Loading...
HomeMy WebLinkAboutWQ0000884_Monitoring - 02-2022_20220328Monitoring Report Submittal Permit Number #* Name of Facility:* Month: * February Report Information WQ0000884 Butterball, LLC Type * NDMR, NDAR-1, NDAR-2, NDMLR Year:* 2022 Upload Document* 20220328112850384.pdf PDF Only 4.54M B Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address:* jbatchelor@butterball.com Name of Submitter: * Joshua Batchelor Signature: Date of submittal: 3/28/2022 This will be filled in automatically Initial Review Reviewer: Gerald, Wanda Is the project number correct?* WQ0000884 Is the monitoring report accepted?* Yes No Regional Office* Wilmington Accepted Date: 4/12/2022 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page _ of Did the application rates exceed the limits in Attachment B of your permit? 21 Compliant - El Non-Compflant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? [d Compliant El Non -Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? E] Compliant E] Non -Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? L] Compliant 0 Non -Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? F±] Compliant 0 Non -Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC- Josh Batchelor Permittee: Bill Folk Certification No.: 991798,987940 Signing Official: Jeff Shamblin Grade: WWIV, S! Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant manager Facilities[Wastewater b Has the ORC c7hanged since the previ NDAR-1? D yes [21 No Phone Number 9 .19-658-6743 ext 2267 Permit Exp.: 9/30/22 2 zz Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the best of my knowledge. I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penatties, for submitting false information, including the possibility of fines and imprisonment for knowing violations, Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Did the mass leading rates exceed the limits in Attachment B of your permit? Q compliant ❑ Non -compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the dates) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Josh Batchelor Permittee; Dill Folk Certification Number: 991798, 987949 Signing Official: Jeffry Sharribiin Grade: WW IV, SI Phone Number: 919-658�6743 ext 2291 Signing Official's Title: Plant Manager Has the ORC changed since the previous NDMLR? ❑ Yes El No Phone No.: 919-653-6743 ext 2267 Permit Exp.; 9/30122 L Signature Date Signature Date By this signature, I certify that this report is accurrate and complete to the hest of my knowledge, I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Sampling Person(s) Certified Laboratories Name; Jefferson Foy Name: Environmental Chemist Name: Josh Batchelor Name- oes all monitoring data and sampling frequencies meet . requirements in ..E • -.- Attachment A of ! permit? 0 Compliantr r If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the noncompliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Josh Batchelor Permittee: Bill Folk Certification No.: 991798, 987940 Signing Official: Jeffry Shamblin Grade: WW IV, sl Phone Number: 919-658-6743 ext 2291 Signing Official's Title: Plant Manager Has the ORC changed since the previous NDMR? F1 Yes 21 No Phone Number: 19-658-6743 ext 2267 Permit Expiration: 9/30/2022 Signature Date Signature Date By this signalure, I certify that this report is accurrato and complete to the best of my knowledge. I certify, under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. l am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February Year: 2022 Did irrigation occur Meld Name: 01A Field Name: 01B Field Name. 01C Field Name: D2A Flrea [acres] 26 75 Area {acres}. 74.59 Area {acres) 11 48 Area (acres) 18.61 at this facility? Cover Crpp Coastal Cover Crop: Coastal Cover Crop Goaslal' Cover Crop:CoasEa] ❑ YES ❑ No I burly Rate {in} Hourly Rate (in): Hour[y Rate (in}. Hourly Rate (in): Annual Rate {in): 5D ' Annual Rate (in): 50 Annual. Rate {iri]: 50 Annual Rate (in): 50 Weather Freeboard Field Irrigated? ]],YES ❑ NO Field Irrigated? 0 YEs ❑ NO Field'Irrigated? YE5 ❑.No Field Irrigated? ❑� YES ❑ NO v ° ° m v 07 a V.. rn E or aD 'arn E rn ar is p' b> E rn; a, ° a rn E rn V OI O u E �+. E ? C a L E E m = m y E A e L c ° 0 1= m 3 U7 w E �, c es c. ri E .°' a- m E a E a asCL i .(U O O O O ° O O � a _, > �, 1 I— CLEO o _ OF in ft ft gal min in in gal min in in gal min in In gal min in in 1 C 52 0 56 95,002 547.8 0.13 0.01. 114.733 547.8 0,06 0.01 97,492: 274.2 0.31 0.07 2 C 58 0 56 1031038 577.2 014 0.01 122,387 579 0.06 0.01 39,591.: 212.4 0.1.3 0,04 69,915 237 0.14 0,04 3 Ci 70 0 58 135,2Z7 730.2 - 0.19 0.02 : 1E5,339 730,2 0.08 0.01 100,695 341 0.20 0.04 4 PC 76 0.06 60 iD4,597 . 5T9, 0.14 0.01. 126,694 547.8 0.06 0.01 89,680 304 0.18 0.04 5 C 44 0 60 127,733 669.E 0.18 0 02 157,175 669 0.08 0.01 103,250 250 0.20 0.05 6 C 47 0 60 88,209 4$6.6 0.12 0.01 100,638 486 0.05 0.01 135,995 461 0,27 0.04 7 R 41 0.88 64 62,088 334..8 0,09 0.02 73,532 3E5.4 0.04 0.01 8 C 49 0 60 112,104 577.8 0.15 ;0.02...:1 134,218 608.4 0.07 0.01 9 C 58 0 58 1111767 608.4 05 0.02 139,431 608.4 0.07 0,01 82,600 280 0,16 0.04 10 C 65 0 56 119,726 639,E 0.16 O.Q2. _i' 140,588 1 669 0.07 0,01 71,685 243 0,14 0.04 11 C 70 0 57 124,496 669 0.17 0.0. [1 146,595 669.6 0.07 0,01 100,973 304,2 0.20 0.04 12 C 64 0 56 132,399 700.2 0.18 0,02 157,577 699 0.08 0.01 140,789 456 0.28 0.04 13 PC 56 0 58 121 067 638.4 0,17 0.02 '' 146,518 670.2 0.07 0.01 105,223 335.4 0.21 O.04 14 C 46 0 64 51,205 304.2 007 0.01 '' 130,064 578.4 0.0E D.01 116,170 365.4 0.23 0,04 15 C 55 0 64 106,855 577.8 0.15 D,02 `, 423,283 609 0,06 0.01 168,185 517.2 0.33 0.04 16 C 65 0 64 123,272 669 6 0.17 0.02.. ': 142,316 669,E 0.07 0.01 134,317 456.6 0.27 0.03 17 C 74 0 64 130,659 700.2 0,18 0.02 154,551 701.4 0.08 0.01 117,845 396 0.23 0.04 18 C 75 0 62 1fl5,06.8 547.8 0714 0.02 121,076 547.8 0.06 0.01 110,221 334.2 0.22 0.04 19 C 60 0 62 117,837 639.E 0.16 0.02 141.224 639 0.07 0,01 111,966 365.4 0.22 004 20 C 54 0 62 127,210 609.E 018 0.02 127,210 608.4 0.06 0.01 ;'i 36,539 274.2 0.07 0.02 21 C 71 0 66 137,343 730 8 0.19 0.02 165,524 730.8 0.08 0.01 22 PC 73 0 66 1331685 699.6 D..18 0.02 168,228 700.2 0.08 0.01 23 PC 76 0 64 1.35.133 699.6 :1. =:0.02 160,536 700.2 0,08 0.01 24 PC 63 0 64 139,051 731.4 0 19 '-0.02 'r' 161,496 700.2 0.08 0.01 25 PC 82 0 64 1,256,814 669.E 173 016 .' 153,952 639.E 0.08 0.01 26 CL 57 0 64 134,1.90 700.8 0,18 I0.02 164,037 730.8 0.08 0,01 27 R 45 0,32 64 105,420 581.4 . 0 15 0.01 123,621 578.4 0.06 0,01 28 C 58 0 64 75,417 366 0.,10 002 r> 148,386 639 0.07 0.01 29 30 31 Monthly Loading: 4 816 612i 5 94 ` 3,910,929 1.93 137 0$3 ;` 0,44 11795,948 3.55 12 Month Floating Total (inj: 42 81 18,19 497E 45.79 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February Year: 2022 Field Name. D7 Field Name: 07A Field Name 08A Field Name: 08B Did irrigation occur Area (acres) 14 89 Area (acres): 6 12 Area (acres). 30 38.:: Area (acres): 34.84 at ti11S facility? Cover Crop. Coastal A.0 Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal YES ❑ No Hourly Rate',(En) Hourly Rate (in): ou Hrly Rate (!n): Hourly Rate (in): Annual Rate;(m) 7.. 7 Annual Rate (in): Annual Rate (in): 111.3 Annual Rate (in): 72.2 Weather Freeboard Field lrrigated? 0 YES ❑ No Field Irrigated? ❑ YES ❑ No Field Irrigate.ci? ❑ YES ❑ No Field Irrigated? ❑ YES 0 No a ° Q1 CM N +� N 'is F w . "C7 m �' 67 a c E � c N 'o E m '� m° ? c E; T bi i s as 9 E m 'A w al T c E M. : :. 61 � E m '� w+ rn c E T C m o m �� �a E:� � °'v �0 1=+� �v �n tea: E+� ,�'0 F.�� �a � o E°a 0 E U o }Q ° .n a i= L a o K° W. Mxa o a P o 0 ° a< ° mx° 5 rL. 8I c m ° x! ° mx°: o a cc o x o m cox° ;v w Q J J: � a J J a �- J a: 7 _] °F in ft ft gal. min m in gal min in in gal.' min in n gal min in in 1 C 52 D 1 56 30,2.8 156.13 0 D7 0.03 175,92i3 547 8 2 C 58 0 56 65,756 321,63 0,16 0.03 69,538: 2416 4 0$ 'O.fl2. 3 CL 70 0 58 73,832 358.3 0.18 0.03 `: 130,893 456 0.16 0 02 4 PC 76 0.06 60 471901 227 52 0.12 0.03 ..` 173,290 54.T8 0,21 0,02 5 C 44 0 60 60,151 286.58 0,15 0.03 `. 981590 334.!8 D:12 0,02 6 C 47 0 60 91,840 461.63 0,23 0.03 145,722 486 6 0.18 .o 02 7 R 41 0.88 64 8 C 49 0 60 94,OD5` 3048 0;91 0,02 9 C 58 0 58 77,.72 379,85 0.19 0.03 = 83,092 273.E Or10 002 10 C 65 0 56 73,222 369.65.. 0 18 0.03.. 67,838 2736 0:08 ''0 42 11 C 70 0 57 56,491 284,93 014 0,03 110,066 364 8 D:`13 6.02 12 C 64 D 56 78,8.97 403.93 0.24 0.03. `: 115,718 36b4 D14 0.02 13 PC 56 0 58 62,299 30.4.82 0 15 0.03 105,067 3.65.4.. C 46 0 64 63,60 311.6 0.16 0,03 101,79334 01214 15 C 55 0 64 63 998 322,18 9.16 0,03 .. 187,522 57T$ 0 23 0.02 16 C 65 0 64 77,061 398 08 ;0.19 0.03 74,969 243 0.45 0.11 133,695 425:4 0:16 0.02 17 C 74 0 64 74,648 372.18 0.18 0.03 18 C 75 0 62 42,650 208,82 0.11 003 19 C 60 0 62 69,324 332.58 0.17 0.03 .':' 23,568 91s2 fl 03 O.D2 20 C 54 0 62 21 C 71 0 66 75089 364.13 0.19 0 03 `- 89,785 273.E 0,54 0.12 22 PC 73 0 66 73,771 359.9 0.18 0 D3 '; 78,371 243.6 0,47 0.12 23 PC 76 0 64 74,471 366 0.18 0,03 120,624 396 Qr15 0.02 24 PC 63 0 64 41;666 206.98 0.10 4.03 129,668 365.4 0.78 0.13 114 752.. 365 4 01.14. 0.02. 25 PC 82 0 64 63,959 31.0.38 0.16 207,0 8 639`6 0.25 ..0.02 26 CL 57 0 64 82,216 409.07 0 20 0.03 93,091 277.2 0.56 0.12 211,087 7D0.2 0.26 0 02 27 R 45 0.32 64 109,893. 544.7 0.27. D 43 .I, 139,844 456i6 0 17 0 02 . 28 C 58 0 64 66,499 _ .:325.78 0.16 0,03 s 105,555 365:4 0 29 30 31 Monthly Loading: 1,697 237: 4.20 ; 465,8$4 2,80 2,716,153 3 29 0 o.oa 12 Month Floating Total (in): 41 08 : r 8.52 17:13 10.84 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 ................- Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February Year: 2022 Did irrigation occur Feld Name: 08C' Field Name: 09A Field Name 0913 A1.' Field Name: 09B-A2 Area (acres) i 0 75 Area {acres). 30,38 Area {acres) 4,2 5 Area (acres). 3.85 of this facility? Govercrop. Coastal Cover Crop: Coastal Cover Crop Coastal Cover Crop: Coastal,' Yes ❑ No Hourly Rate (in) Hourly Rate {in}: Hourly Rate {il) Hourly Rate (in): Annaf Rate.(in) Annual Rate (in): 77.1 Annual Rate (in) 21.76 Annual Rate (in): 11.5 Weather Freeboard Field Irrigated? ❑ YFS 0::NO::..Field Irrigated? YES ❑ NO Field.lrrlgated? [�] YES ❑ No =- Field Irrigated? ❑ YES [21 No 0 _ tm m -o a E E E rnE U « m; E � C M E } 'Co E 6 �, ?y0 � 'vo� a O oro. �oo - om a m >E R' :c > =J J J CD H tL °F in ft ft gal':; thin in in gal min in in gal min in in gal min in in 1 C 52 0 56 162,240 507 0.20 0.02 2 C 58 0 56 46,400 145 0.06 0.02 ` 3 Ct_ 70 0 58 4 PC 76 0.06 60 5 C 44 0 60 160,000 500 0.19 0.02 6 C 47 0 60 148,480 464 0.18 0.02 7 R 41 0.88 64 102,400 320 0.12 0.02 8 C 49 0 60 179,840 562 0.22 0.02 9 C 58 0 58 181,440 567 0.22 0.02 10 C 65 0 56 198,720 621 0.24 0.02 11 C 70 0 57 1 57,312 334.8 0.07 0.01 121 C 64 0 56 65,985 364.8 0.08 0,01 1.31 PC 1 56 0 58 60,538 334.8 0,07 0.01 84,516 547,2 0,73 O.D8 14 C 46 0 64 109,912 577.8 0.13 0.01 151 C 1 55 0 64 107,912 608.4 0.13 0.01 16 C 65 0 1 64 70,058 395A 0.08 0.01 17 C 74 0 64 74,886 421.2 0.09 0.01 18 C 75 0 62 114,325 548.4 0.14 0.02 19 C 60 0 62 122,010 639.6 0.15 0.01 20 C 54 0 62 99,317 517.2 0.12 0.01 211 C 1 71 0 66 76,658 396 0.09 0.01 22 PG 73 D 66 143,749 700.2 0.17 0.01 23 PC 76 0 64 142,472 730.8 0.17 0.01 24 PC 63 0 64 137,760 700.2 0.17 0.01 25 PC 82 0 64 129,863 639 0.16 0.01 26 EL 57 0 64 136,018 699.6 0.16 0.01 27 R 45 0.32 64 92,495 517.8 0.11 0.01 28 C 58 0 64 125,897 638.4 0.15 0.01 29 30 31 Monthly Loading: 0 .; 0,00 3,046,687 3,69 84,51& 0.73 0 0.00 12 Month Floating Tatai (in): 48 11 27.05 21 72 11.4$ FORM: NOAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February Year: 2022 Field Name. 09B.131 Field Name: 096-62 Field Name 09C Field Name: 10A Did irrigation occur -- - Area (acres) 1 75, Area (acres). 11.01 Area (acres) 21 48 Area (acres) 15.19 athis facility? Cover Crap: Coastal Cover Crop: Coastal Cover Crop. Coastal.: Cover Crop Coastal: [] Yes ❑ n:o Hourly Rate (in) Hourly Rate (in): Hourly Rate (in). Hourly Rate (in): Annual Annual Rate (in): 11.5 Annual Rate (in): 25 Annual Rate (in): 79.9 Weather Freeboard Fled Irrigated? F] YeS ❑ NO Field Irrigated? R1 YES ❑ No Field. Irrigated? M Yes ❑ No Field Irrigated? H YES ❑ NO o ai n °1 c °' �' c �' m y c 3? rn CL u 'o m E m e • o ?, E m 'a m? E `o E u m ', .a a E a to 'v Es a' m E M �, q fl .0 y T []. O C1. rn F^ !C cv O O oro N 0 o d. 1=. ❑ o 00 O O. '. 1- o oo _� o fl. h R a KOo c6 2 w E m cn 7a .. - �; �a - a tea;: �-; - �; �a - I- a 7' OF in ft ft gal: min in in gal min in in gal ruin in In gal min In in 1 C 52 0 56 2 C 58 0 56 171,531, 577.8 0,29 0.03 203,820 577.8 0.49 0.05 3 CL 70 0 58 223,404 730.8 0,38 .0.03.. 202,293 578A 0,49 0.05 4 PC 76 0.06 60 165,20.6. 578.4 0.28 0.03 5 C 44 0 60 124,954 395.4 0 21 ;O.p3 ' 6 C 47 0 60 151,643 487.2 0:26 0.03 7 R 41 0.88 64 101,830 366 0i.1.7 0.03 8 C 49 0 60 111,824 36418 019 0.03 9 C 58 0 58 100,540 n4 2 0.17 :0.03 10 C 65 0 56 122,72p 425.4 0.21. 145,071 395.4 0.35 0.05 11 C 70 0 57 106,043 334 8 0.18 0.03 126,682 364.8 0.31 0.05 12 C 64 0 56 103,195 364 8 0.18 0A3 114,977 334.8 0.28 0.45 13 PC 56 0 58 94,51.E 547.2 1.99 0,22 10,000 547.2 0.03 0.00 50,618, 334 8 0.09 0.0.2 55,000 330 0.13 0.02 14 C 46 0 64 15 C 55 0 64 " 1 S C 65 0 64 116,121 334.8 0.28 0.05 17 C 74 0 64 126,341 335.4 0.31 0.05 18 C 75 0 62 82,972 243.6 0.20 0,05 19 C 60 0 62 132,019 364.8 0.32 0.05 20 C 54 0 62 21 C 71 0 66 151,051 396 0.37 0.06 22 PC 73 0 66 23 PC 76 0 64 160,503 426.E 0.39 0.05 24 PC 63 0 64 87,289 244.2 0.21 0.05 25 PC 82 0 64 26 CL 57 0 64 147,619 396 0.36 0.05 27 R 45 0.32 64 28 C 58 0 64 133,417 365.4 0.32 0.05 29 30 31 Monthly Loading: 94;5.16 .(; 1.99 10,000 0.03 11533,50$ 263 1,985,175 4,St 12 Month Floating Total (in): 34.39 10.57 2170 : 33.52 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NEAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February Year: 2022 Field Name 10B' Field Name: 10C Field Name 11 Field Name: 12 Did irrigation occur Area (acres) 31,42 Area (acres) 19.8 Area {acre§) 25.13 ', Area (acres) 17.78 at this facility?Cover _ Crop Coastal Cover Crop. Coastal Craver Crop Coasfai Cover Crop: Coastal 0 YES El No Hourly Rate {in): Hourly Rate (in): Hourly Rate (irf) Hourly Rate (in): Annual Rate (m): 3fl Annual Rate (in): 35 Annual Rate (in). 32.36 Annual Rate (in): 6.42 Weather Freeboard Field Irrigated? YES:: ❑ Na Field Irrigated? ❑ YES ❑ No Fieldlrrigated? filyEs ❑ No-. Field Irrigated? 0 YES ❑ NO O i6 ° w 67 a W N .Q m ri N is d rn 7. C E a E : v E T v df b rn �+ E w 7 2' C d zs U! E o Q1 ate.+ rn >' C E; rn 7� c -.., - m a I- N Q1 ap,• rn 7. C E of 7 C y., ` L N y 'Q 1. C. la U = ' Q. :07 .ro L - 3 '� X O p 7 Q_ O_ E (0'N P '� K O Q O R _� �{ ❑ _ :: K.: a ::. �_ 7 0. p O. - of F- ,L {G �X W Q- E E v ap, N >, m p• O .4. Q 1- t Q p :. J .:. J O J Q •C �- 0 p p J Q I-^ !z:, .O J O �;.._ > Q >- O J O J .G G .: ..} 1­_ EL °V in ft ft gall min in In gal min in in gal min in In gal min I In in 1 C 52 0 56 139,150 506 0.26 0.03 88,743; 366. 0.13 0.02 2 C 58 0 56 89,100 324 0.17 0,03 123,144 486 0.17 0.02 3 CL 70 0 58 92,055 323 0.11 0.02 89,375 325 0.17 0.03 171,093 578.4 0 24 4 PC 76 0,06 60 151,905 533 0.18 0 02 72,891 234.42 0.14 0,03 431,640 517.8 0..19 .. 0 02 5 C 44 0 60 64,980 228 0.08 0 02 ` 126,025 487 2 0.18 0.02 6 C 47 0 60 132,240 464 0.16 0 02 106,460 4566 0.15 0.02 7 R 41 0.88 64 87,725 319 0.16 0.03 88,153 3354 0.12 0,02 8 G 49 0 60 65,725 239 0.12 0.03 111,494 456 0.16 0,02 111,494 456 0,23 0.03 9 C 58 0 58 127,639 4566 0.18 0.02..! 127,639 456.6 0.26 0.03 10 C 65 4 56 42,186 189.08 0.08 0.02 165,692 4806 023 0.03 11 C 70 0 57 108,343 3342 0.13 002 81,129 321,98 0.15 0.03 178,991 517,2 025 '0.03 :` 12 C 64 0 56 138,5i0 486 ... 0.16 0.02 74,991 337.5 0,14 0.02 100,643 608A 0 14 0.01 44,000 608.4 0.09 0.01 13 PC 56 0 58 101,7.45 357 0.12. 0.02 81,541 308.58 0.16 0.03 14 C 46 0 64 571855 203 007 0.02 73,191 283.2 0.14 0,03 15 C 55 0 64 85X7... 273,E 0.10 0.02 124,516 489.68 0.23 0.03 16 C 65 0 S4 32;257 152.4 0.fl4 0.01 94,373 360.4 0.18 0.03 17 C 74 0 64 82,136 313.45 0.15 0.03 18 C 75 0 62 135,613 498.88 0.25 0.03 19 C 60 0 62 71,540 270.48 0.13 0.03 20 C 54 0 62 70,767 263,72 0.13 0.03 21 C 71 0 66 91,522 348,77 0,17 0.03 22 PC 73 0 66 80,898 303.32 0.15 0,03 23 PC 76 0 64 53,996 212.37 0.10 0.03 24 PC 63 0 64 84,558 314.68 0.16 0.03 25 PC 82 0 64 88,449 326.42 0.16 0.03 26 CL 57 0 64 94,266 362.32 0.18 0.03 27 R 45 0.32 64 112,682 432.22 0.21 0.03 28 C 58 0 64 85,120 328.88 0,16 0.03 29 30 31 Monthly Loading: 965;697:` f.13 2,167,460 4,03 1,519 717: 2 14 283,133 0.59 12 Month Floating Total {in): 27.73 28.40 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin month: February Year: 2022 Meld Name. 13 Field Name: 14 Field Name. 15C Field Name: 16 Did irrigation occur Area (acres): 31 42 Area (acres): 12.07 Area (acres) 18 D3 Area (acres) 12.95 at this facility? Cover Crop: Coastal..:..Cover Crop: Coastal Cover Crop. Coastal.' Cover Crop: Coastal. D YES ❑ No Hourly Rake (in) Hourly Rate (in): Hourly Rate (in). Hourly Rate (in): Annual Rate,(in). 31.42 Annual Rate (in): 78.02 Annual.Rate (in). 39 21 ' Annual Rate (in): 65.38 Weather Freeboard Field Irrigated? D YTs ❑ No ' Field Irrigated? ❑� YES ❑ NO Field irrigated? DYES ❑ NO Field Irrigated? YES ❑ NO E E CYl 7 E p " m E E E� E a E ma E; arbg .o ..a . x . h at o a E m QL EL .rnci ~ i1 © m C ar in ft ft gal:: min In in gal min in in gal min it1 in gal min in in 1 C 52 0 56 881743 366 0. J0.. 0.02 98,760; 506 0:20 0.02 i- 36,028 155,78 0.10 0.04 2 C 58 0 56 123,144 486 014 002 48,360 248 0,15 0.04 46,117 588.0;2 0.09 #VALUEI 120,787 541.82 0.34 0.04 3 CL 70 0 58 171,094 576.4 0.20 0102 :> 39,990 577.8 0.12 0.01 37,491 61527 008 0.01 88,271 398.08 0.25 0.04 4 PC 76 0.06 60 131,640 517.8 0.15 0.02 ` 43,290 222 0.13 0.04 33,238 580.23 0.07 0.01 51,682 233.28 0.15 0.04 5 C 44 0 60 125,025 4872 :0.15 0.02 85,605 439 0.26 0,04 55,965; 287; 0.11 0 02 (, 147,891 620.9 0.42 0.04 6 C 47 0 60 106,460 456 6 0.12 0.02.....80,145 411 0.24 0,04 90,675. 465 0 02.... 104,305 463.8 0.30 0.04 7 R 41 0,88 64 88,163 335.4 0.10 0,02 i 52,845 271 0.16 0.04 62,400.: 320 0 i.3 0 02 . ; 73,645 318.75 0.21 0.04 8 C 49 0 60 111,494 456 013 0,02 79,560 408 0.24 0.04 %260.; 26.8. 0; 1 0.02 : 67,344 290.23 0.19 0.04 9 C 58 0 58 85,020 436 0.26 0.04 49,920 256. 0.10. 0.02 76,755 327.1 0.22 0.04 10 C 65 0 56 87,945 451 0.27 0.04 76,723, 385.45 0.16 0.02 'i 84,021 369.25 0.24 0.04 19 C 70 D 57 34,288 517.8 0.10 0.01 68,641: 336.88 0.14 0.02 -' 70,098 298.08 0.20 0.04 12 C 64 0 56 105,300 540 0.32 0.04 86,512, 435.63 0.18 0.02 : 87,212 372.92 0.25 0.04 13 PC 56 0 58 98,670 506 0.30 0.04 125,1.92 619.02 0.26 0.02 73,970 313.27 0.21 0.04 14 C 46 0 64 30,084 456.6 0,09 0.01 64,993 318.48 0.13 } 03 78,683 32q.97 0.22 DA4 15 C 55 0 64 45,743:' 2276 009. 0.02 74,470 322.28 0.21 0.04 16 C 65 0 64 24,848 395.4 0,08 0.01 79,666 406, 0;15 0.02. 80,167 340.03 0.23 0.04 17 C 74 0 64 138,6$7 688.67 0;28 ;O.D2 151,034 616.95 0.43 0.04 18 C 75 0 62 67,335 3116 0:14 .0 03 .:: 49,678 210.1 0.14 0.04 19 C 60 0 62 41,076 580.8 0.13 0.01 57,963 315:75 0;1.4 0.03 79,392 334.08 0.23 0.04 20 C 54 0 62 31,761 489.6 0.10 0.01 65,152 303,9 0.13 0.03 89,056 363.72 0.25 0.04 21 C 71 0 66 33,263 519.E 0.10 0.01 71,70 34D5 0,15 0.03 ': 85,137 350.4 0.24 0.04 22 PC 73 0 66 40,608 580.2 0.12 0.01 80,898 303 32 0 17 0.03 : 120,623 489.72 0.34 0.04 23 PC 76 0 64 40,448 702.E 0.12 0.01 83,961: 389 08 0 17 0.03 93,428 395.33 0.27 0.04 24 PC 63 0 64 35,728 519.6 0.11 0,01 .68,032' 315.33 0.14. `0.03 85,243 345.63 0,24 0,04 25 PC 82 0 64 28,797 366.6 0.09 0.01 72,838. 33553 0:15 0 03 .;7 86,504 352.32 0.25 0.04 26 CL 57 0 64 37,691 489 0.12 0.01 91,89.1. 43277 019 0.03 `' 85,717 360.38 0.24 0.04 27 R 45 0.32 64 115,341 54537 0.24 0,03 132,120 545.78 0.38 0.04 28 C 58 0 64 32,813 457.8 0.10 0.01 71,632 32725 015 0.03 ;: 75,216 306.5 0.21 0.04 29 30 31 Monthly Loading: 946 753. 1.11 1,218,135 3,72 2,069,793 4 23 2,448,473 EM 6.96 12 Month Floating Total (in): 29.28 ` 38.33 32:34 41.15 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February Year: 2022 Field Name 18 Field Name: 1=ield Name. Field Name: Did irrigation occur . Area (acres) 2.25 Area (acres): Area (acres} Area (acres): at ti11S facility? Cover Crop Coastal Cover Crop: Cover Crop. Cover Crop: JA YES ❑ No Hourly Rate;(in) Hourly Rate (in): Hourly Rate in Hourly Rate {in}: Annual Rate (m): 65.39 Annual Rate (in}: Annual Rate {(rt): Annual Rate (in): ' Weather Freeboard Field irrigated? [ YES ❑ NO Field Irrigated? ❑YES ❑ NO Field irrigated? ❑YES ❑ NO Field Irrigated? ❑YES ❑ NO m c ° V _ n E d V � M. E noEx U) E E Ea E� Em E D mE„m >rn_ E A N 0) xo CS a CQ : > pE � te �E,rnvaa 4- m 2 0a _j F ° LO OF in ft ft gal: mire in in gal min in in gal min... Iri in gal min in in 1 C 52 0 56 2 C 58 0 56 3 CL 70 0 58 37,294 297.38 0.61 0.12 4 PC 76 0.06 60 5 C 44 0 60 6 C 47 0 60 7 R 41 0,88 64 8 C 49 0 60 9 C 58 0 58 141316 109.82 0 23 0.13 10 C 65 0 56 11 C 70 0 57 12 C 64 0 56 391047 307.37 0,64 0.12..': 13 PC 56 0 58 14 C 46 0 64 77777777. 15 C 55 0 64 4,207 32,1.25 0.07 0.01 16 C 65 0 64 34;270 26.1.73 0.56 17 C 74 0 64 18 C 75 0 62 28,007 209.5 0.46 19 C 60 0 62 20 C 54 0 62 21 C 71 0 66 38,736 283.73 0.63 0.13..:`. 22 PC 73 0 66 23 PC 76 0 64 24 PC 63 0 64T. 82 0 64 57 0 64 36,700 269.63 0.60 .. " 0.13 45 0.32 64 UR 58 0 64 Monthly Loading: 232527 ` 3.81 0 0.00 0 .': 0:00 0 0.00 12 Month Floating Total (in): 48.56::: FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Dublin Month: February Year: 2022 Field Name: 02C Field Name. 03 Field Name: OS Field Name: 07 Field Name: 07A Area (acres): 9.16 Area (acres): 15.66 Area (acres): 18.03 Area (acres) 9.57 Area (acres): 6.12 Cover Crop: Coastal Cover Crop; Coastal :' Cover Crop: Coastal Cover Crap: Coastal Cover Crap: Coastal Load Type: PAN road Type: PAN Load Type; PAN Load Type AN Load Type: PAN Field Loaded? 0 YES ❑ No Field Loaded? [ vas ❑ No Field Loaded? ❑ Yes (] NO Field Loaded? Q YES ❑vo' Field Loaded? [ Yes ❑ NO a a°aa a°a' Qa ° y ° a 'a >' a a a _L CL n CLC o a) 0 z E. tn � z zz o a >U a o Uo oo oV ¢ U o a o V > Month gal mg1L lbslac Ibslac '` gal mg!L lbslac Ibslac`.i gal mglL Ibslac Ibslac gal '.;; mg IL. Ibslac Ibslac,; gal mglL lbslac Ibslac March 0 37A8 0.0 0.0 787,992 3T48 157 157. . 1,867,735 37.48 32.4 32.4 2,161,097 37.48 70 6 70 6 . 0 37.48 0.0 0.0 April 0 55.03 0.0 0.0 0 ' S5.03 0,0 157.', 2,485,830 55.03 63.3 95.7 2,564;068. 55.03 1230 1936'i 0 55.03 0.0 0.0 May 503,648 59,21 27.2 27.2 988,083.. 59;21 31: 2 46.9.; 1,320,394 59.21 36.2 131.8 277,237 59.21 1413 20.7 9 125,793 59.21 10,2 10.2 June 35$,638 48.56 15.9 43.0 2,065137 48 56 53 4 1 M3 . 267,393 48.56 6.0 137.8 ``,1,754,Z:70 48;56 74 3 282 1 . 0 48.56 0.0 102 July 1,111,575 73.26 74.1 117.2 3,484,1g8 7.326 135,9 236.2 1,163,636 73.26 39.4 177.3 s'1,669,021 73.26 106:6 3861...' 257,228 73.26 25.7 35.8 August 63,939 41.28 2A 119.6 `4,684 8q9 41 28 103`0 339,2.j 189,072 41.28 3.6 180.9 2,301,346 41 28 82 8 471 5 ' 74,458 41.28 4.2 40.0 September 1,915,287 47 82.0 201.5 2,359,348 47 591 39$:3. 2,796,617 47 60.8 241.7 `657,600 47, 269 4984 ` 281,707 47 18.0 58.1 October 1,781,765 47.77 77.5 279.0 '1,004,379 4777 256 423.8. 0 47.77 0.0 241.7 r1,409,439 47.77 58:7 55711 106,667 47.77 6.9 65.0 November 405,853 47.69 17.6 296.6 ;5, K 540 47 69 131.:7 555.5 69,117 47.69 1.5 243.2 >1,761,2 3 4769 73:2 63.0 3: 0 47.69 0.0 65.0 December 984,645 64.63 57.9 354.E '4,182;144 6463 143,9 639.4. 545,224 64.63 16.3 259.5 889,953 64:63 50,;1 6804f; 73,800 64.63 6.5 71.5 January 732,742 55.64 37.1 391.7 i2,295 026 55.64 68;0 767.4: 619,865 55.64 16.0 275.4 11. 41 375 55.64 74,7 755 1 ;i 30,600 55.64 2.3 73.8 February 859,822 58.95 46.1 437.8 '3,054 519 6&95 95;9 863.3.; 0 58.95 0.0 275.4 11 1,697 237 58i95 K21 642 3' 465,884 58,95 37.4 111.3 12 Month Floating PAN toad (Ibslaclyr): 437.8 863;3 275.4 842;3 111.3 Annual PAN Load Limit (Ibslaclyr}: FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February Year: 2022 Field Name: 08A Field Name: 08B Field Name: 08C Field Nar�e 09A Field Name: 09B-A1 Area (acres): 30.38 Area {acres}: 34,84 Area (acres): 10.75 Area (acres}. 30 38 Area {acres}: 4.25 Cover Crop: Coastal Cover Crop, Coastal Cover Crop: Coastal Cover Crop. Coastal Cover Crop: Coastal Load Type: PAN Load Type: PAN.::..Load Type: PAN load Type: PAN Load Type: PAN Field Loaded? [AYES ❑ NO Field Loaded? Field Loaded? ❑ YES [ANO 1 field Loaded? ❑ YES ❑ iS0 : Field Loaded? (� YES ❑ NO v a o ¢ as c z o z a� z° z w z Q z m ti r z b a z m aj a ¢ a aj a .� aCL O ,� O �, W E. ra ° N 0zz E �� o I aa oV a : o < ? > o o � > o U a o U b ¢ar Ua aw UU > � Month gal mglL Ibslac lbslac gal m.g1L Ibslac lbslac', gal mg1L lbslac Ibslac gal mg[L Ibslac Ibslac: gal mg1L lbslac lbslac March 3,512,059 37.48 36.1 36.1 2,523,781.:37.48..22 6 22 6 .; 0 37.48 0.0 0.0 O.J.37A8 0-0.::.0.0 0 37.48 0.0 0.0 April 1,949,388 55.03 29.4 65.6 2,417;3i19 55,03 31 8 54 5 : 1,3$6,041 55.03 59.2 59.2 1,567,934 55;03 23.7 23.7 ; 0 55,03 0.0 0.0 May 2,071,552 59.21 33.7 99.3 1,247,854 59,21 17 7 72.2. 696,507 59,21 32.0 91.2 3,155 594 59.21 51,3 75.0 178,630 59.21 20,8 20.8 June 2,571,119 48.56 34.3 133.5 1,299A42 48 56 15 1 87 3 :.,' 2,109,108 48.56 79.5 170.6 1,702 326 48.56 22:7 97,7 521,030 48.56 49.6 70.4 July 0 73.26 0.0 133.5 0 73:26 0,0 873 `, 2,024,002 73.26 115.0 285.7 1,652267 73,26 332 1309; 554,855 73.26 79.8 150.2 August 3,638,989 41.28 41.2 174.8 1.25138.1 4128 124 996 2,301,149 41,28 73.7 359A 348,64:1 . 4128 3,9. 134:8i 577,563 41.28 46.8 197.0 September 1,065,432 47 13.7 188.5 2,494,595 47: 28 1 127.7 : 356,421 47 13.0 372,4 ` 372,83. 47s 4,8 139;6 334,474 47 30.8 227.8 October 0 47.77 0.0 188.5 658,902 47 77 7.5 135.2 , 1,726,929 47.77 64.0 436.4 3,293,219 47.77 43:2 182 8i 83,308 47.77 7.8 235.6 November 127,328 47.69 1.7 190.2 427,322 . 4769 4.9 140.1 ` 2,576,950 47.69 95.3 531.7 `i2.682,899 47 69 33 8 216;6 171,224 47.69 16.0 251.6 December 0 64.63 0.0 190.2 455,440 . 64. 63 7.0 147.2, 864,441 64.63 43.3 575.0 11,905 280.64.63...33 8 250A. 0 64.63 0.0 251.6 January 1,529,315 55.64 23.4 213.5 0. 55.64 ..0.0 147.2 0 55.64 0.0 575.0 :2,698;91 55.64 4.1 2 291.7 0 55.64 1 0.0 251.6 February 2,715,153 58.95 43.9 257.5 0 5895 00 147.2'! 0 58.95 0.0 575.0 3,0466$7 58;95 493 3410 84,516 58.95 9.8 261.4 12 Month Floating PAN Load 257.5 147:.2 575.0 341'0'. 261.4 (I bslaclyr): Annual PAN Load Limit FORM; NDMLR 08-19 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of FORM: NDMLf2 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February Year: 2022 Field Name: 10B Field.Name: 10C Field Name: 11 Field Name: 12 Field Name: 13 Area (acres): 31.42 Area (acres): 19.8 Area (acres): 26.13 Area (acres). 17.78 Area (acres): 23.26 Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Coastal Cover Crap: Coastal Cover Crop: Coastal Load Type: PAN Load Type. PAN Load Type: PAN Load Type: PAN Load Type: PAN Field Loaded? ❑ Yes ❑ No Field Loaded? ❑ Yi=s ❑.No :` Field Loaded? 0 YES ❑ No Field Loaded? ❑ YEs ❑ NO Field Loaded? ❑ YES ❑ No O O a CL a N ? a° °' m aY O U C au z R- 'a a� O C '-.'� O o 7 E a 3 �e a a N E 3 a 2 °' i7Y:.0 1�.1 -:C a� a f1 V L O C ^.� p ;s . o - �: E a_ 7 cs0. a Q Q a N E j O ay d f� �u Ol C V d a� z a °- -a a� 2 O C '-� O �V N O 7 7 Q �e a a 4 a 41 _ E 7 ? C ay d :r° (V. 0) .0 -.G a� a d ,o �.� = O C J O .' ;a' ..O E Q < :: c� Q n- a (U E 7 j z O a° °' 12 M C L) O C a� Z a °- a O J O ;� .� o E a 7 a Month gal 1,934503 mg1L Ibslac Ibslac gal mg!L Ibslac Ibslac' gal mg1L Ibslac Ibslac ` gal rog1L Ibslac Ibslac`I gal mg1L Ibslac Ibslac March 37.48 19.2 19.2 2,144,949 37,48 339 339 2,816,472 37.48 33.7 33.7 919,31.0 37.48 16.2..16.2.: 1,825,667 37.48 24.5 24.5 April 2,806:7801 55.03 41.0 60.2 93,840 55 03 .2.2 .36.0..'; 3,001,132 55.03 52.7 86.4 613,187 55 03 15;8 32 0 408,733 55,03 8.1 32.6 May 352,924 59.21 5.5 65.8 1,242,300 5923 ..31.0. 67 0 'l. 2,118,684 59.21 40.0 126.4 0 ` 59 21 00 32 0 - 1,623,329 59.21 34.5 67.1 June 1,888,761 48,56 24.3 90.1 0 '' 4856 0.0 67=0 ` 1,883,802 48.56 29.2 155.6 66,841 48.56 1.5 335: 1,987,356 48.56 34.6 101.7 July 3,243,207 73,26 63,1 153.2 A,304294 73.26 402 107.3i 3,154,288 73,26 73.8 229A 0 7U6 00 335 3,192,618 73.26 83.9 185.5 August 3,209,364 41,28 35.2 188.4 3,371;727 4128 586 165.9 1,842,184 41.28 24.3 253.7 438;618 4128 8:5 420:: 3,871,234 41.28 57.3 242.8 September 1,157,875 47 14.4 202.8 0 47 00 1659 870,409 47 13.1 266.7 0 47. O.0 424 ` 6,143,058 47 103.5 346.3 October 4,015,244 47.77 50.9 253.7 1 364 509 :47.77. 2T5 1.93.4. 1,256,272 47,77 19.2 285.9 251;755 47.7.7 6.6 474. ; 2,377,503 47.77 40.7 387.1 November 4,134,402 47.69 52.3 306.1 2,474,522 47 69 49.7. 243.1.: 989,660 47,69 15.1 300.9 0 :47.69. 0,0 476 ;` 1,584,025 47.69 27.1 414.2 December 1,416,194 64.63 24.3 330.4 :2,030,678 64,63 553 298..3 1,255,650 64.63 25.9 326.8 0 64 63 0.0 47.6 .. 1,145,021 64.63 26.5 440.7 January 467,526 55.64 6.9 1 337.3 s.1,221,261 55;64 28;6 327.0 1 2,236,514 55.64 39.7 1 366.E 528,294 55 64 13 8 61 4 :: 1,699,581 55.64 33.9 474.E February 965,697 58.95 15.1 352.4 2,167,460 58,95 53 8 . 380.8. 1,519,717 58.95 28.6 395.2 ': 283,133 .58 95 7i8 69 3 ; 946,753 58,95 20.0 494.6 12 Month Floating PAN Load (lbslaclyr): 352.4 380.8 395.2 69.3 494.E Annual PAN Load Limit FORM: NDMLR 08-11 NON -DISCHARGE MASS LOADING REPORT (NDMLR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February Year: 2022 Field Name: 14 Field Name > 15c Field Name: 16 .:Field Name: 18 Field Name: Area (acres): 12.07 Area {acres} $ 03 Area (acres): 12.95 Area {acres.}. 2.25 Area (acres): Cover Crop: Coastal Cover Crop. Coastal :` Cover Crop: Coastal Cover Crop: Coastal Cover Crop: Load Type: PAN Loatl Type: PAN Load Type: PAN Load Type. PAN Load Type: Field Loaded? [J YES ❑ NO Field Loaded! ❑YES ❑ No ' Field Loaded? 0 YES ❑ NO Field. Loaded? YES ❑ . ❑ No ': ? Field Loaded? ❑YES ❑ No c ° ZrL Z d Z o z as w z o z ass z O z m ° a ELQ v ° Ln 0. ° o a° a m r % a¢ N A M C i O r Q O E m e L O E .�. [57 C ° zz a E a a E a� a a� a� U Month gal mglL Ibslac Ibslac gal mg 1L lbslac Ibslac gal mg1L Ibslac ibs/ac gal % mglL Ibslac lbslac`. gal mglL Ibslac lbslac March 2,276,192 37.48 58.9 58.9 2,fi67,054 37,48 46:2 46;2 2,859,698 37.48 69.0 69.0 353,475 37.48 49.1 49:.1 April 664,461 55.03 25.3 1 84.2 2,682,77$ 55;03 68:3 1145s1. 2,135,726 55.03 75.7 144.7 501,248;' 55..03 61.4. 1166.. May 1,611,521 59.21 65.9 150.1 9041326 59,21 248 139;3; 474,070 59.21 18.1 162.8 288,126 59.21 63,21 1738' June 1,017,055 48.56 34.1 184.3 :1,798,258 4456 40.4 179 7.. 443,527 48.56 13.9 176.7 419,042 48,56 75.4 249.2 . July 1,147,964 73.26 58.1 242.4 899,468 73 26 30.5 240.2. i 2,322,877 73.26 109.6 286.3 167,247. 73.26 45,4 294 6.'; August 1,312,690 41.28 37.4 279.8 '.`674,235. 4128 12.9 223.0> 2,347,813 41.28 62.4 348,7 475,765`. 41A 72.8; 367A: September 278,102 47 9.0 288.9 i2,146,331 47 46.7 2697I 1,930,150 47 58.4 407.1 7775 47 29.8 3973 October 1,262,728 47.77 41.7 330,5 ;1,123,071 47,77 248 2945I 523,100 47.77 16.1 423.2 113,945'_ 47,77 20.2; 417;4i November 1,164,542 47.69 38.4 368.9 482,141 47.69 O.A 3052i 31,700 47.69 1.0 424.2 155,736;. 4769 27:5. 445i0.; December 1,738,826 64.63 77.7 446.E 1,304634 6463 39.`0 3442... 0 64.63 0.0 424.2 256,510) 64:63 .606.4. January 1,144,12$ 55,64 44.0 1 490.5 '1,754595 5564 45..1 389.3'. 1,810,2991 55.64 64.9 1 489.0 384,191., 56,64 79.2. 5857.: February 1 1,218,135 58.95 49.6 1 540.2 2,069,793 58 96 56.4 445,7` 2,448,4731 58.95 93.0 1 582.0 232,527.. 58.95 56.8 636 5 12 Month Floating PAN Load ` (lbslaclyr}: 540.2 445.7 582.00.0 Annual PAN Load Limit (lbslaclyr): FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.! WQ0000884 Facility Name: Mt. Olive Turk e y P r oce s s i n g Facility I County: Duplin Month: February /1Flow Measuring P. ■ Effluent ■ No now generated Parameter Monitoring •. ■ Influent ■ Effluent ■ Groundwater Lowering ■ surface water Parameter .. ® • 11 . •11 •. .11 sa.mpling Type: FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0000884 Facility Namo: Mt. Olive Turkey Processing Facility County: Duplin Month: February • • I #E ® 1 i M® see E ■- : lil FORA: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.- VVQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February • nI 1, " # 1 11 �:Yi� • 1 # 1 ® 1 I1 E m, 1/ m M.bnthly 1 . FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: VVQ0000884 Facility Name: Mt. Olive Turkey Processing Facility county: Duplin Month: February Year: 2022 PPI: 004 Flow Measuring Point: ❑ influent ❑ Effluent ❑ No flow generated Parameter Monitoring Point: ❑ Influent Q Effluent ❑ Groundwater Lowering ❑ Surface Water Parameter Code -► 50050 : 00310 00916 00680 00940j 50060 31616 00927 00630 .: 00610 00625': 00620 00556 .` 00400 WQ09C: 00931 y c Q ca 3 + E Q1 E o 16 o = b)E ��+ +oo Zo oa o fL U U QO ozC O l- 0 24-hr hrs GIRD mglL mg/L .: mg1L mg1L.:") mg1L 0/1.00:mL mg1L mg/L..:` mg1L mg/L ':i mg/L mg1L ! su mglL :r Ratio 1 07:00 8.5 1;406,000! 0.07 7.45 2T 07:00 8.5 1,748,000 0.25 7.47 3 07:00 8.5 2,173,000. 388 9.2. 89.9 0.36 G;�1 5,24......0.27....88.2 121 0.22 8.6 7.39 54;21 11.34 4 07:00 8.5 1,7.19,000 0.21 7.58 5 07:00 8.5 1;492,000 0.12 7.62 6 ,590,000 0.21 7.58 7 07:00 8.5 852,000 0.21 7.57 8 07:00 8,5 1,176,000. 0.48 7.49 91 07:00 8.5 1281,000 0.37 7.55 101 OT.00 8.5 154000' 0.22 7.48 Ill 07:00 8.5 1631,000.. 0.55 7.49 121 1,883,000 0.34 7.44 131 1,552,0fl0 0.39 7.57 141 07:00 8.5 1,140,000 0.33 7.57 151 07:00 8.5 1.,445,000.. 0.19 7.57 161 07:00 8.5 1564,000.': 0.31 7.47 171 07:00 8.5 1471,000: 317 :10 110 0.4 3260 6.43 0.62 78.8 158 0.44 10,8 7.51 63.68 13.04 181 07:00 8.5 1,105,000' 0,3 7.73 191 07:00 8.5 1232,000i 0.26 7.64 20 928,000 i 0.34 7.5 211 07:00 $.5 1,390,000 0.4 7.59 221 07:00 8.5 1;1921000 0.46 7.51 231 07:00 8.5 1418,000 0.26 7.55 241 07:00 8.5 1352,000 0.41 7.52 251 07:00 8.5 1.;220,000.. 0.49 7.49 261 07:00 8.5 1646,000; 0.44 7.54 271 1;326,000, 0.41 7.74 281 07:00 8.5 1;261,000 0.44 7.6 29 36 31 Average: 1,419,036, 352.50 9.60 .: 99.95 0.33 5.71.10 5.84 0 40 ,< 83.50 139.50. 0.33 .9.70 ..'. 5895. r,': 12.19 Daily Maximum: 2,173,000` 388.00 1.0. 00 110.00 0.55 3,260.00. 6.43 0.52 88.20 1.16.8.00 0.44 10.80 .' 7.74 63.68 13,04 Daily Minimum: 852,000 317.00 9.20 .` 89.90 0.07 1.00 5.24 0,27 78.80 121.00, 0.22 3.60. 7.39 ..54.21 11.34 Sampling Type: Recorder:: Grab Grab '. Grab Grab ' Grab Grab Grab Grab ' Grab Grab '< Grab Grab ` Grab Calculated Calculated Monthly Limit: Daily Limit: Sample Frequency: Continuous 2 x Month 2 x Month 2 x Month 3 x Year 5 x Week .2 x Monthi 2 x Month 2 x Month ` 2 x Month i2 x Month 2 x Month 2 x Month 5 x Week 2 xMonth 2 x Month FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQ0000884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February r ® 1 r•�i r ® r 11 '® . ,•. ., r rr r • . -SamplingT FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: Q0000:84Processing Facility . Duplin I Month;February Flow Measuring Point:generated _.. _. .. ... .. ... Parameter Monitoring Point: El influent El Effluent E] Groundwater Lowering Surface Water Parameter Code ---p- • • f • � M 1021 r ® r rr Sampling Type:': Mvnthly Limit: FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No,:1i1111884 Olive Turkey Processing • Duplin Month:February1 •_ Its � -- . •. ■ ■ ■ '. - - - ..- I1�:1 � Fi. 1 11� 11. I ii•11 • m Average. 1.80 1.00 0r56 1.70 14.70 Daily Maximum: 1.80.. " 5.00 0.56 1.70 14A0 '. 6.01 Daily Minimum. 1.80 .' 5.00 0.56 .:`.. 1.70 14.70 6.01 Sampling Type: Grab::.Grab Grab Grab Grab '.'< Grab Monthly Limit: Daily Limit: Sample Frequency Monthly Monthly Monthly:.: Monthly Monthly ' Monthly 1. FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: WQOOOO 884 Facility Name: Mt. Olive Turkey Processing Facility County: Duplin Month: February ............. Parameter Code ---o- • • ®® go m • 1/ � - m# Is �. /�E= tum ® 1 Nally Minimum. # FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permit No.: 111111::4 .. Olive Turkey Processing Facility County:Duplin Month:-• i 1 eLarameter Uwe • o + • , ' now _.. F m FORM: NDMR 03-12 NON -DISCHARGE MONITORING REPORT (NDMR) Page of Permitll0000::4 Olive Turkey Processing Facility County: r -4 i •i• 11.71 li. 1 11. 11. I 11.11 • r O • I 41 : • i /. /• :1 11 4