August 17, 2007
Caldwell County
WQ Project No. 071307
NCSR 1301 (Broadway Street) Bridge No. 75 Replacement
APPROVAL of 401 Water Quality Certification with Additional Conditions
Mr. Charles Beck
Director of Public Works
City of Lenoir
Post Office Box 958
Lenoir, North Carolina 28645
Dear Mr. Beck:
You have our approval, in accordance with the attached conditions and those listed below, for the following impacts in
Spainhour Creek, for the purpose of replacing Bridge No. 75 on NCSR 1301, Broadway Street in the City of Lenoir,
Caldwell County:
Stream Impacts in the Catawba River Basin
Site Permanent Fill Temporary Fill in Permanent Fill in Temporary Total Stream Stream
in Intermittent Intermittent Stream Perennial Stream Dewatering in Impact Impacts
Stream (linear (linear ft) (linear ft) Perennial Stream (linear ft) Requiring
ft) (linear ft) Nlitigatio
n (linear
ft)
Site 1 64 64 0
Total 64 64 0
Total Stream Permanent Impact for Project: 641inear feet.
The project should be constructed in accordance with your application dated July 27, 2007 (received July 31, 2007),
including the environmental commitments made in the application letter. After reviewing your application, we have
decided that these impacts are covered by General Water Quality Certification No. 3627. This Certification corresponds
to Regional General Permit Number 31 issued by the U.S. Army Corps of Engineers. In addition, you should acquire
any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and
Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the
accompanying 404 Permit.
This approval is valid solely for the purpose and design described in your application (unless modified below). Should
your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner
must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the
conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now
or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506
(h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any
additional conditions listed below.
One
No hCarolina
~aturally
North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 296-4500 Customer Service
Internet: www.ncwaterquality.org FAX (828) 299-7043 1-877-623-6748
An Equal Opportunity/Affirmative Action Employer
Mr. Charles Beck
August 17, 2007
Page Two
Erosion and sediment control practices must be in full compliance with all specifications governing the proper
design, installation and operation and maintenance of such Best Management Practices in order to protect surface
waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control
Planning and Design Manual.
b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be
such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina
Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow
sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the
project.
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with the
requirements of the Sedimentation Pollution Control Act.
2. There shall be no excavation from or waste disposal into, jurisdictional wetlands or waters associated with this
permit without appropriate modification. Should waste or borrow sites be located in wetlands or streams,
compensatory mitigation will be required since that is a direct impact from road construction activities.
3. Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this
Certification. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall
be removed and the natural grade restored upon completion of the project.
4. Adequate sedimentation and erosion control measures must be installed and maintained on the project site to
minimize sediment transport to downstream aquatic resources. Temporary cover (wheat, millet or similar annual
grain) or permanent herbaceous cover should be planted on all bare soil within fifteen (15) days of ground disturbing
activities to provide long-term erosion control. Erosion control mating should be used in conjunction with
appropriate seeding on disturbed soils in steep slope and riparian areas. Steep slopes are defined as those slopes
graded at an angle, which cannot retain vegetative cover. Matting shall be secured in place with staples or wherever
possible, live stakes of native trees. Straw mulch and tall fescue shall not be used in riparian areas.
5. For projects impacting waters classified by the NC Environmental Management Commission as Trout (Tr), High
Quality Waters (HQW) or Water Supply I or II (WS-I, WS-II), stormwater shall be directed to vegetated buffer
areas, grass-lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff
prior to discharging directly into streams. Mowing of existing vegetated buffer areas is strongly discouraged.
6. Bridge deck drains should not discharge directly into the stream. Stormwater shall be directed across the bridge and
pre-treated through site-appropriate means (grassed swples, pre-formed scour holes, vegetated buffers, etc.) before
entering the stream. Please refer the most current version of the Division of Water Quality's Stormwater Best
Management Practices Manual.
7. Demolition and Removal of the old bridge structures must follow US Army Corps of Engineers requirements.
8. Native riparian vegetation (e.g. rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and
red maple) must be reestablished within the construction limits of the project by the end of the growing season
following completion of construction.
9. Riprap shall not be place in the active thalweg channel or placed in the streambed in such a manner that precludes
aquatic life passage. Bioengineering boulders or structures should be properly designed, sized and installed.
10. The use of riprap above the Normal High Water Mark shall be minimized. Any riprap placed for stream stabilization
shall be placed in stream channels in such a manner that it does not impede aquatic life passage.
11. Heavy equipment shall be operated from the banks rather than in the stream channels in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream.
12. All mechanized equipment operated near surface waters must be regularly inspected daily and maintained to prevent
contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
13. The dimension, pattern and profile of the stream above and below the bridge shall not be modified. Disturbed
floodplains and streams shall be restored to natural geomorphic conditions.
Mr. Charles Beck
August 14, 2007
Page Three
14. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures such as
sandbags, rock berms, cofferdams and other diversion structures should be used to prevent excavation in flowing
water.
15. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters
is prohibited.
16. If concrete is used during construction (e.g., headwalls), a dry work area shall be maintained to prevent direct contact
between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be
discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills.
17. No rock, sand or other materials shall be dredged from the stream channel, except where authorized by this
certification.
18. A copy of this Water Quality Certification shall be maintained on site at the construction site at all times. In
addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the City
of Lenoir or the on-site project manager.
19. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality
standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any
other appropriate requirements of State or Federal law. If DWQ determines that such standards or laws are not being
met (including failure to sustain a designated achieved use) or that State of Federal law if being violated, or that
further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification.
20. This certification does not authorize the discharge of waste rock and dirt into the stream or riparian zone except for
permitted areas associated with the bank stabilization work.
21. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S. or
protected riparian buffers.
22. Upon completion of the project, the City of Lenoir shall complete and return the enclosed "Certificate of Completion
Form" to notify NCDWQ when all work included in the §401 Certification has been completed. This form shall be
returned to the Transportation Permitting Unit of the NC Division of Water Quality, 2321 Crabtree Blvd., Suite 250,
Raleigh, North Carolina 27604.
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act
within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to
Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service
Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have
any questions, please telephone Mr. Nlike Parker of the Asheville Regional Office at 828-296-4500.
Sincerely,
Coleen H. Sullins, Director
Division of Water Quality
cc: Amanda Jones, USACE Asheville Field Office
Transportation Permitting Unit
Mike Parker, Asheville Regional Office