Loading...
HomeMy WebLinkAboutNCC212186_NOT Closeout Documents_202204134 C> Greenville � NORT Fi CARO[.I NA ENGINEERING Engineering Department-Sedimentation/]Frosion Control Program December 24, 2021 Letter of Final Inspection TDG Properties, LLC Cintas Warehouse Northland Drive Greenville, NC 27834 Re: Project Name: Cintas Warehouse Project Number: ESCP-2021-0010 County: Pitt Disturbed Acreage: 4.5 Responsible Party: TDG Properties, LLC Dear Mr. Lane, This office has completed its final site inspection of the referenced project. We find the site stable and in compliance with the approved Sedimentation and Erosion Control Plan. Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been closed for this project and you will need to terminate your NCG01 permit. Please do not hesitate to call if you have any questions. Res ectfully, Victor C. Long Engineering Assistant III Engineering Department City of Greenville, NC vlong@greenvillenc.gov www.greenvil lenc.gov 252-329-4888 City of Greenville Engineering Department Land Development Division 252-329-4467 SOIL EROSION AND SEDIMENTATION CONTROL INSPECTION REPORT Report No. 21.12.3004 Date Inspected: 12/30/21 Pro ect Name: Cintas Warehouse Location: Northland Dr Weather Conditions: Cloudy, 65' Soil Conditions: Wet Contact For Erosion Issues: Scott Anderson Contractor: ER Lewis Financially Responsible Party: TDG Properties, LLC PROJECT AND SITE CONDITIONS Yes Is Site In Compliance with the Ordinance Yes Are Erosion Control Measures Pro2erly Maintained No Is Site Currently Under Notice of Violation No Has Off Site Sedimentation Occurred Yes Have Previous Violations Been Corrected No Were Pictures Taken TYPE OF VIOLATION ❑ No Approved Plan, City Code 9-8-5(a) ❑ I Inadequate Buffer Zone, City Code 9-8-7 i a ❑ Failure to Follow Approved Plan, City Code 9-8-17 ') ❑ Graded slopes and fills too steep, City Code 9-8-7(2 ❑ Revised Plan Required, City Code 9-8-20 b (9) ❑ Unprotected exposed slopes, City Code 9-8-7(2) ❑ Failure to Provide Adequate Ground Cover, City Code 9-8- 7(2),(3) ❑ Failure to maintain erosion control measures, City Code 9-8-13 FInsufficient ❑ measures to retain sediment on site, City Code 9-8-20 b Other: (describe) Click here to enter text. ❑ Failure to take all reasonable measures, City Code 9-8-5(b) DESCRIPTION OF SITE CONDITIONS: Site is stable and has been completed according to plan specifications. Necessary documents received by storm water engineer. Eligible for Notice of Termination. NIA NIA PREVENTATIVE ACTIONS TO CONSIDER: CORRECTIVE ACTIONS REQUIRED: DEADLINE FOR COMPLETION OF CORRECTIVE ACTIONS: NIA Copies to: ❑ On Site Supervisor (Signature) ® Contractor ® Financially Responsible Party ® Engineer Report By: Tyler Averett PH: 252-329-4828 Date: 12/30/2021