HomeMy WebLinkAboutNCG020052_DMR Upload Review_20220419Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 1/28/2022 2:58:43 PM (DMR Submittal)
Submit by Georgoulias, Bethany A 4/19/2022 10:49:06 AM (DMR Submittal Review)
• Georgoulias, Bethany A assigned the task to Georgoulias, Bethany A 4/19/2022 10:48 AM
• The task was assigned to DEMLR SW Admin 1/28/2022 2:58 PM
DMR Submittal from 1/28/2022
Permit and Facility Information:
Permit Number* Enter COC or Individual Permit Number
NCG020052
Must begin with NCS or NCG
Facility Name: * Hanson Aggregates - Crabtree Quarry
County: * Wake
Note: Facility name and county are used to help the reviewer verify the permit number entered, and to display the
Regional Office address on the submitter's form (not here). These metadata details will be pulled from current BIMS
information after the DMR(s) are filed. If the submittal is accepted, simply note any errors in the reviewer's comments.
Monitoring Period Information:
Monitoring Period What is the YEAR of the sample date(s)?
Year:* 2021
DMR Upload* Click the upload button or drag and drop files here to attach document.
Crabtree 3rd Q-2021 WW&SW DMRs.pdf 600.82KB
Only PDFs are accepted.
Comments: 3rd Quarter-2021 DMRs
* By checking the box and signing box below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this Discharge Monitoring Report (DMR) Upload form is a "transaction" subject to Chapter 66,
Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
• I understand that an electronic signature on this upload form has the same legal effect and can be enforced in the same
way as a written signature; AND
• I intend to electronically sign and submit this DMR Upload form.
Full Name: * Jack Garvey
Name of person submitting this form
Email Address:* Jack.Garvey@lehighhanson.com
Phone Number: * 19193802746
Signature:
f�
Date: * 01 /28/2022
Review
Review Date: 04/19/2022
Confirm Permit No.* Correct the permit ID number if needed.
NCG020052
Confirm DMR Year* 2021
Multiple DMRs will be automatically filed in a subfolder denoting the sampling year entered above.
Can submittal be Yes
accepted?* No (Explain why below)
Do Central Office No
staff need to be Yes
alerted? *
Do Regional Office No
staff need to be Yes
alerted?
Type of Permit* General
Ensures DMR(s) filed correctly.