Loading...
HomeMy WebLinkAboutNCC211910_Annual Fee Waived Email_20220410 Morman, Alaina From: laserfiche@ncdenr.gov Sent: Sunday,April 10, 2022 4:38 PM To: Randy.Veltri@duke-energy.com; nuwan.wijesuriya@duke-energy.com Cc: Morman,Alaina; Georgoulias, Bethany; Selkane,Aziza; nuwan.wijesuriya@duke- energy.com Subject: Construction SW General Permit Annual Fee Update - NCC211910 Dear Construction General Permit Permittee: This email is to notify you that the 2022 annual fee for Certificate of Coverage (COC) no. NCC211910 has been applied or waived. No future fees will be required, as this permit is no longer active. This COC is for Asheville Plant-Oteen 115kV East in Buncombe County, issued to Duke Energy Progress, LLC. This communication is in reference to Invoice no. NCC211910-2022. If you have any questions,please contact the Stormwater Program Billing Specialist at(919) 707-3710, or visit https://deq.nc.gov/NCGO1. The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh,NC 27699-1612 This email was automatically generated by Laserfzche. Please do not respond to this email address, as responses are not monitored. i