Loading...
HomeMy WebLinkAbout310005_Waste Utilization Plan_20220411SLUDGE PLAN AMENDMENT Grower(s): Farm Name: County: Smithfield Hog Production Scott Farm Facility 31-05 Farm Capacit : Farrow to Wean Farrow to Feeder Farrow to Finish Wean to Feeder Feeder to Finish Wean to Finish Gilts Boars 14,375 Storage Structure: Storage Period: Application Method: Anaerobic Lagoon >180 days Irrigation This amendment allows the producer to apply sludge on the fields shown on the next page. Owner/Manager Technical Specialist - 11 - Z-2- Date Date Reception Area Specifications Tract Field Irrigated Soil lst Crop Time to 1st Crop 1st Crop Lbs NIAc Lbs N Total Ibs N Acreage Type Code Apply Yield Ibs NIUnit Residual /Ac Utilized 2nd Crop Time to 2nd Crop 2nd Crop Lbs N/Ac Lbs N Total Ibs N Code Apply Yield Ibs NlUnit Residual /Ac Utilized Total Lbs NIAc Total lbs N Utilized R Brock R1-R3 35.45 Ra D Feb15-June 180.0 0.75 15 120 4254 * 0 0 120 4254 0 0 0 0 _0 0 0 0 0 0 0 0 0 0 ` 0 0 0 0 0 0 0 0 • 0 0 ` 0 0 * 0 0 0 0 0 0 * 0 0 * 0 0 • 0 0 • 0 0 • 0 0 0 0 0 0 " 0 0 * 0 0 0 0 * 0 0 ' 0 0 • 0 0 0 0 * 0 0 • 0 0 0 0 0 0 0 0 0 0 " 0 0 0 0 • 0 0 0 0 0 0 * 0 0 0 0 ` 0 0 • 0 0 Totals: 35.45 4254 0 4254 Quick Map FieIdAIytics� p nx•nr Inna Grower: BROCK FARMS Farm: RAIL ROAD TRACK Field: B12 f the Angels ::f. olic Church Southeastern' Grain.Corripany rch:of 11WtrEL: 0 0.07 0,14 O. 0.28 e.80 U Label Area White 35.45 Notes; Mt. Olive 04/05/22 12:37 PM 1/1