HomeMy WebLinkAboutSite Inspection 04.06.22 Bridge 2 on NC 141 Slow CreekWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20191578
NCDOT - Replace Bridge 2 on NC141 (BR-0011)
Cherokee
NCDOT - Replace Bridge 2 on NC141 (BR-0011)
NC DOT Division 14 - Sylva
4/6/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-83° 56' 44''+35° 05'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on April 6, 2022. Kenny Corn was
present during the inpsection.
Site is compliant with the 401 Water Quality Certification. NPDES records were up to date.
Continue to add groundcover where needed and per NPDES stabilization timeframes.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20191578
4/6/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2