Loading...
HomeMy WebLinkAboutSW5220101_Supplement-EZ Form_20220408SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name 2 Project Area (ate 3 Coastal Wetland Area (ac) 4 Surface Water Area (ac) 5 Is this project High or Low Density?_ 6 Does this project use an off -site SCM? Hardee's - Main Street No COMPLIANCE WITH 02H .1003(4) 7 _ Width of vegetated setbacks provided (feed_ _ _ _ _ N/A 8 Will the vegetated setback remain vegetated? _ N/A 9 If BUA is proposed in the setback, does it meet NCAC 021­1.1003(4)( -q)? _ _ _ N/A No 10 Is streambank stabilization proposed on this project? NUMBER AND TYPE OF SCMs: 11 Infiltration System ~12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 1 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting (RWH) 18 Green Roof 19 Level Spreader -Filter Strip L( S-FS) 20 _Disconnected Impervious Surface (DIS) _21 Treatment Swale 22 Dry Pond 23 Storm Filter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: _ Ray Watson, PE 28 O_rganization: McAdams 25 Street address: _ _ 2905 Meridian Parkway 30 gLty, State, Zip: _ _ — — Durham, NC, 27713 _ 31 Phone number(§): Email_ 9193615000 watson@mcadamsco.com 32 Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. NO! • „ C14 RBI ►� > fir 6 SignalDesi er Date DRAINAGE AREAS 1 Is this a high deiect? Yes 2 If so, number of draina a areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No FORMS LOADED AREA INFORMATION re Site 1 1 4 Type of SCM N/A 76.793 76,793 5 6 Total drainage area (sq ft 90115.00 Onsite drainage area (sq ft 90115.00 7 Offsite drainR9e area (sq ft) 8 Total BUA in project (sq ft) New BUA on subdivided lots (subject to permitting) 9 (sq ft) New BUA not on subdivided lots (subject to 10 oermitting) (sf) 11 Offsite BUA (sq ft) 12 Breakdown of new BUA not on subdivided lots: ~ Parking (sq ft _ 0 _ 61956_ sf 61956 sf 0 61956 sf 61956 sf 32323 sf 32323 sf Sidewalk (sq ft) 2755 sf 2755 sf 13 14 Roof (sq ft) Roadway (sq ft) Future (sq ft) _ Other, please specify in the comment box below (sq ft) New infiltrating permeable pavement on subdivided lots (sq ft) New infiltrating permeable pavement not on subdivided lots (sq ft) Existing BUA that will remain (not subject to permitting) (sq ft) Existing BUA that is already permitted (sq ft) Existing BUA that will be removed (sq ft) Percent BUA Design storm inches) esign volume of SCM (cu fD Valculation method for design volume 3099 sf 3099 sf 23779 sf 23779 sf 15 16_ 17 18 69% 81% 19 20 21 1.0 in 1,0 in 5831 cf 5831 cf ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): 1 = Subbasin 1 to SCM A STORMWATER WETLAND 1 !Drainage area number 1 _ iMinimum r PtT treatment vp)ums (cu (0 _ 8sl of SEVERAL MOC FROM 02H .3050 3 Is the SCM Rued Ito treat the SW from all &Irfaces at build -out? Yes Is the SCM located away from contaminated soils? _ Yes W hat are the side slopes of the SCM (H:V)? 3.1 4 5 6 Does the SCM have retaining walls, gabion walls or other engineered No _ side slopes? 7 Are the inlets, outlets, and receiving stream protected from erosion (10 Yes year storm? Is there an overflow or bypass for inflow volume in excess of the Yes 6 design volume? What is the method for dewatering the SCM for maintenance? Drawdown Orifice 9 10 If applicable, will the SCM be cleaned out after construction? Ye 11 Does the maintenance access comply with General MDC (8)? Yes 12. Does the drainage easement comply with General MDC (99)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with N/A General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M _Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desfgyned by an NC dcerised_professional7 Yesi 113 Design volume of SCIV (w R) 5831 19 Are the inlet(s) and outlet located in a manner that avoids short- Yes cftui6ng? f. 20 Are berms or baffles Eroyid0d to Improve the flow paflli No 21 Does the orifice drawdown from below the top surface of the Yes ermanent.pool? 22 Does the wetland minimize impacts to the receiving channel from the 1 Yes yr, 24-hr storm? _ 23 Is a trash rack or other device provided to protect the outlet system? Yes 24 Elevation, peak attenuation above temporary pool (if applicable) (fmsl) 273.57 25 Elevation, temporary pool (lop of the temporary inundation zone) (fmsl) 273.25 26 Elevation, permanent pool (top of the shallow water zone) (fmsl) 272.00 271 Elevation, bottom of shallow water zone (fmslj 271 _50 28 Elevation, bottom of forebay deep pool at deepest point (at forebay 268.90 entrance) (fmsl) 29 Elevation, bottom of forebay deep pool at shallowest point (at forebay 269.00 exit) (fmsi) 30 Elevation, bottom of non-forebay deep pool at deepest point (fmsl) 269.00 Planting Zones 31 • Area, total surface area of the SW wetland at temporary pool elev. (sq 5,740,00 (I) _ 32 Area, temporary inundation zone at temporary pool elev (sq fl) _ 2.311.00 33 Area, shallow water zone at temporary pool elev. (sq 1 2,507.00 34 Area, forebay at temporary pool elev. (sq R) 631.00 35•Area, non-forebay deep pool at temporarypool elev Ssgft) _ 291 00 36 Percent area provided, temporary inundation zone (should be 30-45%) 40 % 37 Percent area provided, shallow water zone (should be 35-45%) 44 % _ T 38 Percent area provided. deep pool (lorebay) (should be 10-15%) 11 % 39 Percent area provided, deep pool (non-forebay) (should be 5-15%) J 5 % Depths and Outlet 40 Peak attenuation depth above temporary inundation zone (inches) 4 in 41 Temporary inundation zone depth (temporary pool to permanent pool) 15 in 42 Shallow water zone depth (permanent pool to bottom of wetland) 6 in (inches) 43 Depth, forebay at entrance (permanent pool to bottom of forebay 37 in entrance) (inches) 44 Depth, forebay at exit (permanent pool to bottom of forebay exit) 36 in nches) 45 Depth, non-forebay deep pools (permanent pool to deep pool bottom) 36 in (inches) 46 If there is an orifice. diameter (inches) 1 in 47 If there is a weir, weir height (inches) 48 It there is a wek,.weir length (inches) 12 in 49 Drawdown time for the temporary_pool (days)_ Wetland 9:19 AM 4/8/2022 STORMWATER WETLAND Sod and Plants 50 Soil amendment depth (inches) 51 Has a soil amendment specification been provided? Yes 52 Has a landscaping plan that meets SW Wetland MDC (12) been Yes provided? 53 Number of plants per 200 square feet (#) in the shallow water zone: 54 Does the temporary inundation zone planting comply with SW Wetland Yes MDC (14)? 55 Are the dam structure and temporary fill slopes planted in non- Yes clumping turfgrass? SW W41 cattalls be Wanted In the weHand7 No 57Please use this space to prowda any addilional Information about the stormwater wetland(s): 24) Peak Attenuation for the 1 yr, 24-hr storm 42) Shallow Water zone depth = average/design depth for this zone = 6" 47) 0.25 in weir height 53) 50 plants per 200 square feel Wetland 4 9:19 AM 4/8/2022