HomeMy WebLinkAboutNCC221353_ESC Approval Submitted_20220407Iredell County Planning & Development
Erosion Control Section
349 North Center Street
P.O. Box 788
Statesville, NC 28687
Date: December 71h 2020
LETTER OF APPROVAL WITH MODIFICATIONS
Edward Belanger
Windstone Crossing, INC.
541 Isle of Pines Rd.
Mooresville, NC 28117
RE: Project Name: Windstone at Autumn Leaf
Acres Approved with Modifications: 2.66
Project ID: TRTMN-2021-034
Project Location: PIN 4740098843.000
Submitted By: Darden Engineering Services, PLLC
Date Received: November 20`h 2020
Plan Type: New
Dear Mr. Belanger:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and herby issue this Letter of Approval with Modifications.
Modifications must be received in this office no Iater than two weeks prior to the project start
date. Failure to submit modified plans can result in a violation and fine under the Iredell County
Land Development Code. The Modifications required for Approval are listed on the attached
page. The Certificate of Approval issued by Iredell County must be posted at the job site. This
plan approval shall expire three (3) years following the date of this approval as is required by
Title 15A NCAC 4B.0129 and Appendix H of the Iredell County Land Development Code.
Title 15A NCAC 413 0118(a) and Appendix H of the Iredell County Land Development Code
requires that a copy of the approved erosion control plan be on file at the job site. Any
amendments and/or revisions to the approved plan must be reviewed and approved prior to
implementation in order for the site to remain in compliance. Failure to submit plans for approval
may result in administrative actions and/or penalties as indicated in the Iredell County Land
Development Code. Also, this letter gives notice as required by G.S. 113A-61.1(a) and Appendix
H of the Iredell County Land Development Code, of our right of periodic inspection to insure
compliance with the approved plan.
Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
Letter of Approval with Modifications
Windstone at Autumn Leaf
December 71h 2020
Page 2 of 3
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Iredell County Land Development Code and the
Sedimentation Pollution Control Act of 1973, (North Carolina General Statute I I3A-51 through
66), this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act and Code.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval. It is the responsibility of the applicant to obtain all other required permits or
approvals.
As of May 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to
the commencement of any land disturbing activity on the above named project. The NOI form
may be accessed at deq.nc.gov/NCGOI I. Please direct questions about the NOI form to Annette
Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul. clark a ncdenr.gov. After you submit a
complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or
after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR
Stormwater Central Office staff in Raleigh.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it is required that this
office to be notified of the proposed starting date for this project. Failure to notify this office of
the starting date may result in a Notice of Violation and civil penalty. Please notify us when you
plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
�;7
�J—
Jonathan Williams
Erosion Control Inspector II
Enclosures: Modifications
Fact Sheet on the New NCGOI Permit
Permit
Letter of Approval with Modifications
Windstone at Autumn Leaf
December 7t" 2020
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Windstone at Autumn Leaf
Project ID: TRTMN-2021-034
County: Iredell
Reviewed by: Jonathan Williams
Required changes are designated as "RC" under legal authority from NC
General Statutes Chapter 113A Article 4 and the Iredell County Land
Development Code.
Suggested changes are designated as "SC" for improvement of the plan.
1. Add stormwater ditch at the Northwest section of the cul-de-sac to the limits of
disturbance. —RC
2. Label silt fencing as double -row silt fencing on the plan. Add detail. —RC
3. Show locations of silt fence stone outlets on the plan. —RC
4. Ensure stone outlets at double row silt fencing are staggered. -RC
5. Show location of construction entrance on the plan. —RC
6. Provide copy of NCDOT permits for road right-of-way work as applicable. —RC
7. Install inlet and outlet protection for driveway culvert pipe. —RC
8. Provide stone outlets for section of road side ditch for subdivision road that drains
towards Autumn Leaf Road. —RC
9. Mark locations for checkdam points in the roadside ditch. —RC
10. In the Erosion Control Sequence remove all measure maintenance that do not apply to
this project. —RC
11. Add notes of inspections to the plan. Inspections should be performed weekly and after
every 1 inch rainfall event in a 24 hour period. —RC
12. Add outlet structure to the stormwater ditch located at the Northwest section of the cul-
de-sac. —SC
13. Use straw wattles for all checkdams on the project. -SC