HomeMy WebLinkAboutSW6210402_Plansheet C-6.0-1 - Misc. Detail_20210504TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) RYE (GRAIN) 120 ANNUAL KOBE LESPEDEZA 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND BEYOND JUNE. SEEDING DATES: JANUARY 1 - MAY 1 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) GERMAN MILLET 40 A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB./ACRE. SEEDING DATES: MAY 1- AUGUST 15 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALL) SEEDING MIXTURE: SPECIES RATE (LB./ACRE) RYE (GRAIN) 120 SEEDING DATES: AUGUST 15 - DECEMBER 30 SOIL AMENDMENTS: FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB./ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB./ACRE KOBE LESPEDEZA IN LATE OR EARLY MARCH. 1 TEMPORARY SEEDING SPECIFICATIONS CURB AND GUTTER TO BE POURED IN 10' SECTIONS WITH EXPANSION JOINTS EVERY 50' (90' IF MACHINE PLACED) 11 3/8" (END OF CURVE) "' 04 r� :. 3000`i PSI CONCRETE,, If 11 7/8" (LOW POINT IN CURVE) 24" 7 24" STANDARD ROLL CURB " 1 8RADIUS �-----�� � JOINT SEALER 1/8" TO 1/4" 4" 4" 1/2" JOINT FILLER GROOVE JOINT IN SIDEWALK TRANSVERSE EXPANSION JOINT IN SIDEWALK 5' 5.5' NOTE: 1. PROVIDE CONTROL JOINTS AT DISTANCE EQUAL TO WIDTH OF SIDEWALK, PROVIDE 1/2" EXP. JOINTS WITH PRE -MOLDED E.J. FILLER AT MAX. 30' O.C. 2. CONCRETE COMPRESSIVE STRENGTH SHALL BE 3000 PSI. IN 28 DAYS. NTS NTS SEEDING MIXTURES: SPECIES RATE (LBS./ACRE TALL FESCUE 80 PENSACOLA BAHIAGRASS 50 SERICEA LESPEDEZA 30 KOBE LESPEDEZA 10 SEEDING NOTES: 1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED. 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB./ACRE. 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB./ACRE. NURSE PLANTS: BETWEEN APRIL 15 AND AUG. 15, ADD 10 LB./ACRE OF GERMAN MILLET OR 15 LB./ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15, ADD 25 LB./ACRE RYE (GRAIN). SEEDING DATES: BEST POSSIBLE EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APR. 30 FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31 SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH: APPLY 4,000 LBJACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE: IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS OR TOP DRESS WITH 500 LB./ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. SEEDING MIXTURE SPECIES RATE (LB./ACRE) COMMON BERMUDAGRASS 40-80(1-2 LB./1,000 FT2) SEEDING DATES: COASTAL PLAIN: APR. - JULY SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 500 LB./ACRE 10-10-10 FERTILIZER. MULCH: USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000 LB./ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG DRAINAGE DEVICES. MAINTENANCE: A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECTION AND REPAIR MULCH FREQUENTLY. REFERTILIZE THE FOLLOWING APR. WITH 50 LB./ACRE NITROGEN. 2 PERMANENT SEEDING SPECIFICATIONS COMPACTED SUBGRADE CARRY BASE COURSE 6" BEYOND SURFACE COURSE AT LOCATIONS WITHOUT CURB AND GUTTER COMPACTED C NTS 8 ASPHALT PAVEMENT GRASSED OR RIP RAP LINED SWALE NOTE: THIS CROSS SECTION IS TO BE USED FOR THE ENTIRE LENGTH OF THE SWALE. SEE PLAN FOR WIDTH GRASS OR EROSION CONTRL LINING SEE GRADING PLAN SEE PLAN FOR 1� DEPTH 3 s ' COMPACTED SUBGRADE 2.0' UNLESS OTHERWISE SHOWN J1 3 EXISTING GROUND CONSTRUCTION SPECIFICATIONS: 1. REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA. 2. EXCAVATE THE CHANNEL AND SHAPE IT TO NEAT LINES AND DIMENSIONS SHOWN ON THE PLANS PLUS 0.2 FT OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW FOR BULKING DURING SEEDBED PREPARATIONS AND SOD BUILDUP. 3. REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL SO THAT SURFACE WATER MAY ENTER THE CHANNEL FREELY. 4. ESTABLISH GRASS IN THE CHANNEL IMMEDIATELY. 5. USE SEEDING SPECIFICATIONS SHOWN ON THIS SHEET TO SEED SWALES. MAINTENANCE & CONSTRUCTION: 1. INSPECT THE SWALE FOR EROSION ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED AREAS. 3. MAINTAIN PROPER CROSS SECTION UNTIL THE SWALE IS STABLE. 4. KEEP THE GRASS IN A HEALTHY. VIGOROUS CONDITION AT ALL TIMES. 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. 2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION. 3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF -SITE BORROW OR WASTE AREAS STAGING OR STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A COPY OF THE AMENDED PERMIT. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR OR THE ENGINEER. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND STABILIZED. 9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO RECEIVING OUTLET. 10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF -PRODUCING EVENT ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED. 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA. 13. WHEN CROSSING CREEK OR DRAINAGE -WAY, THE CONTRACTOR SHALL RIP -RAP WITH FABRIC DISTURBED BANKS AND CHANNEL AND RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN 2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED IMMEDIATELY. 3 GENERAL EROSION AND SEDIMENT CONTROL NOTES DRIVE STEEL POSTS 18" INTO THE GROUND ATTACH WIRE FENCE TO POSTS AND EXTEND NOTES: MAXIMUM 8' O.C. AND EXCAVATE A 4" X 8" TRENCH UPHILLALONG THE LINE OF THE BOTTOM OF THE FENCE 8" INTO THE EXCAVATED TRENCH AND TURNED OUT POSTS. 4" IN THE TRENCH. 1. WIRE SHALL BE A MINIMUM OF 32 INCHES IN WIDTH AND TOP & BOTTOM STRAND SHALL HAVE A MINIMUM OF 6 WIRES WITH 12" STAY SPACING. MIN. 10 GA. WIRE 2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND STEEL POSTS STAY WIRES SHALL BE FASTENED ADEQUATELY TO THE WIRE WITH #9 WIRE MIN. 12-1/2 GA STAPLES 1-1/2" LONG. FABRIC THAT DETERIORATES TO SUCH EXTENT THAT IT'S EFFECTIVENESS IS REDUCED SHALL BE WIRE LINE WIRES REPLACED BY CONTRACTOR AT CONTRACTOR'S EXPENSE. MIN. GA. 12 1/23. STEEL POSTS SHALL BE A MIN. OF S HEIGHT AND SHALL BE THE SELF FASTENER ANGLE STEEL TYPE. 4. CONTRACTOR SHALL REVIEW SILT FENCE ONCE PER WEEK ANDAFTER EACH RAINFALL OCCURRENCE. ANYNECESSARY �.' REPAIRS OR CLEAN-UP TO MAINTAIN THE EFFECTIVENESS OF THE DEVICE SHALL BE MADE IMMEDIATELY. d r 5. REMOVE DEPOSITED SEDIMENT ALONG THE FENCETO PROVIDE ADEQUATE STORAGE VOLUME AND TO REDUCE "f PRESSURE ON THE FENCE AS NEEDED. STEP 1 STEP 2 5. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR ATTACH THE FILTER FABRIC TO THE WIRE FENCE, BACKFILL THE TRENCH AND COMPACT THE SOIL REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE EXTEND THE BOTTOM OFTHE FABRIC 8" INTO THE FIRMLYTO ANCHOR THE BOTTOM OFTHE SILT CONTRIBUTING DRAINAGE AREA IS STABLE. TRENCH AND TURNED OUT 4" IN THE TRENCH. FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. POSTS MAX 8' O.C. YWIRE FENCE "HOG WIRE" A ~` FILTER FABRIC �rT� I ¢ #9 WIRE STAPLES 1 1/2 LONG BOTTOM OF WIRE FENCE AND i FILTER FABRIC BURIED 8" IN w EXCAVATED TRENCH &TURNED x OUT 4" IN THE TRENCH _FLOW �f ""y STEEL POST DRIVEN 24" INTO GROUND STEP 3 A STEP 4 SECTION A -A MAINTENANCE 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE AFTER NTS THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED AND NCDENR APPROVES REMOVAL. 5 SILT FENCE 1.5% 5\09 .. 0 50' ROW GRAVEL ENTRANCE SHALL BE 50 FEET IN LENGTH AND 12 FEET IN WIDTH WITH 20 FOOT RADIUS AT EXISTING ROADWAY 36-0" MIN L 4'-0" 10'-0" FILTER FABRI WASHED STONE GRAVEL CONSTRUCTION ENTRANCE DESIGN CRITERIA AGGREGATE SIZE - USE 2-3 INCH WASHED STONE DIMENSION OF GRAVEL PAD THICKNESS - 6 INCHES MINIMUM WIDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESS POINTS OF THE VEHICULAR ENTRANCE AND EXIT AREA, WHICHEVER IS GREATER LENGTH - 50 FT. MINIMUM. LOCATION - LOCATE CONSTRUCTION ENTRANCES AND EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE AND TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. AVOID STEEP GRADES AND ENTRANCES AT CURVES IN PUBLIC ROADS. CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS REQUIRED FOR STAGING AND/OR BORROW AREAS AND MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER. CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL ACCEPTANCE. MAINTENANCE MAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY 50, REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH mTn, RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO PUBLIC ROADWAYS. AGGREGATE 6" MIN. THICKNESS 2-3" COURSE NTS 4 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE STANDARD METAL POSTS 2'-0* IN GROUND �19 GAUGE HARDWARE CLOTH (1/4 MESH OPENINGS) 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACES POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE AND BOTTOM. PLACING A 2 FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE WIRE AND SMOTH TO AN EVEN GRADE. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ACCUMULATED SEDIMENT AND ESTABLISH FINAL GRADING ELEVATIONS. 6. COMPACT THE AREA PROPERLY AND STABILIZE IT WITH GROUNDCOVER. MAINTENANCE INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (112 INCH OR GREATER) RAINFALL EVENT. CLEAR THE MESH VIIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOTTO DAMAGE OR UNDERCUT THE WIRE MESH DURING THE SEDIMENT REMOVAL. REPLACE STONE AS NEEDED. NTS 6 HARDWARE CLOTH & GRAVEL INLET PROTECTION 14' 14' 2 12' 12' 2' - 2% 2" SF9.5B 2%� w w w NOTES U 1. SECTION SHOWN TO DEPICT TYPICAL CUT & FILL CONDITIONS ONLY. GRADING PLAN SHOWS WHETHER SECTION IS IN CUT, FILL OR BOTH 2. GEOTECHNICAL ENGINEER SHOULD BE CONSULTED TO DETERMINE DEPTH OF ABC NEEDED TO MEET NCDOT REQUIREMENTS 3. DEVELOPMENT WILL HAVE SIDEWALK ON ONE SIDE OF THE ROAD, SEE PLAN FOR SIDEWALK LOCATIONS. NTS ROADWAY TYPICAL SECTION unrrc• v- MAX. 25' RADII ALONG THE EXISTING ROAD AT ALL NEW ROAD CONNECTIONS. NTS (60" MIN. FLOOR WIDTH) NTS [NOT PERMISSIBLE FOR NEW CONSTRUCTION] 12 HANDICAP RAMP WITH TRUNCATED DOMES GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) NTS II ■ 411,,',D ■ aolutuonat% civil engineering I land surveying 409 Chicago Drive Suite 112 Fayetteville, INC 28306 9 Y office 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com ♦���,�N ••••' ••• ZO: O�� -q'•• y i Q� 7 SEA 10274 i •.�� I NEB•••: �♦�� CC)TT g� ����♦ REVISIONS PROJECT NAME WOODHAVEN SUBDIVISION SITE & EROSION CONTROL DETAILS CLIENT J&K GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1721 DRAWING SCALE NOT TO SCALE DATE RELEASED MARCH 1, 2021 SHEET NUMBER C-6mO 10 SIDEWALK WITH CURB 11 TYPICAL SWALE CROSS SECTION 13 GROUND STABILIZATION CHART PIPE OUTLE WELL-DEFINED 1 INFLOW STRUCTURE CONSTRUCTION SPECIFICATIONS PIPE OUTLET TO FLAT AREA- GRAVEL OR FABRIC SECTION A -A PLAN GRAVEL OR FABRIC SECTION A -A NOTES 1. LA IS THE LENGTH OF THE RIPRAP APRON. 2. D = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER FABRIC OR BLANKET SHOULD BE INSTALLED BETWEEN THE RIPRAP AND SOIL FOUNDATION. FILTER LAYER GRAVEL OR FABRIC INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (} INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. NTS TYPICAL RIP RAP APRON BAFFLES INFLOW DEWATERING ZONE FILTER 1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, V,AOD VEGETATION, ORGANIC MATTER AND OTHER OBJECTIONABLE MATERIAL E THE FILL IN LIFTS NOT TO EXCEED 9INCHES AND MACHINE COMPACT IT. R FILL THE EMBANKMENT 6INCHES TO ALLOW FOR SETTLEMENT. Z w z z a s w 5. y 11 ^ l 1 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-0-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30 CM) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4" - 6" (10 CM -15 CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2" - 5" (5 CM -12.5 CM) (DEPENDING ON BLANKET TYPE) AND STAPLED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 M - 12 M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4" (10 CM) APART AND 4" (10 CM) ON CENTER OVER ENTIRE WIDTH OF THE CHANNEL. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. NOTE: * IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. A NOTE: B C CRITICAL POINTS * HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IF NECESSARY TO ALLOW STAPLES TO SECURE THE A. OVERLAPS AND SEAMS CRITICAL POINTS ALONG THE CHANNEL SURFACE. B. PROJECTED WATER LINE C. CHANNEL BOTTOM/SIDE ** IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE SLOPE VERTICES OR STAKE LENGTHS GREATER THAN 6" (15 cm) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. MAINTENANCE: 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE NTS REINSTALLED. 2 EROSION CONTROL BLANKET INSTALLATION L = THE DISTANCE SUCH THAT POINTS A AND B ARE OF EQUAL ELEVATION ' CENTER OF THE DAM IS � TO BE 9" LOWER THAN SKIMMER DEWATERING THE EDGES (MIN) TO FORM A WEIR A 1.5' MIN. DEVICE EMERGENCY ON STONE SPILLWAY BEDDING 9" MIN MIN 8" FILTER FABRIC EMBANKMENT 1' FREEBOARD BAFFLES CHANNEL OR DITCH CLASS A OR B EROSION CONTROL STONE / I ! t APPLICATION A 6" MIN. INVE T ELEVATION OFi EMERGENCY SPILLWAY MAINTENANCE EMERGENCY SPILLWAY 1. INSPECT THE CHECK DAMS AFTER EACH RAINFALL BUT IN NO 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. 4. PLACE THE BARREL ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4 INCH LAYERS AND COMPACT IT UNDER AND AROUND THE PIPE TO AT LEAST THE SAME DENSITY AS THE ADJACENT EMBANKMENT. PLACE A MINIMUM OF 2 FEET OF COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURER'S INSTRUCTIONS 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACHED THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT. ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. 7. INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTEND POSSIBLE. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8 INCH STAPLES. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ONE PIECE. IF MULTIPLE SECTIONS AREA REQUIRED, THE UPPER SECTION SHOULD OVERLAP THE LOWER SECTION SO THAT WATER CANNOT FLOW UNDER THE FABRIC. STONE SEDIMENT STORAGE ZONE CROSS-SECTION VIEW 8. DISCHARGE WATER INTO THE BASIN TO PREVENT EROSION. USE TEMPORARY SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY. 9. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE EMBANKMENT BEFORE THE AREA IS CLEARED. 10. INSTALL POROUS BAFFLES AS SPECIFIED. 11. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. CENTER OF THE DAM IS TO BE 9" LOWER THAN THE EDGES (MIN) TO FORM A WEIR 21 4 r!q�� AT CENTER CASE LESS THAN ONCE PER WEEK FILTER FABRIC 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN. TAKE CARE SECTION A -A TO AVOID UNDERMINING THE DAM DURING CLEANOUT. 3. CLEAN OR REPLACE THE STONE WHEN IT SHOWS SIGNS OF CLOGGING OR OTHERWISE DOES NOT PERFORM CORRECTLY 4. WEIR SECTION MUST BE 9" LOWER THAN ABUTMENTS 5. DOWNSTREAM APRON LENGTH SHOULD BE 3 TIMES THE HEIGHT OF THE WEIR. INLU PVC VENT PIPE 7 CHECK DAM WITH WEIR FLEXIBLE HOSE SCH 40 PVC **SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC. PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAJRCLOTH SKIMMER. SKIMMER MAINTENANCE INSPECT SKIMMER SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OF SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. EXCAVATE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH SEDIMENT CONTROLS. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER IS FLOWING UNDERNEATH OR AROUND THEM. UNCLOGGED THE SKIMMER AS NEEDED. CHECK TO MAKE SURE ORIFICE INSIDE OF THE SKIMMER IS NOT CLOGGED; IF SO, REMOVE THE DEBRIS. IF SKIMMER ARM OR BARREL IS CLOGGED, REMOVE THE ORIFICE AND CLEAR THE DEBRIS. CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE TRASH AND DEBRIS FROM THE SKIMMER AND POOL AREAS. ►Ik 6 TEMPORARY SKIMMER BASIN NTS ® 4.00' [1.22M] TRM INSTALLATION 8.00'[2.44M] 2.00' [0.61 M] 2"-14.00' [1.22M] 2"-5^ 0.7 STAPLES PER SQ. YD. (0.8 STAPLES PER SQ. M) O T- ® L 2.00' [0.61 M] 50' [0.46M] 4.00' [1.22M] • 3.00' [0.91 M] • L 200 [0.61 MI 2.00' [0.61 M] • 4.00 [1.22M] 41 40 4.00' [1.22M] 1.3 STAPLES PER SQ. YD. 1.7 STAPLES PER SQ. YD. (1.5 STAPLES PER SQ. M) (2.0 STAPLES PER SO. M) 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM' , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING ON BLANKET TYPE. 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE BLANKET WIDTH. NOTE: *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY SECURE THE BLANKETS. MAINTENANCE: 1. INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. 2. IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. 3. IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS, THE BLANKET SHOULD BE REMOVED AND THE AREA RESEEDED. AFTER RESEEDING, THE BLANKET SHOULD BE REINSTALLED. NTS 3 EROSION CONTROL BLANKET INSTALLATION NATURAL GROUND MAX. SLOPE (TYP) IN. 2.5 2.5 ­11 NATURAL GROUND z 25 / / COMPACTED SOIL *** WHEN A GRAVEL DIVERSION BERM IS REQUIRED, THE HEIGHT SHALL BE REDUCED TO 12 INCHES AND THE TOP WIDTH TO 6", ALL OTHER REQUIREMENTS SHALL REMAIN THE SAME. TEMPORARY DIVERSION KEY NOTES: 1. CLEAR THE ARE UNDER THE BERM AND STRIP THE ROOTS/OTHER ORGANICS. 2. COMPACT THE SIDE SLOPES, PREFERABLY WITH A TRACKED VEHICLE TO SLOW RUNOFF VELOCITIES. 3. VEGITATE THE RIDGE OF THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS THE BERM WILL REMAIN IN PLACE FOR LESS THAN 30 DAYS. MAINTENANCE: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. 8 TEMPORARY DIVERSION BERM NTS ® ® L L I 1.50' [0.46M] 3.00' [0.91M] • 1.50' [0.46M] 3.00' [0.91 M] • • .00 • 4.00' [1.22M] • • • 1.00' [0.30M] • 2.00' [0.61M] 4.00' [1.22M] 3.4 STAPLES PER SQ. YD. 3.6 STAPLES PER SQ. YD. (4.1 STAPLES PER SQ. M) (4.3 STAPLES PER SQ. M) NTS 4 STAPLE PATTERN FOR 4' ROLLS 4.00' [1.22M] 8.00' [2.44M] • • 2.00' [0.61 M] • 4.00' [1.22MI 0.7 STAPLES PER SQ. YD. (0.8 STAPLES PER SQ. M) ® 0 I I I T 2.00' [0.61 M] 1.50' [0.46M] 4.00' [1.22M] • • 3.00' [0.91 M] • • • 2.00' [0.61 M] • • • • • 4.00' [1.22M] 4.00' [1.22M] • 1.3 STAPLES PER SQ. YD. 1.7 STAPLES PER SQ. YD. (1.5 STAPLES PER SQ. M) (2.0 STAPLES PER SQ. M) 1.50' [0.46M] 1.50' [0.46M] 3.00' [0.91 M] • • • 3.00' [0.91 M] • • • • • • • 2.00' [0.61 M] • • • • • • 4.00' [1.22M] • • • • • • • 1.00' [0.30M] • • • 2.00' [0.61 M] i • • • • • • -_j 1.00' [0.30M] 3.4 STAPLES PER SQ. YD. 3.6 STAPLES PER SQ. YD. NTS (4.1 STAPLES PER SQ. M) (4.3 STAPLES PER SQ. M) F5 STAPLE PATTERN FOR 8' ROLLS Q LASS 1 RIP RAP (SEE SECTION THRU BASIN BELOW) LASS 1 RIP RAP HEADWALL 57 WASHED STONE 1' THICKX 3' HIGH MIN. SEDIMENT STORAGE AREA PERSPECTIVE VIEW NOT TO SCALE FLOO STORAGE lNATURAL GROUND ZONE �F12 l ' I RIP RAP HEADWALL SEDIMENT STORAGEFLOW- 15 FLOVbc---_ 1 5 -- ,-=' IPE INVERT - 57 FILTER FABRIC MAX SEDIMENT DEPT WASHED LASS 1 RIP -RAP CONSTRUCTION SPECIFICATIONS: (CLEAN OUT POINT) STONE 1. CLEAR THE AREA OF ALL DEBRIS. 2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE AROUND SECTION THRU BASIN, FILTER, & CULVERT PIPE THE PIPE INLET. NOT TO SCALE 3. A 1 FOOT THICK LAYER OF NCDOT #5 OR #57 STONE SHOULD BE MAINTENANCE: PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. 4. SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER OUTSIDE OF THE STONE HORSESHOE 18" BELOW NATURAL GRADE. EACH SIGNIFICANT (1/2" OR GREATER) RAINFALL EVENT AND REPAIR 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT, STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS AND STABILIZE WITH GROUND COVER. ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM NTS THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. 9 ROCK PIPE INLET PROTECTION IIII solutions D Is im t e q. C1vft engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com 11 ♦♦����N 11DAR9 ���i � ♦ .•••• ••. �I .• SEA ,•4� �� •; jk 0274 .• G ► NE •.��♦�� REVISIONS PROJECT NAME WOODHAVEN SUBDIVISION SITE & EROSION CONTROL DETAILS CLIENT J&K GENERAL CONTRACTORS 645 Laurinburg Highway Raeford, North Carolina 28376 Phone: (910) 638-6102 PROJECT INFORMATION DESIGNED BY: SEAN/CHRIS DRAWN BY: SEAN/CHRIS CHECKED BY: SCOTT PROJECT NUMBER: 1721 DRAWING SCALE NOT TO SCALE DATE RELEASED MARCH 1, 2021 SHEET NUMBER C-6m 1