Loading...
HomeMy WebLinkAbout20220301 Ver 1_Approval Letter_20220406 SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED April 06, 2022 DWR # 22-0301 Burke County Marc Nitard 2523 West Paradise Harbor Dr Connelly Springs, NC 28612 nitardsfurniture@live.com Subject: Approval of Individual 401 Water Quality Certification Nitard, Paradise Harbor Dear Mr. Nitard: Attached hereto is a copy of Certification No. 4761 issued to Marc Nitard, dated April 06, 2022. This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Water Quality Certification. If you change your project, you must notify the Division and you may be required to submit a new application package with the appropriate fee. If the property is sold, the new owner must be given a copy of this Certification and is responsible for complying with all conditions. [15A NCAC 02H .0507(d)(2)]. This Water Quality Certification does not relieve the permittee of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to, Sediment and Erosion Control, Non-Discharge, Water Supply Watershed, and Trout Buffer regulations. This Water Quality Certification neither grants nor affirms any property right, license, or privilege in any lands or waters, or any right of use in any waters. This Water Quality Certification does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person and does not create any prescriptive right or any right of priority regarding any usage of water. This Water Quality Certification shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Water Quality Certification to possess any prescriptive or other right of priority with respect to any other consumptive user. Upon the presentation of proper credentials, the Division may inspect the property. This Water Quality Certification shall expire on the same day as the expiration date of the corresponding Section 404 Permit. The conditions shall remain in effect for the life of the project, regardless of the expiration date of this Water Quality Certification. DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028 North Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 Nitard, Paradise Harbor DWR# 22-0301 Individual Certification #WQC004761 Page 2 of 7 Non-compliance with or violation of the conditions herein set forth may result in revocation of this Water Quality Certification for the project and may also result in criminal and/or civil penalties. If you are unable to comply with any of the conditions of this Water Quality Certification you must notify the Asheville Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. The permittee shall report to the Asheville Regional Office any noncompliance with, and/or any violation of, stream or wetland standards [15A NCAC 02B .0200] including but not limited to sediment impacts to streams or wetlands. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the permittee became aware of the non-compliance circumstances. This approval and its conditions are final and binding unless contested [G.S. 143-215.5]. This Certification can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk’s Office at (919) 431-3000. A party filing a Petition must serve a copy of the Petition on: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 If the party filing the Petition is not the permittee, then the party must also serve the recipient of the Certification in accordance with N.C.G.S 150B-23(a). This letter completes the Division’s review under section 401 of the Clean Water Act and 15A NCAC 02H .0500. Please contact Mitchell Anderson at 828-296-4662 or mitchell.anderson@ncdenr.gov if you have any questions or concerns. Sincerely, G. Landon Davidson, P.G. Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ-ARO DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028 North Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 Nitard, Paradise Harbor DWR# 22-0301 Individual Certification #WQC004761 Page 3 of 7 Electronic cc: Stefan Wilson, Bennick Grading Brandee Boggs, USACE Asheville Regulatory Field Office Andrea Leslie, North Carolina Wildlife Resources Commission Todd Bowers, EPA DWR 401 & Buffer Permitting Branch Electronic file DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028 North Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 Nitard, Paradise Harbor DWR# 22-0301 Individual Certification #WQC004761 Page 4 of 7 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION CERTIFICATION No. 4761 is issued in conformity with the requirements of Section 401, Public Laws 92-500 and 95-217 of the United States and subject to North Carolina’s Regulations in 15 NCAC 02H .0500 and 15A NCAC 02B .0200, to Marc Nitard, who have authorization for the impacts listed below, as described within your application received by the N.C. Division of Water Resources (Division) on February 22, 2022 and subsequent information on March 10, 2022, and by Public Notice issued by the Division on March 05, 2022. The State of North Carolina certifies that this activity will comply with water quality requirements and the applicable portions of Sections 301, 302, 303, 306, 307 of the Public Laws 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. The following impacts are hereby approved. No other impacts are approved, including incidental impacts. [15A NCAC 02H .0506(b)] Type of Impact Amount Approved (units) Permanent Amount Approved (units) Temporary Open Waters Site 1 0.029 (acres) 0 (acres) This approval requires you to follow the conditions listed in the certification below. CONDITIONS OF CERTIFICATION [15A NCAC 02H .0507(c)]: 1. The permittee shall report to the DWR Asheville Regional Office any noncompliance with, and/or any violation of, stream or wetland standards [15A NCAC 02B .0200], including but not limited to sediment impacts to streams or wetlands. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the permittee became aware of the non-compliance circumstances. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 2. No waste, spoil, solids, or fill of any kind shall occur in wetlands or waters beyond the footprint of the approved impacts (including temporary impacts). Citation: 15A NCAC 02H .0506; 15A NCAC 02H .0507(c) 3. All activities shall be in compliance with any applicable State Regulated Riparian Buffer Rules in Chapter 2B of Title 15A in the North Carolina Administrative Code. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 4. When applicable, all construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). Regardless of applicability of the Sediment and Pollution Control Act, all projects shall incorporate appropriate Best Management DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028 North Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 Nitard, Paradise Harbor DWR# 22-0301 Individual Certification #WQC004761 Page 5 of 7 Practices for the control of sediment and erosion so that no violations of state water quality standards, statutes, or rules occur. Design, installation, operation, and maintenance of all sediment and erosion control measures shall be equal to or exceed the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual, or for linear transportation projects, the North Caroline Department of Transportation Sediment and Erosion Control Manual. All devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) sites, including contractor-owned or leased borrow pits associated with the project. Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. For borrow pit sites, the erosion and sediment control measures shall be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. Reclamation measures and implementation shall comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act and the Mining Act of 1971. If the project occurs in waters or watersheds classified as Primary Nursery Areas (PNAs), SA, WS-I, WS- II, High Quality Waters (HQW), or Outstanding Resource Waters (ORW), then the sedimentation and erosion control designs shall comply with the requirements set forth in 15A NCAC 04B .0124, Design Standards in Sensitive Watersheds. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC02B .0200; 15A NCAC 02B .0231 5. Sediment and erosion control measures shall not be installed in wetland or waters except within the footprint of temporary or permanent impacts otherwise authorized by this Certification. If placed within authorized impact areas, then placement of such measures shall not be conducted in a manner that results in dis-equilibrium of any wetlands, streambeds, or streambanks. Any silt fence installed within wetlands shall be removed from wetlands and the natural grade restored within two (2) months of the date that DEMLR or locally delegated program has released the specific area within the project to ensure wetland standards are maintained upon completion of the project. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B .0231 6. Erosion control matting that incorporates plastic mesh and/or plastic twine shall not be used along streambanks or within wetlands. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 7. If the project is covered by NPDES Construction Stormwater Permit Number NCG010000 or NPDES Construction Stormwater Permit Number NCG250000, full compliance with permit conditions including the erosion & sedimentation control plan, inspections and maintenance, self-monitoring, record keeping and reporting requirements is required. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B .0231 DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028 North Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 Nitard, Paradise Harbor DWR# 22-0301 Individual Certification #WQC004761 Page 6 of 7 8. All work in or adjacent to streams shall be conducted so that the flowing stream does not come in contact with the disturbed area. Approved best management practices from the most current version of the NC Sediment and Erosion Control Manual, or the NC Department of Transportation Construction and Maintenance Activities Manual, such as sandbags, rock berms, cofferdams, and other diversion structures shall be used to minimize excavation in flowing water. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200 9. Application of fertilizer to establish planted/seeded vegetation within disturbed riparian areas and/or wetlands shall be conducted at agronomic rates and shall comply with all other Federal, State and Local regulations. Fertilizer application shall be accomplished in a manner that minimizes the risk of contact between the fertilizer and surface waters. Citation: 15A 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B .0231 10. Any rip-rap required for proper culvert placement, stream stabilization, or restoration of temporarily disturbed areas shall be restricted to the area directly impacted by the approved construction activity. All rip-rap shall be placed such that the original streambed elevation and streambank contours are restored and maintained and shall consist of clean rock or masonry material free of debris or toxic pollutants. Placement of rip-rap or other approved materials shall not result in de-stabilization of the stream bed or banks upstream or downstream of the area or be installed in a manner that precludes aquatic life passage. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 11. Any rip-rap used for stream or shoreline stabilization shall be of a size and density to prevent movement by wave, current action, or stream flows, and shall consist of clean rock or masonry material free of debris or toxic pollutants. Rip-rap shall not be installed in the streambed except in specific areas required for velocity control and to ensure structural integrity of bank stabilization measures. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0201 12. All mechanized equipment operated near surface waters shall be inspected and maintained regularly to prevent contamination of surface waters from fuels, lubricants, hydraulic fluids, or other toxic materials. Construction shall be staged in order to minimize the exposure of equipment to surface waters to the maximum extent practicable. Fueling, lubrication, and general equipment maintenance shall be performed in a manner to prevent, to the maximum extent practicable, contamination of surface waters by fuels and oils. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c); 15A NCAC 02B .0200; 15A NCAC 02B .0231 13. In accordance with 143-215.85(b), the permittee shall report any petroleum spill of 25 gallons or more; any spill regardless of amount that causes a sheen on surface waters; any petroleum spill regardless of amount occurring within 100 feet of surface waters; and any petroleum spill less than 25 gallons that cannot be cleaned up within 24 hours. Citation: 15A NCAC 02H .0507(c); N.C.G.S 143-215.85(b) DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028 North Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 Nitard, Paradise Harbor DWR# 22-0301 Individual Certification #WQC004761 Page 7 of 7 14. The permittee and their authorized agents shall conduct all activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act), and any other appropriate requirements of State and Federal Law. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) 15. The permittee shall require its contractors and/or agents to comply with the terms and conditions of this certification in the construction and maintenance of this project, and shall provide each of its contractors and/or agents associated with the construction or maintenance of this project with a copy of this Water Quality Certification. A copy of this Water Quality Certification shall be available at the project site during the construction and maintenance of this project. Citation: 15A NCAC 02H .0506(b); 15A NCAC 02H .0507(c) This approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 Permit. The conditions in effect on the date of issuance shall remain in effect for the life of the project, regardless of the expiration date of this Certification. [15A NCAC 02H .0507(c)] This, the 06 day of April 2022 G. Landon Davidson, P.G. Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ-ARO GLD/ma 4761 DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028 North Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED April 06, 2022 DWR # 22-0301 Burke County Marc Nitard 2523 West Paradise Harbor Dr Connelly Springs, NC 28612 nitardsfurniture@live.com Subject: APPROVAL of CATAWBA RIPARIAN BUFFER IMPACTS WITH ADDITIONAL CONDITIONS Nitard, Paradise Harbor Dear Mr. Nitard: You have our approval for the impacts listed below for the purpose described in your application received by the Division of Water Resources (Division) on February 22, 2022 and subsequent information on March 10, 2022, and by Public Notice issued by the Division on March 05, 2022. These impacts are covered by the Catawba Buffer Rules and the conditions listed below. This Buffer Authorization does not relieve the permittee of the responsibility to obtain all other required Federal, State, or Local approvals before proceeding with the project, including those required by, but not limited to, Sediment and Erosion Control, Non-Discharge, Water Supply Watershed, and/or Stormwater regulations. The following impacts are hereby approved, provided that all of the Conditions listed below, and all of the conditions of the Catawba Buffer Rules are met. No other impacts are approved, including incidental impacts. [15A NCAC 02B .0611(b)(2)] Type of Impact Amount Approved (SF) Permanent Amount Approved (SF) Temporary Buffers – Zone 1 Site 1 3750 (square feet) 0 (square feet) Buffers – Zone 2 Site 1 0 (square feet) 0 (square feet) This approval is for the purpose and design described in your application. The plans and specifications for this project are incorporated by reference as part of this Authorization Certificate. If you change your project, you must notify the Division and you may be required to submit a new application package. If the property is sold, the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC 02B .0611(b)(2)] DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028 North Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 Nitard, Paradise Harbor DWR# 22-0301 Buffer Authorization Certificate Page 2 of 3 If you are unable to comply with any of the conditions below, you must notify the Asheville Regional Office within 24 hours (or the next business day if a weekend or holiday) from the time the permittee becomes aware of the circumstances. The permittee shall report to the Asheville Regional Office any noncompliance with the conditions of this Authorization Certificate and/or any violation of state regulated riparian buffer rules [15A NCAC 02B .0614]. Information shall be provided orally within 24 hours (or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. Additional Conditions: 1. No trees shall be removed from Zone 1 of the Catawba Buffer unless they are directly within the construction access corridor. If trees are removed, forested vegetation shall be re-established within the construction access or other temporary impact area occurring in the protected buffer zone within the next growing season following construction of the project. [15A NCAC 02B .0614(7) and (8)] 2. The Permittee shall replant the vegetation within temporarily disturbed areas associated with this project in an “in kind” manner immediately following construction. Restoration of trees/shrubs/forest must be completed by the first subsequent planting season (November 1 through March 30). Note, if the tree plantings do not survive, they will need to be replaced such that the density is sufficient to provide 260 trees per acre at maturity. [15A NCAC 02H .0507(c), 15A NCAC 02H .0506(b)(3), and 15A NCAC 02B .0614(10)(dd), (ee)] 3. Immediately post- construction, bare soils must be stabilized as quickly as possible by providing a temporary ground cover. Newly seeded areas should be protected with mulch and/or erosion matting. This ground cover is a temporary measure used to address erosion until buffer restoration can be accomplished. [15A NCAC 02B .0611(b)(4) / (c)(4), 15A NCAC 02B .0203, 15A NCAC 02B .0614(7) and (8)] This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] Upon the presentation of proper credentials, the Division may inspect the property. This Authorization Certificate can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty (60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/ or by calling the OAH Clerk’s Office at (919) 431-3000. DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028 North Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 Nitard, Paradise Harbor DWR# 22-0301 Buffer Authorization Certificate Page 3 of 3 One (1) copy of the Petition must also be served to the North Carolina Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This Authorization Certificate neither grants nor affirms any property right, license, or privilege in any lands or waters, or any right of use in any waters. This Authorization Certificate does not authorize any person to interfere with the riparian rights, littoral rights, or water use rights of any other person, nor does it create any prescriptive right or any right of priority regarding any usage of water. This Authorization Certificate shall not be interposed as a defense in any action respecting the determination of riparian or littoral rights or other rights to water use. No consumptive user is deemed by virtue of this Authorization Certificate to possess any prescriptive or other right of priority with respect to any other consumptive user. This Authorization shall expire five (5) years from the date of this letter. This letter completes the Division’s review under the Catawba Riparian Buffer Rules as described in 15A NCAC 02B .0614. Please contact Mitchell Anderson at 828-296-4662 or Mitchell.Anderson@ncdenr.gov if you have any questions or concerns. Sincerely, G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ – ARO ec: Stefan Wilson, Bennick Grading Brandee Boggs, USACE Asheville Regulatory Field Office Andrea Leslie, North Carolina Wildlife Resources Commission DWR 401 & Buffer Permitting Branch Electronic file DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028 North Carolina Department of Environmental Quality | Division of Water Resources Asheville Regional Office | 2090 U.S. Highway 70 | Swannanoa, North Carolina 28778 828.296.4500 WR Project No.: ______________________ County: _____________________________________________ Applicant: _______________________________________________________________________________________ Project Name: __________________________________________________________________________________ Date of Issuance of 401 Water Quality Certification: ________________________________________ Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant’s authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant’s Certification I, _____________________________________, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ______________________________ Date:_________________________________ Agent’s Certification I, _____________________________________, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ______________________________ Date:_________________________________ If this project was designed by a Certified Professional I, ____________________________________, as a duly registered Professional ___________ (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: ______________________________________ Registration No. ________________ Date ____________________ DocuSign Envelope ID: 576479DE-CCF3-4AF9-8B72-36D7FADD1028