HomeMy WebLinkAboutNCC201379_NOT Closeout Documents_20220401North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension, Wilmington, NC 28405 (910) 796-7215
County: Columbus Project: Fair Bluff Housing Complex River basin: Lumber
Person financially responsible: Mills Construction Company of SC, Inc. - David Project #: COLUM-2019-007
Richardson, Executive Director
Address: 4501-124 Atlantic Avenue, Raleigh, NC 27628
1. Project Location: Rough and Ready Road, Fair Bluff
Pictures: No
2. Weather and soil conditions: 50's sunny, workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): None
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: February 10, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under the
SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction
Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The
NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this
correspondence must be uploaded as part of completing the NOT process.
Reported by: Caroline Dalis WwCfr G bOUL Others present: ,
Date of inspection: February 09, 2022 Time arriving on site: 10:50 AM Time leaving site: 11:00 AM
cc: