HomeMy WebLinkAbout20071411 Ver 1_More Info Letter_20070822~pF WATF9p Michael F. Easley, Governor
~~' L/ William G. Ross Jr., Secretary
~ r North Carolina Department of Environment and Natural Resources
~ ~ Coleen H. Sullins, Director
Division of Water Quality
August 22, 2007
DWQ Project # 07-1411
Wake County
CERTIFIED MAIL: RETURN RECEIPT REQUESTED
Mr. Robert Robertson
BRG Construction, Inc.
101 N. Salem Street
Apex, NC 27502
Subject Property: Whitehall Manor Greenway
Ut to Beaver Creek [030605, 16-41-10-(0.5), WSIV, NSW] AFTER-THE-FACT
REQUEST FOR MORE INFORMATION
Dear Mr. Robertson:
On August 17, 2007, the Division of Water Quality (DWQ) received your After-the-Fact application
dated August 17, 2007, to fill or otherwise impact 0.05 acres of 404/Wetland, 148 linear feet perennial
stream impact, and 115 linear feet intermittent stream impact, to construct the. proposed residential
subdivision. The DWQ has determined that your application was incomplete and/or provided inaccurate
information as discussed below. The DWQ will, require additional information in order to process your
application to impact protected wetlands and/or streams on the subject property. Therefore, unless we
receive five copies of the additional information requested below, we will have to move toward denial of
your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete
until we receive this additional information. Please provide the following information so that we may
continue to review your project.
Additional Information Requested:
1. Please re-submit your site plans on full plan sheets at a scale of no smaller than 1 "=50'.
2. Please provide building envelopes for all lots with wetlands on "Street D" on the site plans.
3. Please provide documentation that DWQ has made intermittent/perennial stream determinations
on the site, or please contact DWQ to schedule intermittent/perennial stream determinations on
the site.
4. Please clearly indicate on the plans where the proposed greenway trail is to be located.
5. Please explain why a 10-foot greenway trail is required. Normally, 8 feet will meet ADA
requirements. Reducing the width will minimize impacts to wetlands.
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center, Raleigh, North Carolina 27699-1650
2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604
Phone: 919-733-1786 /FAX 919-733-6893 /Internet: ]rttp://h2o.enr.state.nc.us/ncwetlands
None Carolina
~tura!!y
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper
BRG Construction, Inc.
Page 2 of 2
August 22 2007
Please submit this information within 30 calendar days of the date of this letter. If we do not receive this
requested information within 30 calendar days of the date of this letter, your project will be withdrawn
and you will need to reapply with a new application and a new fee.
This letter only addresses the application review and does not authorize any impacts to wetlands, waters
or protected buffers. Please be aware that any impacts requested within your application are not
authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian McMillan at 919-733-
1786 if you have any questions regarding or would like to set up a meeting discuss this matter.
S' erely
Cyndi Karoly, Supervisor
401 Oversight/Bxpress Review Permitting Unit
CBK/ijm
cc: Lauren Cobb, DWQ Raleigh.Regional Office
USACE Raleigh Regulatory Field Office
File Copy
Central Files
Nicole Thomson, S&EC, P.A., 11010 Raven Ridge Road, Raleigh, NC 27614
071411 WhitehallManorGreenway(Wake)On_Hold