Loading...
HomeMy WebLinkAboutNCG500180_Compliance Evaluation Inspection_20220407ROY COOPER Governor ELIZABETH S. BISER Secrete:Ty RICHARD E. ROGERS. JR. t?irrcror Mr. Jimmy Summers Vice President EHS & Sustainability American & Efird, LLC. P.O. Box 507 Mount Holly, NC 28120 Dear Mr. Summers: NORTH CAROLINA Environmental Quality April 7, 2022 Subject: Compliance Evaluation Inspection A & E Dyeing & Finishing Plant # 15 NPDES Permit No. NCG500180 Gaston County Enclosed is a copy of the Compliance Evaluation Inspection for the inspection conducted at the subject facility on April 5, 2022, by Ori Tuvia. John Smith's cooperation during the site visit were much appreciated. Please advise the staff involved with this NPDES Permit by forwarding a copy of the enclosed report. Since the previous inspection, the facility's non -contact cooling system was turned into a closed loop system and is no longer discharging. Since the facility is no longer discharging and a discharge pipe has been blocked, the facility can rescind the permit, or can keep the permit for backup or future expansion. As long as the facility is not discharging no sampling is required. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori.tuvia@ncdenr.gov. Cc: Laserfiche Sincerely, DocuSigned by: L4uI4tw11 Paw.). F161 FB69A2D84A3... for W. Corey Basinger Regional Supervisor Mooresville Regional Office Division of Water Resources North Carolina Drpartrncnt of Environmental Quality I Division of Water Resources Mooresville ktgionakOffice 1610East Center Avenue, Smote 301 I Mooresville, NorthCarotlna 2811S 704.663.1699 United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code 1 IN I 2 IL 21IIIIII NPDES yr/mo/day Inspection I 3 I NCG500180 111 121 22/04/05 117 Type 1810I IIIIIIIII1I Inspector Fac Type 191 S I 2011 IIIIIIIIIIIIIIIIII I IIIIII P6 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved 67I1.0 I 70I I 711 172 I N I 73I 1 74 751 I I 1 I I I I I I 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES oermit Number) Dyeing & Finishing Plant #15 22 American St Mount Holly NC 28120 Entry Time/Date 12:OOPM 22/04/05 Permit Effective Date 20/12/15 Exit Time/Date 12:30PM 22/04/05 Permit Expiration Date 25/11/30 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted John Kent Bowyer,PO Box 507 Mount Holly NC 281200507//704-951-2531/ No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Operations & Maintenar Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Ori A Tuvia Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date 4/ 7/2 02 2 —DocuSigned by: DW R/M RO WQ/704-663-1699/ c1 — BB057A2DE017498... Signature of Ma Andrew Pit rtoeatiOA Reviewer Agency/Office/Phone and Fax Numbers Date rA""' H P' 13WR/MRO WQ/704-663-1699 Ext.2180/ 4.7.22 F161FB69A2D84A3... EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 NPDES yr/mo/day 31 NCG500180 111 121 22/04/05 I17 Inspection Type 18 [j 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Page# 2 Permit: NCG500180 Inspection Date: 04/05/2022 Owner - Facility: Dyeing & Finishing Plant #15 Inspection Type: Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new El El • ❑ application? Is the facility as described in the permit? • El El El # Are there any special conditions for the permit? El • El El Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection? • El El El Comment: Since the previous inspection the facility non -contact cooling system was turned into a closed loop system and is no longer. Since the facility is no longer discharging and a discharge pipe has been blocked, the facility can rescind the permit, or can keep the permit for backup or future expansion. As long as the facility is not discharging no sampling is required. Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • El ❑ ❑ Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable El ❑ El Solids, pH, DO, Sludge Judge, and other that are applicable? Comment: Page# 3