HomeMy WebLinkAboutNC0021601_CEI_NOD2022PC0042_20220407
SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED
April 07, 2022
Zachary Ollis, Town Manager
Email: manager@tryonnc.gov
Town of Tryon
SUBJECT: NOTICE OF DEFICIENCY
Tracking Number: NOD-2022-PC-0042
Permit No. NC0021601
Tryon WWTP
Polk County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Tryon WWTP on March 15,
2022. This inspection was conducted to verify that the facility is operating in compliance with the conditions and
limitations specified in NPDES WW Permit No. NC0021601. A summary of the findings and comments noted
during the inspection are provided in the enclosed copy of the inspection report.
The Compliance Evaluation inspection was conducted by Division of Water Resources staff from the Asheville
Regional Office. The following deficiency was noted during the inspection:
Inspection Area Description of Deficiency _________________________________________________________________________________________________________________________________________________________________________
Compliance Schedules An Action Plan was due no later than July 1 2021 as required by Section A.4 of the permit to
address the new copper and chloride limits. The plan was not submitted until 2022. _________________________________________________________________________________________________________________________________________________________________________
In addition, the issues below must also be addressed:
Compliance Issue:
Clarifier #1: The weir teeth are rusted in clarifier #1 and in need of repair/replacement. This has not adversely
affected treatment and the Asheville Regional Office acknowledges the Town has budgeted for the work in 2025;
however, it is recommended these repairs occur sooner to avoid costly emergency repairs.
DocuSign Envelope ID: 0E89F383-4465-446D-9F52-1CDED52BBA4E
Remedial actions should have already been taken to correct this problem and prevent further occurrences in the
future. The Division of Water Resources may pursue enforcement action for this and any additional violations of
State law. To prevent further action, carefully review these deficiencies and address the causes of
non-compliance to prevent the recurrence of similar situations.
If you should have any questions, please do not hesitate to contact Mikal Willmer with the Water Quality
Regional Operations Section in the Asheville Regional Office at 828-296-4686 or via email at
mikal.willmer@ncdenr.gov.
Sincerely,
Daniel Boss, Assistant Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Inspection Report
Ec: LF
Deborah Bradley, ORC
DocuSign Envelope ID: 0E89F383-4465-446D-9F52-1CDED52BBA4E
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0021601 22/03/15 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Tryon WWTP
1526 E Howard St
Tryon NC 28782
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
09:00AM 22/03/15 20/08/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Deborah M Bradley/ORC/828-859-5626/
Other Facility Data
11:30AM 22/03/15 24/12/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Deborah Bradley, /ORC/828-894-2048/Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self-Monitoring Program Sludge Handling Disposal Facility Site Review Compliance Schedules
Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Mikal Willmer DWR/Division of Water Quality/828-296-4686/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: 0E89F383-4465-446D-9F52-1CDED52BBA4E
4/7/2022
4/7/2022
NPDES yr/mo/day
22/03/15
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Mikal Willmer, with the Asheville Regional Office, conducted a Compliance Evaluation Inspection of
the Town of Tryon’s WWTP in conjunction with the facility’s Pretreatment Audit on 3/15/2022.
Deborah Bradley (ORC) and Mike Fife (BORC) were present and assisted in the inspection.
The facility is being operationally maintained in compliance with permit limits; however, there are
items noted during the inspection that should be addressed.
Copper & Chloride Compliance Schedule Section A (4): Tryon did not meet the first milestone due on
July 1, 2021. The requirements for this and the next milestone were discussed with plant staff. The
Town has drafted a response to milestones one and two and will submit to the Division by July 1,
2022. It should be noted, the Town has not exceeded the new limits listed in the permit that go into
effect on July 1, 2023.
Solids Handling: Facility holds a Class B permit for land application. The Town land applies their own
residuals as needed. Tryon has a sludge thickener followed by a mixed sludge holding pond that is
lime stabilized before land application. No issues maintaining solids within the facility.
Mechanical Bar Screen: Screen is still in working order; however, the screen bypass flow channel
during high flow events does not have a manual bar screen and can introduce debris into the
aeration basin. Recommend Tryon explore installation of a manual screen for the bypass flow
channel.
Secondary Clarifiers: Clarifier #2 has been refurbished and Clarifier #1 has new electrical and drive;
however, the weir teeth are still severely rusted. This does not appear to have adversely affected
effluent values, but this has been a noted deficiency since 2017. This was discussed with the Town
Manager after the facility inspection. Clarifier upgrades are budgeted in the CIP for 2025.
Recommend allocating funds sooner in the CIP calendar to avoid an emergency repair.
Disinfection: Facility manually adjusts chlorine gas during rain events. They check chlorine residuals
before and after to determine the appropriate feed rate.
Dedicated Field: Staff report the changing banks of Vaughn Creek are beginning to reduce the
acreage of the dedicated land application field. Please confer with your contracted soil scientist
about the severity of the loss. If significant acreage is being lost, a permit modification will be required
to reduce the permitted acreage for this site.
NC0021601 17 (Cont.)
Page#2
DocuSign Envelope ID: 0E89F383-4465-446D-9F52-1CDED52BBA4E
Permit:NC0021601
Inspection Date:03/15/2022
Owner - Facility:
Inspection Type:
Tryon WWTP
Compliance Evaluation
Compliance Schedules Yes No NA NE
Is there a compliance schedule for this facility?
Is the facility compliant with the permit and conditions for the review period?
Facility missed a milestone. See summary for details.Comment:
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Analyze DO, pH, setteable solids, MLSS, sludge judge.Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Municipal special conditions.Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
Page#3
DocuSign Envelope ID: 0E89F383-4465-446D-9F52-1CDED52BBA4E
Permit:NC0021601
Inspection Date:03/15/2022
Owner - Facility:
Inspection Type:
Tryon WWTP
Compliance Evaluation
Record Keeping Yes No NA NE
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
Reviewed annual report during inspection. Sent via mail to Central Office.Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
New meter calibrated 12-10-2022 by Matt Lassiter.Comment:
Aerobic Digester Yes No NA NE
Is the capacity adequate?
Is the mixing adequate?
Is the site free of excessive foaming in the tank?
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
Facility does not have an aerobic digester. See summary for details.Comment:
Solids Handling Equipment Yes No NA NE
Is the equipment operational?
Is the chemical feed equipment operational?
Page#4
DocuSign Envelope ID: 0E89F383-4465-446D-9F52-1CDED52BBA4E
Permit:NC0021601
Inspection Date:03/15/2022
Owner - Facility:
Inspection Type:
Tryon WWTP
Compliance Evaluation
Solids Handling Equipment Yes No NA NE
Is storage adequate?
Is the site free of high level of solids in filtrate from filter presses or vacuum filters?
Is the site free of sludge buildup on belts and/or rollers of filter press?
Is the site free of excessive moisture in belt filter press sludge cake?
The facility has an approved sludge management plan?
See summary for details.Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
This is an older mechanical screen and not rated for peak flows. See summary for
details.
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
Clarifiers had 1' and 2' sludge blankets. See summary for details.Comment:
Aeration Basins Yes No NA NE
Page#5
DocuSign Envelope ID: 0E89F383-4465-446D-9F52-1CDED52BBA4E
Permit:NC0021601
Inspection Date:03/15/2022
Owner - Facility:
Inspection Type:
Tryon WWTP
Compliance Evaluation
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Surface
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
Attempt to keep DOs below 3 mg/L throughout the year.Comment:
Disinfection-Gas Yes No NA NE
Are cylinders secured adequately?
Are cylinders protected from direct sunlight?
Is there adequate reserve supply of disinfectant?
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de-chlorination?
Does the Stationary Source have more than 2500 lbs of Chlorine (CAS No.
7782-50-5)?
If yes, then is there a Risk Management Plan on site?
If yes, then what is the EPA twelve digit ID Number? (1000-____-____)
If yes, then when was the RMP last updated?
Staff manually adjust chlorine feed. See summary for details.Comment:
De-chlorination Yes No NA NE
Type of system ?Liquid
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de-chlorination substance stored away from chlorine containers?
Comment:
Are the tablets the proper size and type?
Are tablet de-chlorinators operational?
Page#6
DocuSign Envelope ID: 0E89F383-4465-446D-9F52-1CDED52BBA4E
Permit:NC0021601
Inspection Date:03/15/2022
Owner - Facility:
Inspection Type:
Tryon WWTP
Compliance Evaluation
De-chlorination Yes No NA NE
Number of tubes in use?
Comment:
Influent Sampling Yes No NA NE
# Is composite sampling flow proportional?
Is sample collected above side streams?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is sampling performed according to the permit?
Time composite. Sampler at 3 degrees during inspection.Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment:
Page#7
DocuSign Envelope ID: 0E89F383-4465-446D-9F52-1CDED52BBA4E