Loading...
HomeMy WebLinkAbout20220560 Ver 1_SAW-2017-02307 Morrison Farm -West 1st St AJD_20220411 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2017-02307 County: Dare County U.S.G.S.Quad: Kitty Hawk NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner/Applicant: Mr.Robert Howsare Morrison Farm Associates II LTD Partners Address: 8800 Row-cab Line Road Rockwell,NC 28138 Telephone Number: 704-279-3128 Size(acres) 21.8 Nearest Town Kill Devil Hills Nearest Waterway Albemarle Sound River Basin Albemarle-Chowan USGS HUC 03010205 Coordinates Latitude:36.01933 Longitude:-75.67989 Location description: The 21.8-acre property is located at 1300 West 1st Street,approximately 300 feet north of Parkwood Drive in Kill Devil Hills,Dare County,NC.The property is currently an un-developed,forested tract that is intersected by West 1st Street.The property contains 1.55 acres of jurisdictional wetlands abutting Colington Creek. Indicate Which of the Following Apply: A. Preliminary Determination _ There are waters,including wetlands, on the above described project area, that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC§ 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC§403). The waters,including wetlands, have been delineated,and the delineation has been verified by the Corps to be sufficiently accurate and reliable. Therefore this preliminary jurisdiction determination may be used in the permit evaluation process,including determining compensatory mitigation. For purposes of computation of impacts,compensatory mitigation requirements,and other resource protection measures,a permit decision made on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process(Reference 33 CFR Part 331). However,you may request an approved JD,which is an appealable action,by contacting the Corps district for further instruction. _ There are wetlands on the above described property, that may be subject to Section 404 of the Clean Water Act(CWA)(33 USC§ 1344)and/or Section 10 of the Rivers and Harbors Act(RHA)(33 USC§403). However,since the waters,including wetlands, have not been properly delineated,this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation,this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over all of the waters,including wetlands, at the project area,which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner,you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. B. Approved Determination _ There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act(RHA)(33 USC §403)and Section 404 of the Clean Water Act(CWA)(33 USC§ 1344). Unless there is a change in law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are wetlands on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC§ 1344). Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We recommend you have the waters of the U.S. on your property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner,you may wish to obtain a consultant to conduct a delineation that can be verified by the Corps. Page 1 of 2 SAW-2017-02307 _ The waters of the U.S.,including wetlands, on your project area have been delineated and the delineation has been verified by the Corps. If you wish to have the delineation surveyed,the Corps can review and verify the survey upon completion. Once verified,this survey will provide an accurate depiction of all areas subject to CWA and/or RHA jurisdiction on your property which,provided there is no change in the law or our published regulations,may be relied upon for a period not to exceed five years. X The wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on February 5,2018.Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are no waters of the U.S.,to include wetlands,present on the above described project area which are subject to the permit requirements of Section 404 of the Clean Water Act(33 USC 1344). Unless there is a change in the law or our published regulations,this determination may be relied upon for a period not to exceed five years from the date of this notification. X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act(CAMA). You should contact the Division of Coastal Management in Elizabeth City,NC,at(252)264-3901 to determine their requirements. Placement of dredged or fill material within waters of the US,including wetlands,without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act(33 USC§ 1311). Placement of dredged or fill material,construction or placement of structures,or work within navigable waters of the United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act(33 USC§401 and/or 403).If you have any questions regarding this determination and/or the Corps regulatory program,please contact Billy Standridge at(910)251-4595 or Billy.W.Standrid2e(a,usace.army.mil. C. Basis For Determination: The wetlands within the property were delineated using the Corps of Engineers 1987 Wetland Delineation Manual and the Atlantic and Gulf Coastal Plain Regional Supplement Version 2.0.The wetlands on the property abut Colin2ton Creek,a Traditional Navigable Water. D. Remarks: E. Attention USDA Program Participants This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants,or anticipate participation in USDA programs,you should request a certified wetland determination from the local office of the Natural Resources Conservation Service,prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this determination,you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a Notification of Appeal Process(NAP)fact sheet and request for appeal(RFA)form. If you request to appeal this determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Jason Steele,Review Officer 60 Forsyth Street SW,Room 10M15 Atlanta,Georgia 30303-8801 In order for an RFA to be accepted by the Corps,the Corps must determine that it is complete,that it meets the criteria for appeal under 33 CFR part 331.5,and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form,it must be received at the above address by April 6,2018. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** STANDRIDGE.BILLY.WA Digitally signed bySTANDRIDGE BILLY WAYNE129068J956 DN:r-US,o=US.Government,ou=DOD,ou=Pq,ou=-USA, Corps Regulatory Official: YNE.1240687956 cn.STADate.20118020E13L4402LY -0500'24068'956 Date: February 5,2018 Expiration Date: February 5,2023 SAW-2017-02307 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so,please complete our Customer Satisfaction Survey,located online at http://corpsmapu.usace.army.mil/cmapex/f?p=136:4:0. Copy Furnished: Mr.Brian Rubino Quible and Associates,P.C. P.O.Drawer 870 Kitty Hawk,NC 27949 SAW-2017-02307 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Morrson Farm Associates II LTD Partners File Number: SAW-2017-02307 Date: February 5,2018 c/o Mr.Robert Howsare Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/inet/functions/cw/cecwo/reg or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit(Standard or LOP)because of certain terms and conditions therein,you may request that the permit be modified accordingly.You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice,or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter,the district engineer will evaluate your objections and may:(a)modify the permit to address all of your concerns,(b)modify the permit to address some of your objections,or(c)not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections,the district engineer will send you a proffered permit for your reconsideration,as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit,you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission(LOP),you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety,and waive all rights to appeal the permit,including its terms and conditions,and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit(Standard or LOP)because of certain terms and conditions therein,you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety,and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD,you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. SAW-2017-02307 E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION II -REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/or the If you only have questions regarding the appeal process you may appeal process you may contact: also contact: District Engineer,Wilmington Regulatory Division, Mr. Jason Steele,Administrative Appeal Review Officer Attn: Billy Standridge CESAD-PDO U.S.Army Corps of Engineers, South Atlantic Division 60 Forsyth Street,Room 10M15 Atlanta,Georgia 30303-8801 Phone: (404) 562-5137 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel,and any government consultants,to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation,and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer,Wilmington Regulatory Division,Attn: Billy Standridge,69 Darlington Avenue,Wilmington,North Carolina 28403 For Permit denials,Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer,Commander,U.S.Army Engineer Division,South Atlantic,Attn:Mr.Jason Steele,Administrative Appeal Officer,CESAD-PDO,60 Forsyth Street,Room 10M15,Atlanta,Georgia 30303-8801 Phone:(404)562-5137 0l0 PIzI tialelnlsed uomuiLi9 M JN3 SdIO9 ANIAV'S'fl 9ESI-3'3U1'Buryueld V Bui(eNnS WeoqzeS slot E 0 NVf 03A1333t1 OtnreaS -an MN 1124.3387¢1 MX me Mee "maw meeksmns ammo. roinm.1 s awxue morass Oa g} .GMWO YNi7ON113 AMON - AAAf<1O3 EMI - dl@2N10I 7IANILI► - STIIN 7Id1Q 1111 .110Smm,09 71%N VIM NQ! A%ANf1S. 08ULW ARd dO J : 'S f SIhfNId NOIS!kWff 1S IVO WZLPII 2