HomeMy WebLinkAboutNC0025984_PARREV_20220420Regional Pretreatment Annual Report Review
NC0025984_PARREV_2022042016
Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included? ADEQUATE? POTW noted Corrections? Regional Office: Asheville
Narrative YES NO NA YES NO NA POTW: Forest City WWTP
PPS Form YES NO YES NO NPDES Permit No. NC0025984
SNCR YES NO YES NO Report Period: 1/1/21 to 12/31/21
IDSF YES NO YES NO
Full Modified
For modified programs evaluate shaded
items only. A Narrative is required for a
modified program only if there are SIUs
in SNC.
Allocation Table YES NO YES NO
Compliance Schedules YES NO NA YES NO NA
Public Notice YES NO NA YES NO NA
Program Information YES NO YES NO YES NO
Historical SNC YES NO NA YES NO NA YES NO NA
If No, check recommendation below:
1. Have at least 90% of SIU permits been issued within 180
days of expiration? (See Allocation Table).
Yes No Not req’d NOD NOV QNCR NCP Civil Penalty
Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not req’d NOD NOV QNCR NCP Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in
SNC, including those causing pass-through or interference? (See
Narrative and SNCR Form)
Yes No NA NOD NOV QNCR NCP Civil Penalty
Assessment
4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP Civil Penalty
Assessment
Note: Exceptions should be explained in the comment section below:
AZP and TOFC are currently working on a Consent Order to bring the facility
consistently in compliance and reduce the metals and ammonia loading on the
Riverstone WWTP (NC0087084).
Reviewed By: Mikal Willmer Date: 04/20/2022