Loading...
HomeMy WebLinkAbout20171044 Ver 1_As-Built_2022_20220411Mitigation Project Information Upload ID#* 20171044 Version* 1 Select Reviewer: * Erin Davis Initial Review Completed Date 04/11/2022 Mitigation Project Submittal - 4/11/2022 .................................................................................................................................................................................................................................................................. Is this a Prospectus, Technical Proposal or a New Site? * 0 Yes O No Type of Mitigation Project:* Stream Wetlands Buffer Nutrient Offset (Select all that apply) Project Contact Information Contact Name: * Matthew Reid Email Address: * matthew.reid@ncdenr.gov Project Information ID#:* 20171044 Existing ID# Project Type: Project Name: County: Version:* 1 DMS Mitigation Bank Whittier Creek Mitigation Project Surry Document Information Mitigation Document Type: * Mitigation As -Built Plans File Upload: Signature ............................................ Print Name: * Signature:* Whittier_100020_AB_2022. pdf Existing Version 5.86MB Please upload only one PDF of the complete file that needs to be submitted... Matthew Reid VICINITY MAP INDEX OF SHEETS TITLE SHEET CONVENTIONAL ,NAPOL, L.ENEPAL NOTES VESETATION SELECT ION NCCOT CONVENTIONAL SYMBOLS DETAILS PLAN VIE,/ PROFILES NORTH CAROLINA DIVISION OF MITIGATION SERVICES SURRY COUNTY LOCATION: ROCK HILL CHURCH ROAD & NURSE ROAD TYPE OF WORK: AS — BUILT PLAN \\ Vy\ \\ \\\ \ \ \\ \ \v{ BEGIN REALH I STA. 11+3. B \ \ BEGIN UTJA STA. 10+00.00 END UTAA BEGIN STAB TA.13+2I.80 I� 5 NC 162039 1 19 NCDMS ID NO. 100020 GRAPHIC SCALES 20 0 20 40 PLANS 20 0 20 40 PROFILE (HORIZONTAL) 0 10 20 PROFILE (VERTICAL) REACH SUMMARY REACH AS -BUILT LENGTHS UT4A UT4B UT5 R7 327.80 753.57 747.21 1,342.56 LF LF LF LF PREPARED FOR THE OFFICE OF: NCDEG DIVISION OF MITIGATION SERVICES 1652 MAIL SERVICE CENTER RALEIGH, NC 27699-1652 Michael Baker INTERNATIONAL CONTACT: MATTHEW REID PROJECT ,oM IGEN SPRING 2 020 TDATE KATHLEEN M. MCKEITHAN, PE PROJECT ENOLVEER PROJECT ENGINEER 2/22/2022 PE STEAM CONVENTIONAL SYM! OLS SUPERCEDES SHEET 1-i: °o J-HOOK VANE IF F— PHOTO POINT 1 l ccoso ROCK VANE MONITORING WELL 00:0 OUTLET PROTECTION 1 _ /wI x FLOW GAUGE t ROCK CROSS VANE ..—% DOUBLE DROP ROCK CROSS VANE IN -STREAM GAUGE •`."':�*. SINGLE WING DEFLECTOR--B3s--- EXISTING MAJOR CONTOUR %�''�. DOUBLE WING DEFLECTOR EXISTING MINOR CONTOUR j.asy` P-eee, TEMPORARY SILT CHECK LIMITS OF DISTURBANCE ROOT WAD PROPERTY LINE 4, GRADE CONTROL LOG J-HOOK VANE ._s FOOT BRIDGE LOG VANE `--' TEMPORARY STREAM CROSSING ® LOG WEIR 1-1 ROCK FORD STREAM CROSSING LOG CROSS VANE ® TRANSPLANTED VEGETATION / \ LOG ROLLER )3< TREE REMOVAL l, � r111 GRADE CONTROL LOG JAM '--` TREE PROTECTION aEc162039E NO -AND. STANDAI6D SPECIFICATIONS NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANN/NG AND DESIGN MANUAL MARCH2009 (REV2013) PROJECT °" `'eEs ENGINEER �,Hn 6.06 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE 6.24 RIPARIAN AREA SEEDING -APPROVED ', Dienar ' BY. O2O/Oozz 6.62 TEMPORARY SILT FENCE ""Y""�^'� DATE 6,63 TEMPORARY ROCK DAM .1 Ba no.a;am Michael Baker INTERNATIONAL,Ittn<P: } NCDMS ID NO. 100020 GENE AL NOTES 1. THE CONTRACTOR IS REQUIRED TO INSTALL IN -STREAM STRUCTURES USING A TRACK HOE WITH A HYDRAULIC THUMB OF SUFFICIENT SIZE TO PLACE BOULDERS. LOGS AND ROOTWADS. 2. WORK IS BEING PERFORMED AS AN ENVIRONMENTAL RESTORATION PLAN. THE CONTRACTOR SHOULD MAKE ALL REASONABLE EFFORTS TO REDUCE SEDIMENT LOSS AND MINIMIZE DISTURBANCE OF THE SITE WHILE PERFORMING THE CONSTRUCTION WORK. 3. CONSTRUCTION IS SCHEDULED FOR THE SUMMER OF 2020. 4. CONTRACTOR SHOULD CALL NORTH CAROLINA "ONE -CALL" BEFORE EXCAVATION STARTS. (1-800-6324949) 5. ALL ON -SITE ALLUVIUM SHALL BE HARVESTED AND STOCKPILED PRIOR TO FILLING ABANDONED CHANNELS. 6. TOPSOIL SHALL BE EXCAVATED TO A DEPTH OF 8" AND STOCKPILED SEPARATELY FROM UNDERCUT SOIL. 6" OF TOPSOIL SHALL BE PLACED ON ALL BANKFULL BENCHES AND AS DIRECTED BY THE ENGINEER. 7. ALL DISTURBED EMBANKMENTS SHALL BE MATTED WITH COIR FIBER MATTING OR AS DIRECTED BY THE ENGINEER. 8. ALL STREAM BANKS SHALL BE LIVE STAKED. 9. UNLESS THE ALIGNMENT IS BEING ALTERED, THE EXISTING CHANNEL DIMENSIONS ARE TO REMAIN UNLESS OTHERWISE NOTED. 10. CONTRACTOR WILL ENSURE THAT FENCING IS INSTALLED OUTSIDE THE CONSERVATION EASEMENT AS SHOWN ON THE PLANS BUT NO MORE THAN 1' OUTSIDE. 11. WHERE PROPOSED FENCE CROSSES EXISTING STREAMS, THE CONTRACTOR SHALL UTILIZE A SECTION OF BREAK AWAY FENCE, A FLOOD GATE, OR ELECTRIFIED CHAINS AS DIRECTED BY THE ENGINEER. CONSTRUCTED RIFFLE %_:% CHANNEL PLUG 0 0 BOULDER CLUSTER I CHANNEL FILL BOULDER STEP V A BRUSH TOE WITH LIVE STAKES GEOLIFT WITH BRUSH TOE —©— SAFETY FENCE —TF— TAPE FENCE I I PROPOSED WETLAND RESTORATION —FP— 100 YEAR FLOOD PLAIN I * I PROPOSED WETLAND ENHANCEMENT —101— CONSERVATION EASEMENT - —^LB— - JURISDICTIONAL WETLAND BOUNDARY "'NOTE: ALL ITEMS ABOVE MAY NOT BE USED ON THIS PROJECT PLANTING PLAN VEGETATION SELECTION Permanent seed mixtures for the project site shall be planted throughout t e fioodplain and riparian buffer areas except the vernal pools. Permanent seed mixtures shall be app ied with temporary seed, as defined in the construction specifications. Scientific Name Common Name Percent of Seeding Density Qbslacre) Wetness Tolerance Scientific Name Common Name %Planted by Wetland Riparian Zone— Overstory Species A Agrostis Redtop Mixture 10% 1.5 FACW Species P Tolerance Betula nigra River Birch 10% FACW alba Elymus inicus FACW All Buffer Plantings at 680 stems/acre using 8' X 8' spacing Juglans nigra Black Walnut 5% FACU vir y 9 Panicum virgatum Virginia Wildrye Switchgrass 15% 15% 2.25 2.25 FAC Riparian Zone— Overstory Species Platanus occidentalis Sycamore 15% FACW Tripsacumdactyloides Eastern Gamma Grass 5% 0.75 FACW Betula nigra River Birch 10% FACW Liriodendron tulipifera Tulip Poplar 15% FACU Polygonum pennsylvanicum Pennsylvania Smartweed 5% 0.75 FACW Juglans nigra Black Walnut 5% FACU Flvanica GreenAsh 5% FACW scoparium Little Blue Stern 5% 0.75 FACU Platanus occidentalis Sycamore 14% FACW PennsYSchizachyrium Juncuseffusus Soft Rush 5% 0.75 FACW Liriodendron tuli i Tulip Poplar 14% FACU erous lyrata ()Berens Overwp Oak 10% OBL Bidens frondosa (or aristosa) Beggars Tick 5% 0.. 5 FACW era P.% P P Querousphellos Willow Oak 10% FAC Coreopsis lanceolate Lance -Leaved Tick Seed 10% 1.5 FACU Fraxinuspennsylvanica Green Ash 5% FACW Litmus americans American Elm 5% FACW Dichanthelium clandestinum Tioga Deer Tongue 15% 2.25 FAC Quercus lyrata Overcup Oak 10% OBL Diopyros virginiana Persimmon 5% FAC Andropogon gerardii Big Blue Stern 5% 0.75 FAC euercusphellos Willow Oak 10% FAC Sorghastrum nutans Indian Grass 5% 0.75 FACU Litmus americana American Elm 5% FACW H amelis virginiana Witch Hazel 5% FACU Diospyros virginiana Persimmon 5% FAC Lindera benzoin Spicebush 5% FAC TEMPORARY SEEDING SELECTION AND APPLICATION RATES Nyssa sylvatica Blackgum 1% FAC Carpinus caroliniana American Hornbeam 5% FAC euercus michaurii Swamp Chestnut Oak 1% FACW Acer negundo Box Elder 5% FAC Application Celhs laevigata Sugarben'y 1% FACW Amelanchier arborea Serviceberry 1% FAC Common Name Scientific Name Application Time Rate Total (Ibslacre) Cereal rye Secale eaeao/e Sept - March 3 lb/1,000 sq ft. 130 lbs/aere Browntop millet Panicum ramosum April - Aug 1lb/1,000 sq ft. 44 lbs/aere *S.U.E = SUBSURFACE UTILITY ENGINEER BOUNDARIES AND PROPERTY: State Line County Line Township Line City Line Reservation Line Property Line Existing Iron Pin Property Corner Property Monument Parcel/Sequence Number Existing Fence Line Proposed Woven Wire Fence Proposed Chain Link Fence Proposed Barbed Wire Fence Existing Wetland Boundary Proposed Wetland Boundary ^a Existing Endangered Animal Boundary Existing Endangered Plant Boundary BUILDINGS AND OTHER CULTURE: Gas Pump Vent or U/G Tank Cap 0 O Sign Well Small Mine Foundation Area Outline Cemetery Building School Church Dam I I P 1 I I HYDROLOGY Stream or Body of Water Hydro, Pool or Reservoir Jurisdictional Stream is Buffer Zone 1 Bz 1 Buffer Zone 2 cc 2 Flow Arrow Disappearing Stream Spring Wetland Proposed Lateral, Tail, Head Ditch 7 > > > False Sump STATE OF NOI' TH CA DIVISION OF HIGH OLINA AYS CONVENTIONAL SYMBOLS RAILROADS: Standard Gauge RR Signal Milepost Switch RR Abandoned RR Dismantled csx nuNSPORT . RIGHT OF WAY: Baseline Control Point Existing Right of Way Marker Existing Right of Way Line Proposed Right of Way Line Proposed Right of Way Line with Iron Pin and Cap Marker Proposed Right of Way Line with Concrete or Granite Marker Existing Control of Access • A Proposed Control of Access Existing Easement Line Proposed Temporary Construction Easement Proposed Temporary Drainage Easement Proposed Permanent Drainage Easement Proposed Permanent Utility Easement Proposed Temporary Utility Easement Proposed Permanent Easement with Iron Pin and Cap Marker ROADS AND RELATED FEATURES: Existing Edge of Pavement Existing Curb Proposed Slope Stakes Cut A, Proposed Slope Stakes Fill Proposed Wheel Chair Ramp Existing Metal Guardrail Proposed Guardrail Existing Cable Guiderail Proposed Cable Guiderail Equality Symbol Pavement Removal VEGETATION: Single Tree Single Shrub Hedge Woods Line Orchard Vineyard TDE PDE PUE TUE EXISTING STRUCTURES: MAJOR: Bridge, Tunnel or Box Culvert Bridge Wing Wall, Head Wall and End Wall - MINOR: Head and End Wall Pipe Culvert Footbridge Drainage Box: Catch Basin, DI or JB Paved Ditch Gutter Storm Sewer Manhole Storm Sewer UTILITIES: POWER: Existing Power Pole oNc C roNo Bw 2- OO Proposed Power Pole Existing Joint Use Pole Proposed Joint Use Pole Power Manhole Power Line Tower Power Transformer U/G Power Cable Hand Hole H-Frame Pole Recorded U/G Power Line Designated JiG Power Line (S.U.E.*) WATER: Water Manhole Water Meter Water Valve Water Hydrant PROJECT REFERENCE NO. SHEET NO. 162039 1-B NCDMS ID NO. 100020 Recorded WG Water Line I .. H. APPROVED BY: 2/22/2022 OO I Designated U/G Water Line (S.U.E.*) Above Ground Water Line P/G Water TV: TV Satellite Dish O' -< TV Pedestal TV Tower A LPG TV Cable Hand Hole 0 Recorded LPG TV Cable Designated U/G TV Cable (S.U.E.*) Recorded LPG Fiber Optic Cable Designated U/G Fiber Optic Cable (S.U.E.*)—----""--- GAS: bGas Valve Gas Meter -6- 0 SANITARY SEWER: •—• Sanitary Sewer Manhole cR TELEPHONE: Existing Telephone Pole • Proposed Telephone Pole 4 " Telephone Manhole OT Telephone Booth 0 Telephone Pedestal 0 4r" .4 Telephone Cell Tower LPG Telephone Cable Hand Hole 0 Q Recorded LPG Telephone Cable 6 Designated LPG Telephone Cable (S.U.E.*) Recorded U/G Telephone Conduit Designated LOG Telephone Conduit (S.U.E.*)- ----__- C Recorded LOG Fiber Optics Cable "�eYad Designated LOG Fiber Optics Cable (S.U.E..)- --- Recorded LOG Gas Line Designated LPG Gas Line (S.U.E.*) Above Ground Gas Line P/C Gas Sanitary Sewer Cleanout LOG Sanitary Sewer Line Above Ground Sanitary Sewer 55 P/C Sanitary Sewer Recorded SS Forced Main Line Designated SS Forced Main Line (S.U.E.*) s MISCELLANEOUS. Utility Pole Utility Pole with Base Utility Located Object Utility Traffic Signal Box Utility Unknown U/G Line U/G Tank; Water, Gas, Oil AG Tank; Water, Gas, Oil WG Test Hole (S.U.E.*) • 0 Abandoned According to Utility Records End of Information AATUR E.O.I. TYPICAL RIFFLE, POOL, AND BANKFULL BENCH CROSS SECTIONS >o NG. SH EET CHANNEL PLUG 162039cE 2Np —CHANNEL ToeFPwwEo k�,'essio ezpJEc. 03Bd 3 eN ct Hsc HG„,„„7_K.xL._ ED BY: / / zz .,kr 3F /;\ \\/\. R.. s \\\�\�\� X\\� o-+,qc� sal�so - wl,kr .I.; :.ocF.FreR�, a(, pe \ T / D+ � PENCH LIMIT. RIFFLE RIFFLE WITH BANKFULL BENCH"'° 41 I CHANNEL PLUG Michael Baker INTERNATIONAL, FisiF OFTERRA_E NCDMS ID NO. 100020 hTOP Ep — W NCCHPA "�M///// o t✓ ✓✓//. \ \�� d wnr .� � \ \ FINISH GRADEFINISH 6oyL CHANNEL VT .. . ' ws POOLWIDTH BANKFULL 11.0 �0 s0 as 0.0 POOL WITH BANKFULL BENCH MAXIMUM DETPN w/D(W /p ) 12.2 TEuPEUNIC — ON -SITE CLAY MATERVI WILL BE COMPACTED USING HEAVY EQUIPMENT IN.. INCH LIFTS. SIT 2. THE REMAINDEROISTING CHANNEL To BE PLUGGED WILL EE COMPLETED FILLED TO THE TOP -OF -BANK BANKFULL AP. (Abld) 10.0 80 13.0 26.3 5.0 9.0 41.0 75.0 BO-ROINWIDTNEOW - 0 _ o 5.0 s 12.8 6.0 OP (t11 0 rv/A 0 rv/A 0 rv/A 0 rv/A INSIDE POOL SIDE SLOPE N/A N/A N/A N/A OUTSIDE POOL SIDE SLOPE N/A 30 N/A 30 N/A 30 N/A 20 TYPICAL STRUCTURE PLACEMENT ROCK CROSS VANE FLO. 1/3 BeTTOM WIDTH CONTROLGRADE SEESHEET LOG ,HOCK0e ROOT WADS COVER LOGS FILTER FA.BRN', �� N� Ppl BED ANNELB= g +" oEOFeANK �rt B MINIMUM\ SECTION A - A — WELL 8\/0 / GreADEDEIIN �/ Via- p // \\ H{PS�� / p° 0 /s. iaska —/ OoV00�o0F li 0 <(.'9 / ° ooq illW o Og°g oo C °0° \ �i,J % 0 oOO ono ° qqo _ /U°DO071 i r / / / Ud ♦ �, /.. MAT BANKS WITH COIF FIBER MATTING '� —1--_-'- su :f m fl'LOUR VANE ^ POOL BANKFULL Te,E HEADER ROOK 8 �sTreEAM eA.Nr. YILL FLOW SLOPE VANE ANGLE e 20 M. PLAN BOULDERS VIEW 70 AR ELEVATION vO pTER RpaK g • PROFILE VIEW B-8 VANE ARM REA.H LEE C,IR RIFFLE ' ":"Zi 1=EE SHEETTeFI CMFT WITH ERUSH TOE TCP OF eANrc (SEE SHEET.) STRUCTURE NOTES: 2, 'x3' PLOW REACH in �xJxa �� CROSS VANE INVERT/GRADE POINT — RIFFLE T] NOTES FOR ALL VANE STRUGTURES: N THEN UP,TREAM11 TO 'DO.NY,ARD TO THE DEPTH OF THE BOTTOM ROOTER ROCK, AND . I 'I ��/~ SCOUR O\� LL ON UPSTREAM // // \//°// 1. GENERALLY CONSTRUCTED RIFFLES ROOT WADS LOG VANES AND CO R FIBER MATTING ILL BE INSTALLED IN THE LOCATION AND SEQUENCE AS SHOWN CONSTRUCTIO0,1Z PA PaOV DTTrIE oERSEJEUGINEEa NG 3. COIR FIBER INTERRACESTALLEDGTREAMBANKS, m SCRIBED RESTORED ON ALL S DE TE�HNicA:I ECIM�.ATieus ISEp IN THE 4. ROOMADS MAY BE REPLACED WITH GEOLIFT. 3 I %\�//�/\�\\°///POOL . LONSTRUCJANGLE AND SLOPE SPECIFICATIONS, SHOWN. I I - E ALL STONE FILTER FABIB PROFILE VIEW C -C' ALLU ALLUVIUM 5E INCORPORATED TeO INTO cKFILu HERE AVAILABLON-SITE v. BOULDERSILLMUST BE A MINIMUM OF C AND WILL INCLUDE FOOTER ROCKS. OUTLET PROTECTION o Na. O. ROCK VANE 162039cE 2A 1. TVP STORLIVATER OR CHANNEL OUTLET 113 BOTTOM OF CHANNEL PROJECT •e�H"c^�Acliy., <``'-;es'siooF'w.n r`°SQL ✓"�9' ENGINEER �,�W"^P. Nd:«tf.. BY: OUTLETWIDTH or. CHANNEL —HEADER ROCK La BOULDER _ C384.2 .APPROVED el, FLOOD PLAIN .'— MAXT,PI 116:1. IS FLOW as _ FLOW 0°TO BO° ": NGNEA'N$`y z/zz/zozz o,° • 0 \ FLOOD PLAIN M1M lu . DATE EocrER ROLK ///N���� CKFILL— g° �TeNE 6A oEOTExmE FABRIC •HEADER �S ��t „y , O L. C--r'..; PROFILE VIEW . RTt ?, Annk ° Michael Baker �� r ° q O DAPS BETWEEN ROCKS INTERNATIONAL ;.,. STREAM ELEVATION NCDMS ID NO 100020 "R i PcoL —SO R(.GK— `L;\ PEa oIRE�iIL�u BANKFULL HEADER ROCK ',SLOPE455 TO cF4EuuINEER FLcutL x,� �_ BorroM OFO mmeL g,'I waco r I.Ow 0:� \ • .ij0 — .2.I SLOPE Borrow lwDTry STONE 6Acx6a FOOTER LIEe SEDTExmE FABRIC SCOUR P AVATEDI ,c PROFILE VIEW PLAN VIEW STREAMED — HEADER STONE eAcx6aL HEADER ROCK FOR ALL VANE STRUCTURES LCIF FIBER MATTINU AND VEUETATION V /// /\\ PLAN VIEW \\NOTES 1. INSTALL UEOTEXTILE FABRIC, EEOINNINM AT THE TOP OF THE HEADER ROCKS AND EXTEND DOWNWARD TO THE DEPTH OF THE BOTTOM FOOTER ROCK. AND THEN UPSTREAM TO A MINIMUM \ \ K \ / / // /</ \/ , \// \/VV/j/\// //\�/\/ �//�/ i i.//R r,EOTExraE FABRIC— CROSS SECTION A -A - o FOOTERc c Ids DE 3 START A MEOTE.TLE FABRC CONTINUE 4. AN EXTRA ROCK CAN BE PLACED IN SCOUR POOL FOR HABITAT IMPROVEMENT. 'I L DSPECIFICATIONS.FPTO ROL KS. 7. AFTER ALL STONE NFILLHAND PLACED STONE HAS BEEN POAPS LAOEDFUPSTILL INITHE UPSTRE.ADM SIDE OF TER AND HEESTRUCTURE WITH WELL LMIX OF CLASS B. CLASS A. UVIUMEHEREAVAILELEVATION OF THE TOP eF THESTAHEADER ROCK.INCTO ORPOinATEES ON-SITE MINIMUM SECTION A - A FOOTER ROCK s. T SLOPE GRADE CONTROL J-HOOK VANE J-HOOK VANE BOTTOM BOTTOM 2IDTH OF WILTH OF CHANNEL CHANNEL FLOW O t. � E�AP6 R`�DIREfTICNOFENGINEER PE oPTIONAy STREAM BANKFULON HEADER ROCK FLOW WIDTHOF WTH OF CHANNEL FLOn CHANNEL _R TDBR �I�'..� STREAM BED ELEVATION roNE�rxFILL BANXFN HEA DER ROCK ��� 8'Ae V�' T� A T—FOOTER ROCK ROOTER ROCK UEOTExmEFABRIC— SCOUR wouEXuvA EDI PROFILE VIEW A b, — FOOTER ROCK _TONE SAcrcFIu FOOTER ROCK UECTExnO LE FABRIC— PROFILE VIEW � ° off. - POOLXFILL —SCOURPOOL PER IRECTION STR6.MBED— HEADEk ROCK EXCAVATED, STONE eAc ��.° OF ENGwEER "O%•� REACH Er A `., �F° R PocLrExcevATEDr aolREcncN ACKFILL— >F ENOwEER AlSTONE IX REA.DHr 107110 NO AP TEEN ROCKS —HEADER Rocrc sTREAAIeED— HEADER Rccr. ,TONE PLAN VIEW —NO MAPS EN ROCKS —HEADER ROCK “EOTEXTILE FABRIC— PLAN VIEW io MINIMUMMMINIMUM�ub F FOOTER ROOK O o\o SECTION A - A NOTES FOR ALL VANE STRUCTURES: 1. INSTALL GEOTExTILE FABRIC BTGINNIIUOAT THE TOP OF THE HEADER ROCKS RAND EXTEND °ECTExnLE FABRIc- MINIMUMF TEN THE F THE BOTTOM FOOTER ROCK, AND THEN UPSTREAM TO - PLACE FILL ON UPSTREAM SIDE OF VANE ARM, BETWEEN THE ARM AND STREAMANK. START AT BANK AND PLACE FOCTER ROCKS FIRST AND THEN HEADER ': 4. CONTINUE WITH STRUCTURE FOLLOWINO ANOLE AND SLOPE SPECIFICATIONS. AN EXTRA ROCK CAN BE PLACED r 10' MINIMUM SECTION A -A FOOTER ROCK FOR ALL VANE STRUOTURES: 1. INSTALL FILTER FABRIC FOR DRAINAGE BEGINNING AT THE MIDDLE OF THE HEADER ROCKS AND EXTEND H wNNWARDNIMUM TOTHEOF THE BOTTOM FOOTER ROCK. AND UPSTREAM TO , FOOTERTHEN 2. A TRENCH BELOW THE LED FOR FILL ON UPSTREAM I REACH 4. crcFIL3. E ARMS AND INVERT WCT AMLE AND SLOPE IITHAWEL GRADED MIX OF CLASS B, A, ANDNS A.S SHOWN. FILL was ON UPSTREAM SIDE OTATF HEADER AND FOOTER ROCKS. K� ILLHAU BEEN PLACED. FILL IN THE UPSTREAM SIDE OF THE STRUCTURE WITH ONaITEAuuvIUM TO THE ELEVATION OF THE TOP OF THE HEADER ROCK. 5. INCORPORATED INTO THE STONE 6AcrcFIuwHEreE G. AVAILABLE. slu MUST BE A. AnNIInuMeF REA.OH: ie z.8_T LOG AND ROCK STEP / POOL PROJECT NG. SHEET H BOULDER STEP t62039CE 2B �1 411 F _ PROTECT.$\ JS NG TRANSPLANTS — OD ) - ice-, - - c�,�R et RUN P ' FLOW �_ `GEOTE%TILE FABRIC r SECTIONA -A' —STONE SAcrcFiu .4)414 of e„N �� &� TOE cano .zoiEc*�IGHI..E. .A'A:P�o, S5I q SEAL 83 BJ P H EY'+ (M GINEER NdGuf.. APPROVED BY: z/2y2ozz %.017� B' DATE: �e any Michael Baker °� 4 " o$°sue INTERNATIDNALa,, 0b1N°°BdJ� ROOT WADS cEXCAVATEI � BASE FLcw HEADERLOG NCDMS ID NO. 100020 BOULDERS HEAD OF RIFFLE BOULDER °° ° PLAN VIEW 111, 16.4 6-.1114, u iu��eouFr— ____, SECTION 6-B' PORTER LouPOOL PROFILE A -A' REACH 'VE. GEOTE%TILE FABRIC INSTALLED1. SOIL SHALL BE COMP,TED AROUND BURIED PORTION OF FOOTERS WITH THE BUCKET L ,� , UTa6 " rl REACH NOTES: BA FULL D AND RECENTLYH RVE TED SIDE.AND EXTENDING INTO THE BANK E ON EACH Z. ,OIL SHOULD BE COMPACTED WELL AROUND BURIED PORTION, OF LOG. ILL A .,... TRANSPLANTS CAN BE USED INSTEAD OF BOUDERS PER DIRECTION OF ENNINEER. PLAN VIEW c. AFTER ALL STONE BACKFILL HAS. PEEN PLACEDTHE UPSTREAM OF THE WITH 'i i o rcvIELL OF EXCAVATOR. 3. INSTALL NON -WOVEN FILTER FABRIC UNDERNEATH FOOTER BOULDERS. R I, LAYER Re., BOULDER CONTROL MATTI, AT THE TOE OF THE BANK EXTENDS DOWN TO THE UNDERCUTELEv ADED MI%O S. GLAS. AND. STONE TO THE RED ELEVATIION 7. BOULDER STEPS UST EE EXTENDED OA MINIMUM OF .INTO THE BANK. USE SILL BOULDERS REACH 7 _,axa IF NECESSARY. B. THALWEG AN INVERT WILL BE CONCAVE .AND SHAPED FER DIRECTION OF THE DESIGNER. HDE ELEVATION OF TN E TOP OF THE HEADER INCORPORATIX E ONsrE ALiwIUMi WHERE VAIEAEDE. GRADE CONTROL LOG J-HOOK VANE LOG VANE RIED EAMBED STONE BACKFILL HEADER LOG �'. LOG BURIED BELOW STREAMBED STONE EACKFILL B FULL ANY PS BETWEEN LOGS MUST BE FILLED WITH OTHER RECELY HARVETED BRANCHES CR COBBLE AND RER INSTALLING FILTER IC AND BACK FILLING An RLOG sa.TILE aBEFOI HEADER LO ,F.ZircXTILE A BANKFNLL SECTION C MINIMUM A A FABRIC GGA'e. \y A A BANrcFULL DOTER LOG_ .aD SECTION B�GE : MINIMUM —y, A -A' A C'MIN. L ° FILTER FABRIC RDDTV AD to sa BANKFULL I POOLn crExnLE FABRIC RCCMnG i- z _ en"rceuu FLOW sTreEAMeED FLo.I V, m ROOTWAD ROOTWAD v ,TREAIeouLDER- -9BED PLAN VIEW b` STREAMBANK BOULDERS CAN i A - GTM BEEEN oG' u- BE FILLED WITH OTHER RECENTLY HARVETED BRANCHES BEFORE INSTALLING ALSO BE USED. FILTER FABRIC AND BACK FILLING ARM PLAN VIEW LOG BURIED IN TLEASTs FcoTER Lcu "," �% HEADER DOG— r"� PROFILE VIEW PROFILE VIEW 1. LOGS SHOULD BE, LEAST 1L" IN DIAMETER. RELATIVELY STRAIGHT, HARDWOOD, RECENTLY HARVESTED, AND FOOTERED. G. BOULDERS MUST BE OF SUFFICIENT SIZE TO ANCHOR LOGS. 3. SOIL SHOULD BE t.OMPACTED WELL AROUND BURIED PORTIONS OF LOG, 4. ROO-RINDS SHOULD DE PLACED BENEATH THE HEADER L AND PLACED SO THAT IT LOCKS THE HEADER LOG INTO THE NOTES- I. LOC, SHOULD BE AT LEAST 10'' IN DIAMETER RELATIVELY STRAIGHT HARDWOOD AND RECENTLY HARVESTED. -� G DANK. SEE ROOTWAD DETAIL. 5. BOULDERS SHOULD BE PLACED ON TOP OF HEADER LOG FOR CHOKING. RE'CH LEZH gR 2. BOULDERS MUST BE OF I WELL AROUND BURIED PORTIONS OF LOGS. 4. ROOTWeLS BE PLACED EENEATH THE HEADER LONeND PLACED SO THAT IT DOCKS THE HEADER LCG ''EACH LanH "VEER HEADERBE L. TO 0.7., FEET APART. UINA SHOULD INTO THE BANK. SEE ROOM,. DETAIL. FBOULDERS 7. eaIC SHOULD NAiLtED To THE LOG BELOW THE EAC.KFILL.,;Rxa re,a' B. TRANSPLANT, OR BOULDERS CAN BE USED R SILLMU: nINIMUMO a D OF nDs, PER DIRECTION OF ENGINEER. urs T "` BE PER DIRECTION a "AD ODF ROODNL crc FI EN TTFTER INSTEAD ENGINEER. urs z.a 1G ED FILL OP STRUCTUREPORTELL CLASSL STONE HAS BEEN REACH] ia' cY,,u x4 THE SIDE OF THE WELL CrcFILLHAS BEEN PLACED.FILLTO BGRADED REACH 15 eva�4' TOP OFiHE OFF HE ELEVATION OF HEADER -SITEALUV WHERE AVAILABLE 4'az.'STONE TO THE ELEvaneN OFTHETOF OF THE HEADER ROCK. INCORPORATE ON -SITE ALLUVIUM MKO HEEVATION OF THE ROC INCORPORATE ONSITE ALLUVIUM WHERE AVAILABLE ELEVATION OF THE TOP OF THE HEALER ROCK. LIVE STAKING TRANSPLANTED VEGETATION • PROE162039CE No. SHEEETTNO. —TOT OF srREAMBANK TOP OF SEEa re TR qNL Er VEGETATION.ROCTM.nLL.AND SOIL MATERI PROJECT p`p ortss '' - '`sF�L ` 3 8432 RE H ENGINEER N"�^^H 1,64 .. APPRca ED BY. —TCE OF SLOPE TOP OF STREAMBANK OTTOM OF CH EL PLANT JUST DIAMOND.APED STAKES ON TOP BELOT/ BANKFULL LIOF BANK AND NE IN STAG ATTERN ( .' E� ' , �.i�ii 2/22022 y DATE: TOE OF SLOPE— N — TRANSPLANTED VEGETATION,RCOT a, AND SOILMAEERIAL Michael Baker —EDECF BANK INTERNATIONAL CROSS SECTION VIEW PLAN VIEW SQUARE CUT TOP BUDS FACING UFWARG--� EOTTOMOFFBA NNEL NCDMS ID NO. 100020 EXCAVATE AAHOL WILL CROSS SECTION VIEW 1. HIE SIZE BANK TR NSSTABILIZED ACCOMMODATENTT BE PLACED. ca LPACWG SAVE1U pNL`— IN —2''_3'LENGTH EXCAVATION AT THE TOE OF THE BANK. 2. EXCAVATE ENTIRE ROLANT OT MASFRONT AND AS MUCH ADDITIONAL SOIL MATERIAL AS POSSIBLE. IF ENTIRE ROOT M RS CAN NOT BE EXCAVATE IN ONE BUCKET LOAD, THE TRANSPLANTISTOO ARGE `-3• SPACING NLNLM/� —TRANSF,NTED VECEETATIOU AND ROOTMASS IL ...OTHER SHoULD BE sELECTED. ¢EDTHAT 4. NG ETATION IS ORIENTATED VERTICALLY. IN ANY HOLE, AROUND THE TRANsPLANT AND COMPACT. 5. AY LOOSE SOIL LEFT IN THE STREAM SHOULD BE REMOVED. K. PLACE THEY TOUCH. TOP OF BANK I TRANSPLANTSTOGETHER THAT 35-a5 DEGREES LE cLIVE STAKE DETAIL NO LIPS STAKES ON POINT BAR P. STAKES SHOULD BE CUT AND INSTALLED ON THE SAMEDAY. z. DO NOT INSTALL STAKES THAT HAVE BEEN SPLIT.3. STAKES LED WITH BE INSTALLED TO UPWARDS. PLAN VIEW MUST IOD -------- 3.� - =' '�� — —------_-� TOE OF BANK PLAN VIEl SHOULD5. STAKES SE 1Y2TO a INCHES IN DIAMETER AND x TO 3 FT LONG. e. STAKES SHOULD BE INSTALLED LEAVING 1T OF STAKE ABOVE GROUND. PLANTINGS PLANTING SPECIFICATIONS COIR FIBER MATTING TREES1. PLANT BARE ROOT SHRUBS AND TO THE WIDTH OF THE BUFFER AS SHOWN ON THE PLEAS. e. LOOSEN COMPACTED SOIL. OP OF STREAMBANK 3. PLANT IN HOLES MADE BY A MATTOCK DIBBLEPLANTING E.AR, OR OTHER APPROVED MEANE —PLACE TRENCH, LARGE STAKES COIR FIBER MATING IN S INCH DEEP STAKE BACKFILL AND COMPA., 1. BANKS SHOULD BE SEEDED PRIOR TO PLACEMENT CP MATTING. — TOP OF STREAMEANK K INSTALL COIROTHERS I II Y STREAM BANKS OR IN T EE SPACED FURTHER THAN 36" AFART. 4. PLACE LARGE sTAKES NG ALL SEAMS ITHE CENTS U BANK, TOE OF SLOPE IN5. STALLING CNG SHALL ONSTRUCTED RIFFLE'STAKED. AND MATERIAL TRENCHED PRIOR — TOE OF SLOPE BOTTOM OF LHANNEL TYPICAL LARGE MATTING STAKE 4. PLANT IN HOLES DEEP AND vIrt o ENOUGH TO UnNG. ALLOW THE ROOTS TO SPREAD OUT AND GOWNAND 5. KEEP ROOTS MOIST WHILE DISTRIBUTING OR ANAITINE TO BY MEANs OF WET CANVAS, EURLEF, OR STRAW C. HEEL-11.1 PLANTS IN MOIST SOIL OR SAWDUST IF NOT .MPTb PLANTED UPON ARRIVAL TO PROJECT SITE. OM OF CHANNEL PLACE CO1FE FIBER MATTING AT TOE OF SLOPE.. SECURE MATTING WITH LARGE MATTING STAKE LEG LENGTH 17.1, IN )43.1S CM) (TAPERED. TO POINT) CROSS SECTION VIEW OF BARE ROOT PLANTING CROSS SECTION VIEW WIDTHTHICKNESS Hsu iz a1 cool PLANTINGS NOTES: 1. WHEN PREPARING THE HOLE FOR A ROTTED PLANT OR SHRUB DIG THE HOLE 8 -12 INCH. LARGER THAN THE DIAMETER OF THE POT AND THE KAME DEPTH AS THE POT. 2. REMOVE THE PLANT FROM THE POT. IT CN S v THE FLAME- SIDE OF CF STREAMSANK 3. IS ENE PLANTT IE ROOTBOUND(ROOTTGRLWIING IN A SPIRAL AROUND THE ROOT BALL). MAKE VERTICAL — TRENCH —TRENCH STREAMIEANK y `) 1 1 1 1 1 1 1 1 1 1 1 0 0 • 0 0 0 • 0 0 0 0 0 —TOP OF aTREAMEANK TYPICAL SMALL MATTING STAKE OR SEADE JUST DEEP ENOUGH TO CUT THE NET OF ROOTS. ALSO MAKE A CRISS-CROSS CUT ACROSS THE BCDROM OF THE BArcr u. 4. PLACE THE PLANT IN THE HOLE. 5. FILL HALF OF THE HOLE WITH SOIL (SAME SOIL REMOVED FOR 6. WATER THE SOIL TO REMOVE AIR E REST OF THEHER I SLARLOIL. CF CHANNEL — STAKES. . 0 0 . V—STAKES FIBER BMATTINGEHZ EEXTENDT HEAD u oIN (rwCM) (aS CM)TO TOE HEAD 50B N(i, CM)BOUCLE WIT THICKNESS oco IN A1501 (TAPERED TO POINT. n.ao IN(toe CM) PLAN VIEW LEDGE TOTAL LENGTH .33 IN(30.ae CMI CROSS SECTION VIEW OF CONTAINER PLANTING LEDGES • FL� w'Ll A PLUNGE POOL LOWEST LOV.ER THAN ULCERS �E%TEND BELOW VARIESLOMPACTED ESLGFFi ER CULVERT4. DEPTH OF SCOUR 1. LIVE BRANCH curnws SHALL BE THE SAME SPECIES A.S EVEDOR INSTALLEDBE CONSTRUCTION I' I 3. NUMBER OF SOIL LIFTS MAY VARY IN GENERAL LIFTS SHALL WHEN tiEOLIFTS ARE BEHIND 0 BUILTEANKFULL STAGE. I F FOUNDATION. . ,T PAY BE U_ED 4T THE D C Nr E FOUNOAAON IN LIEU OF BRUSH MATERIAL. STAKE TOP LAYER OF (,EE MATTINO DETAIL)TRANSPLANTS GEOLIFT WITH BRUSH TOE EET o 162039cE N0. SH 2NOTES: OR TEMPORARY D AND MATTING FL� THE LIVE STAKES AND I NE EXTEND TO THE 'ONE EACKFLL ENGINEER TO BUILD 4 0 (T.PI DICE TOP OF THE TOP OF BANK i BANKFVu STAGE FIBER MPA,BE MATTING LIFT PROJECT r"CAAc���!, ...CROSS .:4o�ess oy 9 '. PC3 aLP '4.. �-: y�� ii i�K��� ENGINEER Kwf(In.H k.M.f/.i. �aoA•.n APPROVED BY: z/xyxozz K� l�lllllll DEPTH DATE. �� %Y_ lllll ll �%%%� ���% CFTERRnCE rGAkIE, SECTION A - ACOIR a,. Michael Baker _ .tki INTERNATIONAL B vaNE CETAIL lir PLAN q 0 VIEW TOP SOIL (NB) UNDIFLO�UeeEo rH BRANrH cuiTIN vIANTINGPUNFCRavECIE,, NCDMS ID NO. 100020 AnDN LIMB, BRANCHES, ROOTS OR ANY , OOD VEGETATION APPROVED BY THE ENGINEER. i FOUBELNT E NISHEDBED'LEH �—� OTHER_ SECTION B - B FLO. CONSTRUCTION AREA UPSTREAM ----- , STILING BASIN �, MAX ��---�� cc ROCK DAM _ 2. y I MAXIMUM DEPTH FLOOD PLAIN ROCK TOE PROTECTION ROCK TOE PROTECTION TOE PROTECTION ROCK CROSS SECTION VIEW TOP OF BANK �� R PLAN VIEW NTS �rreaNSPLANTs DRIVEN INTO LNG METH. BANK REQUIRES THAT TRENCHING 2ENCH BE EXCAVATED XCA REMAIN CONDITIONS: . No DOWNWARD FerecE ?STONE IrNTS EUTExTILE FABRIC J. FABRIC EXISTING CHANNEL PLAN VIEW STONE BACKFILL SECTEXTILE C -s BSTCNE CROSS SECTION FLOOD PLAIN nsszsroNE ROCK TOE OUT STILLING BASIN OF TRAPPED SEGMENT PRIOR TO REMOVAL TRANSPLANTS ROCK SHOULD BE INSTALLED BELOWSTREAMCLEAN PROTECTION WITH ROCK FORD STREAM CROSSING 5ACKFILL ROCK IN FORD PLACE ADD RIGHT SLOPES. BE SUFFICIENT NAPPk>PR STREAM CROSSING INSTALLED —S,NE OF CULVERT STREAM CROSSING ~� % o M i3 G C ExTILE FABRIC HAVE ALL NECESSARY 2. MINIMIZE 4. INSTALL STREAM GROSSING AT 7. A STA.BILIZED PAD OF STONE BACKE!, ERM AND ACCESS 5. WIDTH OF THE CROSSINU SHALL B SHALL DETERMINE HE_THICK INF.) : � _ B t?,A! :f k84. .� CROSS SECTION VIEW NTS TRANSPLANTS TOP OF s.4NK NOTES. TRENCHING METHOD: IF THE CLASS 2 CANNOT BE NEEDS TOHE I . THIRECONSTRUCTED. M ETTHOOD BELOW CLASS BASE FORE WORK ANGLE TO THE ORI;INAL,TRELMBANK ONTO SIDE B INCHES THICK. LINED .ITH GEOTEXTILE FABRIC SHALL BE USED TO ACCOMMODATE THE LARGEST VEHICLE ,ROSSING THE eHANNEL.ERTHEB MT ANGLEArrc LNG TO EQUIPMENT ZED. Illk CLASS zSTONE FLOW N2. DRIVENzHuoiSHOULD BE INTO THE SANK WITH ROCK SHOULD BEBELOW;I!IIJIIII!IIIIIIIIIIPPIIIIIIIIII.- BARB WIRE FIELD FENCE 4 STRAND - HIGH TENSILE FENCING • PROJECTREFERENCENO. s A. 2E END P c INCH DIAMETER BY FOOT LON�1 I ,, zslH DMMETER EY B FOOT LONG BRACEPOST ,. DAMN D. TIMaERB BRACES POST BRAVE POSTE GM. MIN. PROJECT oks'Es ;�'��;ti •, 03843 4' ENGINEER =H:R ���R�FU aY. z/zz/zozz 4b INCHES BARBVIRE i X X X X X X X X X X X X GINCHEs pYP( GETT NG G NSIZE TOtLnRD THE TCFI�i 1 fI DATE: �1®;1011111 TENSILE RE Michael Baker - ....,_,,. _ / -1 INTERNATIONAL „�°�.»"u.ia NCDMS ID NO. 100020 JaIs ���� // "/ BAR BmvRE ✓���Q \ \ \ \ \ \ \ \ // / // / // / // // \j UND ND LINE GROre INCHES ITYP.I SBRACE TENSLELYRE STRAND HIGH CORNER AND VERICAL I GRcu4D LINE CHANGE BRACING INSTALLATALL PCINTB WHERE OR e'oI STEEL TUBING— ALVANIZED ° GP GWIA�IN FENCEALIGNMENT CHANGE tE DEGREES UP MORE IN -LINE STRAINER OR WATCH BPOLEPOS - DI.A.AmN. STAYaP.ACING-((ENTERrs'M LINE POST, DIA. MIN. GH AlHIRE TENSILE DR FIBERGLASS POST iNOTE: . END POSTS SHALL BE INSTALLED AT A SPACING OF 10.1E FEET. WOVEN WIRE FENCE RAPBCFs BRA/LEG/IRE u wIIRE,— D ISCH ol4METER BYBFOOT LONG r/sTRA.NO BARB WIRE —/O GAUGE WIRE BRACE POST e INCH DIAMETER BY b FOOT LONG a INCHES(T"P.I I I.rn" I IIIii 1 1� 0 1 m LINE i 1 = 48INCHES190." X X X X X X X X X X X X / ED IN SIZE FROM TpP TOD bcTTOM NGLARGE IN_I TQ.AR THETCP GROUND , o ` Ems ,v-- -„ NSN- �- , _ �IGH���FNEwRE6 IINDIGARSU IN -LINE BTRAINER MAX. SPAN END ASSEMBLY ONE PANEL DFLINE FENCE AND LINE FENCE SECTION VARIES \ /\ //\/y X X X `, GAUGE MARE INS GAUGE'AIRE \ \ \ \ \ \ I/\/ /\/\/\//\//\/?' GROUND LINERACE 4INCHES(TYE( BRACE POSTS I111N. TIMBER BRACE POST P" MIN. -1NSULATso MIRE B, C , r, —COO ��� —PRLCE POST ��� 9 z NOTE: END POSTS SHALL BEINETALLEDATASPACINGOFID-,BFEET RE 1 1 4 T DOUBLE STRAND— BRACE BLOCK _ RDNNDNNE II� DRAUBLE STEEL GATES GH TENSILE oEBRA BE ALL N POST SEE PLANS FOR SPECIFIC LENGTH PULL POST ASSEMBLY —EXISTING GROUND CORNER OR END BRACE ASSEMBLY PLACE IN FENCE LINE SO THAT MAXIMUM DISTANCENETNEEN BRACED POSTS DOES NOT EXCEED 1220 FEET OPTIONAL FIGURE NOT1. NOTCH POSTS 7. FOR 4" X le TIMBER BRACES. e. DOLGELS TO BE " DIA. X 5" PLAIN sTEEL ROD. DRIVE DOLL/ELs IABER BRACE. STAPLETo EACH Ey, A. ACE YJRES TO BRACE AND CORNER POSTS AT QUARTER POINTS OF THE POSTS. 1) TENSILE STE4. HIGH TENSILE INGTHRE ILL IOENEW AND SMOOTH AND BULL MEET THE FOLLOWING OSR PSI GALVANIZING TATYPE III C)s TREATED , SHALL BEGE E nRE TREATMENT SHALL CONFORM TO FEDERAL SPECIFICATION nth .Ti. f I-1/Q LONG FOR HARD DSc. RAT QUARTER POINTS cF POSITS. HT BRACE PosTS, OUBLE H ✓ POSTS PLEW R EACH E. AT LINE POSTS SECURE EACH WIRE WITH STANDARD CLAMPS. 7. FIBERGLASS MAY BE USED FOR LINE POSTS. THESE WILL CONSIST OF MARBLE FIBERGLASS. AND POLNIAER REsIlls WHICH HAVE BEEN TREATED BY THERAIOSETINGS (EAT TREATMENT. POS. MUST BE DRIVEN IN THE SOIL AT LEAST . INCHES. b. 2" DIAMETER PIPE DIAGONAL BRACE MAY BE USED IN PLACE OF HORIZONTAL TIMER BRACE AND DIAGONAL WIRES. L. MINIMUM NET RETENTION OF CHRCMATED COPPER ARSENATE (COAT FOR WOOD FENCE POSTS SHALL BE O. ROUND, PER M FOOT. A SINGLE, FOOT LONG. n- INCH MINIMUM DIAMETER POST nAY BE SUBSTITUTED FOR END PANEL LORNER AND VERTICAL CHANGE BRACING AND PULL POST ASSEMBLY. THE le FOOT LONG POSTS SHALL EXTEND A MINIMUM OF 7.5 FEET INTO THE GROUND DETAILS 11. FOR FURTHER ETAILS ON APPROVED METHODS OF FENCE INSTALLATION. SE NATURAL CONSERVATION PRACTICE MATERIALS AND CONSTRUCTION SPECIFICATIONS FOR FENCING (CODE 302) BY MRCS NORTH CAROLINA,FEBUARY,CGT i L / -3 aT d w w ryr�ye� o "o N rN 1 `TTTD� TDDD??ice?i.?cci cci. iF i. i.ii ..i:T.,TNnY.iv': STEEL FRAME GATE L. TTTTi NOTE, 1. POST HEIGHT DIMENSION SHALL BE THE SAME - QUIRED IN THE SPECIFIAiADJACENT HSIDE a. HINGES AND LOCKS SHALL BE INSTALLED AS SPECIFIED BY GATE MANUFACTURER. LJ OF GATE 5.555 PROJECT J. DIXON BROWN & WIFE, HARRIETTE C. BROWN PIN:5925-00-79-5737 DB: 1104 PG: 407 ROCK CROSS VANE (TYP.) BOULDER BANK PROTECTION INSTALLED IN PLACE OF GEOLIFT ADDITIONAL BOULDER BANK PROTECTION INSTALLED CONTR ELE� e i 1. 1 �BE�IMP�EACH 7 STA. 11+36.89 C?HARLES DEAN HOLCOMB-AND MICHAEL GENE H COMB ELMER E. HOLC P1 HOLf1N B (LE)IN 6960-80446g- DB' 1489 PG' 874 \ \�B: 9 PG: 64, LOT 6 UPS VANE INSTALLED \ ORIGINAL \ UPSTREAM ESIGNOF \ �x ----- BRUSH TOE WITH alx�x�a_ AEVE STAKES (TYP.) AS -BUILT THALWEG (T LOG VANE (TYP )k‘ Eecr cx LOC-GANE MOVED i TO STA. 12+50 AS -BUILT TOP -OF BANK (TYP.) LOG VANE NOT INSTALLED — — — — — ARLES DEAN HOLCOMB AND MICHAEL,GENE HOLCO ELMER E. HOLCOMB & WIFE WILMA.F. HOLCOMB (LE. PIN: 5926-00-$04164 DB: 1489.PG: 874 PB: 9 PG' 64, LOT 6 �B BED WIRE FEN AS -BUILT LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 1D/2D/21 & 2/17/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SEALED BY KATHLEEN M. MVKEITHAN. PE C01'STJ3LJCTED RIFFLE W OD INSTA D IN PLACE OF •�LLOG JAM BAKER PROJECT REFERENCE NO. SHEET NO. /62039 3 PROJECT € ..NEER KAM.. H. 8J/* .. 2/22/2022 Michael Baker INTERNATIONALii, NCDMS ID NO. 100020 BARBEp VVVIRE ENCE GRADE CONTROL - ROCK J-HOO/( VANS-)TYP.) GATE FILL EXISTING CHANNEL GHANNEL PLUG WHITTIER CREEK AS -BUILT PLAN VIEW 20 0 20 40 SCALE (FT) AS -BUILT LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 10/20/21 & 2/17/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SEALED BY KATHLEEN M. MCKEITHAN PE I / / CHARDS DEAN HOLCOMB AND / MIC AEL GENE H04COM8 / ELMER E. HOLDOMB & WIFE / WISMA F. HOLCOMk (LE) I N: 5926- 0-80-4164 1 IDB: 1489/ PG: 814 1 f RB: 9 PG264,L01r 6 1 I 1 / / I / / i GADECO/ J-HOOK / / MATCH LINE — SEE SHEET 7 SSE mrk ,ram®"iN>""./ m \ AS -BUILT/ TOP OF BA r BAKER PROJECT REFERENCE NO. SHEET NO. /62039 4 PROJECT € ..NEER Mfff.. H. % k. 0,161171 APPROVED EY: z/22/2022 Michael Baker INT E F NA TIONA L 1/ NCDMS ID NO. 100020 ANGELA D. MEADOWS PORW5O6D9013PG: 678— PORTION OF LOT 5, PB: 9 PG: 64 _EL-6,09ee5' .995 BOULDER BANK PROTECTION INSTAL �— IN PLACE OF GEOLIFT ' LOG VANE INSTALLED IN PLACE OF ROCK VANE STA. 21 +30.12 CONSTRUCTED RIFFLE (TYP.) GEOLIFT WITH BRUSH TOE (TYP.j_ LOG STEP -POOL INSTALLED IN AS -BUILT PLACE OF GADECONTROLLOGJAM__ TOP OF BANK (TYP.) LEZeltr WOOD INST GRADE CONTROL ANGELA D. MEADOWS PIN: 5926-00-90-1044 PORTION OF DB: 1153 PG: 678 PORTION OF LOT 5, PB: 9 PG: 64 BARBED ORE FENCE CHANNEL PLUG FILL EXISTING CHANNEL Z x • WHITTIER CREEK AS -BUILT PLAN VIEW 20 0 20 40 SCALE (FT) SEE SHEET 4 AS -BUILT TOP OF BANk JYP.)v GEOLIFT WITH BRUSH TOE (TYP.) CONTROL POINT .56 ANGELA D. MEADOWS PIN: 5926-00-90-1044 PORTION OF DB: 1153 PG:678 \ PORTION OF LOT 5, PB: 9 PG: 64 ev v v Rf \ THAtW€0{TYP.) ROOK GROSS -VANE (TYPi-- BARBED WIRE FEE ANGELA D. MEADOWS PIN: 5926-00-90-1044 PORTION OF DB: 1153 PG: 678 PORTION OF LOT 5, PB: 9 PG: 64 x—x I r BAKER PROJECT REFERENCE NO. SHEET NO. /62039 5 PROJECT € ..NEER APPROVED BY: 2/22/2022 Michael Baker 1N T E FNA TIONA L[1 no— NCDMS ID NO. 100020 AS -BUILT LEGEND PROPOSED DESIGN AS-BIJILT SURVEY BY KEE MAPPING & SURVEYING 10/20/21 & 2/17/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SEALED BY KATHLEEN M. McKEITHAN, FE BEVERLY A. FULK PIN: 5926-00-90-1044 DB: 1199 PG: 867, TRACT TWO PB: 9 PG: 64, LOT 4 & LOT 1-B FILL EXISTING CHANNEL CHANNEL PLUG WHITTIER CREEK AS -BUILT PLAN VIEW 20 0 20 40 SCALE (FT) FRANCES F. ATKINS CLAYTON FULK (LE) PIN:5926-00-91-0590 DB: 1218 PG: 345, TRACT 2 PB: 9 PG: 64, LOT 2 zz 4B'GM6 INV IN81007 INV our,/ /gypp 64' �,6° �" pI�94010 / 78 78 78 78 78 AS -BUILT LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 10/20/21 & 2/17/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SEALED BY KATHLEEN M. McKEITHAN, PE CHARLES DEAN HOLCOMB AND MICHAEL GENE HOLCOMB ELMER E. HOLCOMB & WIFE WILMA F. HOLCOMB (LE) PINS 5924-00-80-4164-_—, __---_— DB: 1489 PG:874 �/— — PPP�.9'PG:-644=0T.6 ,— -- ___TIwo ------ --- LOG DR -OF INSTALLED_IIN15LACCE-OF�- --AS-BUJ -T- __-_-—GRADE_CONTROL J ROON VANE TOP'OF BANK (TYPJ— ,_ — EP_Ix4.T ---- T IB'P17PGN\ „EXCAVATE BANKFULL BENCH BEGIN UT4 STA. 1 0+00.00 CHARLES DEAN H ELM)ER E. HOLC P9INT.011 Ev.mos9Ezv EEJ4?V4 A\ A \ V ) / VEG PLOT3� I I ILCOMB AND MIG/HAEL GENE WOLCOMB MB & WIFE WIL A F. HOLCOMB (LE) IN: 5926-00-80 164 I / DB: 1489 PG: 74 IPB: 9 PG: 64, �.OT 6 I \ I / I S-B UJLT--- THACWEGLTYP.) ]S3!)P1gM — • LOG VANE INSTALLED IN PLACE OF J-14QOK VANE • C) BANKS AT 3:1 vOINsza04_ AJ 3+76.55 ND T4A / BEGI 4T ST4 . a+27.80 \ \ CHARLES. DEAN I% C0//B A1<p MICHAEL GENE HOLCOMB ELMER E. HOLCOMB & WIFE WILMA F. HOLCOMB (LE) PIN:5926-00-80-4164 DB: 1489 PG: 874 PB: 9 PG: 64, LOT 6 5- LLI 1- N MATCH LINE r BAKER PROJECT REFERENCE NO. SHEET NO. /62039 6 PROJECT € ..NEER .6& H. H.W' k. APPROVED BY: 2/22/2022 Michael Baker INTERNATIONALii, NCDMS ID NO. 100020 FILL EXISTING CHANNEL CHANNEL PLUG • WHITTIER CREEK AS -BUILT PLAN VIEW 20 0 20 40 SCALE (FT) //>/\ \ CHARLES DEAN HOLCOMB AND MICHAEL GENE HOLCOMB ELMER E. HOLCOMB & WIFE WILMA F. HOLCOMB (LE) PIN: 5926-00-80-4164 DB: 1489 PG: 874 PB: 9 PG: 64, LOT 6 2rroPGa ROCK CROSS VANE{_''+_ 1\D[SI�IONAL LOG Df ]�vu A' S AL D 2NuR' la/PcrGR 2r POPLAR 18 PO MRGR AT LOG STEP POOL (TYPJ) \ / \ AS -BUILT THALWEG (T 'P.) \ L4G DROP INSTALLED IN PLACE OF./OCULAR STEP AS-EUlkiTOP 9FEgNKfT f A1GELA,D. MEADOWS PIN:5926-069)h1044 - /PO&'FO OF 9B: /453 PG: 678 PORTLON OyLO)''/5. PB9' 9 PG: 64,/ / // LO9GANE (TYP.) E CONTROL ROC1Z LOG 0KOP INSTALLED IN VANE (TYP.) PLACEE qF BOULDER STEP A BARBED WIRE FENCE LOG J-HOOVANEINSTALLED IN PLACE OK 9-8100K VANE �..., PI "'y—�*�2cr�_,.am � �+a�� 00 ^�rr��l'- jj _ �. L.R.,o1,.a_ Aao —AS-BUILTv TOP OF BANK (TYP.) N AS-BUILTLOG STEP POOL (TYP.) LOG VANE! STALLED IN PLACE OF ROCK VANE LOG\VANE INSTALLED IN PLACOF ROCK VANE THALWEG (TYP.) v / \CHARLES DEAN HOLCOMB AND MICHAEL GENE HOLCOMB\ ROCK J-HO \ \ ELMER E. HOLCOMB WIFE WILMA F. HOLCOMB (LE) \ VANE (TYP. PIN: 5926.00-80-4164 \\ \ DB. 1489 PG;8_74 \ \\ PB: 9 PG: 64, LOTS • v END vv STA. 17+92.7 SIN •-STREAM G.GE\#2 Rk1 I("C£OkSVAyE \ N / Y j vAvvVvv vv vv y v v v v v 0300 v `LECI \\ \ \\\\\\\ \ \ \\ \\\\ \\\ \ \ \\\\\ V vyyvV 1 l \ \\ \ \°.NGEyA D. MEADOWS / WIN: 5926-00-90-1044 / O TI OF`DB: 1153 PG: 678 PI TIONN F LOT 5, PB: 9 PG: 64 A V I I I I A LOCxVANE NOT I�JSTSLLcD \ V A A A\ \ V A A A \ V A V A A AV V A V 1 A \ 1 I .CONS)-RI}CIIEDI RIFFLEI(TYPJ i II j 1 1 kkY n I I \\ r')��7�'(a POPLAR 1 1 BRUSH -TOE -WITH -LIVE-STAKES (TYP:)`��\\ %\ ANGELA D. MEADOWS, ..PYN.'S.�^.6-00 90-1044g PORTION OF b0g 1153 PGL678"/ PORTION OF LOT./1 PB: 9 PG:6 a2 BAKER PROJECT REFERENCE NO. SHEET NO. /62039 7 PROJECT € ..NEER H. H.W' k. APPROVED EY: 2/22/2022 Michael Baker INTERNATIONALii, NCDMS ID NO. 100020 AS -BUILT LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 10/20/21 & 2/17/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SEALED BY KATHLEEN M. M.KEITHAN, PE FILL EXISTING CHANNEL CHANNEL PLUG WHITTIER CREEK AS -BUILT PLAN VIEW 20 0 20 40 SCALE (FT) - 36. RCP \ \\� (MEILING \ \ 1 \ \\ CONCRETE \ CNP INV WT:ONKNOWNINV IN:102768' 50' POM/ f�x� \Y ( \im/^yx./� / _ --_ \( /// /EG BOULOERtTEP (TYPj_ ROCK CROSS VANE (TYP.) \_� / / AS -WILT TF�LWEG (T�lP.) o= / / / / BARBED MIRE FENCE �__ may. �� I /LO DROPINS$ALLED PLACE / �- \ m /� / // YEG PLOT4 1 GRADE CONJROL J-HOOK VANE ��� ARE m a3 ' ] RYA. 12+s \I I11 �/ X GAUGE#1 ®��1�� lAfIr ilji/ - ®®�' ®1��6 \� /CABLE E� \\yrJs: .1 ../ �f� .� ` '+rvw� . `'"I""1 „te _ "--`' 1q\ 1 I I � Rf SENOC x� rtfauLPuluT Y95yi ANGELA D. MEADOWS PIN: 5926-00-90-5577 DB: 1332 PG: 199 PB: 24 PG: 57 PORTION OF LOT 5, PB: 9 PG: 64 BAKER PROJECT REFERENCE NO. SHEET NO. /62039 8 PROJECT € ..NEER MIL. H. H.W' 4. APPROVED BY: 2/22/2022 Michael Baker INTERNATIONALii, I Oa NCDMS ID NO. 100020 \ \ _ L'TV \ cur \\\ \ \ _ LACE 00 P /. LDERf41N �� \ NR \ \\.�\ \ \ --- as--- PACE OPB'0L(LDER STEP INv ou \ \\ \\--,�e4_e_� _ = _, LOG J-HOOK VAPI€INSTALL€D LOG -PROP INS FALZEDiN- .-- IN PLACE O��RADE ZpCyLFORD STREAA4 ERflSS1�G INV IN:ro�o>e v _ - -- -- TOP 0 BANK TYP. INV OU . , J.<.'`aLnCE OF-ST-E-P_ I``T ��44bK E- INSTALL 3tRl2ucE OF'� � ) CONSTRUCTED RI i i i GRAADE�CONTROLRGCK `\�� ulo��' -- // / J-HOOKa/AiSE(TYP.) / / 77 ANGE7D. ME8AD6WS / GED'LIFT WITH _ 7 i7 v ..PIP25926-00-90-1044 BRUySI4 TOE(TYP7 '., PORTION OFf7B: 1153 PG:6Z6-�� / /�� PORTION OF/LOTS, PB 9 PG: 64 // / p ,R DROPP INSTALLED IN / LOG VANE INSTALLED IN/ CEO,rJ-HOOKY // PLACE OFJ046OK VANE' / EWW/S8 FENCE --` ---- \ _____-------__ 48"RCI3 ANDPLUNGE-FOOL --_ vvv - ANGELA DT M0 DOWS \ ! PIN: 5926-00-90-1044 \ \--- \-------' --- PORTION OF DB: 11 PG: f PORTION OF LOT 5, PB: 9 6:64 \ , BE 1NtiT \\\STA±OO. 1 \ \\ FRAYTEN F. AT(LE) \ \ \ \\ CLAYTON FULK (50 \ \ PI210 PG: 45, TRACT DB: B: PG: 64, TRACT 2 P8: 9 PG: 64, LOT 2 NN \ \ AS -BUILT LEGEND PROPOSED DESIGN AS -BUILT SURVEY BY KEE MAPPING & SURVEYING 10/20/21 & 2/17/22 RED LINE VARIATIONS FROM ORIGINAL DESIGN SEALED BY KATHLEEN M. MCKEITHAN, PE FILL EXISTING CHANNEL CHANNEL PLUG H 41 60 41 WHITTIER CREEK AS -BUILT PLAN VIEW 20 0 20 40 SCALE (FT) 1,000 990 980 4w H1 1} F TW BAKER PROJECT REFERENCE NO SHEET NO I 162039 9 PROJECT ENGINEER ata.. H. 1,16x44. APPROVED PPE 2/zyxoxz Michael Baker INTERNATIo NNL'LI NCDMS ID NO 100020 980 980 1,00D 99D ARA REACH 7 A 1 D00 990 4— 980 980 S s KIEFFI 970 970 15+00 16+00 17+00 18+00 19+00 20+00 7 APT uu REACH 7 THAI AQAF FAE 1,010 1,000 a-EU 990 I �gd u — PGA BAKER PROJECT REFERENCE NO 162039 PROJECT ENGINEER Michael Baker INTERNATIONAL',i, SHEET NO 1 10 MH/.. H. HeM:fL. APPROVED PT: 2/22/2022 NCDMS ID NO 100020 990 1, 000 990 UT4 1 000 Il1111111►IGillllllllllllllil�!11111111!' ��•''���!!���1��111111�llllii�'���'�j��lllh���������II�IIIIIIIIIIIIIIIIIIIIIIIII !1! !1! 11 11 111111 111 I PP! "' ' ' ' 1 I�' IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII�i������������ollnm�oiiilli��m�������o�m��a������� IIIIIIIIIIIIUIIiIIIiIIII�IiIlilliliiillllllllllllll,IIIIII11111il11Iu1IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIiihhhh11!!!!1111111111l111111111111111111111III ...� III III 11111 m IIII li 990 980 980 15+00 16+00 17+00 18+00 19+00 20+00 1,020 UT5 1,010 1, 000 ihi;! usi111iii ;G aillignIPP"H1111 1111111114111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111 �!'. ---•;pi pnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 111111111111111111111111111111111111O11111I1ihmlllll11111 iil�ii111l:11iii iiiiii jijplllpl�mmmmmmmmnmmmmmmnmmm mni mmmmmmmmmmmmmmmmmmmmn ••• •••••• " " l�IIIII��11111 illibliI111111111111111111 11.i llf;;Illllll;;;mmmm;mm;m;;;mllllllllllllllllllllll, nnnnnnnnnnnnnnnnnnnm!nnnnnnnnnmm�mnnnnnn.: ...�'!'!r 11!!1l1uuuIIIIIIIIIIIDIIIIIIIIII��liIIRI!I9IIIIIIIIIII '' 4 .!1111"""°' 111!!'�IIIIIIIIIIIIIIII 1111111111 BAKER P OJECT REFERENCE NO SHEET NO 162039 11 PROJECT ENGINEER Mlf/.. H. 1,1644. APPROVED EN: 2/22/2022 Michael Baker IIIIIIiiil s1Ii11III 11111111111111111111 11111111111111111111 11111111111111111111 11111111111111111111 11111111111111111111 !IIIIIIIIIIIIIIIIIII ! 1p INTERNATIONAL'1,, NCDMS ID NO 100020 s,. 990 990 1,010 1, 000 Inn ■ 990 UT5 mun mun AS Tr A VLF uIIII.1111 11111111111 1 010 1 000 990 980 980 15+00 16+00 17+00