HomeMy WebLinkAboutNC0020664_PARREV_20220418Regional Pretreatment Annual Report Review
NC0020664_PARREV_2022041816
Regional Pretreatment Annual Report (PAR) Review
Is the PAR on time? Does it have two copies?
Did they send any other submissions with it?
Included? ADEQUATE? POTW noted Corrections? Regional Office: Asheville
Narrative YES NO NA YES NO NA POTW: Spindale WWTP
PPS Form YES NO YES NO NPDES Permit No. NC0020664
SNCR YES NO YES NO Report Period: 1/1/21 to 12/31/21
IDSF YES NO YES NO
Full Modified
For modified programs evaluate shaded
items only. A Narrative is required for a
modified program only if there are SIUs
in SNC.
Allocation Table YES NO YES NO
Compliance Schedules YES NO NA YES NO NA
Public Notice YES NO NA YES NO NA
Program Information YES NO YES NO YES NO
Historical SNC YES NO NA YES NO NA YES NO NA
If No, check recommendation below:
1. Have at least 90% of SIU permits been issued within 180
days of expiration? (See Allocation Table).
Yes No Not req’d NOD NOV QNCR NCP Civil Penalty
Assessment
2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not req’d NOD NOV QNCR NCP Civil Penalty
Assessment
3. Has effective enforcement been taken against industries in
SNC, including those causing pass-through or interference? (See
Narrative and SNCR Form)
Yes No NA NOD NOV QNCR NCP Civil Penalty
Assessment
4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP Civil Penalty
Assessment
Note: Exceptions should be explained in the comment section below:
Facilities allocation table is showing over allocation for Silver and there is only 4.6 of
MAHL remaining for Nickel. ORC indicated he was going to verify the HWA tables were
accurate. Additionally, the HWA updated and submitted in 2020 has not been
approved. Silver allocations may need to be adjusted with the new NPDES permit
limit.
Reviewed By: Mikal Willmer Date: 04/18/2022