HomeMy WebLinkAboutSite Inspection 4.6.22 Br 182 Bell Hill RoadWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20210297
NCDOT - Replace Bridge 182 on SR 1127
Cherokee
NCDOT - Replace Bridge 182 on SR 1127
NC DOT Division 14 - Sylva
4/6/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-84° 10' 51''+35° 03'
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted on April 6, 2022 by Kevin Mitchell with the Asheville Regional Office. Jesse Adams was
present during the inspection. The following are items that need attention:
- Station 16+19 LT - Stabilize soil within rip rap on the left bank descending below culvert.
- Station 16+19 LT - Add a measure in the ditch leading to the JS on the right bank descending below the culvert.
- Add groundcover per NPDES stabilization timeframes.
NPDES records were up to date.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20210297
4/6/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2