t �•i• i• i •t t t. tit*p•,•t.� •t•ttttt•••*+•,t•ttttt•♦ +.•tt•tt..ttttttttt.ttt, ••t•t+.•t ..••••••+•+••+••••t•++tt••••..i t*�t•t�tt*�t�••t�•�tt*b••.tt*t,t•.+.t.�t*t� ••.ttt•t•t•••••t• tttt••� •••t•••••••t•••••t•••••••+•••••••••••••tt• ►y�t�0•y�t�t•.�t�0•y�t�0•y�t�pt�t�t t.tt.tttt.t.t•t.. ::�.�.�:��• .�:•�.�:�•:�.�:�%' � ••••••••••••• t0•y�0•••• .t.... :��:�.�: r .. � N .� 128 S. Main Street Holly Springs, NC 27540 .•o.+.o o. t ttttt ►+.+.o.+.o.+.+.o+.+.o o.+.o+.+.+.•.• ►4 . t.•.•.•t.❖tt. t,.+.t.•.•*t*.tt.,;.+ t*.•ttt.tt.t.• +•.❖.o;.;.;t;•;«;•;•;•;,.;:;:;;::;;:;; tttt t.tt....... t. •*iiii +,ttttttttttttttttttt♦ ,ttttt A • ■ - a A mt. .....tt+.ottttttttt+.•t ttttttttttttttttttttt •••tttttttttttttttt tt...... ,i.iiitttttttt t.+�t_t�rt_ ►tit_•••...•._ t_•t�V. •_tom♦ ����� t•O��O.O� ►��O��O.O��O•��O.O•���•��0•� •►tttt•�+ttttt•�tttt•�+ttttt•�tttttttttt+•t tt*...•.......+tt*••tt+ttit•tS. _ tt�t.. ■ ■ ■ • �a #4K1 c�C 5,T +•ttt•�ttt t_t..t_t. ••t•••♦♦•'+t«•�••+•t••++•+•t•�t•♦•+•,+.t, .t t..t.-t.• t.. —..t...•.. - _ . ■ _.t_t..t_t_._t_t..t_t..t_t_._t_t .•..t.❖.+. ..❖.•..❖.tt.❖.t❖.+t.❖.tt.•. ,t••.+.�t�t*tt.+.t.;.;t;.;.;.;t;.;.;.;.;.;t - .• - #5 @ 10" e ��� ., �. EACH WAY CONSTRUCTION :I. SLOPE VARIES 3'-0" SQUARE 3'-O,T DRAWINGS 3X12 JOIST PILE CAP 4'-0" SQUARE (25' SPAN) 4'-0" (25' SPAN) REF #: 09-012 2 - 518"0 THRU BOLTS PATE (SEE DETAIL B, SHEET S B-3)(TYP. ) / PROJECT: SE2C 027-00 TIMBER PILES (TYP.) 1-4.- ALTERNATE CONCRETE FOOTING DETAIL SECTION A -A ISSUE: 1 .. USE ALTERNATE FOOTING DETAIL FOR SITUATIONS WHERE 3 FEET EMBEDMENT CAN NOT BE OBTAINED [F1=111=ll =I I 11III j_jilE-lli=lsl 11 -11I= 11=1-9--=-.01 FOR CONCRETE POST FOOTING DETAIL. 10'-0" I 10'-0" I 10'-0" REVISIONS: Aar. (HORIZ. SECTION) r~ (SECTION BASED ON HORIZ. DIST.) I. (HORIZ. SECTION) DOCUMEJT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COvPLETED ELEVATION VIEW WITH SLOPED DECKING PROD. MGR: DAVID RUGGLES, PE DAVIELIZA GLES,,PE NOTE: ALL BOARDWALKS ARE LEVEL. THIS ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ERU DETAIL IS ONLY APPLICABLE IF FIELD WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE ADJUSTMENTS ARE REQUIRED. STANDARDS AND SPECIFICATIONS 3 0 ' 1 5 ' 0 30' s B_4 SCALE: 1"=30' NORTH BOARDWALK DECKING 3X12 JOIST s ip p 1 FULL -DEPTH BLOCKING SEE DETAIL F WITHIN 6" OF POST AT BENT 2 - 3X12 PILE CAP MEMBERS SEE DETAIL E 2-3X12 PILE CAP MEMBER 6X12 JOIST NOTCHED 6X12 JOIST SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE (TYP.) @ 20' SPAN SIDE OF BENT (TYP.) BEAUFORT, SC I CHARLESTON, SC �� o r (SEE SHEET SB-6 FOR NAILING PATTERN) I @ 10' SPAN SIDE OF BENT (TYP.} 1 GLENWOOD AVE. I SUITE 600 RALEIGH. NC 27603 PHONE 1919,789.9977 1 u u 11 1 v sepiinc.com . I 6X12 I I, $� 11 " JOIST `�'"i PILE I I I CAP T I MEMBER 811 m 3 WORKING DAYS 9" MIN. TIP DIAM. TIMBER PILE (TYP.) v ftHI CO i - ! 1 BEFORE R THE YOU DN IG uNDERGROUND FACILITIES _ I I ❑ _ _ -------------T— -- Know what's below. III 'Cr III Call before you dig. !III !III i 4„ I I THRU BOLTS THE LOCATIONS OF EXISTING UNDERGROUND UTILRIES ARE SHOWN IN AN IIII III III III -_ �CC77 — _ - _ __—_ I - I I I 1 1 APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE ENACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND I I I AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT ~ CO I I /� 4" MIN. I I I BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. o I (TYP.) i I I I 8'-3" i 1'-7" NOTICE: SITE SAFETY THE RESPONSIBILITY I I i I I FULL -DEPTH BLOCKING r I I SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR AT 5'-0" MAX. CTS. MIN. (TYP.)(TYP. EACH SIDE OF PILE) ! u THRU BOLTS ! SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, (TYP.) II to9" OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. V----- I' T NOTCHED END OF `� i 21/" NOTCH TIMBER PILES I I I I 6X12 JOIST (TYP. AT +' I I 6 X 12 - . EXT. JOISTS FOR 20' (TYP.) y ` ! I I Ij JOIST cv SPANS) ELEVATION iv » u II II I I END VIEW •AR pi/' = �.�N 'FE551p'V _ oN " II BEAM CONNECTION TO TIMBER PILES =a • o r- SEAL 10 „ -0 SPAN20'-0" 2- 5/"O THRU BOLTS (SEE DETAIL B)(TYP.) 3X12 SPACER 4 X 6 RAIL POST TYP.) ( SPAN 10'-0" SPAN TYPICAL 20SPANS ' ( } • �.... F % ' `' .' G� •• �••��' R .0 ► I~ ► c—oocuSigne, . - - 11 . �- 3/2021 �C E276EUF4'2.22 . PLAN VIEVIL SIMPSON BP - �� FT SPAN /g"o - 3 (TYP. 5SIMPSON BP /$}� - 3 (P•� 223 S. WEST 5T. 100 rw..i NSUITE FI. RALEIGH, NC 27603 FOR DETAIL B, SEE SHEET SB-2 S T E WART T(919)360-8750 �� 15 FT SPAN SIMILAR ► COPYRIGHT© 2021 — — — — — — SEPI ENGINEERING 8 CONSTRUCTION. INC I VI 1111111'. " 6X12 JOIST WWASHERS TOYP.S 2- THRU WI/WASHERSOTYP. ___ ___ Arbor Creek TOP 2X8 RAIL 5'-0" TENSION BAR (FROM TO TOP RAIL} (VINYL COATED TO MATCH 5'-0" DECK SEE ATTACHMENT FENCE) 5'-0" NOTCHED 6X12 JOIST DETAIL A FOR CHAIN LINK TO POST 3X12 JOIST DETAIL ON SHEET SB-3 3X12 SPACER ATTACH 2X8 TOP RAIL Wl(2)#10X3" DETAIL E 6X12 JOIST 6X12 JOIST 3X12 SPACER DETAIL -N F Middle Greenway Town Parks of and Creek y Holly prings Recreation WOOD SCREWS 12" CTS. [ 36" BLACK VINYL COATED CHAIN LINK FENCE 4X6 RAIL [POST (TYP) @ AT CAP AT INTERIOR RAIL POST 2X8 RUB RAIL ATTACHED >!••_••_•!•_•!••_• •_+!•`', •_••_•!•_•••_••_••_•!•_•!••_••_ !•' r•! •!•!••_ !••_••_•,_•'••_••_. •_ _+!••_ _ •_•!+!• _ . w._:!!••_•!•_•!••_••_••_••_ !•!•!+!••_•!•_•!•! ' •,_•!••_••_••_••_•!•!••_ !••_•_ •_.t!•!••_••_ !••_••_ TO POST Wl MIN. OF 4-NO. 10X3 % " 4.... - N •:❖:❖:+:•:� ..............�. ir.... •'• •• •❖:+:•:• !+. •❖❖ •••: > .+.+.......+.+......,: •+❖❖:+:❖+:❖:❖ •• •• •❖:+ ..•:..+....+..+.+..... ►+•:❖❖• • •❖:+:❖❖:+:❖:•: I VW- — ...+..+.+.... i ❖••+:❖❖❖:+:❖❖+:❖•• STAINLESS STEEL SCREWS TYP. (TYP.) :� F.....At... :: = :: : ;•............... � : : : :: •.............. � : : • ►................... ............., ......� .•.•.....+..I+..I+.•.•.•.•.•..I..+..I+... cox* PREPARED FOR: .._... ':'':':='' ----••-•••-•_.vv v ' •:❖:❖:❖:❖:❖:❖:❖:❖❖❖: ................... ❖❖:❖❖:❖:❖:❖❖❖:❖:•: .;•; ;._._...._... ►❖:❖:❖❖:❖:❖❖❖:❖❖:+: ►❖:❖:❖:❖:❖:❖:❖:❖:❖:❖:•: Town of Holly Springs GALVANIZE ❑ FENCE STAPLES SPA. @ 18 O.C. •❖•❖•❖••i ,❖❖.❖•. ••.•••••+•.�• '.,.±+2•!•2.!.! ❖:, •❖•❖•❖•❖•❖•❖•❖•••❖:• .•••.,•.•••.+•.+••••.+••.•�•�•••••• , ...•.•..... 4„..•... .+...+• •...•+.... .+�.•.• •".•...• :❖:❖•❖•❖•❖•❖•❖••:❖:❖•❖ •••�++••.+•.+�•.••�•�•••.••• .•..... .•:.•+.... A... ... ..:+..�.� 4.• •'+_+!._., ••!+_+!._., ►•••••❖•❖•❖•❖•❖•❖•❖•❖•❖:• ►•• •.+•.•.+.•• •.+• •• •. .• •.+••••••••�•�••�••••�••�•�••�••�•�••�•�••�•�•�• ,►..+...+�.�.•..... .+.... .+�..... .+.... .+........ . ►_., !+_+_._+_••.•_..•!+_+!..•.•+•. •❖:❖•❖•❖:❖:•:❖:$❖••.....' , .... .+.... .+..�.•..... ...... ...... .+.... .+...... .+.... . •+�.❖.❖.•.❖.❖.❖.�.❖.•.•.�.❖.• REINFORCED CONCRETE APPROACH (SEE SHEET SB 6 FOR DETAIL) 128 S. Main Street Holly Springs, NC 27540 MAX. TOP AND ( BOTTOM) (TYP.) :❖:❖.❖:•: _+_+!._.2•_+_:•1.._+_._+2•!•_+!._.2•!+_ :❖:❖:❖:❖:❖:•••7N❖.❖:❖:❖ _• ,• ..�._+2•!+_+_._• ; ►:❖:❖:❖:❖:❖:❖.❖:❖:❖:❖:• _., ; ►:❖:❖:❖:❖:•:.:❖.'.W.:❖••. • • • • • • • • • • • • • • • • • ••• • • CONSTRUCTION ll FI DRAWINGS .. 2 - 518"O THRU BOLTS 6 X 12 JOIST (SEE DETAILS E & F) TYP. : f ABC STONE REF #: 09-012 } DATE SEE BEAM CONNECTION 2X4 BOTTOM BAND 3X12X12'-0" WING WALL BOARDS PROJECT: SE2C.027-00 TO TIMBER PILES DETAIL (2 REQUIRED) (ABOVE AND BELOW CAP) ISSUE: 4 - 3X12 CAP (TYP.) MEMBERS — I l;l 11 — _=L=1II=1I111 Ei 1 AEAl-1Tf J Ll }� i 1 l—�1 I CI I IJ 1 I (TYP.) }`1 I;E i li I� I 1 i Iml� MIN. TIP DIAM. 21/2" NOTCH IN TIMBER --v— ��9" TIMBER PILE (TYP.) PILES TO PROVIDE - 1 0'-0" FULL BEARING (TYP.) 20'-0" 74 REVISIONS: .. I.I.►- ELEVATION VIEW 20 FT SPAN - - DOCUMEJT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COvPLETED PRAJ.MGR: PE DAVIdTUGGLESIZABETH ALL CONSTRUCTION SHALL BE IN ACCORDANCE , PTYPICAL DETAILS FOR 15 FT & 20 FT BOARDWALK UNIT WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED Y: DLAVIDRUGGL SS PEE STANDARDS AND SPECIFICATIONS 30' 15' 0 30' sB.5 SCALE: 1"=30' NORTH a3 CV CN UJ 3 a� 15 73 a S 0 C`1 0 Q C`1 NOTES:s _ p 1 GALVANIZED ANGLE: 3/2" X 3/2' X 16" WITH 4 - " THRU BOLTS (TYP.) JOISTS SHALL BE PARALLAM PLUS PSL BEAMS SIMPSON JOIST SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILL I CHON 1 CHARSTON, OTTE SC =N IP HUC416 HANGER (TYP. EA. JOIST) 3%"x16" PSL I ' SUITABLE FOR EXTERIOR APPLICATIONS. ALL HARDWARE SHALL BE GALVANIZED AND FOLLOW RECOMMENDATIONS OF PARALLAM PLUS MANUFACTURER. 1 GLENWOOD AVE. I SUITE 600 RALEIGH. NC 27603 PHONE 1919.789.9977 .�•t 2 THICK X fi X 16 r - r' + 4E4 sepiinc.com SPACER (TYP.) 1 1 811 m 3 WORKING DAYS r7 BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES Know what's below. SIMPSON Call before dig. HUC612 X 12 BLOCKING ,.j you JOIST HANGER LZ 1/POINTS THE LOCATIONS OF EXISTING UNDERGROUND UTILRIES ARE SHOWN IN AN VERIFIED (TYP. EA. JOIST AT O " APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE _ FOR APPROACHES M TO 25' SPAN) OQ (TYP.) [1! co T DOUBLE 31/2X 16" PSL BEAM CAP (SEE NAILING PATTERN ON SHEET ENACT LOCATION OF ALL EXISTING UTIUTIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. @ S B-7 } NOTICE: _ICONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER } = a S SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR — Tr _ �p SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. II - - - - - - -C11 7 T ' ) — ' i ....... ,l— 11 t d • me"! L ''FF.5 S/p''•.4, N 0 15'-0" SPAN x25'-0" Z X 6 DECKING SEE DETAIL D SHEET SB-7 SPAN /D 1\ ,I 3/ x16 PSL 4 X 6 RAIL POST (TYP.) 10'-0" SPAN x c—DocuSigne. 4/ Vii SEAL r ' • • 11725 • 9�%•:vG I ,�:�' , cici �� R 'tit\)- .-•_ _ 11 _ - '-" /3/2021 PLAN VIEW - 25 FT SPAN - BOARDWALK C '--C4E276EDF4'2422. x ENGINEER SHALL CONFIRM ADJACENT SPANS 223 S. WEST 5T. SUITE1100 RALEIGH. NC 27603 S T E WART T(919)380-8750 COPYRIGHT© 2021 SEPI ENGINEERING 8, CONSTRUCTION. INC Arbor Middle Creek Creek - CANTED 2X8 TOP RAIL TENSION BAR (FROM TO TOP RAIL} (VINYL COATED TO MATCH 5'-0" MAX. DECK FENCE) SEE DETAIL A FOR CHAIN LINK TO POST ATTACHMENT DETAIL ON SHEET SB 3 Greenway 36" BLACK COATED LINK FENCE VINYL CHAIN .41 0.Town (TYP.) 4X6 RAIL POST (TYP) of Holly Springs Parks and Recreation ♦...�� •♦ �♦�t_�. �� - ......1 „AAA_ ........... ►....� ►I ►A♦�♦CAI, !►WWWF ..s ►....� ! A.. ►.A..♦�.�A♦�.�A♦�.1, ►..♦.• ►.WWWWWWWWWWI I i.1 I ►.♦.♦• ►..•.� ►....� ►1 ��A..♦�.�A...�A..♦�..� ♦� ►...♦ ♦.♦♦.• ►r, A♦ A...A& ►• ►♦♦.♦• ►..♦.• ►.♦.♦• ►• A�,♦►A♦• A ►♦MI ►....s ►♦..♦• ►.I •• ►♦.♦.♦ ♦.♦.t �.' ►� ►....� ► ♦•:�i�•�♦t♦t♦t♦t ♦-.-♦t.t♦-♦-•-� ♦•♦,♦,,,♦•♦A I • I /♦,♦.,♦,,,♦•.,♦,,,♦•.,♦,,,♦•.,♦,•� I 1/,♦,,,♦.,♦,,,♦•.,♦,.,♦,,,♦�,,♦�.,♦� I .•♦.•♦♦•♦♦♦♦ ♦-♦.♦�•�♦�.-♦� . - .♦-4/i.♦-♦-•-♦-♦-♦--•-♦-♦-♦-♦- -♦-•--♦-44A- I ►.❖♦❖.•♦❖♦❖.❖.•♦•.❖.❖♦❖.�♦•/ 1 ♦ ♦ ♦. ♦-♦-•-♦-•-♦,.„♦-•-♦,&—♦-•-♦�♦�1: 1 I ►♦❖♦❖♦•.❖♦ i ♦...�♦�•-♦-♦- -• •.❖.❖♦❖ �.�♦�♦�♦�♦-•: 1►.•♦❖.❖.•♦❖/ I �•�♦�.�♦�♦♦�♦�.�1 ........ ........ .....-W4; �...................-; I.....................1i .2.•2.•.. • .......� .................. I.................../� I........ ...... .......� ,♦. ♦•• ♦♦ •• ,♦•• ♦•• ♦,/ ► ♦•• ♦♦.,♦•.4 I •/ ♦♦♦♦,. ♦,♦•♦♦,.♦,♦•♦♦,.♦,.♦♦,.•� I I ►♦,♦♦,♦♦♦,.♦,♦♦,♦••♦,♦♦♦,.♦,♦♦♦ I ♦•. • To. ...... • VA, SS. FENCE STAPLES ••• �.!.t.!.X!._ • ♦A.A.A.A.At.. A. !♦A.AA.A.AA• 1 ! ►!44..♦!.!.!.!..:!.!.!.!..4%. !.!..:t4.• I ! ►:!.!.!.!..X.44..:!.!.!.!..:!.!.!.!.!♦!• I 4+4!4t•...t ....•...•., .t.!.t.!4. A... ►•......•....•........... ►e..4t.!.!♦..4.•!.!.!..4!♦. It•AM..♦• ►........•.............i !.!.!.!.!...!♦!.!.!..♦!•!.!♦. I!.!.!♦!.I!.!Al ►❖..❖..•.• I ►❖.❖.❖4e. .❖..•..•. .!.!.• �.!..& ►..•...... nett i♦•♦e♦ie� PREPARED FOR: ,� -------- ...a♦...♦andva. -------- I•.♦.♦.•.♦I•.♦.' -------------------------------------------------� �♦.•.♦1 :♦�1 !►•v•♦••T•�•�♦�•�•T•�•�♦v a.: •I♦I•I•I ,/♦:COX i•�♦�•...!..7 •.•.•.•�•I•I•X4 I ....--- f.♦.•.♦: :.2 -------� ♦:..♦x•.♦:..�. -------------------------------------------------- '►•.•.♦;•-•I•.•.♦;•.•.♦IC•I•.•.♦IC•I•-•�•- I►••I•••I•-•I•.•.♦i•-1.1..♦IC•I•�•�♦Ni i►�•.♦:♦.•.♦:•.♦A ------ I•❖.♦.•.♦1 , �::::::::� !E•1•.•..,,io:•.•� SPA 1 . @ 8 O. C. MAX. (TOP AND •-..•.•-.. ........• .❖♦❖♦•.❖♦• .•��♦♦♦♦♦ ....... ........ -•-..•-.•-.. ........ ••♦❖♦•.•♦•♦❖♦1 ♦♦♦♦♦.♦1 ...... ..••♦•.1 ►.•-....� ....../ I ♦•.❖♦❖♦❖�.1 ►..♦..♦•I ....• �........I i ►............. ..•,...•.,...•,....•..�, • ►.•♦.•..❖♦.•..❖♦.•..❖♦❖♦.❖41 ►♦♦.♦..♦.♦..♦.♦.♦♦.♦♦♦I �..........• ./.....t&At•A.......t&.1 ANN%p i i •►♦♦.♦.♦..♦.♦..♦.♦..♦.♦I I.............. ;► ►-..-.-.-.-.•...wit...-..".,, .,..,.•..,,...,,...,,, ► .-V.-..' ❖♦.•..❖♦.•..❖♦.•. / .....................1 .•..-.. ....... •♦•.❖❖♦•. I♦♦♦♦♦♦ ....... ♦.♦•.♦ .•-..•.•. ..... •. •♦❖♦❖♦•♦❖' ........, ....• ........ ►-.-..-.-....-....-.-....-..-.-. .•.,..•.,.•,...•,...., /♦.• • ❖♦.•. •.• • ❖♦.• • ❖ • • ►...................... ................ ►..................... i ►-.-.-.-.-.-.-...... w..-. ".. I .•.,.,..•.,...•....•,.� I ►♦.•..••••❖♦.••••❖♦.❖.❖♦.•••••� ►.....................� ,............./ /.....................1 , 1 .......-. I ........ I ►♦❖♦❖♦•♦❖♦ ►....... I......•...... ►._.._._.._.� ...•.•. .♦ •. •. ❖♦•.❖♦❖ ....... ...... : ►-.....-... I,•♦•..,♦••♦•1 i .•♦.•..•..❖4 ►........ I....../ ;►........ Town of Holly Springs Y 128 S. Main Street BOTTOM) (TYP.) O••40.. ►Os' .•....... ' �•OOOOs'OA ........ ►....... I .......• I ►....................., ►.••p••,•.•,•,•0,•.•,•,••p••,•,,,•p,11 ►..................... , ►•,•p,•,••,•••p,,•,•••,•.,•,•••,••0,•; •OOs'000 ....... 0000000� .......• ►..................... ..................,... ►..................... ►.•.,.,.•.,.,.,.,,,.•.,.*,,.,,.,.•,.i11 ........ i ........ OOOOs'O .♦♦♦♦. ►........ i .♦. � Holly Springs, N C 27540 Jr p u 1 ° 1, 11 111, 11 1 1 I p pi 11 11 J !--I I I—f I I —I I f I-1 I I — �J��I I �TI� 5„ 2- /$ THRU BOLTS WI l ITI w >=�=i I M i f�ITcl I I�� I, —1 11� I I� I l �ITI>> —'r— DOUBLE 3/2X 16 PSL BEAM CAP N.'':.. WASHERS AND NUT EXPOSURE ON INTERIOR (TYP.) '.�C�' Ni"---- TIMBER PILES iv— CONSTRUCTION DRAWINGS REF #: 09-012 /t 3�/2" X 16" PSL STRINGER ���� DATE PROJECT: SE2C.027.00 ""---- +tE-I+E-11-E+1r~1!F TIMBER PILES 1iFila_IL=IElII ISSUE: I 1 f I 15'-0" I 251-0" I 10'-0„ REVISIONS: ELEVATION VIEW 25 FT SPAN BOARDWALK C - - FOR ADDITIONAL DETAILS, SEE ELEVATION VIEW ON SHEET SB-3 DOCUME JT NOT CONSIDERED FINAL UNLESS ALL DESIGN LOADS SIGNATURES COvPLETED PEDESTRIAN LIVE LOAD 90 PSF VEHICLE LIVE LOAD * 10,000 LB TYPICAL BOARDWALK DETAILS P PROJ. MGR: DAVID RUGGLES, PE WIND LOAD ON ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: ELIZABETH PHELPS, PE SUPERSTRUCTURE 35 PSF NOTE: IF THE CONTRACTOR WANTS TO MODIFY BOARDWALK CAP CONNECTION TO MATCH WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE OTHER BOARDWALKS, DETAILS MUST BE SUBMITTED TO THE ENGINEER FOR APPROVAL. SUBMITTAL MUST INCLUDE CONNECTION CALCULATIONS THAT ARE SEALED BY A PROFESSIONAL ENGINEER REGISTERED TO PRACTICE IN THE STATE OF NORTH CAROLINA. STANDARDS AND SPECIFICATIONS 30' 15' 0 30' sB.6 SCALE: 1"=30' NORTH s . p 1 SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE BEAUFORT, SC I CHARLESTON, SC 1 GLENWOOD AVE. I SUITE 600 RALEIGH. NC 27603 PHONE 1919.789.9977 FOR NOTES, SEE SHEET SB-1 2 - 4" x 6" SCREWS, SCREW FROM 10'-0" MIN. CLEAR WIDTH OPPOSITE FACE AT ADJACENT sepiinc.com ` SET OF SCREWS c�] al. 811. 3 WORKING DAYS BEFORE YOU DIG FDE THE LOCATION OF — ,• i 0 �J lJ UNDERGROUND FACILITIES Know what's below. 27�� CaII before you dig. — SIMPSON H U C416 JOIST HANGER (TYP. EA. JOIST) T r~ THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE ENACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE FAILURE UTILITIES.TO EXACTLY LOCATE AND — I,j Ifl II 3] N N► 1 . ITj' NOTICE: CONSTRUCTION SITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER i DOUBLE 32" x �" PSL BEAM NAILING PATTERN SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR ', SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, ,■ NOTE: JOISTS NOT SHOWN FOR CLARITY OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. SEE DETAIL E • i � DOUBLE 16" CAP SECTION 3�/2" X PSL BEAM C—C --,�1172 \— 9" MIN. TIP DIAM. TIMBER PILE (TYP.) " 01,\�,•'CARGii . =. �0FEs S�G4/ , A_ SEAL r: - 5 9G�O: UG I N ;. R. R ,—DacuSign '3,2021 NOTE: FOR ADDTIONAL DETAILS, SEE SECTION A -A ON DWG. SB-1 SIMPSON BP % - 3 (TYP.) �,, 0.4r�- S ''—C E27�n)F1'24.zz 223 S. WEST ST. 3%2X16 PSL STRINGER %/8" SUITE 1100 �� RAEGH. NC ST EWART T(919)380-87 07603 2- GALV. THRU BOLTS Wf WASHERS(TYP.) COPYR_ SEPI ENGINEERING I8,CON RUCTION.INC -------- _.- ...-' D TWO 3/" X 24" LAG 3Y2X16 --. BOLTS. DRILL HOLE --- . BETWEEN PSLs. '-.� PSL STRINGER DETAIL m D Arbor Middle Greenway Creek Creek - ,•'� 2X6 DECKING �' �. TWO 3/4" X 24" LAG Town Holly Springs �� r' „ DOUBLE 3/2 X 16"PSL t` BOLTS. DRILL HOLE of Parks and Recreation •' BEAM CAP BETWEEN PSLs. u B B • . 3 , 1 .. 1 1 n TP:' + : cvT l PREPARED FOR: 1 3/4 PSQ418 STRAP TIE Town of Holly Springs y TWO X 24"LAG (TYP. EA. SIDE} ■ + + DRILL +LE BOLBETWEEN -_______. + + 1 128 S. Main Street Holly Springs, NC 27540 I PSLs. STAGGER STRAPS I M ON OPPOSING ` I T I �+ I PLACE LAG BOLTS IN A SIDES AS REQUIRED TO AVOID BOLT ► ► CENTER OF POST AS T CONFLICT. NOTCH POST AS ' ► SHOWN. COUNTER ► SINK FLUSH WITH TOP ' OF PSL CAP. �- --__ -- __- -' --1--- ;.)' REQUIRED FOR STRAP r TIE ATTACHMENT11 *CONFIRM CONSTRUCTION DRAWINGS REF #: 09-012 '► �'� V V ; DIMENSION IN FIELD DATE .' 1 ' DOUBLE 3�/2" X 16" PROJECT: SE2C 027.00 �• • PSL BEAM CAP ISSUE: . • ♦ . . , r . ,., VIEW B—B VIEW D—D ,.- �' REVISIONS: - ..,.'-`----~r. DOCUME JT NOT CONSIDERED DETAIL E FINAL UNLESS ALL SIGNATURES COvPLETED NOTE: PSQ418 STRAPS NOT SHOWN FOR CLARITY. SEE VIEW D-D. PROJ.MGR: DAVID RUGGLES, PE ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY: PE ELIZABETHRU TYPICAL DETAILS FOR 25 FT BOARDWALK UNIT WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVI GLES,, DAVIDRUGGLES,PE STANDARDS AND SPECIFICATIONS 30' 15' 0 30' sB.7 SCALE: 1"=30' NORTH — X:\2020\5E20.027.00 ToHS - Arbor Creek Greenway\LD\Data Shared \Sent\To Stewart\SE20027 - TLB.dwg 1/2" EXPANSION s . p 1 JOINT 3 X 12 WING WALL BOARD SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE 10" THICK CONCRETE SLAB REINFORCED BEAUFORT,SC I CHARLESTON,SC CONCRETE POUR TO END OF BOARDWALK 21_011 CONCRETE TRAIL 1 GLENWOOD AVE. I SUITE 600 ,q 2X6 DECKING #4 BARS 12" CTS. RALEIGH. NC 27603 PHONE 1919.789 9977 @ 12" CTS. TRAIL sepiinc.com �■j �f 1 3x12 JOIST m 3 WORKING DAYS BEFORE YOU DIG ) �O O �O�{—//��ff O ^ O �� p Q OO Q Q jU 0 ��Q FOR THE LOCAT ON OF Know what's bE�O W UNDERGROUND FACILITIES Call before you dig. B 1 BARS @ D" ASPHALT Q nQ QQ THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN BOARDWALK lll- III=III=III-I III=III ABC APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE �■ III III -III -III -III -III III=III=III-III III=III III III -III -III- COMPACTED III ENACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. _ _ ,-.di-- - _ _-E II ITI=III=III-III III=III ICI III---I-I- I III=III= III; I I� II GEOTEXTILE FABRIC NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWNER NOR THE ENGINEER b , SHALL BE EXPECTED TO ASSUME ANY RESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. CO M PACTE D r PILE CAP (4 - 3X12 MEMBERS) zie SUBGRADE TIMBER PILE CONCRETE/BOARDWALK (TYP) CONNECTION 3 X 12 WING WALL BOARD iv cAR0 �,o, T a0FE551p/ 1/2" EXPANSION _t SEAL r' = 11725 I ASPHALT/CONCRETE PAVING ':•FN '� JOINT 6 10 - #4A1 BARS @ 12 CTS. 6 TRANSITION SEE ASPHALT/ �� G1 '•• .... C3 CONCRETE CONNECTION DETAIL. R.•• 0� r-0acuSigne 111111• /3/2021 10'-0" 1 QT_OH 44, �S ■ ► 4,.._c:•:„,,,aura'2„•22.. fi" #4 B1 BARS @ 12" CTS. 6" PLAN VIEW -APPROACH SLAB CONCRETE APPROACH SLAB 223 S. WEST 5T. SUITE 1100 r..i H. NC �7603 STEWART RA919-87 #4 Al BARS 12" CTS. ©2021 FOR USE ON ALL APPROACH SLABS, UNLESS NOTED OTHERWISE @ COPYRIGHT SEPI ENGINEERING 8, CONSTRUCTION. INC 11 III II I 10" .... . juc- Arbor rbor Creek - ,I ==I uo uoo -• UUo�UoaUo=I= � I I I=1 f=1 f 111�I 1= 1==1�II Middle Greenway Creek 6" COMPACTED ABC Town of Holly Springs Parks and Recreation BILL OF MATERIAL COMPACTED SUBGRADE FOR ONE APPROACH SLAB SECTION A -A (6 REQ'D) BAR NO. SIZE TYPE LENGTH WEIGHT Al 10 #4 STR 91-8" 65 PREPARED FOR: Town of Holly Springs B1 10 #4 STR 9'-8" 65 2'-01T 121-0" TO END DF 128 S. Main Street Holly Springs, NC 27540 #4 BARS 12" CTS. @ I. GEOTEXTILE FABRIC REINFORCED REINFORCING STEEL 130 LBS. CONCRETE COMPACTED ABC 3" CL. APPROACH SLAB = 2 2"ASPHALT T GEOTEXTILE FABRIC CONSTRUCTION CLASS AA CONCRETE 3.1 C.Y. _ DRAWINGS T. oWf %AY 60 t • o 00%c �-�=�C1=T? REF #: 09-012 c; II---1 I - DATE Iaa0 ICII-I,, If_�r-if -I NOTE: I III II III—II III III - II-I III=III=III III —III III=II = I PROJECT: SE2C 027.00 =1 =1 III III I =1 =11II ITI ffl I11 IIIII 1111=11I 1 PAYMENT FOR CONCRETE TRAIL AT EACH END OF BOARDWALK WILL BE MADE ISSUE: UNDER THE PAY ITEM "CONCRETE APPROACH SLAB". COMPACTED SUBGRADE CONCRETE APPROACH SLABS ARE REQUIRED AT THE BEGINNING AND END OF BOARDWALKS A, B, AND C ASPHALT/CONCRETE CONNECTION . REVISIONS: NOTE: GEOTEXTILE TO EXTEND FULL WIDTH OF TRANSITION. COST OF GEOTEXTILE TO BE INCLUDED WITH THE PAY ITEM "CONCRETE APPROACH SLABS". DOCUME JT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COvPLETED PRAWN DAVID PE ALL CONSTRUCTION SHALL BE IN ACCORDANCE DRAWN BY:: THRUPHEL S, ELIZABETH PHELPS, PE WITH ALL TOWN OF HOLLY SPRINGS AND NCDOT CHECKED BY: DAVID RUGGLES, PE TYPICAL DETAILS FOR BOARDWALK APPROACH STANDARDS AND SPECIFICATIONS 30' 15' 0 30' s B.8 SCALE: 1"=30' NORTH — X:\2020\SE20.027.D0 ToHS - Arbor Creek Greenway\LD\Data Shared\Sent\To Stewart\SE20027 - TLB.dwg END OF BOARDWALK �1+ 4 x 4 TRIM ENDS FLUSH s ip p 1 BOARDWALK n WITH 4x4 00; } ;❑o; I°° ° r r _ a0 a SEPI ENGINEERING & CONSTRUCTION, INC. RALEIGH I WILMINGTON I CHARLOTTE / 4 O BEAUFORT, SC I CHARLESTON, SC T [°IN �. a I ` I ❑• I ❑ ° ` ❑ . 1 GLENWOOD AVE. I SUITE 600 ` 71 - RALEIGH, NC 27603 a x 6 PHONE 919.789.9977 I NI T I ` I a a o n ❑ ; o I❑ o I �❑ Q sepiinc.com [�■^e� /,k// ►, GRADE ELEVATION Ee V❑ °o: luc ` D /411��' T ■ /!//1lC A\1557/ a ///A OM( A 3 WORKING DAYS BOARDWALK06, APPROACH RAIL ELEIIATI 'N q 1' - 6 " 0 HOLES a ° 4 � ❑ ° _ (� I ❑4 o 0 —811 1 • 0 I ~ $ o A /° \o_ ° o� ° ° a❑� I I ■ m BEFORE YOU DIG FOR THE LOCATION OF UNDERGROUND FACILITIES below. °❑ ° (N Q Know what's SHOWING BACK FACE OF RAILING,�/ TO BE FILLED WITH °� L Call before you dig. CONCRETE MIX . , .. AROUND POSTS I 1, - 1 ' 6 - - 6 THE LOCATIONS OF EXISTING UNDERGROUND UTILTIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE • "COMPACTED CONCRETE ■ ■ END BLOCK OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND 2 SAND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. OR STONE (TYP.) WITH EMBEDDED 4 X 4 NOTICE: CONSTRUCTION SITE SAFETY 15 THE SOLE RESPONSIBILITY OF THE CONTRACTOR NEITHER THE OWFER NOR THE TYPICAL 30ARDWALK APPROACH RAIL ELEIIATICN SHALLBE EXPECTED TO ASSUME ANYRESPONSIBILITY FOR SAFETY OF THE WORK, OF PERSONS ENGAGED IN THE WORK, OF ANY NEARBY STRUCTURES, OR OF ANY OTHER PERSONS. Dn n 1 SEE TYPICAL -O ,_O RAIL PLAN , rr ,— o 4 x 4 Ill ,/N CAR° �r =.�oFE551�•y��L A_ SEAL r •: r r 11725 ; 9G.•�NG1 N'�� � /• ...• u7 BOARDWALK 15° RAILING �� 4 X 4 POSTS & CONCRETE POST SUPPORTS (TYP.) r—Do°uSigned :- - - 11 - 3/2021 Veua u S C462768DF412422-. 223S.WTE oSTST. ra RALEIGH, NC ST EWART T(919380417 07603 TYPICAL ■ 2X6 RAIL BOARDWALK I Q �r z COPYRIGHT© 2021 SEPI ENGINEERING &. CONSTRUCTION, INC ~c, w `� TYPICAL RAIL PLAN Arbor Creek - _ ‘‘/�`} r Middle Creek 15 ° -� NOTES Mreenway END OF BOARDWALK 1+•± ::L ... - ALL TREATED LUMBER FOR THE GUARDRAIL & POSTS SHALL MEET THE REQUIREMENTS OF SECTION 1082 OF THE NCDOT STANDARD SPECIFICATIONS. ALL SCREWS, BOLTS, NUTS AND WASHERS ARE TO BE HOT DIPPED GALVANIZED. Town of Holly Springs Parks and Recreation THE LOCATION OF POST FOOTINGS AND END BLOCKS ARE TO BE FIELD VERIFIED. DEVIATIONS FROM PLAN DIMENSIONS ARE TO BE APPROVED BY THE ENGINEER. SECTION A -A THE APPROACH RAIL SET INCLUDES FOUR RAILS FOR A PARTICULAR INSTALLATION. FOR APPROACH RAIL SET, SEE SPECIAL PROVISIONS• APPROACH RAILS ARE REQUIRED AT THE BEGINNING AND END OF ALL BOARDWALKS FOR THIS PROJECT. PREPARED FOR: (3 APPROACH RAIL SETS IN TOTAL) END OF APPROACH RAIL SHALL BE AT LEAST 2'-0"FROM EDGE OF GREENWAY WITH A MINIMUM ANGLE OF 15 DEGREES. Town of Holly Springs 128 S. Main Street Holly Springs, NC 27540 —r B4-1 PLAN IF 4X4 POSTS IN BACK OFRECESS CONSTRUCTION DRAWINGS A A 1"CHAMFER 5" 1/q" CARRIAGE REF #: O9-all _( x 1" 0 x %4" RECESS AMffi✓• V BOLT W/ NUT & WASHER IN BACK OF POSTS DATE PROJECT: SE2C.C27-CC 4X4 END RAIL ISSUE: �� 2X5 RAIL 4X4 END RAIL 3-3V2 WOOD 111 �/q"CARRIAGE 5"x a, 4 � SCREWS (TYP.) n.i.i.i.i.i......■....,DMIMMIMM BOLT W/ NUT & WASHER II - iII.1 111 i 1�/a" 2X6 RAIL - i1I ~ 1i' REVISIONS: ��` 2X6 RAIL 1�/" 2X6 RAIL �1I1ItI1l r y 11111 (F vIII l E DOCUMENT NOT CONSIDERED 4x4 SUPPORT FI\AL UNLESS ALL BLOCK •), SIGNATURES COvPLETED S E C T I O N 3-3 SECTION C- C 3 PROJ. MGR: DAVID RUGGLES, PE 2 X 6 RAIL;;, ALL CONSTRUCTION SHALL BE IN ACCORDANCEWITH DRAWN BY: ELIZABETH PHELPS,PE ,,N,... ALL TOWN OF HOLLY S AND NCDOT CHECKED BY: DAVID RUGGLES, PE APPOACH AIL E T A I L S STANDARDS ANDSPECIFICATIONS CONNECTION DETAILS C 30' 15' 0 30 4101sB.9[ OUTSIDE VIEW ) SCALE: 1 " = 30' NORTH ATTACHMENT G OOOOOOOOOOOOOOO 000000000000000 µpi..irk North Carolina Department of Natural and Cultural Resources State Historic Preservation Office Ramona M.Bartos,Administrator Governor Roy Cooper Office of Archives and History Secretary Susi H Hamilton Deputy Secretary Kevin Ci ry May 13,2020 Anna Reusche AReusche@sepiinc.corn SEPI,Inc. 1 Glenwood Avenue,Suite 600 Raleigh,NC 27603 Re: Construct Arbor Creek Greenway,Holly Springs,ER 20-0773 Dear Ms.Reusche: Thank you for your March 25, 2020 email concerning the above project. We have conducted a review of the project and are aware of no historic resources which would be affected by the project.Therefore,we have no comment on the project as proposed. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, contact Renee Gledhill-Earley,environmental review coordinator,at 919-814-6579 or environmental.review(afncdcr.gov. In all future communication concerning this project,please cite the above referenced tracking number. Sincerely, 12_,L,L,23, ):11L.dkai- amona Bartos,Deputy State Historic Preservation Officer Location:109 East Jones Street;Raleigh NC 27601 Mailing Address:4617 Mail Service Center,Raleigh NC 27699-4617 Telephone/Fax:(919)807-6570/807-6599 ATTACHMENT H OOOOOOOOOOOOOOO 000000000000000 res EBX-Neuse I,LLC Stream and Wetland Banks Statement of Availability January 5, 2022 U.S.Army Corps of Engineers Lyle Phillips Raleigh Regulatory Field Office 3331 Heritage Trade Center, Suite 105 Wake Forest,NC 27587 Re Project:Arbor Creek Greenway This document confirms that Town of Holly Springs(Applicant)for the Arbor Creek Greenway (Project)has expressed an interest to utilize 1.43 Riparian Wetland Mitigation Credits from the EBX- Neuse sponsored Neu-Con Wetland& Stream Umbrella Mitigation Bank,specifically wetland credits from the Arrington Bridge Site,in the Neuse HUC 03020201.As the official Bank Sponsor,EBX- Neuse I, LLC, attests to the fact that mitigation is available for reservation at this time. These mitigation credits are not considered secured,and consequently are eligible to be used for alternate purposes by the Bank Sponsor,until payment in full is received from the Applicant resulting in the issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation obligation requiring the credits/units. The Banker will issue the Mitigation Credit Transfer Certificate within three(3)days of receipt of the purchase price.Banker shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and a documented copy of the debit of credits from the Bank Official Credit Ledger(s),indicating the permit number and the resource type secured by the applicant.A copy of the Mitigation Credit Transfer Certificate,with an updated Official Credit Ledger will also be sent to regulatory agencies showing the proper documentation. If any questions need to be answered,please contact me at 854-900-3222 or dlach@xes.us. Best Regards, David Lath Resource Environmental Solutions, LLC 701 E.Bay Street, Suite 306 Charleston, SC 29403