HomeMy WebLinkAboutNCC221471_Site Plan or Location Map_20220414RSKB-1 (WITH RISER) TEMP SKIMMER/RISER BASIN PRE -DEVELOPMENT DA = 18.1 AC INITIAL DISTURBED AREA: 16.4 AC POST -DEVELOPMENT DA = 20.14 AC GRADED DISTURBED AREA: 17.75 AC *DESIGN DA/DIST AREA: 20.14 AC/17.75 AC Q10= CIA= 0.40*5.66*16.4 = 37.13 CFS REQ'D SURFACE AREA=325 SF*37.13 CFS = 12,067 SF PROVIDED SURFACE AREA = ±21,195 SF REQ'D STORAGE VOL. = 16.4*1800 CF= 29,520 CF PROVIDED SED. STORAGE VOL. = ±38,370 CF WATER STORAGE SURFACE ELEVATION = 594.0 (RISER THROAT) DEPTH SED. STORAGE = 1.0 FT TOTAL STORAGE HEIGHT = 2.0 FT TOTAL DAM HEIGHT = 12.0 FT BOTTOM ELEVATION = 592.0 WATER STORAGE SURFACE WIDTH = ±100 FT WATER STORAGE SURFACE LENGTH = ±240 FT WEIR LENGTH = 44 FT WEIR ELEV. = 602.0 TOP OF DAM = 604.0 SKIMMER SIZE =4" DIA. ORIFICE SIZE = 3.0" DIA. DEWATERING TIME: 3.25 DAYS RSKB-2 (WITH RISER) TEMP SKIMMER/RISER BASIN PRE -DEVELOPMENT DA = 7.0 AC INITIAL DISTURBED AREA: 7.0 AC POST -DEVELOPMENT DA = 8.28 AC GRADED DISTURBED AREA: 8.28 AC *DESIGN DA/DIST AREA: 8.28 AC/8.28 AC Q10= CIA= 0.40*5.66*7.0 = 15.85 CFS REQ'D SURFACE AREA =325 SF*15.85 CFS = 5,151 SF PROVIDED SURFACE AREA = ±27,807 SF REQ'D STORAGE VOL. = 7*1800 CF= 12,600 CF PROVIDED SED. STORAGE VOL. = ±32,275 CF WATER STORAGE SURFACE ELEVATION = 584.0 (RISER THROAT) DEPTH SED. STORAGE = 1.0 FT TOTAL STORAGE HEIGHT = 2.0 FT TOTAL DAM HEIGHT = 10 FT BOTTOM ELEVATION = 582.0 WATER STORAGE SURFACE WIDTH = ±100 FT WATER STORAGE SURFACE LENGTH = ±200 FT WEIR LENGTH = 52 FT WEIR ELEV. = 590.0 TOP OF DAM = 592.0 SKIMMER SIZE =3" DIA. ORIFICE SIZE = 3" DIA. DEWATERING TIME: 3.16 DAYS 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL AND PERMIT FROM NCDEQ. 2. OBTAIN CERTIFICATE OF COVERAGE FOR THE NPDES NCGO1 PERMIT FROM NCDEQ. 3. CONTACT EROSION CONTROL INSPECTOR TO ESTABLISH A PRE -CONSTRUCTION CONFERENCE AND INSPECTION SCHEDULE. 3.1. SELF INSPECTION -----EFFECTIVE OCTOBER 1, 2010, PERSONS CONDUCTING LAND -DISTURBING ACTIVITIES, LARGER THAN ONE (1) ACRE, MUST INSPECT THEIR PROJECT AFTER EACH PHASE OF THE PROJECT, AND DOCUMENT THE INSPECTION IN WRITING ON APPROVED FORMS AVAILABLE FROM THE NCDEQ WEBSITE. THE PHASES ARE AS FOLLOWS: 3.1.1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 3.1.2. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 3.1.3. COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 3.1.4. INSTALLATION OF STORM DRAINAGE FACILITIES. 3.1.5. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 3.1.6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 4. CLEAR SITE ONLY AS NECESSARY TO INSTALL INITIAL EROSION CONTROL MEASURES INCLUDING PERIMETER CONTROLS, BASINS, AND BASIN STOCKPILES. 5. INSTALL TEMPORARY CONSTRUCTION ENTRANCE 6. INSTALL PERIMETER SEDIMENT FENCE AND STONE OUTLETS AS SHOWN 7. INSTALL BASINS IN THE FOLLOWING ORDER: 7.1. RSKB-I 7.2. RSKB-II 7.3. SKB-III 7.4. SKB-IV 11. AS EACH BASIN IS FINISHED, CONSTRUCT DIVERSION BERMS DIRECTING STORM -WATER RUNOFF INTO THEIR RESPECTIVE BASINS AND INSTALL SLOPE DRAINS AS SHOWN TO CONVEY CONCENTRATED RUNOFF DOWN -SLOPES INTO THE BASINS. 12. INSTALL CONCRETE WASH -OUT. 13. ENSURE THAT ALL TEMPORARY AND PERMANENT DIVERSION BERMS ARE INSTALLED AND STABILIZED BEFORE SEEDING. 14. SEED EMBANKMENTS AND DISTURBED AREAS OF DEVICES UPON COMPLETION OF CONSTRUCTION. SEE GROUND STABILIZATION CRITERIA AND SEEDING SPECIFICATIONS CONTAINED IN THE PLAN DETAILS FOR MORE INFORMATION. 15. OBTAIN REQUIRED SITE INSPECTION 16. BEGIN CLEARING, GRUBBING, AND STRIPPING OF REMAINING UNCLEARED SITE AREAS AS PROPOSED. 16.1.THE FOLLOWING SHOULD BE LOCATED A MINIMUM OF FIFTY (50) FEET FROM STORM DRAIN INLETS AND SURFACE WATERS AND WITHIN AREAS PROTECTED BY EROSION CONTROL MEASURES. 16.1.1. ANY EARTHEN -MATERIAL STOCKPILES ON -SITE FOR LATER DISTRIBUTION AND/OR REMOVAL 16.1.2. AREAS DEDICATED FOR MANAGEMENT OF LAND CLEARING AND DEMOLITION DEBRIS 16.1.3. CONSTRUCTION AND DOMESTIC WASTE 16.1.4. HAZARDOUS OR TOXIC WASTE SHALL BE LOCATED AT LEAST 50 FEET AWAY FROM STORM DRAIN INLETS AND SURFACE WATERS UNLESS IT CAN BE SHOWN THAT NO OTHER ALTERNATIVES ARE REASONABLY AVAILABLE). 17. BEGIN SITE GRADING. MAINTAIN EROSION CONTROL DEVICES IN ACCORDANCE WITH THE MAINTENANCE PLAN. INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED. 18. INSTALL STORM DRAINAGE SYSTEM AND UTILITIES. STORM PIPING SHALL BE INSTALLED TO THE POINT WHERE IT ENTERS EACH DEVICE. COMPLETION OF PIPING WILL ONLY BE ALLOWED ONCE THE SITE HAS BEEN DEEMED STABLE BY THE EROSION CONTROL INSPECTOR. INSTALL PROTECTION AROUND ALL INLETS AS STORM DRAIN SYSTEM IS INSTALLED. 19. ONCE PERMANENT DIVERSIONS ARE IN PLACE, TEMPORARY DIVERSION BERMS CAN BE REMOVED. SILT FENCE ALONG PERIMETER SHALL CONTINUED TO BE MAINTAINED. 20. CONTINUE TO MAINTAIN EROSION CONTROL MEASURES UNTIL VEGETATIVE COVER HAS BEEN ESTABLISHED OVER ALL DISTURBED AREAS AND SITE HAS BEEN STABILIZED. REMOVE EROSION CONTROL MEASURES ONLY AFTER FINAL INSPECTION AND APPROVAL BY INSPECTOR, EXCEPT FOR THOSE PROTECTING AREAS DOWNSTREAM OF THE SEDIMENT BASIN. 21. AFTER SITE STABILIZATION, OBTAIN FINAL EROSION CONTROL INSPECTION TO CLOSE THE GRADING PERMIT. 22. FILE NOTICE OF TERMINATION WITH NCDEQ TO CLOSE THE NPDES NCGO1 PERMIT. 22.1. NOTE: IF ADDITIONAL PLANS HAVE BEEN SUBMITTED AND APPROVED SHOWING ADDITIONAL WORK, PERMIT CLOSURE PROCESS WILL BE SUPERSEDED BY THE CONSTRUCTION SEQUENCE PROPOSED ON SUBSEQUENT APPROVED PLANS. LINE TYPE LEGEND up -up- EX. UNDERGROUND POWER LINE X X X EX. FENCELINE -• • •- EXISTING WATERLINE uC uC EX. UNDERGROUND COMMUNICATIONS LINE ss ss EX. SANITARY SEWER EX. HYDRANT 0 EX. WATER METER FW FW FLOODWAY LIMITS LINE 500 YEAR FLOOD LINE 500 F 100 YEAR FLOOD LINE 100 F EROSION CONTROL LEGEND LIMITS OF LAND DISTURBANCE MB TEMPORARY DIVERSION BERM (X MARKS GRADE BREAK) TEMPORARY SILT FENCE TEMPORARY SILT FENCE WITH -I8F TEMPORARY STONE OUTLET TEMPORARY CONSTRUCTION ENTRANCE C INLET PROTECTION M MEOAM M SEDIMENT BASIN DRAINAGE AREA DELINEATION LINE - TEMPORARY SLOPE DRAIN w/ DONUT INLET PROTECTION RIP -RAP OUTLET PROTECTION o 0 o SEDIMENT TRAP BAFFLE - - - - -®SKIMMER q,s SILT -SACK INLET PROTECTION CONCRETE WASHOUT SCS SOIL DELINEATION LINE Cn E 2 SCS SOIL TYPE DESIGNATION EXISTING TREE LINE PROPOSED TREE LINE TSKB-3 TEMP SKIMMER BASIN PRE -DEVELOPMENT DA = 3.6 AC INITIAL DISTURBED AREA: 0.2 AC POST -DEVELOPMENT DA = 3.6 AC GRADED DISTURBED AREA: 3.6 AC *DESIGN DA/DIST AREA: 3.6AC/3.6 AC Q10= CIA= 0.40*5.66*3.6 = 8.15 CFS REQ'D SURFACE AREA = 325 SF*8.15 CFS= 2,648 SF PROVIDED SURFACE AREA = 3,727 SF REQ'D STORAGE VOL. = 3.6*1800 CF= 6,480 CF PROVIDED SED. STORAGE VOL. = 7,539t CF WATER STORAGE SURFACE ELEVATION = 582 DEPTH SED. STORAGE = 1.25 FT TOTAL STORAGE HEIGHT = 2.5 FT TOTAL DAM HEIGHT = 4 FT BOTTOM ELEVATION= 580.0 WATER SURFACE STORAGE WIDTH = ±42 FT WATER SURFACE STORAGE LENGTH = ±82 FT WEIR LENGTH = 10 FT WEIR ELEV. = 582.5 TOP OF DAM = 584.0' SKIMMER DIAMETER = 3" ORIFICE DIAMETER = 1.50" DEWATERING TIME: 2.95 DAYS 1. IDENTIFICATION AND LOCATION OF ALL EXISTING UTILITIES IN AND NEAR THE AREAS OF PROPOSED WORK IS THE RESPONSIBILITY OF THE CONTRACTOR. DAMAGE TO UTILITIES EITHER SHOWN OR NOT SHOWN ON THIS PLAN IS THE CONTRACTOR'S RESPONSIBILITY. 2. CONTRACTOR MUST CONTACT NC ONE -CALL, CITY OF GRAHAM, PUBLIC WORKS DEPARTMENT, AND OTHER SERVICE PROVIDERS TO LOCATE ALL UTILITIES PRIOR TO ANY CONSTRUCTION OR EXCAVATION. 3. BOUNDARY AND TOPOGRAPHIC INFORMATION PROVIDED BY: GREEN MOUNTAIN ENGINEERING, PLLC. 4. NO SUB -SURFACE INVESTIGATION WAS PROVIDED BY GREEN MOUNTAIN ENGINEERING, PLLC. 5. CONTRACTOR TO SEED AND STABILIZE DISTURBED AREAS IN ACCORDANCE WITH SEEDING SPECIFICATIONS OF THE CITY OF BURLINGTON/ NCDEQ. 6. ALL UTILITY & ROADWAY CONSTRUCTION SHALL COMPLY WITH STANDARDS AND SPECIFICATIONS OF THE CITY OF BURLINGTON. 7. WORK WITHIN PUBLIC RIGHT OF WAY SHALL COMPLY WITH NCDOT AND CITY OF BURLINGTON TRAFFIC CONTROL REQUIREMENTS. A SAFE CONDITION MUST BE PROVIDED AT ALL TIMES. 8. CONTRACTOR IS RESPONSIBLE FOR ANY REQUIRED UTILITY RELOCATION. CONTRACTOR SHALL COORDINATE RELOCATION AND INSTALLATION OF ALL UTILITY SERVICES WITH THE APPROPRIATE UTILITY SERVICE PROVIDERS. 9. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED PER THE LATEST STANDARDS OF THE LAND QUALITY SECTION OF NCDEQ. 10. CONTRACTOR SHALL MAINTAIN THE SITE IN AN ORDERLY MANNER SO THAT WORKMEN AND THE PUBLIC ARE PROTECTED FROM INJURY. EROSION CONTROL NOTES: 1. EROSION CONTROL DEVICES ARE TO BE INSTALLED BASED ON DETAILS PROVIDED UNDER THE APPROVED PLANS. THE PLANS AND DETAILS ARE BASED ON THE NC EROSION AND SEDIMENT PLANNING AND DESIGN MANUAL, AND RECOGNIZED BEST MANAGEMENT PRACTICES (BMP'S). 2. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE EROSION CONTROL INSPECTOR. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED BY THE EROSION CONTROL INSPECTOR THAT ARE NOT INDICATED ON THE PLANS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN EROSION ONSITE, REGARDLESS OF THE MEASURES REQUIRED. ANY CHANGE IN THE EROSION CONTROL MEASURES AND\OR GRADING SHALL BE CALLED TO THE ATTENTION OF THE ENGINEER AND THE EROSION CONTROL INSPECTOR. 3. WEATHER FORECAST SHALL BE MONITORED. THE CONTRACTOR SHALL PREPARE FOR RAIN EVENTS BY RE-EXAMINING ALL EROSION CONTROL MEASURES PRIOR TO START OF PRECIPITATION. ANY REINFORCEMENT OR CORRECTIONS SHOULD BE PERFORMED AND DOCUMENTED. 4. IF FILL MATERIALS ARE TO BE BROUGHT ONTO THIS PROJECT OR WASTE MATERIALS ARE TO BE TAKEN FROM THIS PROJECT, THIS INFORMATION MUST BE DISCLOSED AND SHOWN ON THE EROSION CONTROL AND GRADING PLAN. BORROW AREAS AND DUMP SITES ARE CONSIDERED TO BE PART OF THIS PROJECT AND THE OWNER IS RESPONSIBLE FOR STABILIZATION AND EROSION CONTROL MEASURES AT THESE SITES. 5. AS OF MARCH 10, 2003, ALL CONSTRUCTION SITES ONE (1) ACRE OR MORE, REQUIRE NPDES PERMITS. THEREFORE: WRITTEN DOCUMENTATION OF A DEVIATION FROM APPROVED PLAN MUST BE NOTED ON THE APPROVED PLANS. " WRITTEN DOCUMENTATION OF AN EMERGENCY SITUATION WHERE SEDIMENT HAS BEEN DISCHARGED OFF SITE MUST BE RECORDED. ALSO, CONTRACTOR'S ACTIONS TO REPAIR AND RETURN AREA TO PRESTORM CONDITION MUST BE RECORDED. " THE PERMITTEE SHALL INSPECT ALL EROSION AND SEDIMENTATION CONTROL FACILITIES EVERY SEVEN DAYS AND WITHIN 24 HOURS OF A .5 INCH OF RAIN. FINDINGS SHALL BE RECORDED AND PRESENTED UPON INSPECTOR'S REQUEST. " THE CONTRACTOR SHALL PROVIDE RAIN -RECORDING DEVICE AND RECORD EACH RAINFALL. " ANY FAILURES THAT CAUSE VISIBLE SEDIMENTATION TO LEAVE THE APPROVED DISTURBED LIMITS SHALL BE CORRECTED IMMEDIATELY AND DOCUMENTED. " A COPY OF THE NPDES PERMIT SHOULD BE KEPT ON SITE FOR REFERENCE. 7. THE EROSION CONTROL INSPECTOR CAN REQUIRE, IN ADDITION TO ANY OTHER CIVIL OR CRIMINAL PENALTY OR INJUNCTIVE RELIEF, THAT ANY PERSON(S) WHO IS ENGAGED IN A LAND -DISTURBING ACTIVITY AND FAILS TO RETAIN SEDIMENT GENERATED BY THE LAND -DISTURBING ACTIVITY, TO RESTORE THE WATERS AND LAND AFFECTED BY THE FAILURE SO AS TO MINIMIZE THE DETRIMENTAL EFFECTS OF THE RESULTING POLLUTION BY SEDIMENTATION. TSKB-4 TEMP SKIMMER BASIN PRE -DEVELOPMENT DA = 3.9 AC INITIAL DISTURBED AREA: 0.2 AC POST -DEVELOPMENT DA = 3.9 AC GRADED DISTURBED AREA: 3.2 AC *DESIGN DA/DIST AREA: 3.9AC/3.2 AC Q10= CIA= 0.40*5.66*3.2 = 7.25 CFS REQ'D SURFACE AREA = 325 SF*7.25 CFS= 2,356 SF PROVIDED SURFACE AREA = 3,727t SF REQ'D STORAGE VOL. = 3.2*1800 CF= 5,760 CF PROVIDED SED. STORAGE VOL. = 7,540t CF WATER STORAGE SURFACE ELEVATION = 584.0 DEPTH SED. STORAGE = 1.25 FT TOTAL STORAGE HEIGHT = 2.5 FT TOTAL DAM HEIGHT = 4 FT BOTTOM ELEVATION= 582.0 WATER STORAGE SURFACE WIDTH = ±42 FT WATER STORAGE SURFACE LENGTH = ±82 FT WEIR LENGTH = 10 FT WEIR ELEV. = 584.5 TOP OF DAM = 586.0' SKIMMER SIZE = 3" DIA. ORIFICE SIZE = 1.50" DIA. DEWATERING TIME: 2.95 DAYS PROJECT NARRATIVE TSKB-5 TEMP SKIMMER BASIN PRE -DEVELOPMENT DA = 4.0 AC INITIAL DISTURBED AREA: 0.2 AC POST -DEVELOPMENT DA = 4.0 AC GRADED DISTURBED AREA: 2.1 AC *DESIGN DA/DIST AREA: 4.OAC/2.1AC Q10= CIA= 0.40*5.66*4.0 = 9.06 CFS REQ'D SURFACE AREA = 325 SF*9.06 CFS= 2943 SF PROVIDED SURFACE AREA = t5,484 SF REQ'D STORAGE VOL. = 2.1 *1800 CF= 3,780 CF PROVIDED SED. STORAGE VOL. = ±11,030 CF WATER STORAGE SURFACE ELEVATION = 580.0 DEPTH SED. STORAGE = 1.25 FT TOTAL STORAGE HEIGHT = 2.5 FT TOTAL DAM HEIGHT = 4 FT BOTTOM ELEVATION = 578.0 WATER STORAGE SURFACE MAX WIDTH = ±60 FT WATER STORAGE SURFACE MAX LENGTH = ±160 FT WEIR LENGTH = 10 FT WEIR ELEV. = 580.5 TOP OF DAM = 582.0 SKIMMER SIZE = 2" DIA. ORIFICE SIZE = 2" DIA. DEWATERING TIME: 2.98 DAYS THE INTENT OF THIS PLAN IS TO OBTAIN A GRADING PERMIT THAT WILL ALLOW THE DEVELOPER TO INSTALL EROSION CONTROL MEASURES, CLEAR TREES, REMOVE STUMPS, AND CONDUCT ROUGH GRADING OF THE SITE. NO IMPERVIOUS SURFACE IS PROPOSED WITH THIS PLAN. A LATER PLAN MAY BE SUBMITTED SHOWING DEVELOPMENT AND APPROPRIATE PERMANENT MEASURES. \\ \ 634 `Da M 6' 6� 0'. 6' \ / j b��ti , o �� co �3 i J ~\ v \ ;co c'� �2� / 6,D4 c/ Fococ�FO 'O l _ - ' c oc oc -Foc /� - �600 eft Fo( c Foc Foc 63� F o c- c o c_ C �, V A \� f Foc -Foc =� . Foc Foote Foci Foc \ - (� � v � �) / k� \ (1Al�VA �p '/ti r I C3 00 eb cm / \ i cis J J cic o JJ 1 0' 125' 250' 500' SCALE: 1 " = 250' / NOTE: SITE IS LOCATED IN THE CAPE FEAR RIVER BASIN DISTURBED AREA f34.2 ACRES CLEARING/GRUBBING AND GRADING EROSION CONTROL PLAN SHEET INDEX C-4.00 ........................... ESC COVER SHEET AND PROXIMITY MAP C-4.01 ........................... INITIAL CONDITIONS EROSION CONTROL PLAN C-4.02 ........................... INITIAL COND. EROSION CONTROL 50 SCALE C-4.03 ........................... INITIAL COND. EROSION CONTROL 50 SCALE C-4.04 ........................... GRADED CONDITIONS EROSION CONTROL PLAN C-4.05 ........................... GRADED COND. EROSION CONTROL 50 SCALE C-4.06 ........................... GRADED COND. EROSION CONTROL 50 SCALE C-4.07 ........................... NCGO1 C-4.08 ........................... EROSION CONTROL DETAILS C-4.09 ........................... EROSION CONTROL BASIN DETAILS C-4.10 ............................ EROSION CONTROL DETAILS CONT. \I 2 ZONE 1 - UNDISTURBED AREA OF VEGETATION EXTENDING THE FIRST 30 FEET LANDWARD FROM THE TOP OF THE STREAM BANK'S NORMAL WATER LEVEL OF OTHER WATER BODIES ON ALL SIDES OF THE SURFACE WATER MEASURED HORIZONTALLY ON A LINE PERPENDICULAR TO A VERTICAL LINE MARKING THE TOP OF THE BANK. ZONE 2 - UNDISTURBED AREA OF VEGETATION BEGINNING AT THE OUTER EDGE OF ZONE 1 AND EXTENDING LANDWARD A MINIMUM OF 20 FEET AS MEASURED HORIZONTALLY ON A LINE PERPENDICULAR TO THE SURFACE WATER. THE COMBINED WIDTH OF ZONES 1 AND 2 SHALL BE 50 FEET ON ALL SIDES OF THE STREAM. SKIMMER DATA/DETAILS: SKIMMER NOTE: BASIN SKIMMERS WERE SIZED USING FAIRCLOTH SKIMMER PHYSICAL ATTRIBUTES FOR THE VARIOUS SKIMMER SIZES. VARIATION FROM THIS MANUFACTURER WILL REQUIRE RE -CALCULATION OF REQUIRED SIZES. IF THE CONTRACTOR DESIRES TO REPLACE THE SKIMMER WITH AN EQUAL OR BETTER OPTIOl' INFORM THE ENGINEER AND REQUEST THAT HE/SHE VERIFI THE SKIMMERS WILL FUNCTION AS INTENDED. SITE INFORMATION ARCEL: • PARCEL ID: 106949 & 107041 *PARCEL ADDRESS: 1729 UNIVERSITY DR. BURLINGTON, NC 27215 *DEED BOOK/PAGE:3837/ 0877 *PLAT BOOK/PAGE: 070/ 0403 • ACREAGE: 48.166t AC • CURRENT ZONING: MDR & MI (See Plan) MDR ACREAGE: ±44.604 AC MI ACREAGE: t3.562 AC *PROPOSED ZONING: NO CHANGE *CURRENT LAND USE: UNDEVELOPED • PROPOSED LAND USE: MULTI -FAMILY TOWNHOMES *EXISTING NUMBER OF LOTS: 2 *PROPOSED NUMBER OF UNITS: 214 MACKINTOSH DEVELOPMENT LLC 1844 BUXTON WAY BURLINGTON , NC 27215 URVE BOUNDARY & TOPOGRAPHIC SURVEY PROVIDED BY: NO SURVEY SERVICES HAS BEEN PROVIDED at this TIME for the PURPOSES of the SCHEMATIC. DESIGNATED WATERSHED: GENERAL SURFACE WATER CLASSIFICATIONS: STREAM NAME: BACK CREEK (LITTLE CREEK) DESCRIPTION: FROM SOURCE TO BIG ALAMANCE CREEK RIVER BASIN: CAPE FEAR FLOODPLAIN: PROJECT SITE IS NOT LOCATED WITH IN A SPECIAL FLOOD HAZARD AREA (SFHA) PER FLOOD MAP 3710884400L WATER ENTRY UNIT GENERAL NOTES: WITH TRASH SCREEN 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME. MODIFICATIONS MAY BE REQUIRED IF FIELD CON00000 T A CHANGE. J 3. EMBANKMENT NITIONS MUST ANKM BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION ORIFICE OPENING INSIDE THE INSTALLED. HORIZONTAL TUBE WITH A 5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE CONSTANT HYDRAULIC HEAD DISCHARGE END OF THE PIPE. 6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. 7. EIGHT SIZES OF SKIMMERS ARE AVAILABLE, REFER TO THE FLOW SHEET, CUT SHEET, AND INSTRUCTIONS ON WEB SITE FOR EACH SIZE. SCHEDULE 40 PVC PIPE (BARREL OR ARM) EARTHEN EMBANKMENT MAXIMUM HEIGHT OF FLOAT WHEN NO EMERGENCY SPILLWAY OTHER STORM WATER DISCHARGE OPENINGS EXIST (MAJOR STORM EVENT) FLEXIBLE HOSE FLOAT _ INVERT OF LOWEST STORM PVC VENT =I=I GRATE WATER DISCHARGE OPENING PIPE -II (MINOR STORM EVENT) TOP VIEW II FLOAT II FLEXIBLE HOSE MUST BE SECURELY FASTENED TO PVC VENT PIPE STORM WATER THE WATER QUALITY DISCHARGE DISCHARGE OPENING OPENING OUTLET PIPE - - _- H FLEXIBLE HOSE WATER ENTRY UNIT L=1.4XDE TH I TO THE OVERFL SCHEDULE 40 PVC PIPE NININ"M LENGTH APPN (BARREL OR ARM) END VIEW SIDE VIEW MAINTAIN DEPRESSION TO - -- (NO SCALE) MINIMIZE CHANCE OF SKIMMER BECOMING STUCK DRAWN BY T. R. EVANS 10/10 FAIRCLOTH SKIMMER° DISCHARGE SYSTEM WITH OUTLET J. W. FAIRCLOTH & SON INC. WWW.FAIRCLOTHSKIMMER.COM STRUCTURE TELEPHONE: (919) 732-1244 FAX: (919) 732-126666 EMAIL: WARRENOFAIRCLOTHSKIMMER.COM WATER ENTRY UNIT WITH TRASH SCREEN ORIFICE OPENING INSIDE THE HORIZONTAL TUBE WITH A CONSTANT HYDRAULIC HEAD SCHEDULE 40 PVC PIPE (BARREL OR ARM) rI ^^T FLEXIBLE HOSE VENT PIPE POTENTIAL FOR PIPING CAN OCCUR. PROPER DESIGN TO MINIMIZE DISCHARGE AROUND PIPE MUST OCCUR. DATER ENTRY UNIT GENERAL NOTES: 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME. MODIFICATIONS MAY BE REQUIRED IF FIELD CONDITIONS WARRANT A CHANGE. 3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION INSTALLED. 5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE DISCHARGE END OF THE PIPE. 6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. 7. EIGHT SIZES OF SKIMMERS ARE AVAILABLE, REFER TO THE FLOW SHEET, CUT SHEET, AND INSTRUCTIONS ON WEB SITE FOR EACH SIZE. THEN EMBANKMENT EMERGENCY SPILLWAY SCHEDULE 40 PVC PIPE (BARREL OR ARM) FLEXIBLE HOSE ----i PVC VENT PIPE T L = 1.4 x DEPTH TO THE OVERFLOW MINIMUM LENGTH APPLIES END VIEW SIDE VIEW MAINTAIN DEPRESSION TO DISCHARGE PIPE MINIMIZE CHANCE OF SCHEDULE 40 (NO SCALE) SKIMMER BECOMING STUCK DRAWN BY T. R. EVANS 10/10 J. W. FAIRCLOTH & SON INC. WWW.FFAIRCLOTH SKIMMER° DISCHARGE SYSTEM WITH EMBANKMENT TELEPHONE: (19) 732-124 TELEPHONE: (919) 732-1244 FAX: (919) 732-1266 EMAIL: WARRENOFAIRCLOTHSKIMMER.COM GREEN MOUNTAIN ENGINEERING, PLLC 7A WENDY CT GREENSBORO, NC 27409 Tel: 336.294.9394 CERTIFICATE #P-0826 www.greenmountainengineers.com SEALS: APPLICANT/DEVELOPER: fD LEOTERRA DEVELOPMENT LAND AIIQCISMON & DEVELOVMENT LeoTerra Development, Inc. CONTACT: Kye Bunker 110 SHIELDS PARK DR., SUITE A KERNERSVILLE, NC 27410 EMAIL: kye.bunker(Meoterradevelopment.com Phone: (M) 336-671-1858 (0) 336-486-3653 PARCEL ID:106949 & 107041 DESIGNED BY: DF CHECKED BY: VCT DATE: 2022.03.21 PROJECT: 21-041 REVISIONS: CALL 811 BEFORE YOU DIG SHEET TITLE: EARLY GRADING - EROSION CONTROL COVER SHEET AND SITE PROXIMITY MAP SHEET NO.: C-4,00