Loading...
HomeMy WebLinkAbout520008_Plan of Action_20220325Smithfield. 600A too,A. 1Zr-spog-tibte Sonar Sludge Survey Reporting Form Farm or Permit Number: Lagoon l.D. Number. Person taking measurements: Staff Date of {measurements: Methods/Devices used for measurement of: Sonar Number of measurement data points: Distance from the present liquid level to the top of sludge: A. Start Pump Level: S, Stop Pump Level: C. Current Freeboard Level: D. 1/2 Treatment Level: E. Average Sludge Level: If pump intake level is <2.5 ft a plan of action is required. AWS52c00 3722Z 3/25/2022 525 2.96 feet 19.80 inches 45.96 inches if value for E is greater than D then sludge levels are in Compliance_ )f value for E is equal to or less than D then a Plan of Action is required_ Volume of sludge to be removed to reach compliance Completed by; Michael Cudd Print Name Retention: 5 years 44 inches 86.75 inches 79,52 inches 2.9 feet 1,112,524 Gallons 371 Dry Tans /UK _ Signature :late Original; 5/21/19 PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION Facility Number_ AWSS20008 Facility Name: 37221 County: Jones Certified Operator Name: Srmith9etd Operator #; *`Attach a copy of Lagoon Sludge Survey Form and volume worksheets Now A certified Sludge Management Plan may be submitted in lieu of Ii is POA. La oon 1 La con 2 La eon-3 La oan4 La oon 5 La con 6 a. Lagcon Name/ Identifier 37221 b. Total Sludge Depth (ft) c. Sludge Depth to be Removed for Compliance (in) 7.24 d Sludge Volume to be Removed (gallons) 1,112.524 1 1 e, Sludge PAN (Ilds.i:000 gal) 10 f. Liquid PAN (lbs.f1000 gal) 2 g. PAN of Sludge (Ibs.) (d x e)/1000 1 11,125.24 Compliance Tinieframes: if the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level results in an elevated waste analysis, a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to D3WR within 90 days. Work to reduce the sludge level must begin within another 180 days. Compliance with MRCS Standard 359 must be achieved within two years of the original sludge survey If the sludge level is non -compliant but below the stop pump level of the lagoon, a POA must be filed within 90 days and compliance with NRCS Standard 359 must be achieved within two years of the original sludge survey indicating non-compliance. If future sludge surveys do not show improvement in sludge levels, OWR may require the owner to develop a sludge management plan that meets the requirements of SB Interagency Group Guidance Document 1.27. SPCA 9-15-2016 Page 1of3 1 NARRATIVE: use this soction to describe the methods) that will be used to lower the sludge depth. f< microbe use is planned. specify the product to be used. 1) Sludge Management Plan (tin aocordancewith NRCS Standard 359, Sludge Management Guidance): Continue current lagoon management and monitoring of sludge as long as: A) the sludge level is less than the slop pump level of the lagoon, Bjnutrient values of the lagoon effluent are within the normal operating range, C) there is no noticeable increase in lagoon odor. D)a minimum 2 5 ft deep zone, free of sludge, at the pump intake is maintained, and E) nutrients applied from lagoon are properly accounted for in the application plan {hJUP). 2) Sludge Removal -Within 90 days of not maintaining the items listed in the above sludge management plan, one of the following options will commence: A) Mechanical Removal by Pump and Haul - a sludge utilization/application plan will be developed that identifies land in the vlc nity of the lagoon that wit' allow for the application of Me agitatedrrnixed sludge layer of the lagoon_ Implementation of the plan will commence within another 180 days Records will be kept of these applications as required by the permit t3) Mechanical Removal by Dewatering • sludge will be removed by dredge or lagoon agtator pump then mixed with polymer and pumped into geotextile tubes (bags) for dewatering, as out ined in the Management Plan or the Distribution of Animal Residuals Solids Permit, OW90037487. After curing for approximately 6 months solids wi1 be distributed within 2 years either i) as a Class A material in accordance with permit #WQ0037487, or ii) if the solids do not meet Class A standards, in accordance with a sludge utilization/application plan for land application. hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. I further certify and acknowledge that compliance with regard to sludge accumulation must be achieved within two yearn of the original sludge survey indicating non-compliance. Sludge Survey Date: NPOES Permitted Facilities Return this form to: 312512022 Animal Feeding Operations Program NC Division of Water Resources 1836 Mall Service Center Raleigh, NC 27599.1638 Campti$noe Due Date. 31252024 Phone: 91 O293-3434 Data: State Permitted Facilities Return this farm to NC Division of Water Resources at the appropriate Regional Office (see following page) SPOA 9-15-2016 Page 2 of 3