Loading...
HomeMy WebLinkAboutNCC202649_MODIFICATION Supporting Documents_20220405DocuSign Envelope ID: EEF72028-85B6-44F2-9679-8964F09lC25C ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director � � srrvE 4 13 NORTH CAROLINA Environmental Quality March 22, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Carolinas, LLC Attention: David Dellario, GM of CCP Projects 400 South Tryon Street, ST06K Charlotte, North Carolina 28202 RE: Project Name: Ash Storage area 1 and Haul Route Improvements (Express Review) Acres Approved: 38.80 Project ID: CLEVE-2020-024 County: Cleveland, City: Mooresboro Address: Duke Power Road River Basin: Broad Stream Classification: Other Submitted By: Duke Energy Carolinas, LLC Date Received by LQS: March 7, 2022 Plan Type: Revised Dear Mr. Dellario: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGOL Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 ��� 704-663-1699 DocuSign Envelope ID: EEF72028-85B6-44F2-9679-8964F091C25C Letter of Approval with Modifications Duke Energy Carolinas, LLC March 22, 2022 Page 2 of 3 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, �DAolcrlu'Signeddb'yI: A I 42CFABFC5BSC459... Zahid S. Khan, CPM, CPESC, CPSWQ Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval c: Inspection Department DocuSign Envelope ID: EEF72028-85B6-44F2-9679-8964F091C25C Letter of Approval with Modifications Duke Energy Carolinas, LLC March 22, 2022 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Ash Storage area I and Haul Route Improvements Project ID: CLEVE-2020-024 County: Cleveland Provide a copy of FRO with correct total acreage and total fees to this office. 2. Additional measures may be necessary during the course of this project. [15A NCAC 4B .0115].