March 11., 2022
LETTER OF APPROVAL
Freedom Constructors of Dunn,. Inc.
Steve Jernigan, Director of New Construction
Post Office Box 608
Dunn; NC 28334
RE: Project Name:.VVildwood Subdivision Lots 1, 2, 4; 10, 12-14
Acres Approved:, 4.6
Project ID HARNE-2022-103
County:Harnett,
arnett, City: Grove Township
Address: Old Stage Road
River Basin: :Cape: Fear
Stream: Classif cation: Other
Submitted by: Fleet Temple
Date Received by. LQS:. March 9, 2022
Plan Type: Residential
Dear Mr. Jernigan:
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to. be acceptable and herebyissue this Letter of Approval. The enclosed
Certificate of Approval must be posted at the job site. This plan shall.expire three.(3)
years following the date of approval, if no land disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2619, all new construction activities are required to complete and
submit an electronic Notice of Intent (NOI) form requesting a Certificate of
Coverage (COC) under the NCGO 10000 Construction Stormwater General. Permit.
This farm MUST. be. submitted and COC issued prior to the commencement of any
land disturbing activity on the. above -named project. The NOI form may be accessed
at deq.ne.gov/NCG0 1. Please direct questions about the NOI form. to Annette Lucas
at. Annette, lucas@,ncdcnr.gov or Paul Clark at Pax] clarkQQa,ncdenr:uov. After you
submit a complete and correct NOI Form, a COC will be emailed to you within
three business days. Initially, DEMLR will not charge a fee for coverage under the
NCG01 permit. However, on or after June 1, 2019; a $100 fee will be charged
annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
w NtrrthcCaroltnaDepartment,afSnvaconmentaiQuality {[tiuisiDnaflE-aerc�y,[+titteraland hand"Resources
C arteliri mot
pay mVIRC, llcgiool. offl k 226 Gr*en Str�*t, SLAMS 71�# I t ayeLt vi[te, l+l�r tlt
4t4i.d���Cic
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, the erosion and sedimentation control
plan is inadequate to meet the requirements of the. Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land -disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form, which you provided.
You are requested to file an amended form if there is any change in the
information included on the form. This permit allows for a land -disturbance, as,
called for on the application plan, not to exceed the approved acres. Exceeding
the acreage will be a violation of this permit and would require a revised plan and
additional application fee. Any addition in impervious surface, over that already
noted on the approved plan, would also require a revised plan to verify the
appropriateness of the erosion control measures and the stormwater retention
measures. (GS 113A-54.1(b)). In addition, it would be helpful if you notify this
office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Chris Baker
Assistant Regional Engineer
DEMLR - Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Fleet Temple, P. E., Fleet Temple Enginecring, PLLC — electronic copy
Landon Chandler, Harnett County Inspections Office — electronic copy
Fayetteville Regional Office