Loading...
HomeMy WebLinkAboutNCC221529_Site Plan or Location Map_20220420PIEDMONT MEMOR/AL DR. lNV 943.7 SR #2695 J WIC W � Q &03 W W W W 8" 1WA TER L 1� BU/L TS r I I W- W� W _ J _ U/��OIV CROSS ROAD A W W J `� I I � W W � w- W- ur - _ W ur u I .0 �_ /NV 94 .9 (IN DEPRESSION) - - - SR #2643 �.. EX. STREETYARD AU - POLE X - AU AU 01 A .. X • K-M SIGN 4 - AU ) AU - - _ B SF� se I Q ..w U AU / AU DISTURBED IT STREET YARD PLANTINGS 12"CEDAR y AC/ AU U _ - _ HOLLY BUSHES (TYPICAL) - oWV STREET YARD PLANTINGS �... U = ® I� O� A� AU -�` AU - _POLE c O PB 6„CHERRY V 15"CEDAR AU 1 cfl POLE AU - - _ 12"CE0A ..d5 GUY I ��AU �U U POLE AU 4" H RRY�� M -U AU AU AU AU - 5"RRY o o c I h��j _ 18"CHERRY �, ..1........ / ...... ........... \ I AU AU POLE OPT/C V� )O��O O O O O�O�O�C7QQ O O U AU AU 4"CHERARU MARKER POLE O O O O O O O O O O O O O O O C siG,� S/[ EX GRA VEL LA Y DOWNAREA EX GRA VEL LA Y DOWNAREA D L X M 11 Lyndon Steel Company, LLC TAXBLOCK5621, TAXLOT 128 D.B. 3386, PG. 226 P/N# 6863 36 2771 ZONED: GI matthewo EX ,� 03/24/2022 3:40:04 PM i NV=912.57' / EXASPHAL T DR/VEWA Y HC HC LL-1 EX GRAVEL PARKING INLET LOCATION UNKNOWN fl,". n� RDS AU 9A J Q VJA U SIGN V UTILITY BOX O FF 944.3 V 942.8 Q 9"CRABAPPLE \ L EX ONE STORY SEPTIC CIO � LOG OFFICE El PUMP \ \ U) O rn 0 I ❑ HEAT \ , ❑ PUMPS 14"CRABAPPLE J , O /NV 941.2 m FORSYTH COUNTY II Q TAXBLOCK5621, TAXLOT310 D.B. 1125, PG. 1705 I I Z P/N # 6863-37-8175 FF 943.3 I I I P L ,r III? EX METAL I I X SIGN WAREHOUSE II II W II \ J O BOLLARD 11 DU V940.4� { { PAD PSTEpR Q , _ DISTURBED LIMITS ,- R I �' { ( GUYI + PB TR L r- n _3 -- �G' OLEm p{�{{{{<<{ I L T S '.CEDAR ... F F9... x CX:._ >: I` BENCHMARK CONTROL POINT #1 w w N:837,090.7295' - �, ❑2 CONC. PAVED E:1,663,594,1419' OVER H I NAD 83/2011 HANG EXISTING CGF. 0.99992810 STAGE 1 CONSTRUCTION SEQUENCE INDUSTRIAL 1. OBTAIN GRADING/EROSION CONTROL PERMIT AND PLAN APPROVAL FROM THE CITY OF WINSTON-SALEM INSPECTIONS DIVISION. BUILDING 2. CONTRACTOR IS REQUIRED TO FILL OUT AND SUBMIT AN ELECTRONIC NOTICE OF INTENT (e-NOI) FORM. ALL CONTRUCTION ACTIVITIES ARE REQUIRED TO FOLLOW THE NEW NCGO1 PERMIT. 3. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A MANDATORY PRECONSTRUCTION CONFERENCE AND AN INSPECTION SCHEDULE. 4. THE CONTRACTOR SHALL CONDUCT SELF -INSPECTIONS OF THE EROSION AND SEDIMENT CONTROL MEASURES AND COMPLETE THE FOLLOWING COMBINED SELF -INSPECTION FORM FOUND ON THE DEMLR WEBSITE; (http://deq.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control/forms). COMPLETE INSPECTIONS FORMS SHALL BE KEPT ON -SITE AND AVAILABLE FOR INSPECTION AT ALL TIMES. IT IS RECOMMENDED THAT A COPY BE KEPT IN A PERMITS BOX. SELF -INSPECTIONS FOR STABILITY AND FUNCTION OF EROSION AND SEDIMENTATION CONTROL MEASURES ARE TO BE PERFORMED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF EACH RAINFALL EVENT OF GREATER THAN 0.5 INCH. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY TO MAINTAIN MEASURES AS DESIGNED. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE MAINTAINED AS SPECIFIED IN THE CONSTRUCTION DETAILS ON THIS PLAN. A RAIN GAUGE SHALL BE INSTALLED AT THE PROJECT SITE FOR MONITORING. 5. A COPY OF THE EROSION AND SEDIMENT CONTROL PERMIT, A HARD COPY OF THE PLAN, AND ALL SELF -INSPECTION RECORDS MUST BE KEPT ON -SITE, PREFERABLY IN A PERMITS BOX, AND ACCESSIBLE AT ALL TIMES FOR INSPECTION. 6. INSTALL THE CONSTRUCTION ENTRANCE AND SEDIMENT FENCE ALONG EDGE. 7. INSTALL ALL PERIMETER SEDIMENT FENCE. 8. BEGIN CLEARING AND GRUBBING JUST ENOUGH TO ALLOW FOR INSTALLATION OF THE SEDIMENT SKIMMER BASIN, SEDIMENT FENCE AND CLEAN WATER DIVERSION DITCHES. STOCKPILE TOPSOIL ON -SITE WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES FOR LATER DISTRIBUTION. 9. CONTRACTOR SHALL GRADE THE CLEAN WATER DIVERSION DITCHES AND IMMEDIATELY LINE THESE DITCHES WITH EROSION CONTROL MATTING AS SPECIFICED AND STORN CHECK DAMS. 10.INSTALL THE 100 SERIES AND 200 SERIES STORM DRAINAGE SYSTEM AS SHOWN ON THIS PLAN. 11. THE SEDIMENT SKIMMER BASIN CAN NOW BE INSTALLED AND THE OUTLET STRUCTURE FOR THE SKIMMER BASIN TO BE BUILT OVER THE END OF THE EXISTING 36" CMP. SKIMMER SHALL BE TIED TO OUTLET STRUCTURE. 12.ONCE THE SEDIMENT SKIMMER BASIN HAS BEEN INSTALLED AS DESCRIBED ABOVE, THEN CONSTRUCTION OF DIVERSION BERMS CAN BEGIN. 13. COMPLETE REMAINDER OF CLEARING AND GRUBBING. STOCKPILE TOPSOIL ON -SITE WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES FOR LATER DISTRIBUTION. 14. REMOVE EXISTING GRAVEL AND EXISTING SHEDS. 15. SEED/STABILIZE DISTURBED AREAS IMMEDIATELY AFTER GRADES HAVE BEEN ACHIEVED. TEMPORARY VEGETATIVE COVER SHALL BE PROVIDED WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1. TEMPORARY VEGETATIVE COVER SHALL BE PROVIDED WITHIN 14 DAYS ON ALL OTHER AREAS. PERMANENT GROUNDCOVER SHALL BE ESTABLISHED IN 15 WORKING DAYS OR 90 CALENDAR DAYS, WHICHEVER IS SHORTER. HOWEVER, NPDES GROUNDCOVER REQUIREMENTS TAKE PRECEDENCE. 16. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR. PROPERTY INFORMATION: PARCEL ID NUMBER: 6863-37-1136.000 6863-37-4244.000 ZONING: GI-L, GI ACREAGE: 5.32 AC PROPERTY OWNER: PARCEL ID NUMBER: 6863-37-1136.000 6863-37-4244.000 WINSTON STEEL, LLC 1947 UNION CROSS ROAD WINSTON-SALEM, NC 27107 DEVELOPER: WINSTON STEEL, LLC CONTACT: SAM WINTERS 1947 UNION CROSS ROAD WINSTON-SALEM, NC 27107 PHONE: (336) 785-0848 EMAIL: swinters@lyndonsteel.com ENGINEER: ALLIED DESIGN, INC. CONTACT: STEVE CAUSEY 4720 KESTER MILL ROAD WINSTON-SALEM, N.C. 27103 PHONE: (336) 765-2377 EMAIL: scausey@allied-engsurv.com O O h O 04 UNION CROSS ROAD 0 Q J� �P VICINITY MAP NOT TO SCALE KEY NOTES AO TEMPORARY CONSTRUCTION ENTRANCE/EXIT. OB TEMPORARY SEDIMENT FENCE. CO TEMPORARY SEDIMENT FENCE WITH STONE STABILIZATION. O NEW TEMPORARY DIVERSION BERM. OE NEW TEMPORARY SKIMMER SEDIMENT BASIN. THE INSIDE SLOPES OF THE SKIMMER SEDIMENT BASIN SHALL BE STABILIZED WITH NORTH AMERICAN GREEN S75 EROSION CONTROL MATTING UPON COMPLETION OF CONSTRUCTION. OF NEW COIR, JUTE OR BURLAP BAFFLES. OG NEW TEMPORARY SKIMMER DEVICE TO BE TIED INTO SKIMMER BASIN OUTLET STRUCTURE. HO NEW TEMPORARY STONE CHECK DAM. lO NEW TEMPORARY ON -SITE CONCRETE WASHOUT STRUCTURE WITH LINER. PROVIDE CLEARLY MARKED SIGNAGE NOTING DEVICE LOCATION. JO EXISTING 15" RCP TO BE EXTENDED WITH NEW 15" RCP. OK NEW BRICK OR CONCRETE DROP INLET. NCDOT STANDARD 840.14 OR 840.15 WITH U.S. FOUNDRY 4139 FRAME AND 6429 GRATE. OL NEW CONCRETE 4 SIDED OPEN THROAT CATCH BASIN. NCDOT STANDARD 840.04 WITH NCDOT 840.54. OM NEW TEMPORARY WIRE AND STONE DROP INLET FILTER. NO NEW BRICK OR CONCRETE MANHOLE. NCDOT STANDARD 840.51 OR 840.52. OO NEW BRICK OR CONCRETE MANHOLE TO BE BUILT OVER THE EXISTING 36" CMP. NCDOT STANDARD 840.51 OR 840.52. OP NEW TEMPORARY SKIMMER BASIN OUTLET STRUCTURE. PROVIDE A 4'x4' PRECAST CONCRETE WAFFLE BOX WITH OPEN TOP INSTALLED OVER THE END OF THE EXISTING 36" CMP TO SERVE AS AN EMERGENCY SPILLWAY. CONNECT THE SKIMMER TO THE BOTTOM OF THE BOX. THE TOP OF THE BOX SHALL BE SET AT 922.0 FOR STAGE 1 AND 2. OQ EXISTING STREETYARD TREES/SHRUBS TO BE REMOVED. EXISTING TREE TO BE REMOVED TO THE STUMP. NO STUMPS MAY BE REMOVED UNTIL THE EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND APPROVED BY EROSION CONTROL INSPECTOR. OR EXISTING FENCE TO BE REMOVED FOR CONSTRUCTION OPERATIONS. COORDINATE WITH OWNER FOR REPLACEMENT UPON COMPLETION OF CONSTRUCTION. EXISTING TREES/VEGETATION TO BE REMOVED. EXISTING TREE TO BE 00 REMOVED TO THE STUMP. NO STUMPS MAY BE REMOVED UNTIL THE EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND APPROVED BY EROSION CONTROL INSPECTOR. ®NEW DITCH SECTION WITH MATTING. SEE SHEET C5.2 FOR DIMENSIONS. ALL DITCHES SHALL BE LINED WITH NORTH AMERICAN GREEN S75 MATTING, STAPLE PATTERN D, DURING GRADING OPERATIONS. ONEW STORM DRAINAGE STRUCTURE NUMBER. REFER TO SHEET C3.2-C3.5 FOR NEW STORM DRAINAGE INFORMATION. EXISTING TREES/VEGETATION TO BE REMOVED TO LIMITS OF NEW TREELINE. EXISTING TREE TO BE REMOVED TO THE STUMP. NO STUMPS MAY BE REMOVED UNTIL THE EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND APPROVED BY EROSION CONTROL INSPECTOR. NEW CLEAN WATER DIVERSION DITCH. DITCH SHALL BE IMMEDIATELY LINED WITH EROSION CONTROL MATTING. PROVIDE CHANNEL LINING NAG S75 WITH STAPLE PATTERN D. EXISTING GRAVEL TO BE REMOVED AFTER INSTALLATION OF EROSION CONTROL MEASURES. GRAVEL MAY BE USED AS SALVAGEABLE FILL MATERIAL WHERE APPROPRIATE IF DETERMINED ACCEPTABLE BY AN INDEPENDENT SOILS TESTING LABORATORY. EXISTING SHED/OUTBUILDING TO BE REMOVED/RELOCATED AS DIRECTED BY OWNER. STAGE 1 DISTURBED AREA = 4.24 AC co 0 Z N w z_ J U) U 0 E Q oT_ o Z r N (n Z J N ccoo a w w �w� °76 � �(D Z_ Q = 70 (9 w U) co r- U) Z M - 3: a) W Y 0 6 CV) o 0- LL FIRM LICENSE C-1891 Z J J O Q Q LLI >- or U LLI W _ vJ z O O z Q U Z p C/) z UO z U Q Z Q J Y U rn Z O 5 � Z Lu co N M N >Q U) N N M 0 O z U m Z w m 0 w Y O Q w d 0 0 U W� > w z O z i W Df ' O UUj W i � w o- w 0 p LL I 0 D I U i D N w Q N N OM 0 OZ Q m SITE DEMOLITION AND STAGE 1 EROSION CONTROL PLAN GRAPHIC SCALE SHEET 30 0 15 30 60 120 IC202 { IN FEET 1 inch = 30 ft»