Loading...
HomeMy WebLinkAboutNCC201331_NOT Closeout Documents_20220404North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Wake Project: Proctor Farm Equestrian Trails River basin: Neuse Person financially responsible: Wake County Facilities Design & Project #: WAKE-2020-020 Construction - Mark Forestieri, Director Address: Wake County Office Building, PO Box 550, Raleigh, 1. Project Location: Doc Proctor Road, Marks Creek Pictures: No 2. Weather and soil conditions: sunny, dry, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Jay Defar Inspection report: Sent Report 9. Corrective action needed: Title: Supervisor Date given/sent: December 07, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Kimberly Summers Others present: Joe Dupree Date of inspection: December 07, 2021 Time arriving on site: 10:55 AM Time leaving site: 11:25 AM cc: