Loading...
HomeMy WebLinkAboutNCC204930_NOT Closeout Documents_20220415ROY COOPER° Governor ELIZABETH S. BISER Secretary � - ��$"" BRIAN WRENN Director NORTH CAROLINA &W&U WRA'd'QUWtty Dear Sir or Madam: Attached is a copy of the inspection report which was prepared following an on -site inspection of the subject site. This report is intended to provide you with information concerning the status of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act of 1973. Please review this report carefully as it may contain corrective actions needed or comments which will assist you in meeting the required performance standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact the named inspector at the address shown on the inspection report if you have any questions. Sincerely, Land Quality Section Mooresville Regional Office North Carolina Department of Environntental Quality Division of6ner€ry, Mineral and Land Resources Moomwillc Rceional Office, 6l0 East Center Avenue, Suite 301 Mooresville, North Carolina 28115 70,4-663-1699 North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Cabarrus Project: Neuenburg Lots Erosion Person financially responsible: New Life Developers. LLC -Gregory Lafferty, Manager Address: 2310 Concord Lake Road, Kannapolis, NC 28083 1. Project Location: North College, Mount Pleasant Pictures: No River basin: Yadkin-PeeDee Project 4. CABAR-2021-025 2. Weather and soil conditions: Cloudy, Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules:' Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: S. Contact made with (name): No one on site Title: Inspection report: Sent Report Date givenlsent: Apri] 01. 2022 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Noticc of Termination (NOT), The NOT is available at: https:l./edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. All projects that have been approved prior to April 01, 2019, under the old permit system, are not required to take any additional actions. The stormwater permit is terminated at the same time as the termination of this erosion control permit. Reported by: Kenny Llywelyn Others present: Date of inspection: March 30, 2022 Time arriving on site: 10:15 AM Time leaving site: 10:20 AM cc: