Loading...
HomeMy WebLinkAboutNC0021601_PAR REVIEW_20220411 Regional Pretreatment Annual Report (PAR) Review Is the PAR on time? Does it have two copies? Did they send any other submissions with it? Included? ADEQUATE? POTW noted Corrections? Regional Office: Asheville Narrative YES NO NA YES NO NA POTW: Tryon WWTP PPS Form YES NO YES NO NPDES Permit No. NC0021601 SNCR YES NO YES NO Report Period: 1/1/21 to 12/31/21 IDSF YES NO YES NO Full Modified Allocation Table YES NO YES NO For modified programs evaluate shaded Compliance Schedules YES NO NA YES NO NA items only. A Narrative is required for a Public Notice YES NO NA YES NO NA modified program only if there are SIUs Program Information YES NO YES NO YES NO in SNC. Historical SNC YES NO NA YES NO NA YES NO NA If No, check recommendation below: 1. Have at least 90% of SIU permits been issued within 180 Yes No Not req’d NOD NOV QNCR NCP Civil Penalty days of expiration? (See Allocation Table). Assessment 2. Were at least 80% of SIUs inspected? (See PPS Form) Yes No Not req’d NOD NOV QNCR NCP Civil Penalty Assessment 3. Has effective enforcement been taken against industries in Yes No NA NOD NOV QNCR NCP Civil Penalty SNC, including those causing pass-through or interference? (See Assessment Narrative and SNCR Form) 4. Does public notice cover all SIUs in SNC? Yes No NA NOD NOV QNCR NCP Civil Penalty Assessment Note: Exceptions should be explained in the comment section below: Town was issued an NOD in 2021 for a missed public notice for the 2020 monitoring year. This appears to have been resolved. Town posted a public notice and submitted a copy to the ARO. SIU was not in SNC for 2021. Tryon may need to reassess copper allocation should this begin to impact their ability to meet their new NPDES limits. Reviewed By: Mikal Willmer Date: 04/11/2022 Regional Pretreatment Annual Report Review NC0021601_PAR REVIEW_2022041116