Loading...
HomeMy WebLinkAboutNCC205846_NOT Closeout Documents_20220405North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Johnston Project: US70 & Swift Creek Road Structure River basin: Neuse Person financially responsible: Duke Energy Progress, LLC - Randy Veltri, Project #: JOHNS-2021-019 Director of Transmission Permitting Address: 440 South Tryon St, Charlotte, NC 28202 1. Project Location: Swift Creek Rd., Wilson Mills Pictures: No 2. Weather and soil conditions: Sunny, dry, workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): N/A Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: March 21, 2022 10. Comments: Project work is complete. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. The project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Lauren Garcia Date of inspection: March 18, 2022 cc: Others present: Time arriving on site: 9:30 AM Time leaving site: 9:45 AM