HomeMy WebLinkAboutNCG500180_Compliance Evaluation Inspection_20220407ROY COOPER
Governor
ELIZABETH S. BISER
Secrete:Ty
RICHARD E. ROGERS. JR.
t?irrcror
Mr. Jimmy Summers
Vice President EHS & Sustainability
American & Efird, LLC.
P.O. Box 507
Mount Holly, NC 28120
Dear Mr. Summers:
NORTH CAROLINA
Environmental Quality
April 7, 2022
Subject: Compliance Evaluation Inspection
A & E Dyeing & Finishing Plant # 15
NPDES Permit No. NCG500180
Gaston County
Enclosed is a copy of the Compliance Evaluation Inspection for the inspection conducted
at the subject facility on April 5, 2022, by Ori Tuvia. John Smith's cooperation during the site visit
were much appreciated. Please advise the staff involved with this NPDES Permit by forwarding a
copy of the enclosed report.
Since the previous inspection, the facility's non -contact cooling system was turned into a
closed loop system and is no longer discharging. Since the facility is no longer discharging and a
discharge pipe has been blocked, the facility can rescind the permit, or can keep the permit for
backup or future expansion. As long as the facility is not discharging no sampling is required.
The report should be self-explanatory; however, should you have any questions, please do
not hesitate to contact Ori Tuvia at (704) 235-2190, or at ori.tuvia@ncdenr.gov.
Cc: Laserfiche
Sincerely,
DocuSigned by:
L4uI4tw11 Paw.).
F161 FB69A2D84A3...
for
W. Corey Basinger
Regional Supervisor
Mooresville Regional Office
Division of Water Resources
North Carolina Drpartrncnt of Environmental Quality I Division of Water Resources
Mooresville ktgionakOffice 1610East Center Avenue, Smote 301 I Mooresville, NorthCarotlna 2811S
704.663.1699
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code
1 IN I 2 IL
21IIIIII
NPDES yr/mo/day Inspection
I 3 I NCG500180 111 121 22/04/05 117
Type
1810I
IIIIIIIII1I
Inspector Fac Type
191 S I 2011
IIIIIIIIIIIIIIIIII I IIIIII
P6
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA Reserved
67I1.0 I 70I I 711 172 I N I 73I 1 74 751
I I 1
I I I I I I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES oermit Number)
Dyeing & Finishing Plant #15
22 American St
Mount Holly NC 28120
Entry Time/Date
12:OOPM 22/04/05
Permit Effective Date
20/12/15
Exit Time/Date
12:30PM 22/04/05
Permit Expiration Date
25/11/30
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
John Kent Bowyer,PO Box 507 Mount Holly NC 281200507//704-951-2531/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Operations & Maintenar
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and
Ori A Tuvia
Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers
Date
4/ 7/2 02 2
—DocuSigned by:
DW R/M RO WQ/704-663-1699/
c1
—
BB057A2DE017498...
Signature of Ma
Andrew Pit
rtoeatiOA Reviewer Agency/Office/Phone and Fax Numbers Date
rA""' H P' 13WR/MRO WQ/704-663-1699 Ext.2180/ 4.7.22
F161FB69A2D84A3...
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
NPDES yr/mo/day
31 NCG500180 111 121 22/04/05
I17
Inspection Type
18 [j
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Page# 2
Permit: NCG500180
Inspection Date: 04/05/2022
Owner - Facility: Dyeing & Finishing Plant #15
Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new El El • ❑
application?
Is the facility as described in the permit? • El El El
# Are there any special conditions for the permit? El • El El
Is access to the plant site restricted to the general public? • ❑ ❑ ❑
Is the inspector granted access to all areas for inspection? • El El El
Comment: Since the previous inspection the facility non -contact cooling system was turned into a
closed loop system and is no longer. Since the facility is no longer discharging and a
discharge pipe has been blocked, the facility can rescind the permit, or can keep the
permit for backup or future expansion. As long as the facility is not discharging no
sampling is required.
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping? • El ❑ ❑
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable El ❑ El
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Page# 3