HomeMy WebLinkAbout20170067 Ver 4_USACE More Info Requested_20220415Strickland, Bev
From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent: Friday, April 15, 2022 11:08 AM
To: Brian Romero
Cc: Homewood, Sue
Subject: [External] Request for Additional Information: SAW-2016-01608 (Reidsville Energy
Center / NTE Carolinas / 4673 NC Highway 65 / Reidsville / Rockingham County /
commercial)
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
All,
Thank you for your PCN, dated 3/18/2022, for the above referenced project. I have reviewed the information and need
clarification before proceeding with verifying the use of Nationwide Permit (NWP) 39 (https://saw-
reg.usace.army.mil/NWP2021/NWP39.pdf). Please submit the requested information below (via e-mail is fine) within 30
days of receipt of this Notification, otherwise we may deny verification of the use of the Nationwide Permit or consider
your application withdrawn and close the file:
1) Please provide an acceptance letter from the NC Division of Mitigation Services (NCDMS) to confirm they have
the correct amount (454) and type (warm water stream) of mitigation credits in HUC 03010103 to satisfy your
compensatory mitigation proposal.
2) It appears that an Individual 401 Water Quality Certification (WQC) is required from the North Carolina Division
of Water Resources (NCDWR) for this project; please note that the Corps cannot verify the use of any NWP
without a valid 401 WQC.
Please let me know if you have any questions.
Sincerely,
Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Mobile: (919) 817-2436
Office: (919) 554-4884, Ext. 30.
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
1
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: https://regulatory.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
From: RaleighNCREG <RaleighNCREG@usace.army.mil>
Sent: Monday, March 21, 2022 1:02 PM
To: bromero@nteenergy.com
Cc: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Subject: SAW-2016-01608 (Reidsville Energy Center / NTE Carolinas / 4673 NC Highway 65 / Reidsville / Rockingham
County / commercial)
Good Afternoon,
We have received your Pre -Construction Notification (PCN) NWP request for the above project and forwarded it to Dave
Bailey for further processing.
Thank you,
Josephine Schaffer
From: laserfiche@ncdenr.gov <laserfiche@ncdenr.gov>
Sent: Friday, March 18, 2022 2:11 PM
To: RaleighNCREG <RaleighNCREG@usace.army.mil>
Cc: SAW-PCN-RG <SAW-PCN-RG@usace.army.mil>
Subject: [Non-DoD Source] PCN - Rockingham - Non -DOT
A new project has been received on 3/18/2022 2:08 PM for Reidsville Energy Center. The link below will take you to the
project folder.
https://edocs.deq.nc.gov/Laserfiche/index.aspx?db=WaterResources#id=2246783;view=browse
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses aren't monitored.
2