Loading...
HomeMy WebLinkAbout20220546 Ver 1_ePCN Application_20220406fr.,f DW R mrlsloa of ware. Resources Pre -Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) December 6, 2021 Ver 4.2 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. BIMS # Assigned* 20220546 Is a payment required for this project? No payment required Fee received Fee needed - send electronic notification Reviewing Office* Fayetteville Regional Office - (910) 433-3300 Information for Initial Review 1a. Name of project: Southbury Development, LLC 1a. Who is the Primary Contact?* Samuel Adam Carter 1 b. Primary Contact Email: Adam@wetlandnc.com Date Submitted 4/6/2022 Nearest Body of Water Killets Creek Basin Cape Fear Water Classification C Site Coordinates Latitude: 35.331782 A. Processing Information County (or Counties) where the project is located: Moore Is this a NCDMS Project Yes No Longitude: -79.41655 Is this project a public transportation project?* Yes No 1a. Type(s) of approval sought from the Corps: Section 404 Permit (wetlands, streams and waters, Clean Water Act) Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Version# * 1 What amout is owed?* $240.00 $570.00 Select Project Reviewer* Chad Turlington:eads\ccturlington 1c. Primary Contact Phone:* (910)890-2779 u Has this PCN previously been submitted?* Yes No 1 b. What type(s) of permit(s) do you wish to seek authorization? Nationwide Permit (NWP) Regional General Permit (RGP) Standard (IP) 1c. Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit (NWP) Number: 29 - Residential Developments Nationwide Permit (NWP) Number: 58 - Utility Line Activities for Water and Other Substances (frequently used) NWP Numbers (for multiple NWPS): 1d. Type(s) of approval sought from the DWR: 401 Water Quality Certification - Regular Non-404 Jurisdictional General Permit Individual 401 Water Quality Certification le. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: 1f. Is this an after -the -fact permit application?* Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? Yes No 1 h. Is the project located in any of NC's twenty coastal counties? Yes No 1j. Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d. Who is applying for the permit? Owner Applicant (other than owner) le. Is there an Agent/Consultant for this project? Yes No 2. Owner Information 2a. Name(s) on recorded deed: Southbury Development, LLC 2b. Deed book and page no.: 5481/539 2c. Contact Person: David Chapman 2d.Address Street Address 20 Cochrane Castle Circle Address Line 2 City Pinehurst Postal / Zip Code 28374 2e. Telephone Number: (760)567-5039 401 Water Quality Certification - Express Riparian Buffer Authorization State / Province / Region NC Country USA 2f. Fax Number: Yes No Yes No U 2g. Email Address:* djchap002@aol.com 4. Agent/Consultant (if applicable) 4a. Name: Samuel Adam Carter 4b. Business Name: Wetland Solutions, LLC 4c.Address Street Address P.O. Box 244 Address Line 2 City Bunnlevel Postal / Zip Code 28323 4d. Telephone Number: (910)890-2779 4f. Email Address: Adam@wetlandnc.com C. Project Information and Prior Project History 1. Project Information 1 b. Subdivision name: (if appropriate) Southbury Development 1c. Nearest municipality / town: Carthage 2. Project Identification State / Province / Region NC Country USA 4e. Fax Number: 2a. Property Identification Number: 857700750624, 857700740932, 2b. Property size: 857700746818 32.67 2c. Project Address Street Address Cagles Ln Address Line 2 City State / Province / Region Carthage NC Postal / Zip Code Country 28327 USA 3. Surface Waters 3a. Name of the nearest body of water to proposed project:' Killets Creek 3b. Water Resources Classification of nearest receiving water: C 3c. What river basin(s) is your project located in?* Cape Fear 3d. Please provide the 12-digit HUC in which the project is located. 030300030303 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Tract is forested and subdivisions surround the proposed project area 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past? Yes No Unknown u 4f. List the total estimated acreage of all existing wetlands on the property: 3.68 4g. List the total estimated linear feet of all existing streams on the property: 1891 4h. Explain the purpose of the proposed project: * The purpose of this project is to construct a road crossing and provide utilities for the approved subdivision 41. Describe the overall project in detail, including indirect impacts and the type of equipment to be used: * The project consist of constructing two road crossing and installing culverts for both. Both culverts will be recessed 20 % within stream bed. BMPs will be in effect through the construction process. We will be removing the old road crossing. Returning wetland back to grade and planting the riparian zone with hydrophytic local native varieties of wood stem veg. Tract -hoe and bac-hoe will be utilized during construction. Silt fence, 57rock,celcer matting, annual warm weather seed mix and temporary waddles will be utilized. Effects will increase treatment function of proposed increase of surface water to headwater wetland. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Comments: Early secession veg growth. Sedimentation intrusion from timbering 5b. If the Corps made a jurisdictional determination, what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Samuel Adam Carter Agency/Consultant Company: Wetland Solutions, LLC Other: 6. Future Project Plans Unknown 6a. Is this a phased project?* Yes No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): Wetlands Streams -tributaries Buffers Open Waters Pond Construction 2. Wetland Impacts 2a1 Reason (?) 2b. Impact type*(?) 2c. Type of W. 2d. W. name* 2e. Forested* 2f. Type of Jurisdicition* M 2g. Impact area* W1 Rd interconnectivity P Headwater Forest Wetland No Both 0.123 (acres) W2 Rd Interconnectivity P Headwater Forest Wetland No Both 0.022 W3 Sewer T Headwater Forest Wetland Yes Corps (acres) 0.013 (acres) W4 Sewer L Headwater Forest Wetland Yes Corps 0.019 (acres) 2g. Total Temporary Wetland Impact 0.032 2g. Total Wetland Impact 0.177 21. Comments: Utility impacts are forested and the road impacts are void of trees mostly grass and sedge 2g. Total Permanent Wetland Impact 0.145 3. Stream Impacts 11 S1 3a. Reason for impact (?) Rd infurstructure 3b.lmpact type* Permanent 3c. Type of impact* Culvert 3d. S. name* ��3e. UT Stream Type* (?) Perennial 3f. Type of Jurisdiction* Both 3g. S. width" Average (feet) 31h. Impact length* 81 (linear feet) S2 Rd infustmscture Permanent Culvert UT 7Perennial Both Average (feet) 80 Qinear feet) 31. Total jurisdictional ditch impact in square feet: 0 31. Total permanent stream impacts: 161 31. Total stream and ditch impacts: 161 3j. Comments: Steam is degraded from sediment transport from forestry activity E. Impact Justification and Mitigation 1. Avoidance and Minimization 3i. Total temporary stream impacts: 0 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: We have delineated out the property and have designed the impacts to the least amount feasible for infrastructure. We are using exsisting crossing to lower impact. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: We will be using BMPs along with a maintenance regiment after rain falls. Materials to be used to help contain and reduce sedimentation transport. silt fence, 57 rock, warm weather grass seed, celcer matting, and waddles will be used 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? Yes No 2c. If yes, mitigation is required by (check all that apply): DWR Corps 2d. If yes, which mitigation option(s) will be used for this project? Mitigation bank Payment to in -lieu fee program Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: Daniels mitigation and NCDMS 3b. Credits Purchased/Requested (attach receipt and letter) Type: Quantity: Riparian wetland .18 Stream 161 3c. Comments 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. Yes No F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No If no, explain why: Not in Neuse or Tar River Basin 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No Comments: G. Supplementary Information 1. Environmental Documentation la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land? Yes No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (1 SA NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * Yes No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality? Yes No 3b. If you answered "no," provide a short narrative description. No space for future development slotted a this time. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat?* Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* Yes No 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh 5d. Is another Federal agency involved?* Yes No 5e. Is this a DOT project located within Division's 1-8? Yes No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? Yes No 5g. Does this project involve bridge maintenance or removal? Yes No 5h. Does this project involve the construction/installation of a wind turbine(s)?* Yes No Unknown 51. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? Yes No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPAC site 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* Yes No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* https://www.fisheries. noaa. gov/resource/map/essential-fish-habitate-mapper 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* hftp;//www.hpo.ncder.gov/ 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplairl Yes No 8c. What source(s) did you use to make the floodplain determination?* NC Flood Risk Information System f(http://fris.nc.gov/fris/Home.aspa?ST=NC Miscellaneous u Please use the space below to attach all required documentation or any additional information you feel is helpful for application review. Documents should be combined into one file when possible, with a Cover Letter, Table of Contents, and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Authorization Ietter.PDF 36.14KB Southbury PJD_20220121.pdf 154.55KB Southbury_Form_JD Request Signed.pdf 293.59KB Southbury_Parcel 1 details.pdf 235.94KB Southbury_Parcel 2 details.pdf 237.64KB Southbury_Parcel 3 details.pdf 243.81 KB Southbury_Upland_Datasheets_Atlantic _and _ Gulf_ Coastal_Plain_Fillable.pdf 458.72KB Southbury_Wetland_Datasheets_Atlantic _and _ Gulf_ Coastal_Plain_Fillable.pdf 472.14KB 20119B - Southbury PH2 WETLAND IMPACTS.pdf 3.22MB RES Cape Fear 03 SOA - Feed & Seed - Southbury.pdf 173.83KB Southbury Development Ph2 DMS Acceptance.pdf 235.02KB Southbury Fig 2 - Wetlands_20220124.pdf 1.35MB Southbury Fig 2b - Wetland Impacts_20220124.pdf 1.37MB Southbury Fig 3 - Topo_20220121.pdf 1.23MB Southbury Fig 4 - Soils_20220121.pdf 1.15MB Southbury Fig 5 - NWI_20220121.pdf 1.27MB Southbury Fig 6 - Flood_20220121.pdf 694.43KB Southbury _IPAC report.pdf 485.35KB Southbury_SHPO map.pdf File must be PDF or KMZ 235.18KB Comments Signature By checking the box and signing below, I certify that: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief'; and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND I intend to electronically sign and submit the PCN form. Full Name: Samuel Adam Carter Signature 156ffe& 11?14T WIC71t Date 4/6/2022