Loading...
HomeMy WebLinkAboutNC0023736_Authorization to Construct_20160415NPDES DOCUHENT SCANNING: COVER SHEET NPDES Permit: NC0023736 Gunpowder Creek WWTP Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Correspondence Owner Name Change Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: April 15, 2016 This document is printed on reuse paper - ignore any content on the reirerse side McGill ASSOCIATES April 15, 2016 Mr. Ron Berry NCDEQ Division of Water Resources Water Quality Programs 512 N. Salisbury Street Raleigh, North Carolina 27604 Dear Mr. Berry: /koo Z 3 q36 c)1,1 13409 RE: Engineer's Certification ATC No. 023 73 6A01 SRF Project No. CS370393-04 Gunpowder Creek WWTP Improvements City of Lenoir, North Carolina Enclosed for your records is the Engineer's Certification for the subject project. If you have any questions or require additional information, please do not hesitate to contact us at (828) 328-2024. Sincerely, McGILL ASSOCIATES, P.A. JOEL A. WHITFORD, PE Project Manager :jw Enclosure cc: Mr. Radford Thomas, City of Lenoir Public Utilities Director (Vend) Mr. Monte Wall, City of Lenoir Plant Superintendent (1/encl) Mr. Mike Waresak, PE, McGill Associates (1/encl) Mr. Curtis Baker, McGill Associates (1/encl) Engineering • Planning • Finance McGill Associates, P.A. • 1240 19th Street, Lane NW, Hickory, NC 28601 Office: 828.328.2024 • Fax: 828.328.3870 • www.mcgillengineers.com City of Lenoir Gunpowder Creek WWTP Authorization to Construct No. 023736A01 Issued February 19, 2014 Engineer's Certification M. I, / - r I CLe' / cJ • /v r pe S•ri� , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe ergo cal weekly/full time) the construction of the modifications and improvements to the Gunpowder Creek Wastewater Treatment Plant, located in Caldwell County, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the following construction: Installation of one (1) 910,000 gallon Sequencing Batch Reactor (SBR) with fine bubble diffusers,one (1) 25 HP floating mixer, one (1) floating decanter, one (1) 205 gpm sludge wasting pump, and piping and controls; installation of five (5) 1,000 scfin blowers with piping and controls; in conformity with the final project plans, specifications, and other supporting data subsequently filed with and approved by the Department of Environment and Natural Resources Division of Water Resources. I certify that the construction of the above referenced project was observed to be built within substantial compliance, intent and in conformity with all applicable regulations and statutes and the project plans, specifications, and other supporting documentation comprising the Authorization to Construct Permit Application package. Signature X(neirf Date 4 - /S`�.• /( -y, TY Registration No. D /9 T' $ b Mail this Certification to: Attn: Ron Berry Complex Permitting Unit DENR/DWR/Water Quality Programs 1617 Mail Service Center Raleigh, NC 27699-1617 -- -- " ‘o t 111 I //// `- \\'. ��R,!� a MD' a - � 6a gi 041//.1111t11.0 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Director Secretary February 19, 2014 W. Lane Bailey City Manager 801 West Avenue NW Lenoir, NC 28645 SUBJECT: Authorization to Construct A to C No. 023736A01 City of Lenoir Gunpowder Creek WWTP Reference: DWI No. CS370393-04 Dear Mr. Bailey: A letter of request for an Authorization to Construct was received December 3, 2013 by the Division of Water Resources (Division), and final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications to the existing 2.0 MGD Gunpowder Creek WWTP, with discharge of treated wastewater into Gunpowder Creek in the Catawba River Basin. This authorization results in no increase in design or permitted capacity and is awarded for the construction of the following specific modifications: Installation of one (1) 910,000 gallon Sequencing Batch Reactor (SBR) with fine bubble diffusers, one (1) 25 HP floating mixer, one (1) floating decanter, one (1) 205 gpm sludge wasting pump, and piping and controls; installation of five (5) 1,000 scfm blowers with piping and controls; in conformity with the final project plans, specifications, and other supporting data subsequently filed with and approved by the Department of Environment and Natural Resources Division of Water Resources. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0023736 issued February 1, 2012; and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in Permit No. NC0023736. 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 Location: 512 N. Salisbury St Raleigh, North Carolina 27604 Phone: 919-807-63001 Fax: 919-807-6489 Internet: www.ncwateroualitv.orq An Equal OpportuniryWffirmative Action Employer W. Lane Bailey, City Manager February 19, 2014 Page 2 of 3 The sludge generated from these treatment facilities must be disposed of in accordance with G.S. 143-215.1 and in a manner approved by the Division. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by the Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. The Asheville Regional Office, telephone number (828) 296-4500, shall be notified at least forty-eight (48) hours in advance of operation of the installed facilities so that an on site inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from a professional engineer certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct and the approved plans and specifications. Mail the Certification to: NPDES Unit, DWR/DENR, 1617 Mail Service Center, Raleigh, NC 27699-1617. Upon classification of the facility by the Certification Commission, the Permittee shall employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding weekends and holidays, must properly manage the facility, must document daily operation and maintenance of the facility, and must comply with all other conditions of T15A:8G.0202. A copy of the approved plans and specifications shall be maintained on file by the Permittee for the life of the facility. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such a manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's responsibilities shall be in complying with these Acts. W. Lane Bailey, City Manager February 19, 2014 Page 3 of 3 Prior to entering into any contract(s) for construction, the recipient must have obtained all applicable permits and fund approval from the State. Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. If you have any questions or need additional information, please contact Ron Berry at telephone number (919) 807-6396. Thomas A. Reeder cc: Joseph C. Williams IV, P.E. McGill Associates, P.A. 55 Broad Street Asheville, NC 28801 DWR/ Asheville Regional Office, Water Quality Programs Central Files NPDES File Without Engineer's Certificate attached: Caldwell County Health Department DWI (funded)/Ken Pohlig, P.E.