HomeMy WebLinkAboutNCC205846_NOT Closeout Documents_20220405North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Johnston Project: US70 & Swift Creek Road Structure River basin: Neuse
Person financially responsible: Duke Energy Progress, LLC - Randy Veltri, Project #: JOHNS-2021-019
Director of Transmission Permitting
Address: 440 South Tryon St, Charlotte, NC 28202
1. Project Location: Swift Creek Rd., Wilson Mills
Pictures: No
2. Weather and soil conditions: Sunny, dry, workable Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): N/A
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: March 21, 2022
10. Comments: Project work is complete. Permanent ground cover sufficient to restrain erosion has been
established. No additional self -monitoring or self -inspections are required. The project is in
compliance and released under the SPCA. Termination of coverage under the NPDES General
Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee
via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Lauren Garcia
Date of inspection: March 18, 2022
cc:
Others present:
Time arriving on site: 9:30 AM Time leaving site: 9:45 AM