Loading...
HomeMy WebLinkAboutNCC201111_NOT Closeout Documents_20220412Sedirnentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Mecklenburg Project: Sharon Elementary School Addition River basin: Catawba Person financially responsible: Charlotte Mecklenburg Board of Education - Gary Project #: MECKL-2020-060 S Adams, Director of Architecture Address: 330I Stafford Drive, PO Box 30035, Charlotte, NC 28208 1. Project Location: Foxcroft Road, Charlotte Pictures: No 2. Weather and soil conditions: Sunny, Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No One Onsite Title: Inspection report: Sent Report Date given/sent: April 01, 2022 9. Corrective action needed: 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion. However, there are some bare areas that need to be stabilized throughout the site and the stormwater basin should be closely monitored until signed off by the city of charlotte. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT) unless permit approval date was prior to April 2019. The NOT is available at: https://edocs.deq.no.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jeffrey Chandler Others present: Date of inspection: March 29, 2022 Time arriving on site: 3:30 PM Time leaving site. 4:00 PM cc: Yes