HomeMy WebLinkAbout20220212 Ver 1_1101 Olive Branch Road_5th Submittal_SIA_20220411Prepared by: 1101 Olive Branch Road STORM WATER IMPACT ANALYSIS 1 101 Olive Branch Road Durham, North Carolina Horvath Associates Project Number: 1886 December 10, 2021 * .................. ii,• } 0- / SEAL ' 39170 I - rt ii} yivDigitallysgnjd by t .h Moth�L.4. nes#*%i'ec L6at `12.10L. J W1''0:5 0f-05'00' N BELS NO: C-O676 Horvath Associates, P.A. Engineers - Planners - Landscape Architects 16 Consultant Place, Suite 201 Durham, North Carolina 27707 (919) 490-4990 Table of Contents Narrative City of Durham Stormwater Site Plan Checklist SCM Sizing Calculations Nutrient Loading Calculations Peak Runoff Analysis Site -to -Drainage Area Analysis Required Maps and Information Narrative A. Project Data • Project Name: 1 101 Olive Branch Road • PIN: 0860-84-52-7778DUR • Address: 1 101 Olive Branch Road • Stormwater Regulatory Basin: Falls Lake • River Basin: Neuse • Existing Impervious Area: 2,000 sf • Proposed Impervious Area: 2,157,800 sf • Area of Disturbance: 5,358,000 sf • TMDL: None • Watershed Protection Overlay: F/J-B B. Site History Aerial photographs indicate the site was completely forested between 1999 and 2013. The below aerial photographs encompass the baseline date time frames that will govern the regulations to this project. The City of Durham does not have any newer aerial photography available at the project location, but photographs available from another application indicate some of the wooded areas were cleared in 2015-2016. 1999 Aerial Photo 2013 Aerial Photo C. Project Description The project will involve clearing the site and constructing a single family and townhome development. D. Quantifying Land Disturbance and Changes in Impervious Surface The project will involve greater than 12,000 sf of land disturbance and will add more than 2,000 sf of new impervious area. This exceeds all thresholds found in the City of Durham Stormwater performance Standards; therefore, the site will not be exempt from any stormwater requirements. E. Watershed Protection Overlays The entire site is in the F/J-B watershed protection overlay. F. Streams There are several buffered streams located on the property. Buffers have been applied per City of Durham requirements. Martin Branch drains through the middle of the site south to north. There is a large wetland area that surrounds the stream. G. Floodplains Floodplain for Martin Branch splits the site in half south to north. A crossing of the floodplain and floodway for Martin Branch is proposed and will require CLOMR/LOMR approval by FEMA. H. Applicable Requirements Peak Runoff Requirements Sec. 70-738. Peak runoff control requirements.(a)Purpose. The purpose of this section is to ensure that the increases in volume, velocity, and peak flow of stormwater discharges from development are addressed, in order to mitigate the impacts on downstream properties and receiving waters. All development, including development that may be exempt from pollutant reduction requirements set forth in remaining sections of this article, is subject to the requirements of this section unless exempted in subsection (b) below. (b)Applicability; calculation of prior impervious area. This section 70-738 applies to the following development, assessed in comparison to pre -development prior impervious conditions as defined in subsections (1) and (2) below: (i) relocation of existing impervious area on a multifamily and other lot; (ii) increase in impervious area on any lot subject to limitations on impervious area in an approved plat or plan for reasons such as watershed protection or stormwater control measure requirements; (iii) increase of more than 500 square feet in impervious area on a multifamily and other lot; (iv) increase of more than 2000 square feet of Impervious Surface area on a single family or duplex residential lot included on a preliminary or final plat submitted for review, or on any lot utilized for recreation. For purposes of calculating these thresholds, subject Development that is part of a Common Plan of Development shall be assessed with other portions of such common plan that have not previously complied with peak flow requirements. (1) For purposes of applying peak flow requirements for the 2- and 10-year storms, the land cover (including type and location) existing as of April 23, 1997 shall be considered the "pre -development conditions"; (2) For purposes of applying the peak flow requirement for the 1-year storm, the land cover (including type and location) that existed as of March 9, 2001 for land in the Falls Basin and Lower Neuse Basin, and as of March 17, 2009 for land in the Jordan Basin shall be considered the "pre -development conditions"; (c)Requirements. (1)Stormwater impact analysis. Development that is not exempt under subsection (b) above shall submit a stormwater impact analysis or approved alternative to such analysis that complies with city stormwater standards as part of the application for site plan or subdivision plat approval, or if such is not required, as part of submittals for construction drawings or utility permit approval. Calculations shall be made in conformance with city stormwater standards. No subdivision plats, site plans, utility permits, or construction drawings shall be approved in the absence of a determination by the stormwater division that required submissions have been made and approved. (2) One-year storm. Development that increases the peak runoff rate from the 1-year storm from pre -development conditions shall provide stormwater management facilities in accordance with City Stormwater Standards such that there is no net increase in peak runoff rate. This requirement shall be applicable in the Jordan basin only when one acre or more of land has been cumulatively disturbed and the previously pervious portion of the property as of March 17, 2009 will be developed to exceed 24% Impervious Surface area (3) Two- and ten-year storms. Development that increases the peak runoff rate from either the 2-year or the 10-year storm from pre -development conditions may be required to provide stormwater management facilities to address the impact, as determined in accordance with City Stormwater Standards. One -Year Storm Peak Runoff Analysis Five locations labeled DP#1, DP#2, DP#3, DP#4, and DP#5, were analyzed to determine the impact of the development on peak runoff rates during the 1-year storm. Each of the locations chosen represents the point upstream of a buffered stream channel where SCM's will discharge in the post -development condition. Peak runoff rates were calculated for the pre -and post -development conditions and demonstrate the runoff rate in the stream channels will not increase in the one-year storm as a result of the development. Two and Ten -Year Storm Peak Runoff Analysis There are two location where concentrated runoff will be discharged from the site in the post -development condition, DP#1 and DP#3. Calculations are provided for DP#1 that demonstrate the SCM provided upstream of this point will attenuate peak flows to at or below the pre -development rate. The second point where runoff leaves the property, DP#3, is in the channel of Martin Branch. Martin branch has a large drainage area to this location of over 1,500 acres. To show compliance with City of Durham requirements for the two and ten-year storms at this location, a site -to -drainage area analysis is utilized to demonstrate that the overall site area draining to it represents a small portion of the overall drainage area. The portion of the site draining to Martin Branch at the analysis point compared to the total drainage area is slightly over the highest threshold listed in the Reference Guide for Development of 10% at 10.2%; however, the overall impervious percentage of the development is significantly less than the proposed land use impervious percentage for this threshold listed in the RGD of 35%, being only 27%. This analysis demonstrates the development complies with the intent of the site -to -drainage area analysis requirements. All impervious surfaces in post -development are considered directly connected. The runoff from these surfaces either drains directly to a stormwater conveyance or are discharged to the ground surface as concentrated flow in such a manner that there will be no appreciable volume reduction through infiltration before the runoff is ultimately collected by the stormwater conveyance. Water Quality Per section, 70-739 of the City of Durham Stormwater Ordinance the project is located in the Falls Regulatory Basin, is part of a Common plan of development, and disturbs more than 12,000 sf since the baseline date of 7/6/2012 (Falls Basin); therefore, the project is subject to the requirements for stormwater pollutants found in sections 70-740 and 70- 741 of the City of Durham Stormwater Ordinance. Required Reductions for Nutrients Sec. 70-740. Required reductions for nutrients and TSS; alternatives; calculations. (a) Nutrient loading rate limits. Development not exempt under subsection 70-739 shall construct and implement SCMs so as to limit the post construction loading rate of nitrogen and phosphorus from the project area to the limits set forth in Table 2 below, or shall comply with an allowed alternative as set forth in subsections (b) through (d) below. A portion of the reduction requirements for nitrogen and phosphorus may be met through off site measures or payments as set forth in section 70-741. Table 2 Nutrient Export Loading Rate Limits Project Location Export Limit Ibs/acre/year Nitrogen Phosphorus Falls Basin 2.2 0.33 Lower Neuse Basin 3.6 not required (c) TSS Reduction. TSS reduction is applicable to Development as further described in this subsection (c) when the following conditions are met: • An increase in Impervious Surface area occurs as compared to what existed as of March 17, 2009; and • The increase in Impervious Surface area assessed in comparison to pervious area existing as of March 17, 2009 exceeds 24% (1) Piped areas in low density projects. Projects that do not require construction of SCMs because their impervious percentage is less than that described in the paragraph above must treat TSS from stormwater runoff that is conveyed in non -vegetated conveyances, such as stormwater pipes, but excluding road and driveway crossings. (2)Overtreatment to address untreatable areas. Where treatment for TSS is not reasonably practicable, as determined by the department, such as when impervious areas include offsite transportation improvements or small noncontiguous areas at the edge of a project, additional reductions of TSS may be required in treatable areas, such as overtreatment in other project areas or treatment of offsite runon. (f)Calculations for nutrient loading and TSS removal. Pollutant loading calculations shall be made using city stormwater standards. All increases in impervious surfaces shall be included, including but not limited internal and off -site transportation improvements. Approved methodologies for calculating pollutant loading shall be maintained in writing by the public works department and shall include those methodologies and calculations required to be used by the division of water quality or DWQ-approved alternate methodologies. (g)Submittals. An applicant shall submit pollutant loading calculations for the pre - and post -development conditions as part of its application for approval of a subdivision or site plan, utility permit, or construction drawings for a street or utility. This project is subject to TSS removal requirements. All runoff from impervious surfaces drains to one of the wet detention basins to receive 85% TSS removal. On -Site Percentage Removal Requirements Sec. 70-741. On -site treatment requirements; offsite purchase and credit options; bacteria control. (a) On Site Nutrient Treatment Requirements. Nitrogen and phosphorus reduction requirements may be met, in part, through offsite management measures or the purchase of nutrient credits. At a minimum, however, in the Falls Basin a percentage of the required nitrogen and phosphorus reductions must be achieved through onsite treatment in the amount shown in Table 3 below. In addition to meeting the percentage reductions below, in the Lower Neuse Basin, nitrogen export load from the site must not exceed 6 lbs. per acre per year for Limited Residential, and 10 lbs. per acre per year for Multifamily and Other. (Note: offsite credit purchases do not meet TSS removal requirements, which must be met onsite.) Table 4 Onsite Nutrient Treatment Requirements Project Location Minimum Onsite Nutrient Treatment Nitrogen Phosphorus Falls - General *50% of required reduction *50% of required reduction Falls Downtown Area Falls exceeding thresholds but with less than 1 acre land disturbance Lower Neuse *30% of required reduction *30% of required reduction No Percentage reductions apply, but the 6/10 nitrogen export limit described in paragraph (a) above must be met *30% of required reduction *30% of required reduction Not required *The "required reduction" is the difference between the post -development loading rate in pounds per acre per year before treatment minus the loading rate target in pounds per acre per year. The percentage shown in the chart above is applied to the difference and the resulting number is the amount in pounds/acre/year that the nutrient loading rate must be reduced onsite. (b)Offset payments to state approved nutrient mitigation banks. Development and redevelopment shall have the option of purchasing nutrient credits from state - approved nutrient banks to partially offset nitrogen and/or phosphorus loads as allowed by state law and regulation, including but not limited to 15A NCAC 02B.0235, 15A NCAC 02B.0282, and 15A NCAC 02B.0240, as they may be amended from time to time. In the Jordan Basin, calculation of credits required shall reflect state approved delivery factors. The number of pounds for which credits are purchased shall be increased by five percent if the nutrient bank is not located in the city. The following additional requirements shall apply: (1)Location of nutrient banks. Development in the Falls Basin must use nutrient banks located in the upper Falls portion of the Falls Basin - the portion that is north and/or west of Highway 50. (2)Certification of nutrient bank provider. Offset credits may only be obtained from nutrient banks certified by the state. (3)Utilization of NC Ecosystem Enhancement Program. Credits may also be obtained from the NC Ecosystem Enhancement Program if such credits are available, and if applicable state requirements regarding utilization of private nutrient banks are first met. (4)Certification of credits. Credits purchased pursuant to this subsection (b) shall be verified by the state and proof of such verification that meets city requirements shall be presented prior to approval of a final plat, or if no plat is required, prior to issuance of the first building permit within the project, or such earlier deadline as may be required by city stormwater standards. The project will provide five wet detention basins, WDB#1, WDB#2, WDB#3, WDB#4, and WDB#5, to provide on -site nutrient reduction. A level spreader with engineered filter strip will also be installed downstream of WDB#5 to provide additional nutrient reduction. The level spreader will receive the low flow drawdown from WDB#5's temporary pool. Nutrient loading calculations are provided that demonstrate the proposed SCM's will provide 50% of the required nitrogen and phosphorus reduction as required for the Falls Basin. Any remaining loading above the required nitrogen and phosphorous loading targets of 2.2 and 0.33 Ibs/ac/yr, respectively, will be reduced by making an offset payment as required by NC state regulations. This meets City of Durham Requirements. Bacteria Control Sec. 70-741. On -site treatment requirements; offsite purchase and credit options; bacteria control. (d)Bacteria Removal; Control of Other Identified Stormwater Pollutants. All Development which constructs SCMs in order to comply with this Article and which is located in an area that is subject to a state -approved Total Maximum Daily Load for bacteria shall be required to have at least one primary SCM for each stormwater discharge that is rated as medium, good, high, or excellent for its ability to remove bacteria from stormwater. Ratings shall be those that appear in the utilized version of the NC DEQ Stormwater design manual and/or North Carolina Stormwater Control Measure Credit Document as specified in the Reference Guide for Development or as determined or approved by the Director. In addition, SCMs required to be constructed under this Article must also treat any other pollutant for which a Total Maximum Daily Load has been identified for the area within which the SCM is located. This project is not located in an area that is subject to a state approved total maximum daily load for bacteria or turbidity; therefore, no bacteria or turbidity removal is required. UDO Sec. 8.7. Watershed Protection Overlay Standards C. Stormwater Control Requirements Where development proposes intensity greater than the maximum authorized by the Low Density Option, engineered stormwater controls shall be used to control stormwater runoff from the first inch of rainfall in order to meet water quality concerns. The project proposes greater than 24% impervious surface; therefore, it is subject to the stormwater control requirement. The first 1-inch of rainfall runoff from impervious surfaces will be directed to a wet detention basin in order to receive a minimum of 85% TSS removal. I. Wet Detention Basins and Level Spreaders The wet detention basins and level spreader are designed to comply with the requirements of the archived NC BMP Manual and the City of Durham's Addendum to that manual. J. Diffuse Flow into Riparian Buffers All wet detention basins provide 30% nitrogen removal and utilize pipes to convey their outflow through the buffer to the stream channel. This complies with Option 2 of Section 8.1.6 of the City of Durham Reference Guide for Development. K. Methodology • Drainage basins were delineated using GIS and field surveyed topography. • United States Geological Survey Map is the Southeast Durham Quadrangle. • The FEMA Map associated with the site is Map 3720086000K and 3720087000K; effective date October 19, 2018. • Soil data to determine curve numbers in the watersheds are from the USDA Web Soil Survey Application. Onsite soils are mostly HSB `D' with some being HSG `B'. L. Conclusions One, Two, and Ten-year rainfall event peak flow detention is provided at DP#1 by WDB#1. One-year peak flow at DP#2, DP#3, DP#4, and DP#5 is provided by the wet detention bason upstream that shares its name. Compliance with Two and Ten-year peak flow requirements at DP#3 is demonstrated utilizing a site -to -drainage area analysis. The five wet detention basins and one level spreader serve to provide 50% of the required nitrogen and phosphorous loading reduction on -site. Any remaining nitrogen and phosphorous loading exceeding 2.2 and 0.33 Ibs/ac/yr, respectively, will be mitigated by purchasing offset credits. 85% TSS removal will be provided in the SCM's for all on -site impervious surfaces except for the greenway trail. City of Durham Stormwater Site Plan Checklist DURHAM i 1869 CITY OF MEDICINE CITY OF DURHAM — STORMWATER SERVICES SITE PLAN SUBMITTAL CHECKLIST Department of Public Works 101 City Hall Plaza 1 Durham, NC 27701 919.560.4326 1 F 919.560.4316 www.durhamnc.gov Date: 03/17/2021 ROJECT INFORMATION Project Name: Phase: N/A 1101 Olive Branch Road Previous Project Name(s): N/A PIN (s ): 0860-03-84-5286 Planning Case Number: N/A Contact Person: Company: Email Address: Matt Jones, PE Horvath Associates, PA matt.jones@horvathassociates.com Phone: Fax: 919-490-4990 INSTRUCTIONS For each review submittal, including re -submittals, the entire Stormwater Impact Analysis (SIA) and submittal checklist shall be submitted. Partial SIA and checklist will result in notification of an incomplete submittal with no review performed. Contact Stormwater Services regarding redevelopment or expansion projects for modified requirements. The following checklist outlines submittal requirements. Initial in the space provided to indicate the following submittal requirements have been met and supporting documentation is attached. A. GENERAL REQUIREMENTS Initials MJ (Check One) Q INSIDE ❑OUTSIDE Watershed Protection Overlay (WPO). Indicate the WPO(s) where the project is located: (Check all that apply) ❑ F/J-A ❑✓ F/J-B ❑ E-A ❑ E-B ❑ M/LR-A ❑ M/LR-B If inside WPO, notation of WPO Standards is required on plans. MJ (Check all that apply) ❑Jordan Basin ✓❑Falls Basin ❑ Lower Neuse Basin MJ A legible copy of the United States Geological Survey 7.5 Minute Quadrangle map is provided, including map reference, with site boundary clearly shown and labeled. The map clearly shows all streams. MJ A legible copy of the published Durham County Soil Survey is provided, including map reference, with the site boundary clearly shown and labeled. The map clearly shows all streams, soil types and soil type boundaries. MJ Tops of banks for the streams are shown on the plan. [Contact the North Carolina Department of Environment and Natural Resources for stream identifications in the Neuse River Basin (Falls and Lower Neuse Basins). Stream determinations in the Jordan Basin shall be submitted per the Letter to Industry found on Stormwater Development Reviews' web site at New Stream Buffer Requirements [First Revision to LTI 07-03-081 (25Auqust2011)]. All Watershed Protection Overlay, Neuse River Basin, Jordan Basin, and City riparian buffers, measured from the tops of the stream banks, are shown on the plan. MJ Page 1 of 6 N/A MJ MJ MJ MJ MJ The 10-foot no build setback, measured from all riparian buffers, is shown on the plan. Diffuse flow is achieved into riparian buffers. (Check One) QYes ❑ No Regulated floodplain located on site. A legible copy of the effective Federal Emergency Management Agency National Flood Insurance Program Flood Insurance Rate Map is provided. Map number, map date, and site boundary are clearly shown and labeled. [This map is required regardless of whether floodplain is located on the site.] The effective and/or future FEMA 100-year floodplain, with base flood elevations (if applicable), are shown on the plan. All applicable notes, per the Standard Notes section of the Reference Guide for Development, have been added to the plan. Stormwater Impact Analysis (SIA) sealed and signed by a registered North Carolina Professional Engineer (NCPE) is provided, including narrative report and drainage calculations. Note: If a site is exempt from stormwater requirements then a narrative advising of the exemption can be submitted by any designer. B. PEAK DISCHARGE RATE EVALUATION Initials MJ MJ MJ MJ MJ MJ An introductory narrative describing pre- and post -development site conditions and site improvement changes, is provided. Note: The baseline conditions for the 1-year event varies based upon the regulatory basin in which the project is located. Drainage area maps (one map for pre -development and one map for post -development) are provided with the following items: MJ Scale and north arrow (Note: Except in the instance of site -to -drainage area maps, the scale of each drainage area map shall not exceed 1" = 30'). MJ Sub -basin area(s) delineated with area(s) in acres indicated. MJ MJ Analysis points clearly identified and labeled. Segmented TR-55 time of concentration flow paths showing and labeling each segment. Methodologies and procedures are fully described. A site plan with contour lines or grading plan identifying pre- and post -development drainage patterns is provided. Pre- and post -development times of concentration, calculated by TR-55 segmented approach, are provided. Calculations for the pre- and post -development peak discharge rates are provided for the 1-, 2-, 10-, and 100-year, 24-hour storm using TR-55, TR-20, HEC-HMS, HEC-1 or Rational Method as applicable. Note: The Rational Method is not accepted for the 1-year analysis, areas that drain more than 50 acres, or watersheds that are not homogeneous. Page 2 of 6 MJ A Summary of Results is provided in the following format: Site Analysis Point # Site Condition Storm Event (cfs) 1-year (cfs) 2-year (cfs) 10-year (cfs) 100-year (cfs) -year (cfs) Pre -Development Post -Development without Detention Post -Development with Detention MJ MJ MJ MJ Conclusions providing detailed findings are provided. Stormwater control measure(s) (SCM[s]) are provided (indicate number of each type of SCM): 1 Level Spreader w/ Vegetative Filter Strip Stormwater Wetland 5 Wet Detention Basin Sand Filter Bioretention Grassed Swale Restored Riparian Buffer Dry Extended Detention Basin Permeable Pavement Green Roof Disconnected Impervious Surface Rainwater Harvesting System Proprietary Systems or Other Not required (provide explanation): The SCM(s) indicated above are required to control the following peak discharge rates: x 1-year 2-year 10-year 100-year Other A downstream analysis in accordance with the Reference Guide for Development is provided with findings, or is x Not required (provide explanation): Detention is provided on site for all required storm events C. POLLUTANT CONTROL RE UIREMENTS Initials MJ The project is exempt based upon cumulative land disturbance as of the applicable baseline date. The proposed project is X >_ 16% impervious (Falls and Jordan Basins) / >_ 24% impervious (Lower Neuse Basin), 85% Total Suspended Solids (TSS) removal is provided for this project, and all the impervious area as reasonably practical is treated by an SCM. OR The proposed project is <16% impervious (Falls and Jordan Basins) / <24% impervious (Lower Neuse Basin), 85% Total Suspended Solids (TSS) removal for all runoff from non -vegetated conveyances is provided for this project, and all the impervious area as reasonably practical is treated by an SCM. The project is low density without non -vegetated conveyances, thus TSS removal is not required. Page 3 of 6 MJ MJ MJ SCMs for TSS removal are provided (indicate number of each type of SCM): Note: Not all of the SCMs listed below provide 85% TSS removal as a stand-alone SCM and must be used in series with other SCMs to achieve the minimum TSS removal of 85%. Level Spreader w/ Vegetative Filter Strip Stormwater Wetland 5 Wet Detention Basin Sand Filter Bioretention Grassed Swale Restored Riparian Buffer Dry Extended Detention Basin Permeable Pavement Green Roof Disconnected Impervious Surface Rainwater Harvesting System Proprietary Systems or Other Not required (provide explanation): Hard copies of the following: • Pre- and post -development nutrient calculations using the Jordan/Falls Lake Stormwater Nutrient Load Accounting Tool found at: http://portal.ncdenr.orq/web/lordanlake/implementation-guidance-archive or http://durhamnc.gov/ich/op/pwd/storm/Pages/SWDevReview.aspx Note: Nutrient calculations are always required regardless if the project is exempt from treatment requirements. • The Nutrient Reporting Form (including the Compliance Worksheet tab) per the 3/7/2013 Letter to Industry http://durhamnc.gov/ich/op/pwd/storm/Pages/LTI-SWDevReview.aspx Pre- and post -development land use area maps that correspond to the categories used in the Jordan/Falls Lake Stormwater Nutrient Load Accounting Tool for the nutrient calculations, to scale no smaller than 1 inch = 100 feet. The maps shall show the map scale, north arrow, and are to have the different land uses either hatched or shaded with areas indicated in a legend on the maps. Note: The land use area maps are always required regardless if the project is exempt from treatment requirements. Page 4 of 6 MJ MJ N/A MJ SCMs for nutrient control are provided (indicate number of each type of SCM): 5 Level Spreader w/ Vegetative Filter Strip Stormwater Wetland Wet Detention Basin Sand Filter Bioretention Grassed Swale Restored Riparian Buffer Dry Extended Detention Basin Permeable Pavement Green Roof Disconnected Impervious Surface Rainwater Harvesting System Proprietary Systems or Other Not required (provide explanation): After meeting the minimum on -site treatment requirements, additional treatment and/or offsite credit purchases, if needed, is provided by: Additional SCMs Nutrient Offset Payment to the North Carolina Ecosystem Enhancement Program Nutrient Offset Payment to an Approved Nutrient Bank Land Bank Credit Transfer (Commitments shall be made prior to October 1, 2015) The project site is located in an area subject to a state -approved Total Maximum Daily Load (TMDL) for bacteria. (As of April 2014, only Northeast Creek has a TMDL for bacteria). SCMs rated as medium or high for bacterial removal are provided (indicate number of each type of SCM): Bioretention Area Stormwater Wetlands Wet Detention Basin Sand Filter Level Spreader w/ Vegetative Filter Strip Restored Riparian Buffer Dry Extended Detention Basin Permeable Pavement Other (specify) X Not required (provide explanation): MJ Page 5 of 6 D. WATERSHED PROTECTION OVERLAY REQUIREMENTS Initials MJ MJ 85% Total Suspended Solids (TSS) removal is required for this project, and 100% of the impervious area will be treated by an SCM. Note: Not all of the SCMs listed below provide 85% TSS removal as a stand-alone SCM and must be used in series with other SCMs to achieve the minimum TSS removal of 85%. SCM for TSS removal are provided (indicate number of each type of SCM): 1 Level Spreader w/ Vegetative Filter Strip Stormwater Wetland 5 Wet Detention Basin Sand Filter Bioretention Grassed Swale Restored Riparian Buffer Dry Extended Detention Basin Permeable Pavement Rooftop Runoff Management Disconnected Impervious Surface Rainwater Harvesting System Proprietary Systems or Other Not required (provide explanation): E. ELECTRONIC FILE SUBMITTAL Initials MJ A compact disc (CD), DVD rom disk, or USB drive, separate from that submitted to fulfill the Planning Department's electronic file submittal requirements, and marked "For Stormwater Services" has been included with the submittal. An electronic file transfer protocol or other internet cloud -based file sharing website can be used in place of the electronic media. The disc or USB drive contains electronic copies of the following: MJ MJ MJ Sealed SIA: entire document including narrative, data, calculations, pre- and post - development drainage area maps, pre- and post -development land use area maps that correspond to the categories used in the JFLSAT, and all appendices (pdf format) Jordan/Falls Lake Stormwater Accounting Tool (Excel format) Nutrient Reporting Form (Excel format) Page 6 of 6 SCM Sizing Calculations 1886-WDB#1 Sizing.xls Surface Area Calcs (85% TSS) Matt Jones, PE 10/26/2021 1886 - 1101 Olive Branch Road WDB#1 - Surface Area Drainage Area to Basin = 18.89 acres Impervious Area to Basin = 9.38 acres Impervious Percentage = 50% Avereage Depth (Volume/SA) = 3.00 ft Interpolation to Determine SA/DA Ratio Average Depth (Vol/SA) (ft) Impervious Lower Boundary 50% Site % impervious 50% Upper Boundary 50% 3.0 3.0 3.0 2.06 2.06 2.06 2.06 2.06 2.06 2.06 SA/DA = 2.06 Surface Area Required = 16,951 sf Surface Area Provided = 30,383 sf <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 2007) Percent Impervious Permanent Pool Average Depth (ft) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1886 - WDB#1 Sizing.xls WQ Volume Matt Jones, PE 10/26/2021 1886 - 1101 Olive Branch Road WDB#1 - Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 18.89 Acres Impervious Area = 9.38 Acres Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Inch Rv= 0.50 (Rv = 0.05+0.9*IA) Runoff Volume (V) = 34285 Normal Pool Elevation = 352.00 Temporary Pool Elevation = 354.00 Temporary Pool Volume = Temporary Pool Surface Area = Percentage Oversized (TPV/V) = 69925 37742 204% cf (V = 3630*RD*Rv*A) cf (From HydroCAD Report) sf (From HydroCAD Report) 1886 - W DB# 1 Sizing.xls Drawdown Orifice Sizing Matt Jones, PE 10/26/2021 1886 - 1101 Olive Branch Road WDB#1 - Drawdown Calculation Water Quality Drawdown Orifice Sizing 3 Ai= Ao= Cd= a= g= HI= T= 37,742 30,383 0.6 0.049 32.2 2.00 in (Orifice Size) sf (Area of pond at the beginning of drawdown) sf (Area of pond at the orifice outlet elevation) (Orifice Coefficient of Discharge) sf Orifice Area (calculated) ft/s` Acceleration of Gravity (constant) ft (Maximum head (t=0)) 4.56 days (Time for water level to fall from HI to Permanent Pool Elevation) 3.5.2 Orifice Equation 3.5.2.1 Drawdown Time Calculations for a Pond with an Orifice Outlet A, dh City of Greensboro Stormwater Management Manual -Orifice Outlet For the specific case where Az = Ao and Hz = 0 1 Cd*a*VZ*8*[r2*A.o* .liiz+2(Al —A0)*H /21] 1886 - WDB#2 Sizing.xls Surface Area Calcs (85% TSS) Matt Jones, PE 10/26/2021 1886 - 1101 Olive Branch Road WDB#2 - Surface Area Drainage Area to Basin = 24.59 acres Impervious Area to Basin = 11.48 acres Impervious Percentage = 47% Avereage Depth (Volume/SA) = 4.00 ft Interpolation to Determine SA/DA Ratio Average Depth (Vol/SA) (ft) Impervious Lower Boundary 40% Site % impervious 47% Upper Boundary 50% 4.0 4.0 4.0 1.43 1.43 1.64 1.64 1.64 1.73 1.73 SA/DA = 1.64 Surface Area Required = 17,567 sf Surface Area Provided = 19,043 sf <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 2007) Percent Impervious Permanent Pool Average Depth (ft) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1886 - WDB#2 Sizing.xls WQ Volume Matt Jones, PE 10/26/2021 1886 - 1101 Olive Branch Road WDB#2 - Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 24.59 Acres Impervious Area = 11.48 Acres Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Inch Rv= 0.47 (Rv = 0.05+0.9*IA) Runoff Volume (V) = 41953 Normal Pool Elevation = 297.00 Temporary Pool Elevation = 299.20 Temporary Pool Volume = Temporary Pool Surface Area = Percentage Oversized (TPV/V) = 49575 25106 118% cf (V = 3630*RD*Rv*A) cf (From HydroCAD Report) sf (From HydroCAD Report) 1886 - WDB#2 Sizing.xls Drawdown Orifice Sizing Matt Jones, PE 10/26/2021 1886 - 1101 Olive Branch Road WDB#2 - Drawdown Calculation Water Quality Drawdown Orifice Sizing 24.34 11.48 3 Ai= Ao= Cd= a= g= HI= T= 25,106 19,043 0.6 0.049 32.2 2.20 in (Orifice Size) sf (Area of pond at the beginning of drawdown) sf (Area of pond at the orifice outlet elevation) (Orifice Coefficient of Discharge) sf Orifice Area (calculated) ft/s` Acceleration of Gravity (constant) ft (Maximum head (t=0)) 3.07 days (Time for water level to fall from HI to Permanent Pool Elevation) 3.5.2 Orifice Equation 3.5.2.1 Drawdown Time Calculations for a Pond with an Orifice Outlet A, dh City of Greensboro Stormwater Management Manual -Orifice Outlet For the specific case where Az = Ao and Hz = 0 1 Cd*a*VZ*8*[r2*A.o* .liiz+2(Al —A0)*H /21] 1886 - WDB#3 Sizing.xls Surface Area Calcs (85% TSS) Matt Jones, PE 12/9/2021 1886 - 1101 Olive Branch Road WDB#3 - Surface Area Drainage Area to Basin = 9.67 acres Impervious Area to Basin = 4.53 acres Impervious Percentage = 47% Avereage Depth (Volume/SA) = 3.00 ft Interpolation to Determine SA/DA Ratio Average Depth (Vol/SA) (ft) Impervious Lower Boundary 40% Site % impervious 47% Upper Boundary 50% 3.0 3.0 3.0 1.73 1.73 1.96 1.96 1.96 2.06 2.06 SA/DA = 1.96 Surface Area Required = 8,256 sf Surface Area Provided = 10,443 sf <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 2007) Percent Impervious Permanent Pool Average Depth (ft) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1886 - WDB#3 Sizing.xls WQ Volume Matt Jones, PE 12/9/2021 1886 - 1101 Olive Branch Road WDB#3 - Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 9.67 Acres Impervious Area = 4.53 Acres Impervious Fraction (IA) = 0.47 Rainfall Depth (RD) = 1.00 Inch Rv= 0.47 (Rv = 0.05+0.9*IA) Runoff Volume (V) = 16498 Normal Pool Elevation = 284.00 Temporary Pool Elevation = 286.00 Temporary Pool Volume = Temporary Pool Surface Area = Percentage Oversized (TPV/V) = 26391 14905 160% cf (V = 3630*RD*Rv*A) cf (From HydroCAD Report) sf (From HydroCAD Report) 1886 - WDB#3 Sizing.xls Drawdown Orifice Sizing Matt Jones, PE 12/9/2021 1886 - 1101 Olive Branch Road WDB#3 - Drawdown Calculation Water Quality Drawdown Orifice Sizing 2 Ai= Ao= Cd= a= g= HI= T= 14,905 10,443 0.6 0.022 32.2 2.00 in (Orifice Size) sf (Area of pond at the beginning of drawdown) sf (Area of pond at the orifice outlet elevation) (Orifice Coefficient of Discharge) sf Orifice Area (calculated) ft/s` Acceleration of Gravity (constant) ft (Maximum head (t=0)) 3.69 days (Time for water level to fall from HI to Permanent Pool Elevation) 3.5.2 Orifice Equation 3.5.2.1 Drawdown Time Calculations for a Pond with an Orifice Outlet A, dh City of Greensboro Stormwater Management Manual -Orifice Outlet For the specific case where Az = Ao and Hz = 0 1 Cd*a*VZ*8*[r2*A.o* .liiz+2(Al —A0)*H /21] 1886 - WDB#4 Sizing.xls Surface Area Calcs (85% TSS) Matt Jones, PE 12/9/2021 1886 - 1101 Olive Branch Road WDB#4 - Surface Area Drainage Area to Basin = 18.50 acres Impervious Area to Basin = 9.23 acres Impervious Percentage = 50% Avereage Depth (Volume/SA) = 3.00 ft Interpolation to Determine SA/DA Ratio Average Depth (Vol/SA) (ft) Impervious Lower Boundary 50% Site % impervious 50% Upper Boundary 50% 3.0 3.0 3.0 2.06 2.06 2.06 2.06 2.06 2.06 2.06 SA/DA = 2.06 Surface Area Required = 16,601 sf Surface Area Provided = 24,451 sf <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 2007) Percent Impervious Permanent Pool Average Depth (ft) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1886 - WDB#4 Sizing.xls WQ Volume Matt Jones, PE 12/9/2021 1886 - 1101 Olive Branch Road WDB#4 - Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 18.50 Acres Impervious Area = 9.23 Acres Impervious Fraction (IA) = 0.50 Rainfall Depth (RD) = 1.00 Inch Rv= 0.50 (Rv = 0.05+0.9*IA) Runoff Volume (V) = 33578 Normal Pool Elevation = 302.00 Temporary Pool Elevation = 303.60 Temporary Pool Volume = Temporary Pool Surface Area = Percentage Oversized (TPV/V) = 45015 30316 134% cf (V = 3630*RD*Rv*A) cf (From HydroCAD Report) sf (From HydroCAD Report) 1886 - WDB#4 Sizing.xls Drawdown Orifice Sizing Matt Jones, PE 12/9/2021 1886 - 1101 Olive Branch Road WDB#4 - Drawdown Calculation Water Quality Drawdown Orifice Sizing 3 Ai= Ao= Cd= a= g= Hi= T= 30,316 24,451 0.6 0.049 32.2 1.60 in (Orifice Size) sf (Area of pond at the beginning of drawdown) sf (Area of pond at the orifice outlet elevation) (Orifice Coefficient of Discharge) sf Orifice Area (calculated) ft/s` Acceleration of Gravity (constant) ft (Maximum head (t=0)) 3.28 days (Time for water level to fall from HI to Permanent Pool Elevation) 3.5.2 Orifice Equation 3.5.2.1 Drawdown Time Calculations for a Pond with an Orifice Outlet A, dh City of Greensboro Stormwater Management Manual -Orifice Outlet For the specific case where Az = Ao and Hz = 0 1 Cd*a*VZ*8*[r2*A.o* .liiz+2(Al —A0)*H /21] 1886 - WDB#5 Sizing.xls Surface Area Calcs (85% TSS) Matt Jones, PE 12/9/2021 1886 - 1101 Olive Branch Road WDB#5 - Surface Area Drainage Area to Basin = 29.53 acres Impervious Area to Basin = 14.97 acres Impervious Percentage = 51% Avereage Depth (Volume/SA) = 3.00 ft Interpolation to Determine SA/DA Ratio Average Depth (Vol/SA) (ft) Impervious Lower Boundary 50% Site % impervious 51% Upper Boundary 60% 3.0 3.0 3.0 2.06 2.06 2.09 2.09 2.09 2.40 2.40 SA/DA = 2.09 Surface Area Required = 26,884 sf Surface Area Provided = 28,583 sf <- from table below <- interpolated <- from table below Surface Area (SA) to Drainage Area (DA) Ratio for Permanent Pool Sizing to Achieve 85 Percent TSS Pollutant Removal Efficiency in the Piedmont (From NCDWQ Stormwater BMP Manual, July 2007) Percent Impervious Permanent Pool Average Depth (ft) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10% 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20% 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30% 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40% 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50% 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60% 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70% 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80% 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90% 3.74 3.10 2.66 2.34 2.11 1.83 1.67 1886 - WDB#5 Sizing.xls WQ Volume Matt Jones, PE 12/9/2021 1886 - 1101 Olive Branch Road WDB#5 - Water Quality Volume Runoff Volume Simple Method Drainage Area (A) = 29.53 Acres Impervious Area = 14.97 Acres Impervious Fraction (IA) = 0.51 Rainfall Depth (RD) = 1.00 Inch Rv= 0.51 (Rv = 0.05+0.9*IA) Runoff Volume (V) = 54669 Normal Pool Elevation = 302.00 Temporary Pool Elevation = 303.80 Temporary Pool Volume = Temporary Pool Surface Area = Percentage Oversized (TPV/V) = 59255 35475 108% cf (V = 3630*RD*Rv*A) cf (From HydroCAD Report) sf (From HydroCAD Report) 1886 - WDB#5 Sizing.xls Drawdown Orifice Sizing Matt Jones, PE 12/9/2021 1886 - 1101 Olive Branch Road WDB#5 - Drawdown Calculation Water Quality Drawdown Orifice Sizing 3 Ai= Ao= Cd= a= g= HI= T= 35,475 28,583 0.6 0.049 32.2 1.80 in (Orifice Size) sf (Area of pond at the beginning of drawdown) sf (Area of pond at the orifice outlet elevation) (Orifice Coefficient of Discharge) sf Orifice Area (calculated) ft/s` Acceleration of Gravity (constant) ft (Maximum head (t=0)) 4.06 days (Time for water level to fall from HI to Permanent Pool Elevation) 3.5.2 Orifice Equation 3.5.2.1 Drawdown Time Calculations for a Pond with an Orifice Outlet A, dh City of Greensboro Stormwater Management Manual -Orifice Outlet For the specific case where Az = Ao and Hz = 0 1 Cd*a*VZ*8*[r2*A.o* .liiz+2(Al —A0)*H /21] Nutrient Loading Calculations DURHAM I I 1869 crc.a.ex.+E CITY OF DURHAM Neuse, Falls Lake and Jordan Lake Developer Nutrient Reporting Form Not required if the project is exempt from pollutant standards per Section 70-739 of the City Code Please complete and submit the following information to the City of Durham Stormwater Services to characterize your project and assess the need to purchase nutrient offsets. See the City of Durham Stormwater Standards. For nutrient offset information, see nutrient offset info PROJECT INFORMATION Applicant Name : Pulte Homes Prepared by : Matt Jones, PE Project Name (& Previous name, if applicable): 1101 Olive Branch Road Site Plan #: D2100088 Project Address (if available): Street: City/Town: County: 1101 Olive Branch Road Date: (mo/d/yr) 5/28/2021 Project Locat'n: Lat: (dec. degrees) 35.960541 Long: (dec. degrees) -768651.000000 PIN/PID #s: 0860-03-84-5286 Is this Redevelopment? ° Yes ° No Development Type (Please check all that apply) Impervious Cover (%) Pre -Construction: ❑ 0 ❑ Commercial ❑ Duplex Residential Industrial o Single -Family Residential Institutional ❑ Multi -Family Residential Mixed Use Impervious Cover (%) Post -Construction: ❑ 28 ❑ WATERSHED INFORMATION (See Jordan map or Falls Lake map) o Upper Falls Basin, 12-digit Watershed ID: ❑ Neuse/Outside of Falls Basin, 03020201 ❑ Jordan Lake (Upper New Hope) 6-digit Small Watershed ID: 030202010304 03020201 Jordan Lake Delivery Factors (%) Nitrogen Phosphorus Site Factor: Site Factor: Neuse/Falls Lake Delivery Factors: There are no delivery factors, so the Delivery Factor = 1. DURHAM STORMWATER PERFORMANCE STANDARDS FOR DEVELOPMENT COMPLIANCE ALTERNATIVE Nutrient loading limits and on -site treatment minimum (Sections 70-740(a) and Sections 70-741(a)) Off -site treatment threshold (%): N: 50 P: 50 Required on -site reduction achieved? N: YES P: YES NUTRIENT OFFSET REQUEST (Must meet the offsite thresholds — see above) Nitrogen Loading / Offset Needs (For the Jordan, Falls, and Neuse/Outside of Falls Watershed areas) (A) (B) (C) (D) (E) (F) (G) (H) (I) (Where Applicable) (J) Untreated Loading Rate (Ibs/ac/yr) Treated Loading Rate (Ibs/ac/yr) Load Rate Target (Ibs/ac/yr) Reduction Needed (Ibs/ac/yr) (from Compl. Worksheet) Project Size (square feet) Offset Duration (yrs) Site Delivery Factor State Buy Down Amount Delivered (Ibs) D* E* F* G Additional 5% if bank not in City limits (Ibs) Total Delivered (Ibs) H + I 4.33 3.21 2.20 1.01 7,819,623 30 1.00 5439.27 271.96 5711.23 Phosphorus Loading / Offset Needs (For the Jordan and Falls Watershed areas) (A) (B) (C) (D) (E) (F) (G) (H) (I) (Where Applicable) (J) Untreated Loading Rate (Ibs/ac/yr) Treated Loading Rate (Ibs/ac/yr) Load Rate Target (Ibs/ac/yr) Reduction Needed (Ibs/ac/yr) (from Compl. Worksheet) Project Size (square feet) Offset Duration (yrs) Site Delivery Factor State Buy Down Amount Delivered (Ibs) D* E* F* G Additional 5% if bank not in City limits (Ibs) Total Delivered (Ibs) H + I 0.73 0.49 0.33 0.16 7,819,623 30 1.00 861.67 43.08 904.75 Responsible Professional Engineer's Name: Matt Jones PE #: 39170 Staff Name: Staff e-mail Phone #: January 9, 2018 Version Watershed (Select from Menu) 1 Falls Lake Basin Jordan Lake Basin Lower Neuse Basin COMPLIANCE WORKSHEET Note that if a nutrient bank is used to buy offset credits in order to achieve compliance with the alternative selected below, the bank must be located in the same watershed as the project site. Compliance Alternative (Pick one alternative, see descriptions and calculations below) 1 0 0 0 Nutrient loading limits and on -site treatment minimum (Sections 70-740(a) and Sections 70-741(a)) Alternative percentage reduction option for Redevelopment that increases impervious area (Section 70- 740(b)) Alternative percentage reduction option for Redevelopment that does not increase impervious area (Section 70-740(c)) Alternative for low impact development in Falls Basin. If the project is Exempt from Stormwater Pollutant standards (Section 70-739), nutrient calculation: Project Area Disturbance (Fill in yellow cell below) 5,358,000 square feet 123.003 acres TABLE 1 THRESHOLDS FOR APPLICATION OF STORMWATER POLLUTANT REQUIREMENTS Project Location Land Disturbance Limited Residential Multifamily & Other Jordan Basin 1 acre 0.5 acres Falls Basin 0.5 acres 12,000 square feet Lower Neuse Basin 1 acre 0.5 acres Note: Thresholds are based upon land disturbance since the applicable basin Baseline date. The Project is Located Outside the Downtown Area (select from menu list) Per Section 70-736, Downtown Area means the Downtown Tier, Compact Neighborhoods, and Suburban Transit Zones as shown on the Durham Comprehensive Land Use Plan most recently approved by the Durham City Council. The Project Type is Limited Residential (select from menu list) Per Section 70-736, Limited Residential means single family and duplex residential and recreational development. Multifamily and Other Development means development not included in Limited Resdiential, and includes but is not limited to multifamily and townhomes, and office, industrial, institutional (including local government institutional), and commercial development. Other key definitions from Section 70-736: Development means Land Disturbance which increases impervious surface on a property, or alters its location, or results in an increase in runoff from a property or a decrease in infiltration of precipitation into the soil. It includes both existing development and new development. It does not include agriculture, mining, or forestry activities. Redevelopment means Development on a site where structures or impervious surface already exists. It is a category of new development. March 30, 2017 Version Nutrient Loading Limits and On -Site Treatment Minimum ORDINANCE REQUIREMENTS Sec. 70-740. (a) Nutrient Loading Rate Limits. Development not exempt under subsection 70-739 shall construct and implement SCMs so as to limit the post construction loading rate of nitrogen and phosphorus from the project area to the limits set forth in Table 2 below, or shall comply with an allowed alternative as set forth in (b) through (d) below. A portion of the reduction requirements for nitrogen and phosphorus may be met through off site measures or payments as set forth in 70-741. TABLE 2 NUTRIENT EXPORT LOADING RATE LIMITS Project Location Export Limit Ibs/acre/year Nitrogen Phosphorus Jordan Basin 2.2 0.82 Falls Basin 2.2 0.33 Lower Neuse Basin 3.6 not required Sec. 70-741 (a) On site nutrient treatment requirements. Nitrogen and phosphorus reduction requirements may be met, in part, through offsite management measures or the purchase of nutrient credits. At a minimum, however, in the Jordan and Falls Basins a percentage of the required nitrogen and phosphorus reductions must be achieved through onsite treatment, in the amount shown in Table 4 below. In addition to meeting the percentage reductions below, in the Jordan and Lower Neuse Basins, nitrogen export load from the site must not exceed 6 Ibs. per acre per year for Limited Residential, and and 10 Ibs per acre per year for Multifamily and Other. (Note: offsite credit purchases do not meet TSS removal requirements, which must be met onsite.) TABLE 4 ONSITE NUTRIENT TREATMENT REQUIREMENTS Project Minimum Onsite Nutrient Treatment Nitrogen Phosphorus Jordan -General *40% of required reduction *40% of required reduction Falls -General *50% of required reduction *50% of required reduction Falls and Jordan within Downtown Area *30% of required reduction *30% of required reduction March 30, 2017 Version Falls and Jordan exceeding thresholds but with less than 1 acre land disturbance *30% of required reduction *30% of required reduction Lower Neuse No percentage reductions apply, but the 6/10 nitrogen export limit described in paragraph (a) above must be met No percentage reductions apply, but the 6/10 nitrogen export limit described in paragraph (a) above must be met *The "required reduction" is the difference between the post development loading in pounds per acre per year multiplied by the site area in acres before treatment minus the loading target, in pounds per acre per year multiplied by the acres. The percentage shown in the chart above is applied to that difference and the resulting number is the amount in pounds/year of nutrient reduction that must be achieved onsite. CALCULATIONS - ENTER VALUES IN YELLOW CELLS Nitrogen Post Loading Rate Untreated (Ibs/ac/yr) Post Loading Rate Treated (Ibs/ac/yr) Load Rate Target (Ibs/ac/yr) Reduction Needed (Ibs/ac/yr) 4.33 3.21 2.2 1.01 Phosphorus Post Loading Rate Untreated (Ibs/ac/yr) Post Loading Rate Treated (Ibs/ac/yr) Load Rate Target (Ibs/ac/yr) Reduction Needed (Ibs/ac/yr) 0.73 0.49 0.33 0.16 ONSITE CALCULATIONS - ENTER VALUE IN YELLOW CELLS BASED ON TABLE 4 Onsite Reduction Required (%) Required Onsite Reduction Achieved? Nitrogen Phosphorus 50 YES YES In the Jordan and Lower Neuse Basins, the nitrogen export loading rate from the site does not exceed 6 Ib/ac/yr for Limited Residential, or 10 Ib/ac/yr for Multifamily and Other. N/A March 30, 2017 Version Project Information Project Name: 1101 Olive Branch Road Submission Date: 10/26/2021 Project Area (ft2): 7,819,623 ft2 Disturbed Area (ft2): 5,358,000 ft2 Development Land Use Type: Single Family Residential Development Activity Type: Development - New Designated Downtown Area? no Project Location/Address: 1101 Olive Branch Road County: Durham Local Jurisdiction: Durham Project Latitude Coordinates: 35.960541 N Project Longitude Coordinates: -78.768573 W Precipitation Station: Durham Physiographic Region: Triassic Basin Nutrient Management Watershed: Falls Lake Subwatershed: Falls - Upper Phosphorus Delivery Zone: Falls - Upper Nitrogen Delivery Zone: Falls - Upper Project Designer and Contact Phone Number / Email: Matt Jones, PE / 919-490-4990 / matt.jones@horvi Part of Common Development Plan? no Project Owner Type: Private Project Description: Townhomes and Single -Family Project Area Land Cover Characteristics PROJECT AREA LAND COVERS TN TP EMC EMC (mg/L) (mg/L) Pre- Post - Project I Project Area (ft2) Area (ft2) Roof 1.18 0.11 902,242 Roadway 1.64 0.34 560,000 Parking/Driveway/Sidewalk 1.42 0.18 695,558 Protected Forest 0.97 0.03 7,819,623 2,310,400 Other Pervious/Landscaping 2.48 1.07 3,238,120 CUSTOM LAND COVER 1 CUSTOM LAND COVER 2 CUSTOM LAND COVER 3 LAND TAKEN UP BY SCM 1.18 0.11 113,303 LAND COVER AREA CHECK Net Change of Land Covers (ft2): Total Project Area Entered (ft2): Total Pre -Project Calculated Area (ft2): Total Post -Project Calculated Area (ft2): 5,509,223 7,819,623 7,819,623 7,819,623 Equations Used and Project Area Calculations S I M P L E METHOD Stormwater Runoff Volume Generated, V Runoff Coefficient R V = Pj* Rv * (P/12) *A R„ = 0.05 + (0.009 *I) where A = drainage area (ft2) where I = percent impervious (%) Pj = fraction of rain events with runoff Average Annual Pollutant Load, L P = average annual rainfall depth (in) L= (Pj*R„*(P/12))*(C*A*2.72) where C = event mean concentration (mg/L) Pre -Project: Post -Project: A = 179.5138 ac P= 47.81 in. V = 1401961 ft3 1= 0% Rv = 0.05 Pi = 0.9 CTN = 0.97 mg/L CTP = 0.03 mg/L LTN = 84.92 Ib/yr LTP = 2.63 Ib/yr A = 179.5138 ac P = 47.81 in. V = 8751521 ft3 I = 29% Rv = 0.31 Pi = 0.9 CTN = 1.42 mg/L CTP = 0.24 mg/L LTN = 776.83 Ib/yr LTP = 130.60 Ib/yr . \ . :!!!e ) \ :, . . ,!!,s «,j `; a , \ \ . o \ . ;\ 1!H ; || { . !\ \ mi !!! { . . . !,!!e , a.j \ S! ) \ e O ) . 9 2 | 8 {; . : . . Proiect Summa Durham Private 0 Falls - Upper Falls - Upper %00Z 2.20 0Mi 01 m 576.80 4.76 a oo M LID 000 oo r-I o ` oo oo r-I Nitrogen Delivery Factor (%): Nitrogen Loading Rate Target (Ib/ac/yr): Nitrogen Load Target at Site (Ib/yr): Nitrogen Load Leaving Site w/SCMs (Ib/yr): N Offsite Buy -Down Threshold Loading Rate Total N Load Reduction Needed (Ib/yr): N Load Treatment Balance at Site (Ib/yr): N Load Treatment Balance at Lake (Ib/yr): 7,819,623 ft2 179.5138 acres 5,358,000 ftL 123.0028 acres Local Jurisdiction: Owner Type: Designated Downtown Area? Subwatershed: Nitrogen Delivery Zone: Durham Single Family Residential Development - New Falls Lake Falls - Upper %00Z rn M O 59.24 N oo 000 N O M N co Q1 N co Q1 oo N Phosphorus Delivery Factor (%): Phosphorus Loading Rate Target (Ib/ac/yr): Phosphorus Load Target at Site (Ib/yr): Phosphorus Load Leaving Site w/SCMs (Ib/yr): P Offsite Buy -Down Threshold Loading Rate (Ib/ac/yr): Total P Load Reduction Needed (Ib/yr): P Load Treatment Balance at Site (Ib/yr): P Load Treatment Balance at Lake (Ib/yr): Project Name: Project Area (ft2): Disturbed Area (ft2): County: Development Land Use Type: Development Activity Type: Nutrient Management Watershed: Phosphorus Delivery Zone: Disturbed Area. 4-0 MS U aj G1 4, •RI o a) cdi o a v ~ a o v a V1 2 N without SCMs Conditions ort Summar Nutrient Ex 0.0% 0.0% 630,326 58.54 N O m O N •c-I r�1 41 O 0 00 N Ln o r-I O in 6,906,266 1.20 in NI 00 ri in 5.25 0.17 73.02 0.74 0 O N 0 l0 NIenu1 r1 LcP1 , Ln 438% 1.22 576.80 N al rO-I O 88.23 01 CS O N 27.6% 8,751,521 524% d- r1 m wO Is. n 4.33 815% N O 130.60 N Q 0.0% 0.0% l0 01 0 r� o O 0.97 84.92 0.47 o 0 0.03 CA t0 N ey O O Percent Impervious (for runoff calculation) (%) Percent Built -Upon Area (BUA) (%) Annual Runoff Volume (ft3/yr) Annual Runoff % Change (relative to pre-D) Total Nitrogen EMC (mg/L) Total Nitrogen Load Leaving Site (Ib/yr) Total Nitrogen Loading Rate (Ib/ac/yr) Total Nitrogen % Change (relative to pre-D) Total Phosphorus EMC (mg/L) Total Phosphorus Load Leaving Site (Ib/yr) Total Phosphorus Loading Rate (Ib/ac/yr) 0 O l0 N m O m 00 0 O Total Phosphorus % Change (relative to pre-D) SCM/Catchment Summary TP Reduction (%) TN Reduction 0 4 J ao E 4J 0 a J dCo C 0 z H v E 0 0 .4J w0 v CC SCM ID and Type c'' 00 l0 m Oin in 00 l0 m 0.00% 0.00% ON. O Cr; m ON. O m m 0.00% 0.00% Or-i r'I 00 m Or-i r'I 00 m 0.00% 0.00% O N. I,: m O N. I,: m 0.00% 0.00% O r'I 00 m O NI 4 m 0 O 6 0.00% 0.00% 0.00% 0.00% 0.00% 0 ill O N 0 Ifl O N 0.00% 0.00% 0 d' 00 r-I 0 d' 00 r-I 0.00% 0.00% 0 1.0 O N 0 1.0 O N 0.00% 0.00% 0 m ul N 0 m u'1 N 0.00% 0.00% 43.53% 0 O al r-I 0 N O m 0.00% 0.00% 0.00% 0.00% 0.00% CO O 0.81 0.00 0.00 0.74 0.74 0.00 O O 0.75 0.75 O O O O kD O k0 O O O 0.00 N. O N O 0.72 0.00 0.00 0.00 0.00 O O O N Lo O N Qo O O O O O O 5.72 5.72 O O O O O O 5.64 5.64 O O O O O O M M ul M M ul O O O O O O r1 r-I et: 5.89 r1 r-I et: 0 0 O 0 0 O 0 0 O 0 0 O 0 0 O O 0.17 O O O O , a—Ia—I O , O O O O O 0.17 0.17 OO,,OO O O a —I O a —I O O O Ot -1 O � r-I O Ot rl O OOOOO-1 O O O O O l0 N r-. l0 N r-. O O O O O O Lfl N r-. Lfl N r-. O O O O O O l0 N r-. l0 N r-. O O O O O O Lfl N r-. Lfl N r-. O O O O O O 1.07 Lfl N r-. 1.07 O O O O O O O O O O O O O O O 8.44% 8.44% 0.00% 0.00% 8.44% 8.44% 0.00% 0.00% 8.44% 8.44% 0.00% 0.00% 00 00 00 l0 r-I 00 00 1.0 r-I 0.00% 0.00% 0 N al 4 N 8.44% 18.00% 0.00% 0.00% 0.00% 0.00% 0.00% Catchment 1 101: Wet Pond per MDC 102: NA Z m 0 r-1 Catchment 2 201: Wet Pond per MDC 202: NA 203: NA Catchment 3 301: Wet Pond per MDC 302: NA Z m 0 m Catchment 4 401: NA 402: NA 403: NA Catchment 5 Z e.1 0 Li-) 502: NA 503: NA Catchment 6 Z e.1 0 l0 Z N 0 l0 603: NA Peak Runoff Analysis SIA - SUMMARY OF RESULTS.xls Matt Jones, PE Summary of Results 1886 - 1101 Olive Branch Road Runoff Analysis - Summary of Results DP#1 Site Condition Storm Event 1-Year (cfs) 2-year (cfs) 10-year (cfs) Pre -Development 8.86 12.13 22.15 Post -Development without Detention 60.79 75.46 116.99 Post -Development with Detention 2.82 3.48 5.41 Post -Development with Detention Percent Increase -68.17% -71.31% -75.58% DP#2 Site Condition Storm Event 1-Year (cfs) 2-year (cfs) 10-year (cfs) Pre -Development 5.07 N/A N/A Post -Development without Detention 78.87 N/A N/A Post -Development with Detention 4,06 N/A N/A Post -Development with Detention Percent Increase -19.92% N/A N/A DP#3 Site Condition Storm Event 1-Year (cfs) 2-year (cfs) 10-year (cfs) Pre -Development 2.85 N/A* N/A* Post -Development without Detention 28.86 N/A* N/A* Post -Development with Detention 2.53 N/A* N/A* Post -Development with Detention Percent Increase -11.23% N/A* N/A* DP#4 Site Condition Storm Event 1-Year (cfs) 2-year (cfs) 10-year (cfs) Pre -Development 1.62 N/A N/A Post -Development without Detention 53.02 N/A N/A Post -Development with Detention 1.53 N/A N/A Post -Development with Detention Percent Increase -5.56% N/A N/A DP#5 Site Condition Storm Event 1-Year (cfs) 2-year (cfs) 10-year (cfs) Pre -Development 3.91 N/A N/A Post -Development without Detention 91.71 N/A N/A Post -Development with Detention 2.46 N/A N/A Post -Development with Detention Percent Increase -37.08% N/A N/A *Site to Drainage Area Analysis provided for 2- and 10-year storms D P#2 Subcat DP#2 Subcat DP #1 Subcat Reach Subcat DP#3 Subcat DP#4 Subcat DP#5 Routing Diagram for SIA PRE Prepared by {enter your company name here}, Printed 8/5/2021 HydroCAD® 10.10-5a s/n 03736 ©2020 HydroCAD Software Solutions LLC SIA PRE Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 8/5/2021 HydroCAD® 10.10-5a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 2 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DP #1: Subcat DP #1 Subcatchment DP#2: Subcat DP#2 Subcatchment DP#3: Subcat DP#3 Runoff Area=6.69 ac 10.01% Impervious Runoff Depth> 1.17" Flow Length=804' Tc=16.8 min CN=WQ Runoff=8.86 cfs 0.654 af Runoff Area=3.50 ac 0.00% Impervious Runoff Depth>1.07" Flow Length=1,108' Tc=12.8 min CN=77 Runoff=5.07 cfs 0.311 af Runoff Area=1.85 ac 0.00% Impervious Runoff Depth>1.07" Flow Length=753' Tc=11.1 min CN=77 Runoff=2.85 cfs 0.165 of Subcatchment DP#4: Subcat DP#4 Runoff Area=6.23 ac 0.00% Impervious Runoff Depth>0.34" Flow Length=1,173' Tc=17.3 min CN=WQ Runoff=1.62 cfs 0.179 af Subcatchment DP#5: Subcat DP#5 Runoff Area=9.22 ac 0.00% Impervious Runoff Depth>0.45" Flow Length=1,667' Tc=16.2 min CN=WQ Runoff=3.91 cfs 0.349 af SIA PRE Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 8/5/2021 HydroCAD® 10.10-5a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment DP #1: Subcat DP #1 Runoff = 8.86 cfs @ 12.10 hrs, Volume= 0.654 af, Depth> 1.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 0.65 55 Forest, good, HSG B 5.37 77 Forest, good, HSG D 0.03 98 Roof, good, HSG D 0.64 100 Water Surface, good, HSG D 6.69 Weighted Average 6.02 75 89.99% Pervious Area 0.67 100 10.01% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.09 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.2 307 0.0680 4.20 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 241 9.83 Lake or Reservoir, Mean Depth= 3.00' 0.7 181 0.0280 4.48 8.95 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 16.8 804 Total Summary for Subcatchment DP#2: Subcat DP#2 Runoff = 5.07 cfs @ 12.06 hrs, Volume= 0.311 af, Depth> 1.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 3.50 77 Forest, good, HSG D 3.50 77 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.4 75 0.0800 0.13 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.0 356 0.1400 6.02 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.4 677 0.0300 4.63 9.27 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 12.8 1,108 Total SIA PRE Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 8/5/2021 HydroCAD® 10.10-5a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment DP#3: Subcat DP#3 Runoff = 2.85 cfs @ 12.04 hrs, Volume= 0.165 af, Depth> 1.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 1.85 77 Forest, good, HSG D 1.85 77 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.2 75 0.1100 0.15 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.9 678 0.0590 3.91 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 11.1 753 Total Summary for Subcatchment DP#4: Subcat DP#4 Runoff = 1.62 cfs @ 12.13 hrs, Volume= 0.179 af, Depth> 0.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 5.14 55 Forest, good, HSG B 1.09 77 Forest, good, HSG D 6.23 Weighted Average 6.23 59 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.4 75 0.0400 0.10 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.0 570 0.0880 4.78 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.9 528 0.0130 3.05 6.10 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 17.3 1,173 Total Summary for Subcatchment DP#5: Subcat DP#5 Runoff = 3.91 cfs @ 12.11 hrs, Volume= 0.349 af, Depth> 0.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" SIA PRE Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 8/5/2021 HydroCAD® 10.10-5a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 5 Area (ac) CN Description 6.46 55 Forest, good, HSG B 2.77 77 Forest, good, HSG D 9.22 Weighted Average 9.22 62 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 9.3 75 0.0810 0.13 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.8 838 0.0950 4.96 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 4.1 754 0.0130 3.05 6.10 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 16.2 1,667 Total Subcat Reach <DP#i> Subcat DP #1 Routing Diagram for SIA PRE Prepared by {enter your company name here}, Printed 8/5/2021 HydroCAD® 10.10-5a s/n 03736 ©2020 HydroCAD Software Solutions LLC SIA PRE Type 11 24-hr 2-Year Rainfall=3.57" Prepared by {enter your company name here} Printed 8/5/2021 HydroCAD® 10.10-5a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 2 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DP #1: Subcat DP #1 Runoff Area=6.69 ac 10.01% Impervious Runoff Depth>1.58" Flow Length=804' Tc=16.8 min CN=WQ Runoff=12.13 cfs 0.878 af Total Runoff Area = 6.69 ac Runoff Volume = 0.878 af Average Runoff Depth = 1.58" 89.99% Pervious = 6.02 ac 10.01% Impervious = 0.67 ac SIA PRE Type 11 24-hr 2-Year Rainfall=3.57" Prepared by {enter your company name here} Printed 8/5/2021 HydroCAD® 10.10-5a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment DP #1: Subcat DP #1 Runoff = 12.13 cfs @ 12.10 hrs, Volume= 0.878 af, Depth> 1.58" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 0.65 55 Forest, good, HSG B 5.37 77 Forest, good, HSG D 0.03 98 Roof, good, HSG D 0.64 100 Water Surface, good, HSG D 6.69 Weighted Average 6.02 75 89.99% Pervious Area 0.67 100 10.01% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.09 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.2 307 0.0680 4.20 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 241 9.83 Lake or Reservoir, Mean Depth= 3.00' 0.7 181 0.0280 4.48 8.95 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 16.8 804 Total SIA PRE Type 11 24-hr 10-Year Rainfall=5.15" Prepared by {enter your company name here} Printed 8/5/2021 HydroCAD® 10.10-5a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 4 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DP #1: Subcat DP #1 Runoff Area=6.69 ac 10.01% Impervious Runoff Depth>2.81" Flow Length=804' Tc=16.8 min CN=WQ Runoff=22.15 cfs 1.568 af Total Runoff Area = 6.69 ac Runoff Volume = 1.568 af Average Runoff Depth = 2.81" 89.99% Pervious = 6.02 ac 10.01% Impervious = 0.67 ac SIA PRE Type 11 24-hr 10-Year Rainfall=5.15" Prepared by {enter your company name here} Printed 8/5/2021 HydroCAD® 10.10-5a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment DP #1: Subcat DP #1 Runoff = 22.15 cfs © 12.09 hrs, Volume= 1.568 af, Depth> 2.81" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.15" Area (ac) CN Description 0.65 55 Forest, good, HSG B 5.37 77 Forest, good, HSG D 0.03 98 Roof, good, HSG D 0.64 100 Water Surface, good, HSG D 6.69 Weighted Average 6.02 75 89.99% Pervious Area 0.67 100 10.01% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 14.5 75 0.0270 0.09 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 1.2 307 0.0680 4.20 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 241 9.83 Lake or Reservoir, Mean Depth= 3.00' 0.7 181 0.0280 4.48 8.95 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 16.8 804 Total D P4 CDP#9 Subcat DP#1 Subcat <WDB#> Subcat WDB #3 WDB#3 <DP#2> Subcat DP#2 WDB#2 Subcat WDB #2 WDB#1 Reach (A/D13#1) Subcat WDB #1 DP#3 4 DP#4 DP#5 <WDB#> Subcat WDB #4 WDB#4 CDP#4) Subcat DP#4 CDP#5) Subcat DP#5 WDB#5 CWDB #5) Subcat WDB #5 Routing Diagram for 1886 SIA POST Prepared by {enter your company name here}, Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 ©2020 HydroCAD Software Solutions LLC 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD© 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 2 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method SubcatchmentDP#1: Subcat DP#1 Runoff Area=0.54 ac 0.00% Impervious Runoff Depth>0.41" Tc=5.0 min CN=WQ Runoff=0.31 cfs 0.019 af SubcatchmentDP#2: Subcat DP#2 Runoff Area=1.89 ac 0.00% Impervious Runoff Depth>1.10" Flow Length=196' Slope=0.0930 '/' Tc=9.2 min CN=WQ Runoff=3.24 cfs 0.174 af Subcatchment DP#4: Su bcat DP#4 Runoff Area=4.04 ac 0.00% Impervious Runoff Depth>0.29" Flow Length=960' Tc=10.9 min CN=WQ Runoff=0.93 cfs 0.096 af Subcatchment DP#5: Su bcat DP#5 Runoff Area=2.80 ac 0.00% Impervious Runoff Depth>0.29" Flow Length=603' Tc=13.0 min CN=WQ Runoff=0.62 cfs 0.069 af SubcatchmentWDB #1: SubcatWDB #1 Runoff Area=18.89 ac 53.36% Impervious Runoff Depth>2.07" Tc=5.0 min CN=WQ Runoff=62.87 cfs 3.252 af SubcatchmentWDB #2: SubcatWDB #2 Runoff Area=24.59 ac 48.47% Impervious Runoff Depth>1.99" Tc=5.0 min CN=WQ Runoff=79.44 cfs 4.075 af SubcatchmentWDB #3: SubcatWDB #3 Runoff Area=9.67 ac 49.33% Impervious Runoff Depth>1.91" Tc=5.0 min CN=WQ Runoff=29.52 cfs 1.538 af SubcatchmentWDB #4: SubcatWDB #4 Runoff Area=18.50 ac 52.97% Impervious Runoff Depth>1.86" Tc=5.0 min CN=WQ Runoff=53.68 cfs 2.862 af SubcatchmentWDB #5: Subcat WDB #5 Runoff Area=29.53 ac 52.93% Impervious Runoff Depth>1.99" Tc=5.0 min CN=WQ Runoff=93.85 cfs 4.893 af Pond 6P: WDB#1 Peak Elev=354.48' Storage=88,181 cf Inflow=62.87 cfs 3.252 af Outflow=2.79 cfs 2.041 af Pond 7P: WDB#2 Peak EIev=302.09' Storage=133,228 cf Inflow=79.44 cfs 4.075 af Outflow=1.06 cfs 1.121 af Pond 8P: WDB#3 Peak EIev=285.93' Storage=25,353 cf Inflow=29.52 cfs 1.538 af Outflow=2.53 cfs 1.535 af Pond 9P: WDB#4 Peak EIev=305.11' Storage=93,512 cf Inflow=53.68 cfs 2.862 af Outflow=0.76 cfs 0.801 af Pond 10P: WDB#5 Peak EIev=306.08' Storage=146,657 cf Inflow=93.85 cfs 4.893 af Outflow=2.19 cfs 2.136 af Link 1: DP#1 Inflow=2.82 cfs 2.060 af Primary=2.82 cfs 2.060 af Link 2: DP#2 Inflow=4.06 cfs 1.295 af Primary=4.06 cfs 1.295 af 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 3 Link 3: DP#3 Link 4: DP#4 Link 5: DP#5 Inflow=2.53 cfs 1.535 af Primary=2.53 cfs 1.535 af Inflow=1.53 cfs 0.897 af Primary=1.53 cfs 0.897 af Inflow=2.46 cfs 2.204 af Primary=2.46 cfs 2.204 af Total Runoff Area = 110.46 ac Runoff Volume = 16.978 af Average Runoff Depth = 1.84" 52.74% Pervious = 58.26 ac 47.26% Impervious = 52.20 ac 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment DP#1: Subcat DP#1 Runoff = 0.31 cfs @ 11.99 hrs, Volume= Routed to Link 1 : DP#1 0.019 af, Depth> 0.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 0.51 61 Open, good, HSG B 0.03 80 Open, good, HSG D 0.54 Weighted Average 0.54 62 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 0.34� 0.32� z o.z8� 0.26� 0.24," 0.22 , 0.2 - 0.18� 3 0 LL 0.14� 0.12� 0.1 0.08," 0.061 0.041 0.02� Subcatchment DP#1: Subcat DP#1 Hydrograph + 0.31 cfs L Type 11 2 1ir 1-Year- Rai n-f II 3 00"- - Runoff Area-0.54 ac Rijn-qff VV Iume='�0.O19 of - Runoff Depth!0.4i" Tc=i5.0xnt cN=1NQ - r L 0 1 2 3 4 5 6 7 8 9 10 11 12 13 Time (hours) 14 15 16 17 18 19 20 21 22 23 24 • Runoff 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment DP#2: Subcat DP#2 Runoff = 3.24 cfs @ 12.01 hrs, Volume= Routed to Link 2 : DP#2 0.174 af, Depth> 1.10" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 1.51 77 Forest, good, HSG D 0.38 80 Open, good, HSG D 1.89 Weighted Average 1.89 78 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.8 75 0.0930 0.14 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 0.4 121 0.0930 4.91 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 9.2 196 Total 3—' 2 -' 0 Subcatchment DP#2: Subcat DP#2 Hydrograph Type -u-24yhr 1-Year Rainfall=3.00" Runoff Aroa=1 89 ac Runoff VojIueie=O.174 Runoff Depth> FIoW Length^1 $lope=Q.0930 '1' tc=9.2 rnin CNTWQ 1.10" 96' 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment DP#4: Subcat DP#4 Runoff = 0.93 cfs @ 12.07 hrs, Volume= Routed to Link 4 : DP#4 0.096 af, Depth> 0.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 1.84 55 Forest, good, HSG B 2.20 61 Open, good, HSG B 4.04 Weighted Average 4.04 58 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.7 75 0.0670 0.19 Sheet Flow, Grass: Dense n= 0.240 P2= 3.50" 1.3 357 0.0840 4.67 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 2.9 528 0.0130 3.05 6.10 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 10.9 960 Total 0 0 Subcatchment DP#4: Subcat DP#4 Hydrograph type II 24 hr, 1-Year Ra nfal l=3.00" Runoff Aroa=4 04 ac Ruiioff Voluime=O.096 Runoff Depth>0.29' Flo* Length=960' Tc=10.9 min N=WQ 0 �l��l������, 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Time (hours) a 15 16 17 18 19 20 21 22 23 24 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment DP#5: Subcat DP#5 Runoff = 0.62 cfs @ 12.09 hrs, Volume= Routed to Link 5 : DP#5 0.069 af, Depth> 0.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 1.93 55 Forest, good, HSG B 0.09 77 Forest, good, HSG D 0.70 61 Open, good, HSG B 0.08 80 Open, good, HSG D 2.80 Weighted Average 2.80 58 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.1 75 0.0670 0.12 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.50" 2.9 528 0.0130 3.05 6.10 Channel Flow, Area= 2.0 sf Perim= 4.0' r= 0.50' n= 0.035 13.0 603 Total 0.65� 0.55� 0.5 0.45� • 0.35� • = LT_ 0.3J 0.25� 0.05 Subcatchment DP#5: Subcat DP#5 Hydrograph 0.62 cfs type ll 4.hr 1-Year Rainfall=i00" Runoff Area=2.80 ac Runoff 069 a Runoff ©eptlr>0.29��- Flow 1Le;ngth=603'- - - Tc=1$.0min 4N=Q 9 10 11 12 13 14 Time (hours) L L i T 15 16 17 18 19 20 21 22 23 24 • Runoff 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment WDB #1: Subcat WDB #1 Runoff = 62.87 cfs @ 11.95 hrs, Volume= 3.252 af, Depth> 2.07" Routed to Pond 6P : WDB#1 Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 0.03 61 Open, good, HSG B 8.78 80 Open, good, HSG D 0.08 98 Roadway, good, HSG B 2.95 98 Roadway, good, HSG D 2.69 98 Roof, good, HSG D 0.70 100 SCM, good, HSG D 0.03 98 Sidewalk, good, HSG B 3.63 98 Sidewalk, good, HSG D 18.89 Weighted Average 8.81 80 46.64% Pervious Area 10.08 98 53.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0 0 LL 5.0 Direct Entry, 70, 65J 60: 55: 50- 45- 40- 35- 30� 25 20 15- 10- Subcatchment WDB #1: Subcat WDB #1 Hydrograph r 62.87 cfs r +--+--+-_+ F r r r T T Type I-124-hr 1 TYear Rair faIIT3.100" Rwnbff Arrea=1889 aP r r r Rungffl Vglyme='13.252o Ru-noff Deptk>2-O7”� - TcT5.0 ruin r tN=WQ r r 0 Kra. ...... i� iZ i i 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ■ Runoff 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment WDB #2: Subcat WDB #2 Runoff = 79.44 cfs @ 11.95 hrs, Volume= 4.075 af, Depth> 1.99" Routed to Pond 7P : WDB#2 Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 12.67 80 Open, good, HSG D 2.55 98 Roadway, good, HSG D 5.53 98 Roof, good, HSG D 0.44 100 SCM, good, HSG D 3.40 98 Sidewalk, good, HSG D 24.59 Weighted Average 12.67 80 51.53% Pervious Area 11.92 98 48.47% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 85-' 80- 75 70 65� 60� 55 ai 50� 3 45 .2 401 351 301 25- 201 15� 10� 5L Subcatchment WDB #2: Subcat WDB #2 Hydrograph r 4- L 79.44 cfs y r 4, Typ H;24hr tt 1zYear_ Rainfalha.O0" _ R rrbff-Arrea=24ZS a� nOff'-V-lµme=4.O7_5 a - Ri noff Depth 1.99 r 0 1 2 3 6 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Runoff 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment WDB #3: Subcat WDB #3 Runoff = 29.52 cfs @ 11.95 hrs, Volume= 1.538 af, Depth> 1.91" Routed to Pond 8P : WDB#3 Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 1.03 61 Open, good, HSG B 3.87 80 Open, good, HSG D 0.26 98 Roadway, good, HSG B 1.20 98 Roadway, good, HSG D 0.23 98 Roof, good, HSG B 1.32 98 Roof, good, HSG D 0.24 100 SCM, good, HSG D 0.48 98 Sidewalk, good, HSG B 1.04 98 Sidewalk, good, HSG D 9.67 Weighted Average 4.90 76 50.67% Pervious Area 4.77 98 49.33% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 32� 30� 28 26� 24� 22- 107- 8- 6� 4- 2- Subcatchment WDB #3: Subcat WDB #3 Hydrograph + - -+ 29.52 cfs L L L 0 Yl�fr/�f/SSfr/Sf/rFi 1 0 1 2 3 4 r L L Ty pe11 24=hr - 1..Year RainfaIIT3.00" T Rtthoff Ara.-916- ae - LJnOff`YQIum,e=1.$38-af Off L L H Depth>1_91" Tc .O i L L L yl ICN= 11/ L L L L L + + + + L L L L L L L ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,, 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Runoff 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment WDB #4: Subcat WDB #4 Runoff = 53.68 cfs @ 11.95 hrs, Volume= 2.862 af, Depth> 1.86" Routed to Pond 9P : WDB#4 Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 4.25 61 Open, good, HSG B 4.45 80 Open, good, HSG D 1.01 98 Roadway, good, HSG B 1.04 98 Roadway, good, HSG D 2.50 98 Roof, good, HSG B 2.08 98 Roof, good, HSG D 0.29 100 SCM, good, HSG B 0.28 100 SCM, good, HSG D 1.20 98 Sidewalk, good, HSG B 1.40 98 Sidewalk, good, HSG D 18.50 Weighted Average 8.70 71 47.03% Pervious Area 9.80 98 52.97% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 60� 55� 50: 45— 30: o = LT_ 251- 20: 151- 10— Subcatchment WDB #4: Subcat WDB #4 Hydrograph L ▪ -r 53.68 cfs Y r r Type-H- 24-hi - 1 Yea-r- Rai i all43.(A" -- -- Runoff -Me =1-8 5Gat-- RungffrVpluine=2.$6 �# 1--kuinaff Deptk>1.86"� - 4- ✓ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Runoff 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment WDB #5: Subcat WDB #5 Runoff = 93.85 cfs @ 11.95 hrs, Volume= 4.893 af, Depth> 1.99" Routed to Pond 10P : WDB#5 Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 1-Year Rainfall=3.00" Area (ac) CN Description 0.08 77 Forest, good, HSG D 2.29 61 Open, good, HSG B 11.53 80 Open, good, HSG D 1.13 98 Roadway, good, HSG B 2.64 98 Roadway, good, HSG D 1.00 98 Roof, good, HSG B 5.37 98 Roof, good, HSG D 0.66 100 SCM, good, HSG D 0.89 98 Sidewalk, good, HSG B 3.94 98 Sidewalk, good, HSG D 29.53 Weighted Average 13.90 77 47.07% Pervious Area 15.63 98 52.93% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment WDB #5: Subcat WDB #5 Hydrograph 105-'T 100" 95 90" L 85"+ 80' fi 75" 70 65" y 60 ▪ 55"�k c 50"� LL 45' 40 35 30' L 25 20� k 15'� 10_ T T r 93.85 cfs 4- 1- 1- + r + r 1- T L 1 1- 1- + r + r r LL L 1- 1- + r I- T r r + ✓ r T ✓ r Type IF 24=hir - 1-Year Rainfal l=*.-00E` - + + r I I + + Winciff Al!ea=2953 at - Run4- V41tna;a4.89 At - ku,noff Depth> 99" - Tc5.0CR=nif 0{(�} II II / 4' 1 1 1 I + - - + I -+--+ T 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Runoff 1886 SIA POST Prepared by {enter your company name here} HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Type 11 24-hr 1-Year Rainfall=3.00" Printed 12/9/2021 Page 13 Inflow Area = Inflow = Outflow = Primary = Summary for Pond 6P: WDB#1 18.89 ac, 53.36% Impervious, Inflow Depth > 2.07" for 1-Year event 62.87 cfs @ 11.95 hrs, Volume= 3.252 af 2.79 cfs @ 13.18 hrs, Volume= 2.041 af, Atten= 96%, Lag= 73.6 min 2.79 cfs @ 13.18 hrs, Volume= 2.041 af Routed to Link 1 : DP#1 Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 354.48' @ 13.18 hrs Surf.Area= 38,923 sf Storage= 88,181 cf Plug -Flow detention time= 337.9 min calculated for 2.037 af (63% of inflow) Center -of -Mass det. time= 227.8 min (1,003.5 - 775.8 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 352.00 352.50 362.00 352.00' Surf.Area (sq-ft) 30,383 34,023 57,578 451,206 cf Device Routing Invert Custom Stage Data (Prismatic)Listed below (Recalc) I nc. Store (cubic -feet) 0 16,102 435,105 Outlet Devices Cum.Store (cubic -feet) 0 16,102 451,206 #1 Primary 347.00' #2 Device 1 #3 Device 1 352.00' 353.20' 36.0" Round Culvert L= 50.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 347.00' / 346.50' S= 0.0100 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads 12.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=2.80 cfs @ 13.18 hrs HW=354.48' (Free Discharge) 4-1=Culvert (Passes 2.80 cfs of 83.20 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.36 cfs @ 7.38 fps) 3=Orifice/Grate (Orifice Controls 2.43 cfs @ 4.87 fps) 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 14 70-1 65▪ 'I ::t:: I 45J 'r m 40-- 1 u = 35- 0 30� 25� i 151 ▪ �r 10L" 5� L L ▪ 1-1 ▪ L L I I -11 Pond 6P: WDB#1 Hydrograph I I L I r Storane=88y'E811-cf - I I I i I 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Inflow • Primary 1886 SIA POST Prepared by {enter your company name here} HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Type 11 24-hr 1-Year Rainfall=3.00" Printed 12/9/2021 Page 15 Inflow Area = Inflow = Outflow = Primary = Summary for Pond 7P: WDB#2 24.59 ac, 48.47% Impervious, Inflow Depth > 1.99" for 1-Year event 79.44 cfs @ 11.95 hrs, Volume= 4.075 af 1.06 cfs @ 18.62 hrs, Volume= 1.121 af, Atten= 99%, Lag= 399.8 min 1.06 cfs @ 18.62 hrs, Volume= 1.121 af Routed to Link 2 : DP#2 Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 302.09' @ 18.62 hrs Surf.Area= 31,498 sf Storage= 133,228 cf Plug -Flow detention time= 439.2 min calculated for 1.118 af (27% of inflow) Center -of -Mass det. time= 263.8 min (1,044.2 - 780.4 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 297.00 297.50 305.00 297.00' Surf.Area (sq-ft) 19,043 22,080 37,470 233,593 cf Device Routing Invert Custom Stage Data (Prismatic)Listed below (Recalc) Inc.Store (cubic -feet) 0 10,281 223,313 Outlet Devices Cum.Store (cubic -feet) 0 10,281 233,593 #1 Primary 294.00' #2 Device 1 #3 Device 1 297.00' 298.80' 36.0" Round Culvert L= 100.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 294.00' / 293.00' S= 0.0100 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads 3.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=1.06 cfs @ 18.62 hrs HW=302.09' (Free Discharge) 4-1=Culvert (Passes 1.06 cfs of 87.37 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.53 cfs @ 10.73 fps) 3=Orifice/Grate (Orifice Controls 0.54 cfs @ 8.56 fps) 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 16 85' 80 75� r 70- 60� 55� _ r • 50� r .2 • 40� 35- 3O- 20� ,r 15/ 10- rr ✓ rr ✓ r r + --+--r 4 4 r 1 1 r 1 1 r ✓ r r ✓ Pond 7P: WDB#2 Hydrograph 79.44 cfs -Inflow Acme=24 9 a - r r r r r ▪ r Y r I_ -Sto-r ge:13 r r r r T r r r r 22S+af - 1- I- L L L L ✓ r ✓ r 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Inflow • Primary 1886 SIA POST Prepared by {enter your company name here} HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Type 11 24-hr 1-Year Rainfall=3.00" Printed 12/9/2021 Page 17 Inflow Area = Inflow = Outflow = Primary = Summary for Pond 8P: WDB#3 9.67 ac, 49.33% Impervious, Inflow Depth > 1.91" for 1-Year event 29.52 cfs @ 11.95 hrs, Volume= 1.538 af 2.53 cfs @ 12.47 hrs, Volume= 1.535 af, Atten= 91%, Lag= 30.7 min 2.53 cfs @ 12.47 hrs, Volume= 1.535 af Routed to Link 3 : DP#3 Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 285.93' @ 12.47 hrs Surf.Area= 14,798 sf Storage= 25,353 cf Plug -Flow detention time= 77.9 min calculated for 1.532 af (100% of inflow) Center -of -Mass det. time= 76.4 min (854.4 - 777.9 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 284.00 284.50 292.00 284.00' Surf.Area (sq-ft) 10,443 12,601 24,121 143,469 cf Device Routing Invert Custom Stage Data (Prismatic)Listed below (Recalc) Inc.Store (cubic -feet) 0 5,761 137,708 Outlet Devices Cum.Store (cubic -feet) 0 5,761 143,469 #1 Primary 282.00' #2 Device 1 #3 Device 1 284.00' 258.60' 24.0" Round Culvert L= 50.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 282.00' / 281.50' S= 0.0100 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf 2.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads 6.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=2.53 cfs @ 12.47 hrs HW=285.93' (Free Discharge) 4-1=Culvert (Passes 2.53 cfs of 25.89 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.14 cfs @ 6.54 fps) 3=Orifice/Grate (Orifice Controls 2.39 cfs @ 9.55 fps) 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 18 Pond 8P: WDB#3 Hydrograph 32� 30� 28- �+ 26- �+ 24� 22 20 / r • - u • 18J 3 16�� 0 a 141 10� 8J 61/ 4� ,T 21 0 + - - 4 - - + ▪ L L I --+--+--+--I--+--+--+-------+--+--+ 7 7 T - - 4 - - 4 L L 7 7 T 4 - - 4 - - 4 7 7 T 4 - - 4 - - 4 7 T 7 7 7 + I Li I IL t i-frow Area=9.-6'7 ao T T Peak EFevT28-5.p3' Storage-25,-363 ec - T + 7 7 T T + 7 7 T 2.53 cfs 7 7 T 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Inflow • Primary 1886 SIA POST Prepared by {enter your company name here} HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Type 11 24-hr 1-Year Rainfall=3.00" Printed 12/9/2021 Page 19 Inflow Area = Inflow = Outflow = Primary = Summary for Pond 9P: WDB#4 18.50 ac, 52.97% Impervious, Inflow Depth > 1.86" for 1-Year event 53.68 cfs @ 11.95 hrs, Volume= 2.862 af 0.76 cfs @ 18.29 hrs, Volume= 0.801 af, Atten= 99%, Lag= 380.3 min 0.76 cfs @ 18.29 hrs, Volume= 0.801 af Routed to Link 4 : DP#4 Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 305.11' @ 18.29 hrs Surf.Area= 33,795 sf Storage= 93,512 cf Plug -Flow detention time= 456.5 min calculated for 0.799 af (28% of inflow) Center -of -Mass det. time= 272.2 min (1,045.1 - 772.9 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 302.00 302.50 310.00 302.00' Surf.Area (sq-ft) 24,451 27,786 45,035 286,138 cf Device Routing Invert Custom Stage Data (Prismatic)Listed below (Recalc) Inc.Store (cubic -feet) 0 13,059 273,079 Outlet Devices Cum.Store (cubic -feet) 0 13,059 286,138 #1 Primary 296.00' #2 Device 1 #3 Device 1 302.00' 303.60' 36.0" Round Culvert L= 50.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 296.00' / 295.50' S= 0.0100 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads 3.0" W x 3.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=0.76 cfs @ 18.29 hrs HW=305.11' (Free Discharge) 4-1=Culvert (Passes 0.76 cfs of 93.91 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.41 cfs @ 8.32 fps) 3=Orifice/Grate (Orifice Controls 0.35 cfs @ 5.67 fps) 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 20 60� 55:- - 45� L 40� N 35- u = 3 30:� 0 25J 20� r 15� „1- 10-- 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) A L L 7 7 r ▪ rt--r ▪ +--r 4 L Pond 9P: WDB#4 Hydrograph HI i i hi H 1nfloaw;Area=1-$.60 ac - POal PeV=1-05.14F L L Storage=93y512 cf r 7 7 r r r ✓ r • r • Inflow • Primary 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 21 Summary for Pond 10P: WDB#5 Inflow Area = 29.53 ac, 52.93% Impervious, Inflow Depth > 1.99" for 1-Year event Inflow = 93.85 cfs @ 11.95 hrs, Volume= 4.893 af Outflow = 2.19 cfs @ 15.13 hrs, Volume= 2.136 af, Atten= 98%, Lag= 190.5 min Primary = 2.19 cfs @ 15.13 hrs, Volume= 2.136 af Routed to Link 5 : DP#5 Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 306.08' @ 15.13 hrs Surf.Area= 41,091 sf Storage= 146,657 cf Plug -Flow detention time= 413.6 min calculated for 2.131 af (44% of inflow) Center -of -Mass det. time= 277.4 min (1,053.1 - 775.7 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 302.00 302.50 310.00 302.00' Surf.Area (sq-ft) 28,583 32,278 50,725 326,477 cf Device Routing Invert Custom Stage Data (Prismatic)Listed below (Recalc) Inc.Store (cubic -feet) 0 15,215 311,261 Outlet Devices Cum.Store (cubic -feet) 0 15,215 326,477 #1 Primary 297.00' #2 Device 1 #3 Device 1 302.00' 303.80' 36.0" Round Culvert L= 50.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 297.00' / 296.50' S= 0.0100 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads 6.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=2.19 cfs @ 15.13 hrs HW=306.08' (Free Discharge) 4-1=Culvert (Passes 2.19 cfs of 93.72 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.47 cfs @ 9.58 fps) 3=Orifice/Grate (Orifice Controls 1.72 cfs @ 6.86 fps) 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 22 0 105 _ 1007:-�' 95 90 85 804-� 75 70 + 65 60� 1 557]- Pond 10P: WDB#5 Hydrograph i+ i 1 i 1 1- 4 1 93.85 cfs 4� r 1 1 L I 1 L i 1 1 1 L 1 L + 4- I 4 + 50 45�' I I I 4- L 1 4- Cn f o*-Areas=2 i53 ac 1300 1 1 1 1 1 LIL 1 ■ Starage=1 4ekS5T cf - - tri L1 L i 1 1 L i 1 1 II II II II II II II 40_ 3;0L � + 1-+ + I +rr II 157:-/ + 1 + ▪ L 10 5� 5 6 7 i 1i 1it 1 ti r I 4- r 1 I + L 2.19 cfs Air 8 9 10 11 12 13 14 15 16 17 Time (hours) 18 19 20 21 22 23 24 • Inflow • Primary 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 23 Summary for Link 1: DP#1 Inflow Area = 19.43 ac, 51.88% Impervious, Inflow Depth > 1.27" for 1-Year event Inflow = 2.82 cfs @ 13.11 hrs, Volume= 2.060 af Primary = 2.82 cfs @ 13.11 hrs, Volume= 2.060 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 0 L Link 1: DP#1 Hydrograph 4 5 9 10 11 12 13 14 Time (hours) 15 16 17 18 19 20 21 22 23 24 ❑ Inflow ❑ Primary 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 24 Summary for Link 2: DP#2 Inflow Area = 26.48 ac, 45.01% Impervious, Inflow Depth > 0.59" for 1-Year event Inflow = 4.06 cfs @ 12.02 hrs, Volume= 1.295 af Primary = 4.06 cfs @ 12.02 hrs, Volume= 1.295 af, Atten= 0%, Lag= 0.0 min Routed to nonexistent node 3A Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Link 2: DP#2 Hydrograph 1 4- nflow 3 4 dnArf Area=26.4j.06 cfs 7 9 10 11 12 13 14 15 Time (hours) 16 17 18 19 20 21 22 23 24 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 25 Summary for Link 3: DP#3 Inflow Area = 9.67 ac, 49.33% Impervious, Inflow Depth > 1.91" for 1-Year event Inflow = 2.53 cfs @ 12.47 hrs, Volume= 1.535 af Primary = 2.53 cfs @ 12.47 hrs, Volume= 1.535 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 0 L Link 3: DP#3 Hydrograph Inflow Area=9.6 H H 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Primary 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 26 Summary for Link 4: DP#4 Inflow Area = 22.54 ac, 43.48% Impervious, Inflow Depth > 0.48" for 1-Year event Inflow = 1.53 cfs @ 12.07 hrs, Volume= 0.897 af Primary = 1.53 cfs @ 12.07 hrs, Volume= 0.897 af, Atten= 0%, Lag= 0.0 min Routed to nonexistent node 3B Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 0 T. Link 4: DP#4 Hydrograph 1 nflow 1 rf Area=22. 1.53 cfs 3 4 5 6 7 8 9 10 11 12 13 14 15 Time (hours) 16 17 18 19 20 21 22 23 24 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 27 Summary for Link 5: DP#5 Inflow Area = 32.33 ac, 48.34% Impervious, Inflow Depth > 0.82" for 1-Year event Inflow = 2.46 cfs @ 12.11 hrs, Volume= 2.204 af Primary = 2.46 cfs @ 12.11 hrs, Volume= 2.204 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 0 L Link 5: DP#5 Hydrograph 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Primary 1886 SIA POST Type 11 24-hr 1-Year Rainfall=3.00" Prepared by {enter your company name here} Printed 12/9/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 27 Summary for Link 5: DP#5 Inflow Area = 32.33 ac, 48.34% Impervious, Inflow Depth > 0.82" for 1-Year event Inflow = 2.46 cfs @ 12.11 hrs, Volume= 2.204 af Primary = 2.46 cfs @ 12.11 hrs, Volume= 2.204 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 0 L Link 5: DP#5 Hydrograph 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Primary Subcat DP4 DP#1 Subcat DP#1 Reach WDB#1 Q\ K\WDB#1 Subcat WDB #1 Routing Diagram for 1886 SIA POST Prepared by {enter your company name here}, Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 ©2020 HydroCAD Software Solutions LLC 1886 SIA POST Prepared by {enter your company name here} HydroCAD© 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Printed 12/10/2021 Page 2 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 2-Year Type II 24-hr 2 10-Year Type II 24-hr Default 24.00 1 3.57 2 Default 24.00 1 5.15 2 1886 SIA POST Type 11 24-hr 2-Year Rainfall=3.57" Prepared by {enter your company name here} Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 3 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DP#1: Subcat DP#1 Runoff Area=0.54 ac 0.00% Impervious Runoff Depth>0.66" Tc=5.0 min CN=WQ Runoff=0.57 cfs 0.030 af SubcatchmentWDB #1: Subcat WDB #1 Runoff Area=18.89 ac 53.36% Impervious Runoff Depth>2.57" Tc=5.0 min CN=WQ Runoff=78.26 cfs 4.053 af Pond 6P: WDB#1 Peak Elev=355.04' Storage=110,405 cf Inflow=78.26 cfs 4.053 af Outflow=3.43 cfs 2.706 af Link 1: DP#1 Inflow=3.48 cfs 2.736 af Primary=3.48 cfs 2.736 af Total Runoff Area = 19.43 ac Runoff Volume = 4.083 af Average Runoff Depth = 2.52" 48.12% Pervious = 9.35 ac 51.88% Impervious = 10.08 ac 1886 SIA POST Type 11 24-hr 2-Year Rainfall=3.57" Prepared by {enter your company name here} Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment DP#1: Subcat DP#1 Runoff = 0.57 cfs @ 11.98 hrs, Volume= Routed to Link 1 : DP#1 0.030 af, Depth> 0.66" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 0.51 61 Open, good, HSG B 0.03 80 Open, good, HSG D 0.54 Weighted Average 0.54 62 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 0.6- 0.55 0.5 0.45- 0.35� `p 0.3� Lc5-.O- aJ to tN =WQ- - 0.2 0.15� 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) Subcatchment DP#1: Subcat DP#1 Hydrograph 0.57 cfs L iypu11;24hr 2-Year Rainfa II 3.57" Runoff Aroa=0L54 ac Runoff 'VQlume='0.030 af Runoff Depth>0.66" • Runoff 1886 SIA POST Type 11 24-hr 2-Year Rainfall=3.57" Prepared by {enter your company name here} Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment WDB #1: Subcat WDB #1 Runoff = 78.26 cfs @ 11.95 hrs, Volume= 4.053 af, Depth> 2.57" Routed to Pond 6P : WDB#1 Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 2-Year Rainfall=3.57" Area (ac) CN Description 0.03 61 Open, good, HSG B 8.78 80 Open, good, HSG D 0.08 98 Roadway, good, HSG B 2.95 98 Roadway, good, HSG D 2.69 98 Roof, good, HSG D 0.70 100 SCM, good, HSG D 0.03 98 Sidewalk, good, HSG B 3.63 98 Sidewalk, good, HSG D 18.89 Weighted Average 8.81 80 46.64% Pervious Area 10.08 98 53.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0 5.0 Direct Entry, 85� 80 75 70 65� 60� z 55� 50 45� 40� 35� 30� 251 Subcatchment WDB #1: Subcat WDB #1 Hydrograph t--t--r 1 1 L 78.26 cfs - L + L T i L r 1- L o- 0 1 // / 2 3 4 5 6 7 8 L PP L L- Type n 24-hr --14--! 2 Yaar Rai f l 3.57�.. - -- RwL L i L L np f-Arrea=t88SL ap-- L L - - O n f-V-gI ie=4. `$- Of- - T Runoff rt L L 4- 1- 4- L 11- L L D pth Z 57�F r TcT5.40 min - L -1 L L 1 1 L H L i r .1. ... ... ... ... ... ... ... ... ... ... ... ... ... �, 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Runoff 1886 SIA POST Prepared by {enter your company name here} HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Type 11 24-hr 2-Year Rainfall=3.57" Printed 12/10/2021 Page 6 Inflow Area = Inflow = Outflow = Primary = Summary for Pond 6P: WDB#1 18.89 ac, 53.36% Impervious, Inflow Depth > 2.57" for 2-Year event 78.26 cfs @ 11.95 hrs, Volume= 4.053 af 3.43 cfs @ 13.18 hrs, Volume= 2.706 af, Atten= 96%, Lag= 73.8 min 3.43 cfs @ 13.18 hrs, Volume= 2.706 af Routed to Link 1 : DP#1 Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 355.04' @ 13.18 hrs Surf.Area= 40,314 sf Storage= 110,405 cf Plug -Flow detention time= 349.5 min calculated for 2.701 af (67% of inflow) Center -of -Mass det. time= 244.8 min (1,017.8 - 772.9 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 352.00 352.50 362.00 352.00' Surf.Area (sq-ft) 30,383 34,023 57,578 451,206 cf Device Routing Invert Custom Stage Data (Prismatic)Listed below (Recalc) I nc. Store (cubic -feet) 0 16,102 435,105 Outlet Devices Cum.Store (cubic -feet) 0 16,102 451,206 #1 Primary 347.00' #2 Device 1 #3 Device 1 352.00' 353.20' 36.0" Round Culvert L= 50.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 347.00' / 346.50' S= 0.0100 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads 12.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=3.43 cfs @ 13.18 hrs HW=355.04' (Free Discharge) 4-1=Culvert (Passes 3.43 cfs of 87.02 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.40 cfs @ 8.22 fps) 3=Orifice/Grate (Orifice Controls 3.03 cfs @ 6.06 fps) 1886 SIA POST Type 11 24-hr 2-Year Rainfall=3.57" Prepared by {enter your company name here} Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 7 85� 80 75 70 65� 607-: 55� • 50 • 45- 3 0 40:, 35� 30� 25� 0 Pond 6P: WDB#1 Hydrograph ▪ r--r -I 4 r 4 4 r ▪ 11 r 78.26 cfs 7 7 7 r--r -I 4 r 4 4 r ▪ 1 L 7 r r biflowiArea=* 89 Lac P lei=1`5504' 7 ✓ ✓ 1 Stor'rge=410 405-Ef - ▪ T r r 4 4 r 1 1 1 3 43 cfs ✓ r Y r 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Inflow • Primary 1886 SIA POST Type 11 24-hr 2-Year Rainfall=3.57" Prepared by {enter your company name here} Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 8 Summary for Link 1: DP#1 Inflow Area = 19.43 ac, 51.88% Impervious, Inflow Depth > 1.69" for 2-Year event Inflow = 3.48 cfs @ 13.02 hrs, Volume= 2.736 af Primary = 3.48 cfs @ 13.02 hrs, Volume= 2.736 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs 0 L Link 1: DP#1 Hydrograph 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Primary 1886 SIA POST Type 11 24-hr 10-Year Rainfall=5.15" Prepared by {enter your company name here} Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 9 Time span=0.00-24.00 hrs, dt=0.05 hrs, 481 points Runoff by SCS TR-20 method, UH=SCS, Weighted-Q Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment DP#1: Subcat DP#1 Runoff Area=0.54 ac 0.00% Impervious Runoff Depth>1.55" Tc=5.0 min CN=WQ Runoff=1.46 cfs 0.070 af SubcatchmentWDB #1: Subcat WDB #1 Runoff Area=18.89 ac 53.36% Impervious Runoff Depth>4.04" Tc=5.0 min CN=WQ Runoff=121.93 cfs 6.353 af Pond 6P: WDB#1 Peak Elev=356.61' Storage=176,862 cf Inflow=121.93 cfs 6.353 af Outflow=4.78 cfs 4.220 af Link 1: DP#1 Inflow=5.41 cfs 4.290 af Primary=5.41 cfs 4.290 af Total Runoff Area = 19.43 ac Runoff Volume = 6.422 af Average Runoff Depth = 3.97" 48.12% Pervious = 9.35 ac 51.88% Impervious = 10.08 ac 1886 SIA POST Type 11 24-hr 10-Year Rainfall=5.15" Prepared by {enter your company name here} Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment DP#1: Subcat DP#1 Runoff = 1.46 cfs @ 11.97 hrs, Volume= Routed to Link 1 : DP#1 0.070 af, Depth> 1.55" Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.15" Area (ac) CN Description 0.51 61 Open, good, HSG B 0.03 80 Open, good, HSG D 0.54 Weighted Average 0.54 62 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment DP#1: Subcat DP#1 Hydrograph 1.46 cfs o 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) dr Type II 24-hr 10-Year RainfallT5.15" Runoff Area=0.54 ac Runoff VQlume=r0.O7O of Runoff Depth>1.55" TcT5.0 miff CN=WQ ❑ Runoff 1886 SIA POST Type 11 24-hr 10-Year Rainfall=5.15" Prepared by {enter your company name here} Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment WDB #1: Subcat WDB #1 Runoff = 121.93 cfs @ 11.95 hrs, Volume= 6.353 af, Depth> 4.04" Routed to Pond 6P : WDB#1 Runoff by SCS TR-20 method, UH=SCS, Weighted-Q, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Type II 24-hr 10-Year Rainfall=5.15" Area (ac) CN Description 0.03 61 Open, good, HSG B 8.78 80 Open, good, HSG D 0.08 98 Roadway, good, HSG B 2.95 98 Roadway, good, HSG D 2.69 98 Roof, good, HSG D 0.70 100 SCM, good, HSG D 0.03 98 Sidewalk, good, HSG B 3.63 98 Sidewalk, good, HSG D 18.89 Weighted Average 8.81 80 46.64% Pervious Area 10.08 98 53.36% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 130- 120-- do-/ 100— 90— r - 80 70-- 3 50- 40— 30_ T Subcatchment WDB #1: Subcat WDB #1 Hydrograph + L L L L 4 4 4 4 - r 7 -T - 7 Ti T P 7 L L 20— 10— 0 1 2 3 4 5 6 7 4- ✓ 4 4 H -+ H 7 L Type II 24-hir 10-Year RainfaI I5 i15" - RtnbfAiea=1-8-a9-at - �4 VOme_6--45$ Runoff Depth >4.O4 F - L + L L TcT5.0 Min CN=WQ 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) 1886 SIA POST Prepared by {enter your company name here} HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Type 11 24-hr 10-Year Rainfall=5.15" Printed 12/10/2021 Page 12 Summary for Pond 6P: WDB#1 Inflow Area = 18.89 ac, 53.36% Impervious, Inflow Depth > 4.04" for 10-Year event Inflow = 121.93 cfs @ 11.95 hrs, Volume= 6.353 af Outflow = 4.78 cfs @ 13.36 hrs, Volume= 4.220 af, Atten= 96%, Lag= 84.6 min Primary = 4.78 cfs @ 13.36 hrs, Volume= 4.220 af Routed to Link 1 : DP#1 Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs Peak Elev= 356.61' @ 13.36 hrs Surf.Area= 44,213 sf Storage= 176,862 cf Plug -Flow detention time= 371.4 min calculated for 4.211 af (66% of inflow) Center -of -Mass det. time= 267.6 min (1,034.4 - 766.8 ) Volume Invert Avail.Storage Storage Description #1 Elevation (feet) 352.00 352.50 362.00 352.00' Surf.Area (sq-ft) 30,383 34,023 57,578 451,206 cf Device Routing Invert Custom Stage Data (Prismatic)Listed below (Recalc) Inc.Store (cubic -feet) 0 16,102 435,105 Outlet Devices Cum.Store (cubic -feet) 0 16,102 451,206 #1 Primary 347.00' #2 Device 1 #3 Device 1 352.00' 353.20' 36.0" Round Culvert L= 50.0' CPP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 347.00' / 346.50' S= 0.0100 '/' Cc= 0.900 n= 0.013, Flow Area= 7.07 sf 3.0" Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads 12.0" W x 6.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads Primary OutFlow Max=4.78 cfs @ 13.36 hrs HW=356.61' (Free Discharge) 4-1=Culvert (Passes 4.78 cfs of 96.92 cfs potential flow) 12=Orifice/Grate (Orifice Controls 0.50 cfs @ 10.20 fps) 3=Orifice/Grate (Orifice Controls 4.28 cfs @ 8.56 fps) 1886 SIA POST Type 11 24-hr 10-Year Rainfall=5.15" Prepared by {enter your company name here} Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 13 Pond 6P: WDB#1 Hydrograph 130� 120'' 1101▪ "� 100:" 90� 80� ,,h ▪ 701" i° 60� 50�� 401▪ " 30:- 20� 101" 0 121.93 cfs 7 y 4 Inflow Area=18.89 ac y -talc giOV=456;61'' p_torage=11768p cf 4 4.78 cfs /7 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) • Inflow • Primary 1886 SIA POST Type 11 24-hr 10-Year Rainfall=5.15" Prepared by {enter your company name here} Printed 12/10/2021 HydroCAD® 10.10-6a s/n 03736 © 2020 HydroCAD Software Solutions LLC Page 14 Summary for Link 1: DP#1 Inflow Area = 19.43 ac, 51.88% Impervious, Inflow Depth > 2.65" for 10-Year event Inflow = 5.41 cfs @ 12.00 hrs, Volume= 4.290 af Primary = 5.41 cfs @ 12.00 hrs, Volume= 4.290 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-24.00 hrs, dt= 0.05 hrs � 5 4—, u - 3 3— o - 2- Link 1: DP#1 Hydrograph L 4- L 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time (hours) ❑ Inflow ❑ Primary Site -to -Drainage Area Analysis 1886 - 1101 Olive Branch Road Site to Drainage Area Analysis ., L-f Cr 1#k3 illAvNvok ,4,1ril_f, ci 50& vcrizr- _ Z_ZW 14( f TOTAL DRAINAGE TO DP#3 =1,594 ACRES d4. _ 4°6'411 4.1? TNI �� 1 rAik U� J /7 ko 1� - 2 /\ . /ill 'P ) n 1 1 \� SITE AREA (SA) = 162 ACRES DRAINAGE AREA (DA) = 1,594 ACRES 1 (SA/DA = 1,594/162 = 10.2% 4'S0•-• Required Maps and Information 1886 - OLIVE BRANCH RD USGS MAP DURHAM SOUTH EAST QUADRANGLE SCALE 1:24,000 N SEERS REPORT FOR 20NE DESCRIPTIONS AND INDEX MAP THE INFORMATION DEPICTED ON THIS MAP AND SUPP0R1ING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMATAT HTTP://FRIS.NC.GOV/FRIS WRhauttlasol ood Elevation WBFE) With 6FE or Depth zone AE. ID. AH. IE, AR MERegulatory Floodway 0.2%Annual Chance Flood Hazard, Areas of 1% Annual Chance Flood with Average Depth Less Than One Foot Or With Drainage Areas of Less Than One Square Mile Tone x — Future Conditions 1%Annual Chance Flood Hazard Zo:e x OTHER AREAS OF — Area with Reduced Flood Risk due to Levee FLOOD HAZARD See Notes zone OTHER — aaetemlbsidethe AREAS 0.2%AAreDnnual Chinedtoance Fl0odplaineoutzonex - Channel, Culvert, or Storm Sewer » Accredited or Provisionally Accredited Levee, Dike, or Floodwall I„ii1,ii1i Non -accredited levee, Dike, or Flaodwall 51Ox North Carolina Geodetic Survey bench mark sIO® National Geodetic Survey bench mark S%D® Contractor Est NCFMP Survey bench mark 0-yes— Cross Sections with l%Annual Chance Water Surface Elevation (BFE) Coastal Transept - ------ Coastal Transect Baseline Profile Baseline Hydrographie Feature OTHER limit of Study FEATURES - Jurisdiction Boundary FLOOD HAZARD INFORMATION SPECML FLOOD HAZARD AREAS GENERAL STRUCIURES NOTES TO USERS Nap se limit of Moderate Wave Action (LiMWA) COASTAL BARRIER RESOURCES SYSTEM ICBRSI NOTE CBRS Area SCALE e lmi.: eN12mettWl Iwledim f wm w.o ise30Pw,mnan. xAVD raael'/enlaR latch SOB Teat 116,000 O 250 500 1.000eet Meters O 75 150 300 PANEL LOCATOR i 08/1 6116 0101 AU osze oNo 0636 00.12 es PAO 4 NORTH CAROUNA FLOODPIAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM co FLOOD INSURANCE RATE MAP o NORTH CAROLINA a —ono ci CT Panel Contains: COMMUNIIy oaf 0260 0178 FEMI CID PANEL SUM/ VERSION NUMBER 2.3.3.2 3720086000N MAP REVISED October 2018 20700D0 FEET 010000 FEET 800000 FEET 78,15.30,1 70,1610,111 SITE Continues to the West X18011[11, FEET FLOOD HAZARD INFORMATION NOTES TO USERS SCALE SEERS REPORT FOR 20NE DESCRIPTIONS AND INDEX MAP THE INFORMATION DEPICTED ON THIS MAP AND SUPORCING DOCUMENTATION ARE ALSO AVAILABLE IN DIGITAL FORMATAT HTTP://FRIS.NC.GOV/FRIS WRRsol ood Elevation(BFE) wdnautt Oa0FEor Depth zone AE, Ao, AH. PE AR SPECML FLOOD Regulatory Fl00dway HAZARD AREAS I� 0.2%Annual Chance Flood Hazard, Areas of 1% Annual Chance Flood with Average Depth Less Than One Foot or With Drainage Areas of Less Than One Square Mile nine x - Future Conditions 1%Annual Chance Flood Hazard x OTHER AREAS OF — Area with Reduced Flood Risk due to Levee FLOOD HAZARD See Notes zone OTHER — asetemldbe0usidethe AREAS 0.2Are%ADnnual ChineancetoFl0odplaietzonex - Channel, Culvert, or Storm Sewer »»»»»m Accredited or Provisionally Accredited GENERAL Levee, Dike, or Floodwall STRUMMER 1.111141001 Non -accredited levee, Dike, or Floodwall x North Carolina Geodetic Survey bench mark sIO® National Geodetic Survey bench mark 510. Contractor Est NCFMP Survey bench mark 0-yes— Cross Sections with l%Annual Chance Water Surface Elevation (BEE) Coastal Transect - ------ Coastal Transect Baseline Profile Baseline Hydrographin Feature OTHER limit of Study FEATURES - Jurisdiction Boundary 1.180 Se limit of Moderate Wave Action (LiMWA) COASTAL BARRIER RESOURCES SYSTEM (CBR.) NOTE CBRS Area e lmi.: eetlZ e33Wl Iwledim f wm w.o ise30Pw,mnan. xAvo raael'/enlaR l inch -500feet 1:6,000 O 250 500 1.000eet Meters O 75 150 300 PANEL LOCATOR i 0-0 0721 0532 0111 0614 06.3 08.2 0610 085 .11/10 0.53 0805 0850 0750 0778 4 NORTH CAROUNA FL00DPLAIN MAPPING PROGRAM NATIONAL FLOOD INSURANCE PROGRAM co FLOOD INSURANCE RATE MAP o NORTH CAROLINA a 0 ci CT co 0 0 IL CIS 0 cD 0870 23nelContains: com uNny dawMN COMET 3rro0e5 PANEL SOF50 VERSION NUMBER 2.3.3.2 KW AMMER 3720087000N MAP REVISED October 2018 pau@ysoU A.ewlKweae a,e'umoys ll'vewpp uo Mel pue sy al, pa 91eulpm00. ee 8ylle+atlpoa pue aalua5 uopeuasuoD 1!o5'a,n,Inai,etl lc luawyetlap 5 p ay, Ap Fytle,eploytl le' ae 2[61 up palid.C.,, Dew siyy 8Z'ON y NI-1O2iVJ HJ ON 'ALNfOD WVH0l0 U U 0 3 ll fze aaaye su,of) 0b89T30T °leas IN, COO SOH O z 000 g aIIW T 000 T 000z 000a 000 b 000 0 0 A z M „ST Sb oBL r 8 8 O U o L O z T O N o o - L = j O • u) I� Q j o 0 U O O 6 2 8 8 O. r 8 8 M „O,Lb 08L 006696E 009696E 006696E 1 1 1 1 1 1 1 1 1 009Z96£ 00£Z96£ 006Z96E 0066$56E 00L696E 009696E 00£696E 006696E 006096E z m ril 006096E z M„ST Sb o8L M „O,Lb ca Natural Resources Conservation Service MAP INFORMATION MAP LEGEND E E ƒ measurements. 0 0 0 Resources Conservation Service 2 o-c ) qE7. { / f co co { ws� / \ka)-0® w 2 = Ca / /tjƒ) j . \ 77 0 \\\�E CO 2u) §§ (o 0 Not rated or not available Water Features Streams and Canals USDA-NRCS certified data as f a o oD \ in o _ § / \} c< 0 = 2 0 0 0 4 §§ q q❑ q q❑❑ q \ A cn Local Roads Not rated or not available Soil Rating Lines Aerial Photography 1 « 2 = 2 0 § o Not rated or not available Soil Rating Points « 2 = 2 ■ ■ ■ ■ Natural Resources Conservation Service Hydrologic Soil Group —Durham County, North Carolina Web Soil Survey Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI Ch Chewacla and Wehadkee soils, 0 to 2 percent slopes, frequently flooded B/D 51.9 8.8% Gu Gullied land, clayey materials 9.6 1.6% MfE Mayodan sandy loam, 15 to 25 percent slopes B 1.7 0.3% PfE Pinkston fine sandy loam, 10 to 25 percent slopes B 82.0 14.0% Ur Urban land 0.9 0.1 % WsB White Store sandy loam, 2 to 6 percent slopes D 80.6 13.7% WsC White Store sandy loam, 6 to 10 percent slopes D 98.0 16.7% WsE White Store sandy loam, 10 to 25 percent slopes D 238.2 40.5% WvC2 White Store clay loam, 2 to 10 percent slopes, moderately eroded D 18.7 3.2% WvE2 White Store clay loam, 10 to 25 percent slopes, moderately eroded D 6.2 1.1 % Totals for Area of Interest 587.8 100.0% USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 3/15/2021 Page 3 of 4 Hydrologic Soil Group —Durham County, North Carolina Web Soil Survey Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 3/15/2021 Page 4 of 4 VNN021V0 H121ON'WVH2IHO GVOd H3NV218 3A110 l0l l w 0 < lilITTIARIMPWR VNI1021VO 1-11210N 'INVHd1C avod HONVII9 3A110 LOLL V, • o VNN021V0 H1210N'WVH2I11O GVON H3NV218 3A11O LOLL Z < J PROJECT AREA LAND COVERS PROTECTED FOREST OTHER PRE -DEVELOPMENT LAND USE MAP VNHO21V0 H121ON'WVH?Jf14 avod HON` III 3AI1O LOLL z< 0 PROJECT AREA LAND COVERS 2 STORY SF UNIT z IMPERVIOUS ASSIGNED PEP LOT (NOT SHADED) z O O NG/DRIVEWAY/SIDEWALK