HomeMy WebLinkAboutSW1170501_Letter of Transmittal_20170517BROOKS
ENGINEERING ASSOCIATES
May 15, 2017
NCDEQ
Stormwater Permitting Unit
512 N. Salisbury Street
Raleigh, NC 27604
919-807-6374
Attention:
Regarding:
Dear Mr. Randall:
Mike Randall
Planning & Project Management / Civil Engineering
Surveying / Environmental Engineering & Services
17 Arlington Street / Asheville NC 28801
www.brooksea.com / 828-232-4700
Acony Bell Project
Henderson County
BEA Project No. 444516
On behalf of BMP Holdings (BMP), we are submitting the enclosed Fast Track Stormwater
Authorization to Construct (ATC) Application for their proposed RV Park, Acony Bell
Community. The Community is an RV Park for Park Model RVs in the Mills River
Community. The project will develop approximately 16.7 acres of the 52 acre parcel and
will be developed in one phase.
The enclosed application package is for 16.7 acres of Low Density Development for to serve
97 RV slips which includes private access roads and pervious gravel parking. Stormwater
runoff will be collected in swales in accordance with Low Density Development
requirements with no discreet stormwater collection system. The proposed impervious area
will be well below the 24% maximum for Low Density Developments.
Included in this submittal are all the necessary items per the stormwater application. The
property has not transferred to BMP Holdings, so all additional requirements have been
included.
Since the development will be constructed in one phase, all meeting Low Density
Development Rules, a detailed Construction Sequence in relation to starting/completing
stormwater phases is not included in this submission.
We appreciate your review of this permit application. Please feel free to call or email to
discuss this submittal.
Sincerely,
Brooks Engineering Associates, P.A.
Mark C. Brooks, P.E.
Enclosures:
A —Fast track application
B -Low density supplement
C —Application fee $505.00
D —USGS Map
E —LLC Documentation for BMP Holdings
F —Lease Agreement
G —Property Deed
H- Stormwater Plans