Loading...
HomeMy WebLinkAboutNCC201137_NOT Closeout Documents_20220411North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Harnett P.roject:. Planters Glen - Phase 2 ......... River. basin: Cape Fear ......... .................... . Person financially responsible: Four W's, Inc. -Don G Welton, President Project #: HARNE-2019-056 Address: P.O. Box 1254, Dunn, NC 28335 1 ... Pi•oj'ect Y:ocation: ' "OffNC'210, Blach Rover Pictures: No 2. Weather and soil conditions: sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8, Contact made with (name): No One Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: December 08, 2021 10. Comments. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project has been released and coverage under NPDES General Stormwater Permit for Construction Activities is terminated. Reported by: Mike Lawyer Others present: Date of inspection: December 07, 2021 Time arriving on site: 12:37 PM Time leaving site: 12:40 PM cc: Sedimentation/Construction • • Report North Carolina Department of Enviromnental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Planters Glen - Phase 2 - Lots 22-39, . ......... ......County:.. Harnett. .. .. .... Project:. 42, 43, 45-4$ River basin:. Cape Fear ..... .... ............... Person financially responsible: Four W's Inc. - Don Ci Wellons, President Project #: HARNE=2020401 NPDES COC: NCC201137 Address: P.O. Box 1254, Duun, NC 28335 L Project Locati64: Off NC 210 Black River'Township Pictures. No 2. Weather and soil conditions: sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A, and rules? Yes If no, check violations below: 5. Violations: G. Is the site in compliance with NPDES Permit NCG010000 Construction Stornnvater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No One Inspection report: Sent Report 3. Corrective action needed: Title: Date given/sent: December 08, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO I) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.dcq.ne.gov/Foriiis/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Mike Lawyer Others present: Date of inspection: December 07, 2021 Time arriving on site: 12:37 PM Time leaving site: 12:40 PM cc: