HomeMy WebLinkAboutSW3200202_Plansheet C9.00-02 - SCM Detail_20220216STORMWATER CONTROL M EASU RE 'A' CONSTRUCTION SPECIFICATIONS GENERAL NOTES 1. PRIOR TO CONSTRUCTION, ANY DISCREPANCIES IN THE PLANS AND NOTES SHALL BE BROUGHT TO THE DESIGN ENGINEER'S ATTENTION IMMEDIATELY. 2. THE FINAL CERTIFICATION FOR THIS FACILITY WILL INCLUDE A CERTIFICATION BY THE ON -SITE GEOTECHNICAL ENGINEER THAT THE PROJECT WAS CONSTRUCTED PER THE APPROVED PLANS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE WITH THE ON -SITE GEOTECHNICAL ENGINEER FOR OBSERVATION AND TESTING SUCH THAT THE ON -SITE GEOTECHNICAL ENGINEER CAN CERTIFY THE CONSTRUCTION. 3. ALL CONSTRUCTION ACTIVITY RELATED TO THE PROPOSED STORMWATER MANAGEMENT FACILITY SHALL BE PER THE DETAILS AND SPECIFICATIONS SHOWN IN THESE DRAWINGS. SOILS, COMPACTION, AND OTHER MISCELLANEOUS DETAILS AND SPECIFICATIONS MAY BE MODIFIED PER THE RECOMMENDATIONS OF THE ON -SITE GEOTECHNICAL ENGINEER. HOWEVER PRIOR TO IMPLEMENTATION THE DESIGN ENGINEER SHALL BE NOTIFIED OF ANY DEVIATION FROM THESE DESIGN DRAWINGS, INCLUDING SHOP DRAWINGS FOR ANY PROPOSED MODIFICATION. 4. THE CONTRACTOR SHALL REFER TO THE LANDSCAPE PLAN FOR THE PERMANENT PLANTING PLAN/SCHEDULE. PLEASE NOTE THAT NO TREES/SHRUBS OF ANY TYPE MAY BE PLANTED ON THE PROPOSED DAM EMBANKMENT (FILL AREAS). 5. DURING THE INITIAL STAGES OF CONSTRUCTION, THE STORMWATER MANAGEMENT FACILITY MAY BE USED AS A SEDIMENT BASIN FOR EROSION CONTROL PURPOSES. IF SO THE CONTRACTOR SHALL FOLLOW THE GENERAL CONSTRUCTION SEQUENCE BELOW: 5.1. THE CONTRACTOR SHALL CONSTRUCTTHE ENTIRE FACILITY (PERMANENT OUTLET STRUCTURE, DAM, ETC.) WITH THE EXCEPTION OF THE INTERIOR FINE GRADING FOR THE FACILITY. THE INTERIOR FINE GRADING WILL BE CONSTRUCTED ONCE THE EROSION CONTROL PHASE IS COMPLETE. 5.2. THE TEMPORARY DRAW DOWN RISER OR SKIMMER SHALL BE CONNECTED TO THE PERMANENT 8--0 DIP DRAIN PIPE. 5.3. ONCE THE UPSTREAM DRAINAGE AREA IS STABILIZED AND THE EROSION CONTROL INSPECTOR APPROVES THE REMOVAL OF THE SEDIMENT BASIN, THE CONTRACTOR SHALL REMOVE THE TEMPORARY DRAW DOWN RISER (OR SKIMMER) AND CLEAN -OUT THE BASIN. ALL SEDIMENT, TRASH, ETC. SHALL BE DISPOSED OF PROPERLY (I.E. - PLACED IN A LANDFILL) AND NOT STOCKPILED IN AN AREA WHERE WATER QUALITY COULD BE ADVERSELY AFFECTED. 5.4. ONCE THE BASIN IS CLEANED OUT, AND ALL EROSION CONTROL DEVICES REMOVED, THE CONTRACTOR SHALL CONSTRUCT THE INTERIOR GRADING SHOWN ON THIS SHEET. 5.5. ONCE THE GRADING IS COMPLETE, THE CONTRACTOR SHALL REQUEST AN ON -SITE INSPECTION AND AN AS -BUILT SURVEY PRIOR TO INSTALLATION OF THE STORMWATER MANAGEMENT FACILITY PLANTS. IF THE CONTRACTOR PLANTS THE PROPOSED VEGETATION PRIOR TO AN AS -BUILT SURVEY (AND SUBSEQUENT APPROVAL), ANY CHANGES TO THE GRADING / RE -PLANTING OF PLANTS WILL BE AT THE CONTRACTOR'S EXPENSE. 5.6. ONCE THE ENGINEER HAS APPROVED THE AS -BUILT GRADING, THE CONTRACTOR SHALL PLANT THE PROPOSED STORMWATER MANAGEMENT FACILITY PLANTS SHOWN ON THE LANDSCAPE PLAN FOR THE FACILITY. AFTER COMPLETION OF THE PLANTING, THE LANDSCAPE CONTRACTOR SHALL PROVIDE A LETTER TO THE ENGINEER CERTIFYING THAT THE PLANTS HAVE BEEN INSTALLED PER THE APPROVED STORMWATER MANAGEMENT FACILITY PLANTING PLAN. 6. THE GRADES SHOWN ON THIS PLAN ARE FINISHED GRADES. IF THE EXISTING SOIL LAYER ALONG THE FOREBAY BERM IN THE PROPOSED WET POND AFTER CONSTRUCTION / COMPACTION IS NOT DETERMINED SUITABLE BY A LANDSCAPE PROFESSIONAL FOR THE WETLAND PLANTINGS, THEN THE CONTRACTOR SHALL AMEND THE PLANTING AREA OF THE WET POND AS DIRECTED BY A LANDSCAPE PROFESSIONAL. 7. ANY REMOVED TOPSOIL SHALL BE STOCKPILED FOR USE IN PLANTING (SEEDING) ON THE DAM EMBANKMENT ONCE FINAL GRADES (AS SHOWN ON THE GRADING PLAN) HAVE BEEN ESTABLISHED WITH COMPACTED FILL. PRIOR TO TOPSOIL INSTALLATION, THE CONTRACTOR SHALL SCARIFY THE THE TOP 2"-3" OF THE BERM SECTION TO PROMOTE BONDING OF THE TOPSOIL WITH THE COMPACTED FILL. THE TOPSOIL DEPTH SHALL RANGE FROM 3"4' ON THE DAM EMBANKMENT. PLEASE NOTE THE STOCKPILED TOPSOIL SHALL BE AMENDED, AS DIRECTED BY A LANDSCAPE PROFESSIONAL, PRIOR TO INSTALLATION ON THE EMBANKMENT. 8. IT IS ANTICIPATED THAT DEWATERING WILL BE NECESSARY IN THE EXCAVATION AREAS (E.G. - EMBANKMENT SUB GRADE, INTERIOR PORTIONS OF THE STORMWATER FACILITY, KEY TRENCH, ETC.). THEREFORE, THE CONTRACTOR SHALL FURNISH, INSTALL, OPERATE, AND MAINTAIN ANY PUMPING EQUIPMENT, ETC.. NEEDED FOR REMOVAL OF WATER FROM VARIOUS PARTS OF THE STORMWATER FACILITY SITE. DURING PLACEMENT OF FILL WITHIN THESE AREAS, THE CONTRACTOR SHALL KEEP THE WATER LEVEL BELOW THE BOTTOM OF THE EXCAVATION / CONSTRUCTION AREAS. THE MANNER IN WHICH THE WATER IS REMOVED SHALL BE SUCH THAT THE EXCAVATION BOTTOM AND SIDE SLOPES ARE STABLE, WITH NO SEDIMENT DISCHARGED FROM THE SITE (I.E. PUMPED WATER MAY NEED TO BE DIRECTED TO AN APPROVED EROSION CONTROL DEVICE SUCH AS A DIRT BAG (ACF ENVIRONMENTAL), OR ENGINEER APPROVED EQUIVALENT, PRIOR TO DISCHARGE). 9. THE RETAINING WALL ALIGNMENT SHOWN ON THESE PLANS DEPICTS THE LOCATION OF THE FRONT FACE OF THE RETAINING WALL AT THE BOTTOM. 10. THE RETAINING WALL IS TO BE A DESIGN -BUILD PROJECT(S) BY THE CONTRACTOR. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO OBTAIN FINAL CONSTRUCTION DRAWINGS FROM A REGISTERED PROFESSIONAL ENGINEER AND GAIN ALL REQUIRED PERMITS NECESSARY FOR THE CONSTRUCTION OF THE RETAINING WALL. 11. THE RETAINING WALL SHALL BE ASSUMED TO BE BACKFILLED WITH OFF -SITE BORROW MATERIAL OR PROCESSED FILL UNLESS CONTRACTOR CAN PROVIDE OWNER WITH CONFIRMATION FROM THE GEOTECHNICAL ENGINEER AND THE RETAINING WALL DESIGNER THAT READILY AVAILABLE ON -SITE SOILS CAN BE USED. 12. THE TOP AND BOTTOM OF WALL ELEVATIONS SHOWN ON THESE PLANS IDENTIFY FINISHED GRADE ELEVATIONS ONLY. THE EXTENT THAT THE RETAINING WALL WILL BE EXTENDED BELOW GRADE TO THE FOOTING SHALL BE IDENTIFIED ON THE RETAINING WALL CONSTRUCTION DRAWINGS. BERM AND SOIL COMPACTION SPECIFICATIONS 1. PRIOR TO CONSTRUCTION THE ON -SITE GEOTECHNICAL ENGINEER SHALL IDENTIFY BORROW FILL AREAS AND VERIFY THEIR SUITABILITY FOR USE WITHIN THE DAM EMBANKMENT. ALSO, THE ON -SITE GEOTECHNICAL ENGINEER SHALL PERFORM STANDARD PROCTORS ON THE PROPOSED BORROW MATERIAL TO ENSURE THAT OPTIMUM MOISTURE CONTENT AND COMPACTION CAN BE ACHIEVED / CONTROLLED DURING CONSTRUCTION. 2. ALL FILL MATERIALS TO BE USED FOR THE DAM EMBANKMENT SHALL BE TAKEN FROM BORROW AREAS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. THE FILL MATERIAL SHALL BE FREE FROM ROOTS, STUMPS, WOOD, STONES GREATER THAN 6", AND FROZEN OR OTHER OBJECTIONABLE MATERIAL. THE FOLLOWING SOIL TYPES ARE SUITABLE FOR USE AS FILL WITHIN THE DAM EMBANKMENT AND KEY TRENCH: ML AND CL. ALL FILL MATERIALS SHALL BE APPROVED BY THE ONSITE GEOTECHNICAL ENGINEER FOR THE INTENDED USE. 3. FILL PLACEMENT FOR THE EMBANKMENT SHALL NOT EXCEED A MAXIMUM 8" LIFT (UNCOMPACTED). EACH LIFT SHALL BE CONTINUOUS FOR THE ENTIRE LENGTH OF EMBANKMENT. BEFORE PLACEMENT OF FILL FOR THE BERM SECTION ALL UNSUITABLE MATERIAL SHALL BE REMOVED AND THE SURFACE PROPERLY PREPARED FOR FILL PLACEMENT. FILL MATERIAL ADJACENT TO ALL SPILLWAY AND DRAINAGE STRUCTURES SHALL BE PLACED IN 4-INCH (UNCOMPACTED) LIFTS AND HAND -COMPACTED TO THE SAME COMPACTION AND MOISTURE REQUIREMENTS AS THE ENTIRE EMBANKMENT. 0 4. ALL FILL SOILS USED IN THE EMBANKMENT CONSTRUCTION SHALL BE COMPACTED TO AT LEAST 95/o OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D-698). THE FILL SOILS SHALL BE COMPACTED AT A MOISTURE CONTENT WITHIN -1 TO +3 PERCENT OF ITS OPTIMUM MOISTURE CONTENT. COMPACTION TESTS SHALL BE PERFORMED BY THE ON -SITE GEOTECHNICAL ENGINEER DURING CONSTRUCTION TO VERIFY THAT THE PROPER COMPACTION LEVEL HAS BEEN REACHED. THE FILL SHOULD BE COMPACTED USING A SHEEPSFOOT TYPE COMPACTOR. IN ORDER TO PREVENT DAMAGE TO THE PIPE, NO COMPACTION EQUIPMENT SHALL CROSS ANY PIPE UNTIL MINIMUM COVER IS ESTABLISHED ALONG THE PIPE. 5. THE DESIGN ENGINEER SHALL BE PROVIDED WITH REPORTS AND CERTIFICATION, BY THE ON -SITE GEOTECHNICAL ENGINEER, THAT THE GEOTECHNICAL ASPECTS OF THE FACILITY HAVE BEEN CONSTRUCTED PER PLAN. THIS CERTIFICATION MUST ADDRESS THE TESTING FOR MATERIALS AND COMPACTION OF THE DAM EMBANKMENT AND SPILLWAY. THESE REPORTS AND CERTIFICATION WILL BE NEEDED DURING THE AS -BUILT CERTIFICATION PROCESS FOR THIS STORMWATER CONTROL MEASURE. THEREFORE, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE TESTING AND OBSERVATION WITH THE ON -SITE GEOTECHNICAL ENGINEER. 6. TESTING OF THE NEW FILL MATERIALS SHALL BE PERFORMED TO VERIFY THAT THE RECOMMENDED LEVEL OF COMPACTION IS ACHIEVED DURING CONSTRUCTION. THEREFORE, ONE DENSITY TEST SHALL BE PERFORMED FOR EVERY 2,500 SQUARE FEET OF AREA FOR EVERY LIFT OF FILL OR AS RECOMMENDED BY THE ON -SITE GEOTECHNICAL ENGINEER. 7. TESTING WILL BE REQUIRED ALONG THE 36"0 RCP OUTLET BARREL AT A FREQUENCY OF ONE TEST PER 25 LF OF PIPE PER VERTICAL FOOT OF FILL OR AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. CONSTRUCTION SEQUENCE 1. PRIOR TO CONSTRUCTION, THE OWNER SHALL OBTAIN A LAND DISTURBING (GRADING) PERMIT AND AN "APPROVAL TO CONSTRUCT" FROM THE VILLAGE OF WESLEY CHAPEL AND TOWN OF INDIAN TRAIL AND ALL OTHER NECESSARY PERMITS FROM APPLICABLE AGENCIES (E.G. 404 / 401 PERMITS) 2. INSTALL ALL SEDIMENT AND EROSION CONTROL MEASURES PER THE APPROVED SEDIMENT AND EROSION CONTROL PLAN. THE CONTRACTOR SHALL MAINTAIN ALL APPROVED SEDIMENT AND EROSION CONTROL MEASURES THROUGHOUT THE ENTIRE PROJECT, AS REQUIRED. THE CONTRACTOR SHALL RECEIVE APPROVAL FROM THE EROSION CONTROL INSPECTOR, AS REQUIRED BY GOVERNING AGENCIES, PRIOR TO ANY CLEARING. 3. CLEAR AND GRUB AREA WITHIN THE LIMITS OF THE PROPOSED DAM CONSTRUCTION. ALL TREES AND THEIR ENTIRE ROOT SYSTEMS MUST BE REMOVED FROM THE DAM FOOTPRINT AREA AND BACKFILLED WITH SUITABLE SOIL MATERIAL. THE BACKFILLED AREAS SHALL BE COMPACTED TO THE SAME STANDARDS AS THE DAM EMBANKMENT. THE REMAINING AREA OF THE EMBANKMENT SHALL BE STRIPPED TO A SUITABLE DEPTH AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. ANY RESIDUAL SOILS TO BE LEFT IN PLACE MUST BE WELL SCARIFIED TO PROMOTE BONDING OF THE NEW EMBANKMENT FILL. NO EMBANKMENT MATERIAL SHALL BE PLACED FOR THE DAM OR KEY TRENCH UNTIL APPROVAL OF THE DAM SUBGRADE / TRENCH IS OBTAINED FROM THE ON -SITE GEOTECHNICAL ENGINEER. 4. EXCAVATE FOR THE NEW KEY TRENCH ALONG THE CENTERLINE OF THE PROPOSED DAM EMBANKMENT. THE TRENCH SHALL EXTEND A MINIMUM OF 5 FT BELOW EXISTING GRADE OR 2 FT BELOW THE CONCRETE CRADLE AND SHALL HAVE A MINIMUM BOTTOM WIDTH OF 5 FEET. THE KEY TRENCH SIDESLOPES SHALL BE A MINIMUM OF 1:1 (H:V). THE KEY TRENCH SHALL BE COMPACTED TO THE SAME SPECIFICATION LISTED IN ITEM 4 OF THE SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS." DEPENDING UPON ON -SITE SOIL CONDITIONS ENCOUNTERED DURING EXCAVATION, THE ON -SITE GEOTECHNICAL ENGINEER MAY VARY THE DEPTH AND DIMENSIONS OF THE KEY TRENCH AS DEEMED NECESSARY. THE ON -SITE GEOTECHNICAL ENGINEER SHALL RETAIN DOCUMENTATION OF ANY VARIATION FOR FUTURE AS -BUILT SUBMITTALS TO THE VILLAGE OF WESLEY CHAPEL. 5. BEGIN PLACEMENT OF BACKFILL WITHIN THE KEY TRENCH. THE KEY TRENCH SHALL BE COMPACTED TO THE SPECIFICATIONS LISTED ITEM 4 OF THE SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS." THE KEY TRENCH SHALL BE TESTED PER THE SPECIFICATIONS LISTED IN THAT SECTION. 6. PRIOR TO INSTALLATION, SUBGRADE CONDITIONS ALONG THE SPILLWAY PIPES SHOULD BE EVALUATED BY THE ON -SITE GEOTECHNICAL ENGINEER TO ASSESS WHETHER SUITABLE BEARING CONDITIONS EXIST AT THE SUBGRADE LEVEL. SHOULD SOFT OR OTHERWISE UNSUITABLE CONDITIONS BE ENCOUNTERED ALONG THE PIPE ALIGNMENTS, THESE MATERIALS SHOULD BE UNDERCUT AS DIRECTED BY THE GEOTECHNICAL ENGINEER. THE UNDERCUT MATERIALS SHALL BE REPLACED WITH ADEQUATELY COMPACTED STRUCTURAL FILL, LEAN CONCRETE OR FLOWABLE FILL AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER. 7. IN ORDER TO HELP PROTECT THE SOIL SUBGRADE FROM DETERIORATION DUE TO EXPOSURE RAINFALL SEEPAGE AND RUNOFF BEFORE THE CRADLE CAN BE POURED IT IS STRONGLY RECOMMENDED THAT A 3" TO 4" THICK CONCRETE MUD MAT BE POURED OVER THE SUBGRADE ONCE IT IS APPROVED BY THE ON -SITE GEOTECHNICAL ENGINEER. THE MUD MAT WILL ALSO PROVIDE BEARING FOR THE BLOCKS THAT TEMPORARILY SUPPORT THE SPILLWAY PIPE UNTIL THE CRADLE CAN BE POURED. THE METHOD OF BLOCK SUPPORT FOR THE PIPE PROPOSED BY THE CONTRACTOR SHOULD BE SUBMITTED TO THE JOHN R. McADAMS COMPANY FOR REVIEW. 8. BEGIN CONSTRUCTION OF THE NEW EMBANKMENT. FILL MATERIALS SHALL BE PLACED IN MAXIMUM 8" THICK LIFTS PRIOR TO COMPACTION, UNLESS DIRECTED OTHERWISE BY THE ON -SITE GEOTECHNICAL ENGINEER. FILL LIFTS SHALL BE CONTINUOUS OVER THE ENTIRE LENGTH OF FILL. IF IT IS NECESSARY, THE EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT BACK TO FINAL GRADE IN ORDER TO ACHIEVE PROPER COMPACTION. 9. AS CONSTRUCTION OF THE EMBANKMENT MOVES FORWARD IT WILL BE NECESSARY TO INSTALL THE CONCRETE CRADLE. THIS MAY BE CONSTRUCTED USING ONE OF THE FOLLOWING METHODS: 9.1. IF THE PROPOSED STRUCTURAL FILL MATERIAL IS UTILIZED AS THE FORMWORK FOR THE CONCRETE CRADLE, THEN THE STRUCTURAL FILL SHOULD BE INSTALLED AND COMPACTED UP TO THE TOP OF CONCRETE CRADLE ELEVATION. ONCE THE STRUCTURAL FILL REACHES THE NEXT DOWNSTREAM JUNCTION BOX OR HEADWALL AND IS COMPACTED TO THE ELEVATION OF THE TOP OF THE CONCRETE CRADLE, EXCAVATE THE CONCRETE CRADLE TRENCH PER THE PROVIDED DETAILS AND CONSTRUCT THE CONCRETE CRADLE AS PER THE PROVIDED CONCRETE CRADLE DETAIL. 9.2. IF THE PROPOSED STRUCTURAL FILL IS NOT UTILIZED AS THE FORMWORK FOR THE CONCRETE CRADLE THEN PRIOR TO CONSTRUCTING THE STRUCTURAL FILL EMBANKMENT, THE FORMWORK FOR THE CONCRETE CRADLE SHOULD BE INSTALLED ON EXISTING GROUND AND / OR THE MUD MAT. THE CONCRETE CRADLE SHALL BE CONSTRUCTED PER THE PROVIDED DETAILS. 10. INSTALL RISER / BARREL ASSEMBLY, ALONG WITH THE EMERGENCY DRAIN SYSTEM. THE DRAIN VALVE LOCATED WITHIN THE RISER BOX SHALL BE KEPT OPEN UNTIL AN AS -BUILT CERTIFICATION HAS BEEN COMPLETED BY THE ENGINEER AND AN APPROVAL TO IMPOUND HAS BEEN ISSUED BY ALL APPLICABLE AGENCIES. 11. INSTALL 36" RCP OUTLET BARREL SPILLWAY FILTER FROM THE DETAILS SHOWN ON SHEET SHEET C9.02. 12. CONSTRUCT EMBANKMENT PER SPECIFICATIONS LISTED IN THE SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS" AND REQUIREMENTS OF THE ON -SITE GEOTECHNICAL ENGINEER. ALL CHARACTERISTICS OF THE EMBANKMENT FILL MATERIAL SHALL MEETTHE STANDARDS SET FORTH IN BERM AND SOIL COMPACTION SPECIFICATIONS INCLUDING COMPACTION AND MOISTURE REQUIREMENTS. IF NECESSARY TO ACHIEVE PROPER COMPACTION THE EMBANKMENT FILL MATERIAL WILL BE OVERBUILT IN HORIZONTAL LIFTS AND CUT BACK TO PROPER FINAL GRADE. ANY HAND COMPACTION ACTIVITIES AROUND SPILLWAY OR DRAIN STRUCTURES SHALL BE CONDUCTED IN 4-INCH LOOSE LIFTS AND BE TO THE SAME COMPACTION AND MOISTURE REQUIREMENTS AS THE ENTIRE EMBANKMENT. ALL COMPACTION AND MOISTURE TESTING SHALL BE CARRIED OUT AS DIRECTED BY THE ON -SITE GEOTECHNICAL ENGINEER AND AS LISTED IN THE SECTION TITLED "BERM AND SOIL COMPACTION SPECIFICATIONS". 13. UPON COMPLETION OF DAM EMBANKMENT, PROMPTLY STABILIZE AND SEED DAM EMBANKMENT PER SEEDING SCHEDULE. 14. SCHEDULE A FINAL AS -BUILT INSPECTION AND AS -BUILT SURVEY WITH THE ENGINEER. AN AS -BUILT INSPECTION SHOULD BE SCHEDULED A MINIMUM OF 60 DAYS BEFORE A PERMIT TO IMPOUND IS REQUIRED. ANY COMMENTS OR DEFICIENCIES IN THE DAM CONSTRUCTION MUST BE CORRECTED TO THE SATISFACTION OF THE ENGINEER AND OWNER BEFORE CERTIFICATION SHALL BE GRANTED. UPON FINAL APPROVAL FROM THE VILLAGE OF WESLEY CHAPEL, CLOSE THE 8"0 BOTTOM DRAIN VALVE IN THE RISER BOX AND BEGIN IMPOUNDING WATER. NO WATER SHALL BE IMPOUNDED BEFORE AN APPROVAL TO IMPOUND IS ISSUED FROM THE VILLAGE OF WESLEY CHAPEL. OUTLET STRUCTURE MATERIAL SPECIFICATIONS 1. THE 36"0 RCP OUTLET BARREL SHALL BE CLASS III RCP, MODIFIED BELL AND SPIGOT, MEETING THE REQUIREMENTS OF ASTM C76-LATEST. THE PIPES SHALL HAVE CONFINED 0-RING RUBBER GASKET JOINTS MEETING ASTM C-443-LATEST. THE PIPE JOINTS SHALL BE TYPE R-4. 2. THE STRUCTURAL DESIGN FOR THE 4' X 4' (INTERNAL DIMENSIONS) RISER BOX WITH EXTENDED BASE SHALL BE BY OTHERS. PRIOR TO ORDERING THE STRUCTURES, THE CONTRACTOR SHALL PROVIDE, TO THE DESIGN ENGINEER FOR REVIEW, SHOP DRAWINGS AND SUPPORTING STRUCTURAL CALCULATIONS SEALED BY A P.E. REGISTERED IN NORTH CAROLINA DEMONSTRATING THE PERTINENT VERTICAL LOADS ARE SUPPORTED BY THE CONCRETE RISER STRUCTURE. 3. THE RISER BOX OUTLET STRUCTURE SHALL BE PROVIDED WITH STEPS 16" ON CENTER. STEPS SHALL BE PROVIDED ON THE INNER WALL OF THE RISER BOX. STEPS SHALL BE IN ACCORDANCE WITH NCDOT STD. 840.66. PLEASE REFER TO SHEET C9.01 FOR LOCATION OF THE RISER STEPS. 4. THE CONCRETE ANTI -FLOTATION BLOCKS SHALL BE PRECAST AS THE EXTENDED BASE OF THE RISER BOX DURING FABRICATION. THE PRECAST BASE SHALL BE INCLUDED AS PART OF THE SHOP DRAWINGS THAT WILL BE SUBMITTED TO THE ENGINEER FOR REVIEW (SEE ITEM 2 ABOVE). IN LIEU OF A PRE -CAST BASE, THE CONTRACTOR MAY OPT TO CAST -IN -PLACE THE ANTI -FLOTATION BLOCK IN THE FIELD. HOWEVER, PRIOR TO CONSTRUCTING THE CAST -IN -PLACE BASE, THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR REVIEW DENOTING THE FOLLOWING: A. STEEL REINFORCEMENT B. THE CONNECTION MECHANISM TO JOIN THE ANTI -FLOTATION BLOCK WITH THE RISER SECTION 5. IF THE ANTI -FLOTATION BLOCK IS PRECAST AS PART OF THE RISER BASE SECTION THE ENTIRE PRECAST RISER BOX STRUCTURE SHALL HAVE A SHIPPING WEIGHT OF 16,603 LBS. THE STRUCTURE WEIGHT SHALL BE THE SHIPPING WEIGHT AND SHALL BE DETERMINED BY SUBTRACTING THE WEIGHT OF THE FACTORY BLOCK OUTS FROM THE GROSS STRUCTURE WEIGHT. THIS INFORMATION SHALL BE SHOWN ON THE SHOP DRAWINGS SUBMITTED TO THE ENGINEER FOR REVIEW. IF THE CONTRACTOR OPTS TO CAST -IN -PLACE THE ANTI -FLOTATION BLOCK, THE CONTRACTOR SHALL ENSURE THE WEIGHT OF THE ENTIRE RISER STRUCTURE IS EQUALTO THE MINIMUM LISTED ABOVE. 6. THE RISER BOX JOINTS SHALL BE SEALED USING BUTYL RUBBER SEALANT CONFORMING TO ASTM-C990-LATEST. IF NECESSARY, THE CONTRACTOR SHALL INCORPORATE A WATERSTOP INTO THE RISER BOX JOINT TO ENSURE A WATERTIGHT CONNECTION. THE CONTRACTOR SHALL PARGE JOINTS ON BOTH THE INSIDE AND OUTSIDE WITH NON -SHRINK GROUT. 7. PRIOR TO ORDERING, THE CONTRACTOR SHALL SUBMITTRASH RACK SHOP DRAWINGS TO THE ENGINEER FOR REVIEW. CONTRACTOR SHALL ENSURE THAT AN ACCESS HATCH IS PROVIDED WITHIN THE TRASH RACK (SEE DETAIL FOR LOCATION) THAT WILL ALLOW FOR FUTURE MAINTENANCE ACCESS. CONTRACTOR SHALL ALSO PROVIDE A CHAIN AND LOCK FOR SECURING THE ACCESS HATCH. NOTE THE ACCESS HATCH SHALL LINE UP WITH THE ACCESS STEPS AFTER INSTALLATION. 8. ALL POURED CONCRETE SHALL MEET THE FOLLOWING SPECIFICATIONS UNLESS OTHERWISE NOTED: -MINIMUM 3000 PSI (28 DAY) -SLUMP = 3" - 5" -ENTRAINED AIR = 5% - 7% PLEASE NOTE NO CONCRETE SHALL BE POURED WHEN THE AMBIENT AIR TEMPERATURES ARE EXPECTED TO BE ABOVE 85°F OR BELOW 40°F. CAST -IN -PLACE CONCRETE SHALL BE "WET CURED" AFTER FINISHING FOR A MINIMUM OF 48 HOURS. 9. GEOTEXTILE FABRIC FOR THE 36" 0 RCP OUTLET BARREL JOINTS SHALL BE MIRAFI 18ON OR ENGINEER APPROVED EQUAL (NON -WOVEN FABRIC) 10. STORMWATER FACILITY EMERGENCY DRAW DOWN IS VIA AN 6" 0 PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 1820 X-CENTRIC VALVE OR APPROVED EQUAL. THIS VALVE IS IN ACCORDANCE WITH AWWA C-517, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HAND WHEEL (SEE DETAIL SHEET C9.02). THE CONTRACTOR SHALL PROVIDE A REMOVABLE VALVE WRENCH WITH A HAND WHEEL ON TOP FOR OPERATION OF THE 6" 0 PLUG VALVE. A CHAIN AND LOCK SHALL ALSO BE PROVIDED FOR SECURING THE WRENCH TO THE TRASH RACK. GRACE POINTE DRIVE w (50' PUBLIC R/W) 121 I v W j LOT LINE STORMWATER ) \ -d•\ - \ 1 \02,CONTROL MEASURE \ \ 1 \ \ MAINTENANCE/ACCESS / / ILL I 1 \ \\\ J O l EASEMENT (TYP.) 614 7-1 611 / `9s STORMWATER CONTROL MEASURE 610 / ' MAINTENANCE/ACCESS REFER TO THE C3 SERIES I \ \ \\ ✓ // / / / / i ( EASEMENT (lYP.) i FOR THE DETAILED DESIGN OF THE STORM SEWER SYSTEMso \ _ _ _ o�� J / / / / l DRAINING TO THE SCM. ! I I N o / / / r- -r _ I , I II 0. 3:1 I 3:1+ 592. \ s \ ---603-9 \ REFER TO THE C3 SERIES - FOR THE DETAIL ED DESIGN OF THE STORM SEWER SYSTEM DRAINING TO THE SCZ _J \ SLOPE SLOE IQ s\\ + 592.00 592.00 + ` _ - - - - -- - - - \ / o �� NWSE - 597.00 \ '/ / \ / t o SEDIMENT 595 I \ o I FOREBAY 592.50 + i I = \ ��� BOTTOM AT 592.0' \ 1 �n SLOPE I o 1 I I u I (1' SEDIMENT STORAGE) �591 M 0)M Ln \o\ 1 1 I1 I \ � ho w 1 592.50 + LT 2 0 °� I� o Iz I I I 1 N IIIIIIII 1 � 1IIII1I1/ - -- - L5 - 9- - 0 � � _1= II I IIIlI1I II IiII iII jI iII I B I o o 0 az CZ�r - 592.50 + + 592.50 + 592.50 595 FOREBAY BERM EL. -597.00 MINIMUM WIDTH _ 5 FT597- a + 597.00 TO BE COMPACTED PER "BERM AND SOIL 00N-595 0 COMPACTION SPECIFICATIONS" 0 591 o O mo Ln CO s ool3.111 3:1 1 1 3:1 3:1 3:1 SLOPE OPE SLOPE LSLOPE SLOPE MAIN POOL , o BOTTOM AT 591.0' 3: o (1' SEDIMENT STORAGE) z o pf 10-FT AQUATIC SHELF `1N I o I I I�IIII�II U m II II1IIIII1 FROM R O-M E \ . 596.50 96/.5/ 1 TO / 597 . 50 ) C o ° � o\i 4 9 L F 03 6 " \ 0 CLASS III ® 10:1 SLOPE (TO BE INSTALLED 0-RING RCP ® 1.02% AROUND SCM PERIMETER) W/ CONCRETE CRADLE PRECAST RISER OUTLET STRUCTURE (JOINTS WRAPPED IN m GEOTEXTILE FABRIC)SHAPE = SQUARE INTERNAL DIMENSIONS = 4 FT. x 4 FT. ENDWALL PER NCDOT STD. 838. 80TOP OF RISER = 601.20 INV. OUT (36"0 RCP) - 596.000 (4) RECTANGULAR WEIRS (3'W x 1H) = 600.20 TOR (4) 3.00"0 ORIFICE = 598.30 VELOCITY DISSI4.5"0 ORIFICE INVERTED SIPHON = 597.00 NCDOT CLASS T RIPRAP°' I INVERT OUT (36"0 0-RING RCP) = 596.50II(SEE DETAIL ON SHEET C9.01) 241 X 9'W X 22" THICK w D50 = 13 (SEE DETAIL SHEET C9.02)Z 0 / J593 594 ho STORMWATER CONTROL FO0 N MAINTENANCE/ACCESSMEASURE EASEMENT (7YP.) L 596 s I 1 / oLLI / / I / I 5 9 � LL \\ � N JO 595 2 / / 600 co I I 595 -- ^ a / 1 1 1 N 0- FOREBAY BERM EL. = 597.00 ' \ + 592.50 \ / / MINIMUM WIDTH = 5 FT \ \\ \ SEDIMENT 592.50 + / / / / TO BE COMPACTED \\ \ \ / 603 FOREBAY PER "BERM AND SOIL \ \\ / COMPACTION SPECIFICATIONS" \ \ \ BOTTOM AT 592.0' 6o4 (1' SEDIMENT 0 \ \. 'IQ \ \� STORAGE) l °' 11l0 3 604 9 / \\ \ \ � \\ ,� ° / � o 6 'X )0 + 607 J . 608 \\IN eo9 1 U `\------- 610 WTHE C3 \ i �\ _ \�\ \ 89 611 O J FOR T HEE DETOAILED DESIGN SERIES \ �- \ /O \ ~ THE STORM SEWER SYSTEM DRAINING TO THE SCM. Q o, ►I�; ° IT o � o Q RAGING CREEK DRIVE GRAPHIC SCALE Z J (50 PUBLIC R/W) 0 15 30 60 > STORMWATER CONTROL MEASURE W PLAN VIEW finch =30ft. 1" = 30' 'J MCADAMS The John R. McAdams Company, Inc. 3430 Torin don Way Y Suite 110 Charlotte, NC 28277 phone 704. 527. 0800 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT MR. MIKE KISSEL KOLTER LAND PARTNERS, LLC 701 SOUTH OLIVE AVENUE, SUITE 111 WEST PALM BEACH, FLORIDA 33401 KOLTER LAND PARTNERS z `1N I o I I I�IIII�II U m II II1IIIII1 FROM R O-M E \ . 596.50 96/.5/ 1 TO / 597 . 50 ) C o ° � o\i 4 9 L F 03 6 " \ 0 CLASS III ® 10:1 SLOPE (TO BE INSTALLED 0-RING RCP ® 1.02% AROUND SCM PERIMETER) W/ CONCRETE CRADLE PRECAST RISER OUTLET STRUCTURE (JOINTS WRAPPED IN m GEOTEXTILE FABRIC)SHAPE = SQUARE INTERNAL DIMENSIONS = 4 FT. x 4 FT. ENDWALL PER NCDOT STD. 838. 80TOP OF RISER = 601.20 INV. OUT (36"0 RCP) - 596.000 (4) RECTANGULAR WEIRS (3'W x 1H) = 600.20 TOR (4) 3.00"0 ORIFICE = 598.30 VELOCITY DISSI4.5"0 ORIFICE INVERTED SIPHON = 597.00 NCDOT CLASS T RIPRAP°' I INVERT OUT (36"0 0-RING RCP) = 596.50II(SEE DETAIL ON SHEET C9.01) 241 X 9'W X 22" THICK w D50 = 13 (SEE DETAIL SHEET C9.02)Z 0 / J593 594 ho STORMWATER CONTROL FO0 N MAINTENANCE/ACCESSMEASURE EASEMENT (7YP.) L 596 s I 1 / oLLI / / I / I 5 9 � LL \\ � N JO 595 2 / / 600 co I I 595 -- ^ a / 1 1 1 N 0- FOREBAY BERM EL. = 597.00 ' \ + 592.50 \ / / MINIMUM WIDTH = 5 FT \ \\ \ SEDIMENT 592.50 + / / / / TO BE COMPACTED \\ \ \ / 603 FOREBAY PER "BERM AND SOIL \ \\ / COMPACTION SPECIFICATIONS" \ \ \ BOTTOM AT 592.0' 6o4 (1' SEDIMENT 0 \ \. 'IQ \ \� STORAGE) l °' 11l0 3 604 9 / \\ \ \ � \\ ,� ° / � o 6 'X )0 + 607 J . 608 \\IN eo9 1 U `\------- 610 WTHE C3 \ i �\ _ \�\ \ 89 611 O J FOR T HEE DETOAILED DESIGN SERIES \ �- \ /O \ ~ THE STORM SEWER SYSTEM DRAINING TO THE SCM. Q o, ►I�; ° IT o � o Q RAGING CREEK DRIVE GRAPHIC SCALE Z J (50 PUBLIC R/W) 0 15 30 60 > STORMWATER CONTROL MEASURE W PLAN VIEW finch =30ft. 1" = 30' 'J MCADAMS The John R. McAdams Company, Inc. 3430 Torin don Way Y Suite 110 Charlotte, NC 28277 phone 704. 527. 0800 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT MR. MIKE KISSEL KOLTER LAND PARTNERS, LLC 701 SOUTH OLIVE AVENUE, SUITE 111 WEST PALM BEACH, FLORIDA 33401 KOLTER LAND PARTNERS z J LU OU a W J - W LU - O O 00 Z LU ( a z LU J J VAWorCo LU % 0 W�(Da= Q = LU > ~ z DC O � LUo z - z J LL O W z 0 �N CARO< THE JOHN R. i = n ' McADAMS = :COMPANY, INC. C-0293 r V� ; T4. �'. CC, OOF � .` qTF ...• �� ,`�. 3 289 INEF,Q;�v �,��4,� R• VAN �I REVISIONS NO. DATE 1 06. 15. 2020 REVS PER 1ST REVIEW BY ALL AGENCIES 2 04. 20. 2021 REVS PER 3RD REVIEW BY ALL AGENCIES PLAN INFORMATION PROJECT NO. KLP-19000 FILENAME KLP19000-SWA CHECKED BY MVD DRAWN BY AJB SCALE 1"=30' DATE 01. 17. 2020 SHEET STORMWATER CONTROL MEASURE'A' PLAN VIEW C9600 TOP OF HANDWHEEL TO EXTEND 1-FOOT ABOVE TRASH RACK TOP OF DAM EL. = 603.50 100-YEAR STORM EL. = 602.73 50-YEAR STORM EL. = 602.20 25-YEAR STORM EL. = 601.69 10-YEAR STORM EL. = 601.18 TOP OF RISER EL. = 601.20 (4) RECTANGULAR WEIRS 2-YEAR STORM EL. = 600.25 (ON EACH SIDE OF RISER) 3'W x 1. O' H 1-YEAR STORM EL. = 599.73 AT INV=600.20 (4) 3"0 ORIFICE INV. = 598.30 WATER QUALITY VOLUME = 598.06 (2 PER SIDE) NORMAL WATER SURFACE EL. = 597.00 36"0 0-RING RCP INVERT EL. = 596.50 DAM ELEV: 603.50 MAIN POOL ELEV: 597.00 TRASH RACK 10 FT. WIDE MINIMUM TEMPORARY POOL (SEE DETAIL) PROPOSED GRADE COMPACTED BERM SECTION ELEV: 598.08 (SEE BERM AND SOIL COMPACTION CONCRETE COLLAR 3 = I I=III=III=III=III=III=III=III=III=III=III 3 SPECIFICATIONS ON SHEET C9.00) - - - 1.00 (TO BE CONSTRUCTED IN I IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII-III- 1 SPILLWAY FILTER SEDIMENT MAIN SEE DETAIL) 0"'11 THE FIELD Y THE CONTRACTOR, 1 - I I=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=III=- (SEE DETAIL SHEET C9.02) FOREBAY POOL VEGETATIVE SHELF _ II II II II II II IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII-III_ _ TOP: 597.50 - - = I I I I=I 11=I 11=I 11=I 11=I 11=I I I=1 11=I 11=I I I=III=III=III=III=III=III=III=III=III=III=III=III 6" COVER FOREBAY SEDIMENT BOTTOM: 596.50 6" COVER STORAGE ELEV: 593.00 (MIN.) - I I=I I I=1 I I I=1 I I=1 11=III=III=III=III=III=III=III=III=III=III=III-III-III-III-III-III-III-III--III=III (MIN.) MAIN POOL SEDIMENT 14=1 I4J I I=I I I 1=III=III=III=III=1 I E 11=I I I=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I I I=III= STORAGE ELEV: 592.00 - =III=I 11=I 11=I I I-- --I I Icl I ICI I =III=III=I I I=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I 11=I I ElIElII=III=III II BOTTOM OF SEDIMENT BOTTOM OF SEDIMENT 591 00 =1 I I=I I =I I -III III IIEl I ; , III I I I I III I I I I I II-�l I [Ell I I � I I EIII=III=III=III=IIElIElIElIElIElIElIElII l I,-; I I I„` I�-1 I I �II I ENDWALL PER NCDOT STD. 838.80 STORAGE ELEV: 592.50 (1 STORAGE ELEV: DEPTH __________ ___ � � I I I I I I I I III -III -III -I I I -I I I -I I I -I I I-� I �_ J_ _ J_ �_ (SEE DETAIL ON SHEET C9.02) (6 IN DEPTH AT EXIT) WET POND FLOW ------------7::� - - APPROXIMATE LOCATION OF O -� 49 LF CLASS III 36"0 0-RING RCP _ -------- - -�-- � �_ __ BOTTOM OF SEDIMENT EXISTING GROUND STORAGE ELEV: 592.00 (ASTM C76-LATEST) 0 1.02� - (1 FT DEPTH AT ENTRANCE) CROSS SECTION �OC� J / ° d ° d --- - 4-----d zd ----- ---------d -----4------------' 4 ----------- a oC - d d --II -°-1-I�I _I d° 4 4/ 4 a ° °I 4.5"0 INVERTED SIPHON RN INV. = 597.00 III III IIII/II II III III IIIIII III IIIIII II IIIIII II IIIIIII III IIIIIII IIIII III IIIIIIIII IIIIIIIII IIII IIIIII 2.0' (MIN) - I- I II_ I II-I IIII IIIIII IIIIII IIIIII IIIIII IIIIII IIIIII IIII III III III IIIIII IIIIII IIIIII IIIIII IIIII IIIIII IIIII III III IIIIII III I (SEE DETAIL ON SHEET C9.02) I -III I - ��� 1',, II -I THICK K JOINT OINICRETEICRADLE 11 FILLERMATERIAL II IIII I I INV 36'0 0- VI ELOCITiY-DISSIPAt TOR 6"0 EMERGENCY DIP SEE DETAIL ON SHEE9. 5 FT. WIDE EL. 596.0 III(SEE DETAIL SHEET C9.02) DRAIN TRASH RACK I III III III III III II I ' I-II-IdI I-_ KEY TRENCH (SEE BERM I IUIIQIII 1 I DETAIL ON SHEET C9.02) INVERT OUT COMPACTION SPECIFICATION -A DOUBLE LAYER OF NON -WOVEN NOTES:(SEE III III III III III III . III III III III III III III III III III III III III III III III III III III SHEET C9.00) KEY TRENCH TO BE = III I III III GEOTEXTILE FABRIC SHALL BE PLACED III I III III III III„.III II - -III CONCRETE CONTRACTOR SHALL FORM INVERT IN = PROVIDED PER THE DIRECTION OF _ - AROUND EACH JOINT OF THE 36" 0 0-RING RCP - I 1 1. REMOVED TOPSOIL SHALL BE STOCKPILED FOR USE IN PLANTING (SEEDING) ANTI -FLOTATION BLOCK -BOTTOM OF RISER STRUCTURE TO DRAIN III III III III III III III THE SITE GEOTECHNICAL ENGINEER - BARREL IN 2 WIDE STRIPS CENTERED ON JOINT. -III- THE DAM EMBANKMENT ONCE FINAL GRADES (AS SHOWN ON THE GRADING x J"O GRADE 8 NLESS STEEL CRETE LAG =W 18 " X 4" X GALVANIZED STEEL STRAP (4 PER RISER JOINT) 0 RISER JOINT CONNECTION DETAIL N.T.S. NOTES: 1. CONCRETE ANTI -FLOTATION BLOCK TO BE PROVIDED WITH MINIMUM TEMPERATURE AND SHRINKAGE STEEL REINFORCEMENT. 2. TRASH RACKS NOT SHOWN FOR CLARITY. 3. THE NUMBER OF GUIDES FOR THE VALVE STEM SHALL BE DETERMINED IN THE FIELD BY THE CONTRACTOR. THE VALVE STEM MUST BE OPERABLE FROM THE TOP OF THE RISER VIA THE HANDWHEEL WITH AN INSIGNIFICANT AMOUNT OF PLAY IN THE VALVE STEM. 4. CONTRACTOR SHALL PROVIDE A JOINT IN THE OUTLET BARREL NO MORE THAN 5-FT FROM THE RISER. 5_0' 4.0' 3.0' (4) RECTANGULAR WEIRS ° (ON EACH SIDE OF RISER) 3'W x VH d c AT INV=600.20 (4) 3"0 ORIFICE d INV. = 598.30----� (2 PER SIDE) INVERTED INTAKE-----,,i (SEE DETAIL ON36"� 0-RING SHEET C9.02) i\ RCP 6"0 DIP DRAIN i W/ TRASH RACK I �' (SEE DETAIL ON SHEET C9.02) ° d d 4 d ° ° d ° ° ° 4 d CONCRETE ANTI -FLOTATION BLOCK 6" DIP DRAIN W/ TRASH RACK (SEE DETAIL ON SHEET C9.02) - III III l l l l l l l III III 1 III PLAN) HAVE BEEN ESTABLISHED WITH COMPACTED FILL. PRIOR TO TOPSOIL - III III III BARREL INVERT NON-SHRINK NKUGROUT III III III III III III III III III III III III 1 III - PERMANENT DAM CROSS SECTION ��IIIIIIIIIIi� INSTALLATION, THE CONTRACTOR SHALL SCARIFY THE TOP 2-T03-INCH ES OF THE BERMN SECTION TO PROMOTE BONDING OF THE TOPSOIL WITH THE COMPACTED N.T.S. FILL. THE TOPSOIL DEPTH SHALL RANGE FROM 3- TO 4-INCHES ON THE DAM EMBANKMENT. d 1.5' °d 8.0' 5.0' d ° d d d ° ° ° d d ° d ° 4 Q 3.0' INVERTED SIPHON d ° (SEE DETAIL ON SHEET C9.02) ° d ° d ° Un ° d d ° d 4 ° 6" PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 1820 X-CENTRIC VALVE OR (4) 3"0 ORIFICE APPROVED EQUAL. THIS VALVE SHALL BE IN INV. = 598.30 ACCORDANCE WITH AWWA C-517, AND (2 PER SIDE) SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL. CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. TOP OF RISER EL. = 601.20 (4) RECTANGULAR WEIRS - (ON EACH SIDE OF RISER) 3'W x VH AT INV=600.20 VALVE STEM GUIDE - (SEE NOTE #3) (4) 3"0 ORIFICE - 4.20' INV. = 598.30 (2 PER SIDE) 5.95' INVERTED INTAKE (SEE DETAIL ON SHEET C9.02) INVERT EL. = 596.50 0.50' 6" DIP DRAIN W/ TRASH RACK 77 ° (SEE DETAIL ON ° SHEET C9.02) 1.25' d ° d CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT AND STAINLESS STEEL HARDWARE CONTRACTOR SHALL FORM 60 DIP DRAIN PIPE_ INVERT OF RISER STRUCTURE CONTRACTOR SHALL CORE -DRILL THE TO DRAIN POSITIVELY TO HOLE FOR THE 6"0 DIP PIPE IN THE INVERT OF OUTLET BARREL FIELD. PRECASTER SHALL OMIT USING NON -SHRINK GROUT REINFORCEMENT IN THIS AREA PERMANENT OUTLET STRUCTURE DETAILS N.T.S. 1.5' (4) RECTANGULAR WEIRS (ON EACH SIDE OF RISER) 3'W x VH ° AT INV=600.20 ° 1 " THICK JOINT FILLER MATERIAL 110 ° L d d ° ° ° CONCRETE CRADLE '6 ° (SEE DETAIL ON ° SHEET C9.02) d ° ° 36"0 0-RING ° RCP FLOW d ° d 4 d d ° d d CONCRETE COLLAR ° (TO BE CONSTRUCTED IN THE FIELD BY THE CONTRACTOR, d ° d SEE DETAIL) d 1" THICK JOINT FILLER MATERIAL PRECASTER SHALL PROVIDE A BLOCK OUT FOR THE 36"0 0-RING RCP CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. TOP OF HANDWHEEL TO EXTEND 1-FOOT ABOVE TRASH RACK CONTRACTOR SHALL PROVIDE STEPS IN ACCORDANCE WITH NCDOT STD. 840.66. STEPS SHALL BE PLACED AT 16" O.C. PRECASTER SHALL PROVIDE A BLOCK OUT FOR THE - 36"0 0-RING RCP CONCRETE COLLAR (TO BE CONSTRUCTED IN THE I FIELD BY THE CONTRACTOR, SEE DETAIL) ---------------------- 36"2 0-RING RCP FLOW O• 4 4 4 � 4 4 Q/ CONCRETE CRADLE 4 (SEE DETAIL ON /4 SHEET C9.02) 16" 1" THICK JOINT FILLER MATERIAL PLUG VALVE. THE VALVE SHALL BE A M&H STYLE 1820 X-CENTRIC CONCRETE ANTI -FLOTATION VALVE OR APPROVED EQUAL. THIS BLOCK VALVE SHALL BE IN ACCORDANCE WITH AWWA C-517, AND SHALL BE OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL. 7.0' 1.0' (TYP.) I� 9.9 LF 2"x2"x1/4" ANGLE ;ONCRETE WCHOR 3OLT (TYP., >EE NOTE 14) DENOTES THE ACCESS HATCH FABRICATED HINGES FOR THE TO BE PROVIDED BY THE TRASH 21x3' ACCESS HATCH. ACCESS RACK FABRICATOR PER OUTLET HATCH SHALL BE POSITIONED STRUCTURE MATERIAL OVER STEPS. NOTES: SPECIFICATIONS (SHEET C9.10) 1. ALL REBAR TO BE #4 REBAR. 2. ALL REBAR AND ANGLES TO BE HOT -DIPPED GALVANIZED AND BE PROVIDED WITH AN EPDXY COATING. 3. THE HOT -DIPPED, GALVANIZED 2"x2"x1/4" ANGLES SHALL BE WELDED TO THE REBAR TRASH RACK. ONCE WELDED, THE ENTIRE ASSEMBLY SHALL BE PLACED ONTO THE RISER WITH ANGLES SITTING DIRECTLY ON TOP OF RISER. 4. CONTRACTOR SHALL ANCHOR THE TRASH RACK TO MANHOLE WALL WITH FOUR 4"x1/4" CONCRETE ANCHOR BOLTS THROUGH ANGLES. 5. CONTRACTOR SHALL OMIT OR ADJUST REBAR AS NECESSARY TO ALLOW FOR CONCRETE COLLAR. RISER TRASH RACK DETAIL 6. ACCESS HATCH SHALL ALIGN WITH STEPS IN RISER. N.T.S. NOTES: 1. ALL REBAR TO BE #4 REBAR. 2. WRAP OUTSIDE OF PIPE WITH VOLCLAY WATERSTOP-RX® 101 (OR PRE -APPROVED EQUIVALENT) AT THE FACE OF THE PRECAST STRUCTURE WALL. PROVIDE 6" OVER LAP ON THE BOTTOM OF THE PIPE. 1 6.0' 1 3" CLEARANCE TO OUTSIDE OF #4 REBAR) 0.5' 3.5' 1.0' ANCHOR DEPTH 3" CLEARANCE TO OUTSIDE OF #4 REBAR) ° ° ° ° 36" 0-RING I� RCP i ° CONCRETE ANCHOR "^'T (TYP., SEE NOTE # 9.9 LF 2"x2"x1/4" ANGLE .00 3" CLEARANCE TO OUTSIDE OF #4 REBAR) 3" ANCHOR DEPTH WRAP OUTSIDE OF PIPE WITH FLEXIBLE PRECAST WATERSTOP SEAL STRUCTURE (SEE NOTE 2) WALL #4 REBAR ANCHORS. CONTRACTOR SHALL - DRILL INTO PRECAST STRUCTURE WALL AND SET ANCHORS USING EPDXY GROUT 4.5' WRAP OUTSIDE OF ° PIPE WITH FLEXIBLE WATERSTOP SEAL (SEE NOTE 2) 4 ° ° ° d d ° ° ° 4 5.2" ° d ° 4 ° (CENTER TO CENTER) ° CONCRETE ANTI -FLOTATION BLOCK _ 4.6' _ r (CENTER TO CENTER) FRONT VIEW ° d4 ° d #4 REBAR TRASH RACK (ABOVE) ANCHOR TRASH RACK TO MANHOLE WALL WITH FOUR EQUALLY SPACED HOT -DIPPED GALVANIZED STEEL CLAMPS. EACH CLAMP ATTACHED TO MANHOLE RISER BY 2-4"x1 /4" CONCRETE ANCHOR BOLTS EACH CLAMP TO BE COATED W/ AN EPDXY COATING. -3000 PSI CONCRETE COLLAR (MIN. 28 DAY STRENGTH) 3" CLEARANCE TO OUTSIDE OF --------- #4 REBAR) 36" 0-RING RCP 5.5" CENTER TO CENTER ° 12" ANCHOR DEPTH d 3" CLEARANCE TO OUTSIDE OF #4 REBAR) 36" CONCRETE COLLAR DETAIL N.T.S. #4 REBAR ANCHORS. CONTRACTOR SHALL DRILL INTO PRECAST BASE AND SET ANCHORS USING EPDXY GROUT CONCRETE ANTI -FLOTATION BLOCK 'J McADAMS The John R. McAdams Company, Inc. 3430 Toringdon Way Suite 110 Charlotte, NC 28277 phone 704. 527. 0800 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT MR. MIKE KISSEL KOLTER LAND PARTNERS, LLC 701 SOUTH OLIVE AVENUE, SUITE 111 WEST PALM BEACH, FLORIDA 33401 KOLTER LA ND PARTl EP z J W a-_ Q OU a>- W J - N LU W �: Ol - L< 0 o0o N - Q z W a z W J J V)Wwco� W Vl a �� J U Q = w_ > z O w o z � z J Li W z O �\A CAR c THE JOHN R. i = n ' McADAMS z = = :COMPANY, INC. T C-0293 X� ,0���. C ' 0�/'yam': 3 289 = eF�C I R• VAN REVISIONS NO. DATE 1 06. 15. 2020 REVS PER 1ST REVIEW BY ALL AGENCIES PLAN INFORMATION PROJECT NO. KLP-19000 FILENAME KLP19000-SWA CHECKED BY MVD DRAWN BY AJB SCALE N / A DATE 01. 17.2020 SHEET STORMWATER CONTROL MEASURE'A' DETAILS C9601 ° #6 REBAR PERIMETER FRAME 4" x 4" 6/6 WELDED WIRE FABRIC (EACH SIDE & TOP OF CAGE) ° 18" (TYP.) d ° 2.03' 2 LF 6"0 DIP 4" ANCHOR DEPTH CONTRACTOR SHALL DRILL INTO PRECAST EXTENDED BASE AND SET ANCHORS USING EPDXY GROUT ° d d4 d 0.86' (CENTER TO CENTER) 6" PVC CAF SCREW TYPE TOP EL. = 597.83 INVERT THROUGH RISER EL. = 597.00 BOTTOM EL. = 596.50 4" x 4" 6/6 WELDED WIF FABRIC (EACH SIDE & TC CAGE) CONTRACTOR SHALL SEAL THE PIPE PENETRATION USING A RUBBER BOOT AND STAINLESS STEEL HARDWARE 0 0 0 2.00' 0 0 0 1 ° 6" PLUG VALVE. THE VALVE ° SHALL BE A M&H STYLE 1820 4 d ° X-CENTRIC VALVE OR d ENGINEER APPROVED EQUAL. ° ° THIS VALVE SHALL BE IN ACCORDANCE WITH AWWA C-517, AND SHALL BE ° OPERABLE FROM TOP OF OUTLET STRUCTURE VIA A HANDWHEEL. #6 REBAR PERIMETER rnrivi� 6"0 DIP DRAIN PIPE CONTRACTOR SHALL CORE -DRILL THE HOLE FOR THE 6" 0 DIP IN THE FIELD. PRECASTER SHALL OMIT REINFORCEMENT IN THIS AREA. 6"0 EMERGENCY DIP DRAIN TRASHRACK DETAILS N.T.S. ❑. 6" PVC CAP WITH 4.5"0 DRILLED ORIFICE PROPOSED GRADE -III-III-11 MI I 36" 0 0-RING RCP FLOW < - n 4 " d d d � . d•a •d • 'd • e d NO. 67 WASHED STONE ENCASED IN NON -WOVEN FILTER FABRIC (MIRAFI 180N OR EQUIVALENT). FILTER FABRIC OVERLAP TO BE A MINIMUM 2' IN THE DOWNSTREAM DIRECTION. SIPHON OUTLET DETAIL N.T.S. CONTRACTOR SHALL PROVIDE STEEL CLAMP TO INSURE A WATERTIGHT SEAL BETWEEN THE SPILLWAY FILTER NON -WOVEN FILTER FABRIC AND 36"0 0-RING RCP OUTLET BARREL RISER OUTLET STRUCTURE PAI ° d 2'� 6.0"0 PVC SIPHON INVERT EL. = 597.00 (NWSE) ENDWALL PER i 6" MIN. NCDOT STD. 838.80 1' MIN. CONTRACTOR SHALL I STEEL CLAMP TO IN WATERTIGHT SEAL BETWE SPILLWAY FILTER NON FILTER FABRIC Al' 0-RING RCP OUTLET ENDWALL PER NCDOT STD. 838.80 NOTE. 4" WEEPHOLES TO BE PROVIDED WITH VARMIT GUARD ON DOWNSTREAM SIDE AND GALVANIZED HARDWARE CLOTH ON UPSTREAM SIDE (Y4" MAXIMUM OPENINGS). VARMINT GUARD SHALL BE HAVILAND BRAND STEEL FINGER TYPE OR ENGINEER APPROVED EQUIVALENT. (2) 4" PERFORATED, CORRUGATED HDPE PIPE (ADS N-12 OR APPROVED EQUIVALENT) ENDWALL PER NCDOT STD. 838.80 SPILLWAY FILTER DETAIL N.T.S. o RR' BARREL PIPE FLOWABLE FILL CRADLE 6" PLUG VALVE. THE VALVE CONSTRUCTION SEQUENCE SHALL BE A M&H STYLE 1820 X-CENTRIC VALVE OR 1. CONSTRUCT FORMWORK FOR FLOWABLE FILL CRADLE ON EXISTING GRADE. APPROVED EQUAL. THIS VALVE SHALL BE IN ACCORDANCE 2. EXCAVATE TRENCH FOR CRADLE AND BARREL PER DIMENSIONS ON DRAWINGS. WITH AWWA C-517, AND SHALL BE OPERABLE FROM 3. PLACE BARREL PIPE ON CONCRETE BLOCKS TO GRADE. CONTRACTOR SHALL WRAP JOINTS WITH 2-FT WIDE TOP OF OUTLET STRUCTURE VIA A HANDWHEEL. STRIPS OF FABRIC AT THIS STEP. 4. PLACE FLOWABLE FILL FOR CRADLE FOR EACH SECTION FROM ONE SIDE OF THE TRENCH. ALLOW FLOWABLE FILL TO FILL ENTIRE AREA UNDER PIPE AND PIPE HAUNCHES AS TO LEAVE NO VOIDS UNDER THE PIPE BEFORE PLACING FLOWABLE FILL ON THE OPPOSITE SIDE OF THE TRENCH. PLACE ENTIRE CRADLE AS ONE LIFT (VERTICALLY) PER DRAWINGS. 5. FLOWABLE FILL CRADLE MAY BE ELIMINATED PER RECOMMENDATION FROM THE ON -SITE GEOTECHNICAL ENGINEER. ANY DEVIATION FROM THIS DETAIL SHALL BE SUBMITTED TO AND REVIEWED BY THE DESIGN 6"0 DIP ENGINEER PRIOR TO IMPLEMENTATION. IF THE CRADLE IS ELIMINATED, THEN A LETTER FROM AN NC PE CERTIFYING THAT ALL SOIL MATERIAL UNDER, AROUND, AND ABOVE THE BARREL PIPE MEETS THE BERM 22' MATERIAL SPECIFICATIONS STATED ON SHEET C9.00 IS REQUIRED. ;TOR SHALL SEAL THE PIPE 6. ALLOW CRADLE TO CURE FORA MINIMUM OF 7 DAYS BEFORE ANY VIBRATING COMPACTION EQUIPMENT IS TION USING A RUBBER BOOT USED IN THE VICINITY OF THE BARREL PIPE. JNLESS STEEL HARDWARE 7. TRENCH TO BE BACKFILLED IN 5" LIFTS WHEN COMPACTION IS BY HAND. BACKFILL IS IN 8" LIFTS WHEN CONDUCTED BY MACHINE. MINIMUM OF 2 FEET COVER MUST BE PRESENT ON 24"0 RCP BEFORE DRIVING OVER WITH HEAVY EQUIPMENT. 12" MIN. ENCASED IN NON -WOVEN FILTER FABRIC (MIRAFI 180N OR EQUIVALENT) WASHED STONE D IN NON -WOVEN -ABRIC (MIRAFI R EQUIVALENT) W1 (FT.] 1_D" H2 H1 �B" O.C. (TYP. ) REFER TO CHART FOR BAR SIZE ELEVATION W2 iFT. PLAN NOTES: 1. A FILTER BLANKET IS TO BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. THE FILTER BLANKET WILL CONSIST OF A MINIMUM 4" THICK LAYER OF STONE (NCDOT #57) UNDERLAIN WITH MIRAFI FILTER WEAVE 700 OR APPROVED EQUIVALENT ENDWAL 80" NCDOT STD. t 36"0 0-RINC A� CORRUGATED HDPE PIPE (ADS N-12 OR APPROVED EQUIVALENT) 24'- PIAN 36" CONCRETE CRADLE DETAIL N.T.S. H2 H1 \\- 6., 8" O.C.(TYP.) REFER TO CHART FOR BAR SIZE SIDE "'�- 3000 PSI CONCRETE, OR PER RECOMMENDATION FROM -ON-SITE GEOTECHNICAL ENGINEER z Q H Q NOTES: < * THIS PRECAST ENDWALL MAY BE USED FOR THE FOLLOWING CC STANDARDS: 838.01, 838.11, 838,21, 838.27, 838.33, 11 -1 ra 2 838.39, 838.51, 83B.57, 838.63 AND 838.69. C7 ¢ CO S 2-1 * INSTALL PRECAST ENDWALLS WITH WINGS AND PAY LL.I Q LL = FOR IN ACCORDANCE WITH SPECIFICATION SECTION 038. it y Q U O * USE 4000 PSI CONCRETE. F 2 W * PROVIDE ALL REINFORCING STEEL WHICH MEETS ASTM A615 U]I- U- 0 J FOR GRADE 60 AND WELDED WIRE FABRIC CONFORMING cc o " Q z �"� TO ASTM A185 WITH 2" MIN. CLEARANCE. * PLACE LIFT HOLES OR PINS IN ACCORDANCE WITH .� 00 F H OSHA STANDARD 1926.704. r W L] PIPE TO BE GROUTED INTO HEADWALL AT JOB SITE BY w B CONTRACTOR * ALL ELEMENTS PRECAST TO MEET ASTM C913. * WELDED WIRE FABRIC MAY BE SUBSTITUTE❑ FOR REBAR AS LONG AS THE SAME AREA OF STEEL IS PROVIDED. • CHAMFER ALL CORNERS 1" On HAVE A RADIUS OF 1". LL NOTE: THE MINIMUM BAR SIZE SHALL BE #5 BARS J AT 8" CTS_THE CONTRACTOR WILL HAVE THE OPTION Q J TO INCREASE THIS BAR SIZE AS NEEDED. LL Q. c 0 ENDWALL DIMENSIONS FT. MINIMUM MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. MIN./MAX. PIPE ❑IA. BAR SIZE H1(FT.) H2(FT.) D (FT.) W1 W2 1.0 #5 @ 8" 1.25/2.00 2.00/3.75 1.25/1.75 3.00/3.75 5.5016.00 1.25 #5 @ 8" 1.2512.00 3.00/3.75 1.25/2.00 3.5013.75 6.5016.75 1.50 #5 @ 8" 1.2512-00 3.0014.25 1.5012.50 3.5013.75 6.5016.75 2.0 #5 @ 8" 1.50/2.50 4.00/4.75 1.7512.50 4.0014.25 7.5018.25 2.5 #5 @ B" 2,50/3.50 4.00/6.00 2.00/3.00 4.5015.50 10.00111.50 3.0 #5 @ 8" 3.00/3.50 5.00/6.00 2.75/3.50 5.2515.75 11.50111.75 3.5 #5 @ B" 3.25/4.50 6.00/6.76 3.25/3.50 6.0016.75 12.00113.25 4.0 #5 @ 8" 3,50/4.50 6.50/7.00 3.25/3.50 6.50Y6.75 13.00/13.25 4.5 #5 @ 8" 4.00/5.00 6.50/8.50 3.25/4.00 7.00/9.25 13.50115.75 5.0 #5 @ 8" 4.50/5.00 7.0018.50 3.25/4.00 7.2519.25 13.75115.75 5.5 #5 0 8" 4.5015.00 1 7150/8.50 3.2514.00 7.2519.25 14.00/15.75 8.0 #5 @ 8" 4.50/5.00 7.501B.50 3.2514.00 7.7519.25 14.75/16.75 OUTLET ENDWALL DETAILS N.T.S. NCDOT CLASS "I" RIPRAP 24'L x 9'W x 22" THICK FILTER BLANKET (SEE NOTE) OUTLET BARREL VELOCITY DISSIPATOR N.T.S. 36"0 0-RING RCP ENDWALL PER NCDOT STD. 838.80 SECTION A A Q W a LU Ili W CC O V � Z Z 2 Fay [A V cv < N LL �a� z o LU Cc � ir 0 li HEET 1 OF 1 838.80 22'LAYER OF CLASS "B" RIPRAP 4 FILTER BLANKET TT McADAMS The John R. McAdams Company, Inc. 3430 Toringdon Way Suite 110 Charlotte, NC 28277 phone 704. 527. 0800 fax 919. 361. 2269 license number: C-0293, C-187 www.mcadamsco.com CLIENT MR. MIKE KISSEL KOLTER LAND PARTNERS, LLC 701 SOUTH OLIVE AVENUE, SUITE 111 WEST PALM BEACH, FLORIDA 33401 KOLTER LAND PARTNERS z J W a-_ Q OU - aw J - LU W Cl) - Q Q LL- O 00 N z W a z LU J J VAWwco� orJ W Vl a =<_ U Q = LU > z O am LU o z � z J � LL- O W z O 04 r THE JOHN R. i McADAMS z = = :COMPANY, INC. T 16 C-0293 Q X� ,o \\///i/i •Q L yr 3 289 = � eFtiO I NEF'���<v \� �,p�,•••....•••�� AI ��IZ I REVISIONS NO. DATE 1 06. 15. 2020 REVS PER 1ST REVIEW BY ALL AGENCIES PLAN INFORMATION PROJECT NO. KLP-19000 FILENAME KLP19000-SWA CHECKED BY MVD DRAWN BY AJB SCALE N/A DATE 01. 17. 2020 SHEET STORMWATER CONTROL MEASURE'A' DETAILS C9602