Loading...
HomeMy WebLinkAbout20220565 Ver 1_Shoreline Stabilization_20220413 0- 0 o 3Le 3 ROY COOPER Governor u MICHAEL S.REGAN x ; Secretary S.DANIEL SMITH NORTH CAROLINA State of North Carolina Director Environmental Quality Department of Environment Quality Division of Water Resources 15A NCAC 02H.0500—Water Quality Certification,Shoreline Stabilization FORM: SSGP 09-2020 Shoreline Stabilization Application Form Three copies of the application(including attachments)and the application fee should be sent to: If sending via US Postal Service If sending via delivery service(UPS, FedEx,etc.) Paul Wojoski Paul Wojoski DWR-401&Buffer Permitting Branch DWR-401 & Buffer Permitting Branch 1617 Mail Service Center 512 N. Salisbury Street Raleigh, NC 27699-1617 Raleigh,NC 27604 NOTE: Before submitting this form, please ensure you have submitted the Pre-Filing Meeting Request Form as we will not be able to accept your application without this important first step.The Pre-Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a)which states 'At least 30 days prior to submitting a certification request,the project proponent shall request a pre-filing meeting with the certifying agency." In accordance with 40 C.F.R.Section 121.5(b)(7), and (c)(5),all certification requests must include documentation that a pre-filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to view the form. Attach documentatio Pre-Filing Meetin his application. Date of Pre-filing Meeti que3 (required) / '1 1J.�. Version if applicable) ( RECEIVED A. Applicant information i15A NCAC 02H .0502(a)] APR 1 3 2022 1. Owner Information Name: Travis iarrett REQ-WATER RESOURCES Mailing Address: 311 Mayberry Street 401 &BL FFER PERMITTING Winston Salem,NC 27107 Telephone Number: 336/442-9629 Fax Number: E-mail Address: 7' 4V/S. AIR ETTa9e©OM. & 044- North Carolina Department of Environmental Quality I Division of Water Resources .. en n „ 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization Letter must be attached if the Agent has signed this application form. (A form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTHORIZ ATION FORM.pdf) Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Fax Number: B. Project Information [15A NCAC 02H .0502(a) & (b)j 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, buildings, retaining walls, docks, impervious surfaces, rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Davidson Nearest Town: Lexington Lake/ river/ ocean adjacent to property: High Rock Lake Property size (acres): 0.31 acres Subdivision name or site address (include phase/lot number): Lot 63, Riverview Acres, 1156 Riverview Rd., Lexington, NC Directions to site - please include road names and numbers, landmarks, etc.: i-Z5 to Lexington exit for NC Hwy 8, go south on NC Hwy 8, R on Linwood- Southmont Rd., L on Riverview Rd., property is on the R side of road. Latitude (in decimal degrees) 35.41.0796 Longitude (decimal degrees) 80.18.0649 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Single-family residential community FORM: SSGP 09-2020 Paee 2 of 6 6. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize an eroding shoreline and protect it from further erosion. 7. Will work be conducted from land? ® From water? ❑ 8. Total amount of impacts below the normal pool lake level / Normal Water Level Permanent impacts (including all excavation, backfill, rip rap, retaining walls, etc.) in square feet: 120 Sq. Ft. Temporary impacts in square feet: None 9. Total amount of impacts above the normal pool lake lever/ Normal Water Level and 50 feet land -ward Permanent impacts (including back fits, excavation, rip rap, retaining walls, etc.) in square feet: 520 Sq. Ft. Temporary impacts (temporary clearing, construction corridor) in square feet: 300 Sq. Ft. 10. Please describe the vegetation above the normal pool' lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): 6 to 8 trees that remain on shoreline will be removed in order to complete the stabilization project. 11. Signature By signing below, 1, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification . est within the applicable reasonable period of time Bate Owner/Agen ignature" j15A NCAC 02H .0502(f)] 'Agent's signature is valid only if an authorization letter from the owner is provided. 12. Please approximately sketch the following information on this plan and provide dimensions for each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation FORM: SSGP 09-2020 Paee 3 of 6 d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake w Full Pond/ Nome, Wooer Leal) Full Pond/ Normal Water Level —"fitocTno'"� 2ft. 150h. additional clearing If necessary eating Dotk 30kx7h 3hx150h i Mould pod/NU& i _ - hs1R-k Above he pond/IMt EXAMPLE Plan View 1 FORM: SSGP 09-2020 Paee4of6 0) Lake m (At Full Water Level) E 0 z 0 0 Side View c 0 u- FORM: SSGP 09-2020 Page 5 of 6 3 ft below full pond water level 4 ft.above full pond water level 2 ft.additional clearing I I I If necessary 1 I •S. Existing bank , ' 1111 ,, gl't 10 ft.bank , a height glikr gz' 1111 "kir Ot"" i . , ‘rr (f)v Side Vi 1r FORM:SSGP 09-2020 Paee 6 of 6 NCDEQ 401 WATER QUALITY CERTIFICATION SHORELINE IMPACT AREA CALCULATIONS APPLICANT: Travis Jarrett 1156 Riverview Road, Lot 63, Riverview Acres STABILIZATION IMPACT AREA CALCULATIONS The attached shoreline site plan shows 60 LF of proposed shoreline stabilization measures. Detail 3 indicates a proposed shoreline slope that is graded at 2:1 and reflects the estimated normal pool level and the estimated height of the subject shoreline above the normal pool level. Calculation 1— Impact Area Below Normal Pool Level (Item 8 on NCDEQ Form SSGP 09-2020) Area of Impact = Shoreline Length x Depth* x Slope = (60') x (1') x (2) = 120 sq. ft. *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 9 on NCDEQ Form SSGP 09-2020) Permanent Impact From Shoreline Stabilization Measures Height of Bank Above Normal Pool Varies Across the Shoreline Estimate 20 LF of Shoreline = 3 ft. Above Normal Pool Estimate 40 LF of Shoreline = 5 ft. Above Normal Pool I I 1 1 1 I 1 Area of Impact = Length x Height x Slope = (20' x 3' x 2) + (40' x 5' x 2) = 120 + 400 = 520 sq. ft. Impact From Construction Above Shoreline Stabilization Assume 5 ft. Wide Zone Area of Impact = 60' x 5 ft, = 300 sq. ft. Total Area of Impact Above Normal Pool Level = 820 sq. ft. A SITE MAP TRAVIS JARRETT SCALE 1" = 20' 1 CLASS 2 RIP RAP VEGETATION AND EROSION CONTROL FABRIC 1 EROSION CONTROL FABRIC TYPICAL CONDITIONS • 36" TO 72" ERODED CUT • WAVE EXPOSURE EXISTING GRADE 1 ` Varies 3to5ft. Assume lit. LAKE ep•n.OM — — FOR: LOCATION: RESERVOIR: TRAVIS JARRETT LOT 63, RIVERVIEW ACRES HIGH ROCK LAKE PROJECT: SHORELINE STABILIZATION PROGRAM PHASE I SITE EVALUATION YADKIN, INC. - BADIN, NORTH CAROLINA DRAWING TITLE: MODERATE RIP RAP STABILIZATION DETAIL 3 bing maps 1156 Riverview Rd, Lexington, NC 27292 • , -4 'cit, e.,.. Es'.37,e,s GH ROCK ESTATES