February 3, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
Asheboro Land Development, LLC
ATTN: Daniel Wall, Member/Manager
2310 Garner Rd.
Raleigh, NC 27610
RE: Project Name: Asheboro Land Development - Soil Borrow Pit
Acres Approved: 5
Project ID: RANDO-2022-017
County: Randolph
City: Asheboro
Address: Gold Hill Rd.
River Basin: Cape Fear
Stream Classification: C
Submitted By: Carlson Environmental Consultants, PC
Date Received by LQS: January 19, 2022
Plan Type: Revised
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this Letter of Approval with Modifications.
The Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to commencement
of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please
direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul
Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
•��/� Winston-Salem Regional Office 1 450 Hanes Mill Road, Suite 300 1 Winston-Salem, North Carolina 271O3
nGv„CANEnn n o.wmm,em - ,�mnioWm 336.776.9800
Letter of Approval with Modifications
Asheboro Land Development, LLC
February 3, 2022
Page 2 of 3
Title 15A NCAC 413 .0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition, it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely,
Zachary
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
Digitally signed by Zachary Lentz
Lentz Date: 2022.02.03 09:25:18-05'00'
Zachary Lentz, PE
Assistant Regional Engineer
Land Quality Section
cc: Raymond Hoffman, P.E. of Carlson Environmental Consultants, PC (via email)
Daniel Wall of Asheboro Land Development, LLC (via email)
WSRO file
Letter of Approval with Modifications
Asheboro Land Development, LLC
February 3, 2022
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Asheboro Land Development - Soil Borrow Pit
Project ID: RANDO-2022-017
County: Randolph
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
1. Prior to land disturbance, this office must be notified of the Project Name and ID of the
approved erosion control plan associated with the C&D landfill. Commencement of land
disturbance prior to approval of an erosion control plan for a single construction project is a
violation of the Mining Act of 1971. [15A NCAC 413, G.S. 113A-57(3), G.S. 74, Article 7]
2. A pre -construction meeting with staff from this office is required prior to land -disturbing
activity. It is recommended that the meeting occur just before the commencement of
excavation and/or grading since the excavation or grading must be completed within one
year. If it is anticipated that the excavation or grading will not be completed within one year,
a mining permit is required prior to land disturbance.
[15A NCAC 413, G.S. 113A-57(3), G.S. 74, Article 7]
3. This approval is for erosion and sediment control and associated construction stormwater
associated with the borrow pit only. It is the duty of the Financially Responsible Party to
assure that land -disturbing activity is conducted in compliance with other applicable
regulations, including, but not limited to, the Mining Act of 1971. Please note that removing
materials beyond the landfill property requires a mining permit.
[15A NCAC 413, G.S. 113A-57(3), G.S. 74, Article 7]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities